Wandsworth

Streetspace for London

We are working with your borough to widen pavements at town centres and transport hubs, create temporary cycle routes on our transport network and create low traffic neighbourhoods.

We are also upgrading the existing cycle route from Pimlico to Putney by creating sections of temporary segregation for example. 

Latest changes to travel

There are temporary changes to travel in London while we work on supporting the restart of the Capital including:

Consultation on operating hours of bus lanes in London 

As part of London Streetspace programme, we're proposing to trial changes to the operating hours of more than 80 kilometres of bus lanes across London to make bus journeys faster and more reliable. 

We want to make sure that people choosing to travel on the bus network have the safest, quickest and most reliable journey at all times of the day. Proposals follow recent extensions to bus lane hours that have seen improvements to speeds and reliability.  

The trial of 24/7 bus lanes is planned to be in place for at least six months to ensure we have enough time to properly monitor the effectiveness of the trial and any impacts. Find out more and share your views at any time online or by emailing betterbusjourneys@tfl.gov.uk.  

Funding for your borough

We provide funding to boroughs and local communities for transport improvements in your local area.

Local Implementation Plan (LIP)

The LIP is produced by the London Borough of Wandsworth and agreed with us. It sets out the details on transport infrastructure changes in a three-year period to support the Mayor's Transport Strategy.

The LIP funding stream provided by TfL to help our partners in the boroughs and the City of London has been paused while we focus on measures to increase walking and cycling and to ensure social distancing on our network.

Find out more about LIP funding.

LIP targets for Wandsworth

Each borough has set targets in their LIP against the Mayor's Transport Strategy outcomes - we track and report on progress against these targets in the LIP3 MTS outcomes borough data pack.

For example, the car ownership in the borough was 82,860 in 2017. The LIP target to reduce car ownership by 2021 is 81,500.

Residents in Wandsworth made an average of 725,000 trips each day between 2015 and 2018 by:

  • Car and motorcycle: 28%
  • Tube/DLR: 10%
  • National Rail and London Overground: 9%
  • Bus/Tram: 12%
  • Taxi/Other: 3%
  • Cycle: 3%
  • Walking: 35%

We also work with boroughs to encourage more cycling. We recorded 21,744 daily cycle trips on average starting in Wandsworth between 2015 and 2018.

More resident and visitor population figures are on the GLA website.

Vision Zero

We are working with boroughs to reduce the number of deaths and serious injuries from all road collisions to zero by 2041. They are responsible for enforcing safe speeds on their roads, as well as leading community programmes to encourage using roads safely. Find out more about Vision Zero.

In 2017 there were 147 individuals killed or seriously injured in Wandsworth. Our target for 2022 is to reduce this number to 81.

Find out more about collisions in your borough. Our collision database, COLLSTATS, is now available as a self-service tool for borough officers and the Metropolitan Police. It allows site specific, borough or London wide collision searches to be made to the most recent validated police data that is available. For access to this database please email CollstatsHelpdesk@tfl.gov.uk.

What we're working on in Wandsworth

Work now going on in your borough includes:

  • Northern line extension - extending the line to Battersea will help regenerate the Vauxhall, Nine Elms and Battersea areas. Two new stations are being built at Nine Elms and Battersea Power Station
  • Wandsworth town centre - we propose to reduce traffic dominance along the High Street and return the road network to two-way
  • Nine Elms and Battersea Park Lane - improvements for bus passengers as well as people walking and cycling
  • Healthy High Streets - Tooting High Street improvements include cleaning and repainting street furniture such as electrical cabinets to promote links with the local area, installing new wayfinding signage to help people find both local markets, working on a scheme to introduce a 20mph speed limit to Tooting Town Centre and  better pedestrian crossings in the area 

Bus network changes

From time to time - after consulting the public - we alter bus routes to reflect changing patterns in demand. We also make temporary changes, often because of road works. See the latest bus changes.

Ultra Low Emission Zone (ULEZ)

To improve air quality the ULEZ will extend to parts of Wandsworth from October 2021.

Our assets in Wandsworth

Assets we maintain in your borough include:

  • Five Tube stations
  • One London Overground station
  • Around 510 bus stops - see all 55 day bus routes in Wandsworth
  • 62 Santander Cycles docking stations
  • Cycle Superhighway 8 which runs from Wandsworth to Westminster
  • One taxi rank
  • Around 235 traffic signals
  • Over 33 kilometres of red routes

See a map of our assets in London.

We maintain our assets until they need to be renewed or disposed of as set out in our asset management plan. We do this by:

  • Servicing them regularly to keep them operational
  • Repairing or replacing faulty assets

Report a problem on a London street with our Streetcare tool.

We do not maintain in Wandsworth:

Report private hire vehicles (PHVs) parked on ranks or unattended taxis on ranks directly to us.

Dealing with severe weather

For documents relating to winter service in the boroughs, go to the Streets publications page.