Status Updates

Find a postcode, place or road

City Route

Farringdon Cross Route

[A3211] Cycle Superhighway East - West (Phase 7, 10, 11) (EC4Y) (City Of London)

  Closures

From: Monday 27 April 2015
To: Monday 14 December 2015

Last updated 13:50 Wednesday 29 July 2015 : Eastbound traffic is currently slow from Upper Thames Street Tunnel and Westbound having intermittent delays from Tower Hill within the Lower Thames Street section of these works. Also slow Westbound towards Northumberland Avenue from Temple within the Victoria Embankment section of these works.

Works | TfL

Cycle Superhighway East - West (Phase 7,10, 11) (Both Directions) - Construction works on Victoria Embankment and Upper/Lower Thames Street. Works will take place in phases along the length of the roads. There will be a minimum of one running lane in both directions with two lanes in place where possible. Currently Lower Thames Street is closed eastbound with a contraflow in the westbound carriageway between Fish Street Hill and Great Tower Street with restricted movements into Water Lane and Great Tower Street until 5th August 2015. Victoria Embankment is reduced to one lane eastbound between Bridge Street and Richmond Terrace and one lane westbound from Northumberland Avenue. There is contraflow working between Horse Guards Avenue and Richmond Terrace and between Waterloo Bridge and Temple Place. Find out more about the project at "https://www.tfl.gov.uk/travel-information/improvements-and-projects/cycle-superhighway-east-west".

  • A3211 (EC3R,WC2N,EC4Y,EC4V,WC2E,EC4R,SW1A,WC2R) (All Directions)
  • Lower Thames Street (EC3R) (All Directions)
  • Victoria Embankment (EC4Y) (All Directions)

Farringdon Cross Route

[A301] Cycle Superhighway North - South (Phase 1) (SE1) (Southwark)

  Closures

From: Monday 09 March 2015
To: Ongoing

Last updated 13:51 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

Cycle Superhighway North - South (Phase 1) (All Directions) - Construction work for the Cycle Superhighway North-South is in progress at St George's Circus. St Georges Circus is reduced to two lanes. All inputs are reduced to one lane and Borough Road is closed westbound. St George's Road is reduced to two lanes from four. There are temporary signals in St George's Road at Princess Street. There are localised lane restrictions on Blackfriars Road and lane closures at the junction with Stamford Street. Find out more about Cycle Superhighway North-South

  • A201 (SE1) (All Directions)
  • A3202 (SE1) (All Directions)
  • Dodson Street (SE1) (All Directions)
  • Gerridge Street (SE1) (All Directions)
  • [A3203] Lambeth Road (SE1) (All Directions)
  • Library Street (SE1) (All Directions)
  • Rotary Street (SE1) (All Directions)
  • [A301] Waterloo Road (SE1) (All Directions)

[A4200] Kingsway (WC2B,WC2A) (Camden,Westminster)

  Closures

From: Wednesday 01 April 2015
To: Tuesday 15 September 2015

Last updated 10:21 Wednesday 29 July 2015 : Delays are possible during peak periods.

Works | Emergency

[A4200] Kingsway (WC2) (Northbound) at the junction of Kemble Street - Kingsway is now open from Aldwych for buses, taxis, cycles and motorcycles. There is a lane closure northbound from Aldwych for continuing works. The restrictions will remain in place for general traffic due to the continuing underground works to repair the damaged structure. Strand Underpass is open to all traffic. Find out more about disruption at Kingsway. -

  • Kean Street (WC2B) (All Directions)
  • Keeley Street (WC2B) (All Directions)
  • Portsmouth Street (WC2A) (All Directions)
  • Portugal Street (WC2A) (All Directions)
  • Sardinia Street (WC2A) (All Directions)
  • Sheffield Street (WC2A) (All Directions)
  • St Clement's Lane (WC2A) (All Directions)
  • [A301] Strand Underpass (WC2B) (All Directions)

[A212] Church Road (SE19) (Bromley,Lambeth)

  Closures

From: Monday 20 July 2015
To: Tuesday 18 August 2015

Last updated 07:45 Wednesday 29 July 2015 : Expect delays in the area

Works | Utility

[A212] Church Road (All Directions) at the junction of Anerley Hill and Westow Hill - Church Road is closed and diversions in place to facilitate utility works.

  • [A212] Church Road (SE19) (All Directions)
  • [A212] Crystal Palace Parade (SE19) (All Directions)

[A4020] Uxbridge Road (W12) (Hammersmith & Fulham)

  Closures

From: Tuesday 28 April 2015
To: Friday 04 December 2015

Last updated 15:24 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A4020] Uxbridge Road (W12) (Westbound) between Shepherd's Bush Green and Coverdale Road - Various carriageway restrictions in place for Major Streetscape Renewal Scheme.

  • Frithville Gardens (W12) (All Directions)
  • [A4020] Hopgood Street (W12) (All Directions)
  • [A219] Shepherd's Bush Green (W12) (All Directions)
  • Shepherd's Bush Market (W12) (All Directions)
  • Stanlake Road (W12) (All Directions)
  • Tunis Road (W12) (All Directions)
  • [A4020] Uxbridge Road (W12) (West Bound)

Victoria Street ()

  Serious

From: Tuesday 03 May 2011
To: Ongoing

Last updated 12:57 Wednesday 29 July 2015 : Traffic is flowing well in the area.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (the Victoria Station Upgrade and the Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system: Bressenden Place is reduced to two narrow lanes; Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place; Victoria Street has restrictions between Bressenden Place and Buckingham Palace Road. Hudson's Place is restricted to taxis only; Allington Street is closed. Find out more about Victoria Station upgrade works

  • Victoria Street (All Directions)

Apex Corner - Junction just east of Old Street roundabout

  Serious

Provisional dates:
From: Monday 13 July 2015
To: Friday 01 April 2016

Last updated 15:47 Thursday 23 July 2015

Works | TfL Works

Works to take place as part of Cycle Superhighway 1

A1

[A1] Holloway Road (N7 ,N5 ,N1) (Islington)

  Moderate

From: Monday 06 October 2014
To: Tuesday 31 January 2017

Last updated 15:22 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | TfL

[A1] Holloway Road (N5 /N7) (Both Directions) at the junction of Highbury Corner - Holloway Road will be reduced to one lane in each direction due to a bridge replacement scheme.

  • A1 (N7 ,N5 ,N1) (All Directions)
  • Highbury Corner (N1) (All Directions)
  • [A1] Holloway Road (N7 ,N5 ,N1) (Both Directions)

A1

[A1] St John's Way (N19) (Islington)

  Moderate

From: Monday 13 July 2015
To: Sunday 02 August 2015

Last updated 17:07 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

St John's Way (Eastbound) at the junction of Archway Road - The road is closed to facilitate utility works.

  • St John's Way (N19) (All Directions)
  • [A1] St John's Way (N19) (East Bound)

A1

[A1] Holloway Road (N7) (Islington)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 14:01 Wednesday 29 July 2015 : Traffic is flowing well on approach to these works.

Works | Utility

[A1] Holloway Road (N7 ) (Northbound) at the junction of Mercers Road - lane one of two is closed due to Thames Water works.

A1

[A1] Holloway Road (N19) (Islington)

  Moderate

From: Wednesday 13 August 2014
To: Wednesday 19 October 2016

Last updated 15:21 Tuesday 28 July 2015 : Delays possible whilst works in progress.

Works | TfL

[A1] Holloway Road (N19) (Both Directions) at the junction of Wedmore Gardens by Upper Holloway station - Carriageway restrictions in both directions for bridge replacement works. Temporary traffic signals will be in operation.

  • [A1] Holloway Road (N19) (Both Directions)
  • Marlborough Road (N19) (All Directions)

A1

[A1] Archway Road (N19) (Islington)

  Moderate

From: Monday 29 June 2015
To: Monday 09 November 2015

Last updated 17:03 Tuesday 28 July 2015 : Delays possible during the course of these works.

Works | Utility

[A1] Archway Road (N19) (All Directions) at the junction of Archway Gyratory - Various carriageway restrictions will be implemented in phases for gas mains replacement works.

  • [A1] Archway Road (N19) (All Directions)
  • [A1] Sandridge Street (N19) (All Directions)

A1

[A503] Seven Sisters Road (N7) (Islington)

  Moderate

From: Friday 24 July 2015
To: Ongoing

Last updated 14:06 Wednesday 29 July 2015 : Traffic is flowing well.

Hazard(s) | Dangerous Structure

[A503] Seven Sisters Road (N7 ) (northbound) at the junction of Bowman's Mews - Unsafe structure - Lane one restriction in place from the junction with Holloway Road and pavement closed due to falling masonry from a building

  • Hercules Place (N7) (All Directions)
  • [A1] Holloway Road (N7) (All Directions)
  • [A503] Nags Head (Holloway) (N7) (All Directions)
  • [A503] Seven Sisters Road (N7) (All Directions)

A10

[A10] High Road (N15) (Haringey)

  Moderate

From: Monday 06 July 2015
To: Monday 19 October 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | TfL

[A10] High Road Tottenham (N15) (Both Directions) - Cycle Superhighway 1 - Phase 1 - The northbound bus lane is closed between Ermine Road and South Tottenham Station.

A12

[A12] Eastern Avenue West (RM6) (Barking & Dagenham)

  Moderate

From: Tuesday 28 July 2015
To: Ongoing

Last updated 13:44 Wednesday 29 July 2015 : Minor delays on Whalebone Lane North on approach to the junction.

Infrastructure Issue | Signal Timing

[A12] Eastern Avenue West (RM6) (All Directions) at the junction of Whalebone Lane North - These Traffic signals are not on computer control.

  • A1112 (RM6) (All Directions)

A12

A11 (E3 ,E1) (Tower Hamlets)

  Moderate

From: Monday 09 February 2015
To: Thursday 31 March 2016

Last updated 13:49 Wednesday 29 July 2015 : Traffic is flowing normally for the time of day.

Works | TfL

[A11] (E1 /E3 ) (Both Directions) between Bow Roundabout (A12) and Aldgate - Cycle Superhighway 2. Lane restrictions and at times temporary traffic signals. Works will take place in phases. Lane one restrictions westbound at the approach to [A1205] Burdett Road in order to put out the temporary splitter Island between lanes one & two safely. Find out more about Cycle Superhighway 2 upgrade

  • A11 (E3 ,E1) (Both Directions)
  • [A1205] Burdett Road (E3) (All Directions)
  • [B134] White Church Lane (E1) (All Directions)

A12

A12 (CM14) (Havering)

  Moderate

From: Sunday 05 July 2015
To: Friday 31 July 2015

Last updated 07:01 Wednesday 29 July 2015 : Local delays possible when works take place.

Works | Other

[A12] A12 (Eastbound) at A12 Eastbound Exit slip to M25 Jct 28 - Exit slip road or a lane closure of the A12 Exit slip to M25 Jct 28 for traffic signal and street lighting upgrading and improvements (Operational hours 2000-0600)

A12

Burdett Road (E3 ,E14) (Tower Hamlets)

  Moderate

From: Tuesday 28 May 2013
To: Sunday 04 February 2018

Last updated 07:01 Wednesday 29 July 2015 : Possible delays whilst works take place.

Works | Other

A1205 Burdett Road (North and Southbound) at the junction of St Paul's Way - The carriageway will be restricted for Crossrail works. Find out more about Crossrail works

  • Burdett Road (E3 ,E14) (South Bound)

A12

Fieldgate Street (E1) (Tower Hamlets)

  Moderate

From: Wednesday 01 July 2015
To: Thursday 30 July 2015

Last updated 07:01 Wednesday 29 July 2015 : Expect delays on diversion routes.

Works | TfL

Fieldgate Street (E1) (Both Directions) closed at Plumbers Row near the East London Mosque until the end of July during Cycle Superhighway-related works.

  • Fieldgate Street (E1) (Both Directions)
  • Greenfield Road (E1) (All Directions)
  • Mulberry Street (E1) (All Directions)
  • Old Montague Street (E1) (All Directions)
  • Plumbers Row (E1) (All Directions)
  • [A11] Whitechapel Road (E1) (All Directions)

A13

[A13] Commercial Road (E1) (Tower Hamlets)

  Moderate

From: Friday 24 July 2015
To: Wednesday 29 July 2015

Last updated 07:03 Wednesday 29 July 2015 : Traffic is flowing well.

Works | Emergency

[A13] Commercial Road (E1 ) (Eastbound) at the junction of Arbour Square - The restrictions are currently confined to the footpath.

  • Arbour Square (E1) (All Directions)
  • [A13] Commercial Road (E1) (East Bound)
  • Devonport Street (E1) (All Directions)
  • Summercourt Road (E1) (All Directions)

A13

[A13] Commercial Road (E1) (Tower Hamlets)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 07:04 Wednesday 29 July 2015 : Traffic is flowing well past the works.

Works | Emergency

[A13] Commercial Road (E1 ) (Westbound) at the junction of Ropewalk Gardens - The bus lane is closed due to a gas leak.

A2

[A2] Deptford Bridge (SE10,SE8) (Greenwich,Lewisham)

  Moderate

From: Monday 22 June 2015
To: Monday 08 February 2016

Last updated 08:28 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

[A2] Deptford Bridge (SE8) (Both Directions) between Deptford Church Street and Deal's Gateway - Various restrictions in place over many phases, to facilitate junction improvement works.

  • [A2] Blackheath Road (SE10,SE8) (All Directions)
  • [A2210] Brookmill Road (SE8) (All Directions)
  • Dean's Gateway (SE10) (All Directions)
  • [A2] Dean's Gateway (SE10,SE8) (All Directions)
  • [A2] Deptford Broadway (SE10,SE8) (All Directions)
  • [A206] Greenwich High Road (SE10) (All Directions)
  • Harton Street (SE8) (All Directions)

A20

A23

[A202] Camberwell New Road (SE11) (Lambeth)

  Moderate

From: Tuesday 28 July 2015
To: Friday 31 July 2015

Last updated 13:50 Wednesday 29 July 2015 : Traffic is moving well in the area.

Works | Utility

[A23] Camberwell New Road (SW9/SE11) (All Directions) at the junction of Brixton Road - banned turn/s and lane closures due to emergency water works. The left turn from Camberwell New Road into Brixton Road southbound is currently closed.

  • [A23] Brixton Road (SE11,SW9) (All Directions)
  • [A202] Camberwell New Road (SE11) (All Directions)
  • Prima Road (SW9) (All Directions)

A20

A23

A24

[A3] Kennington Park Road (SE11) (Lambeth)

  Moderate

From: Sunday 22 March 2015
To: Thursday 31 December 2015

Last updated 13:52 Wednesday 29 July 2015 : Traffic is flowing normally in the area.

Works | TfL

[A3] Kennington Park Road (SE11) (Northbound) at the junctions of Clapham Road and Camberwell New Road (Oval Triangle) - Various restrictions will be implemented during the Oval Triangle Improvement works. The inner lane of the triangle is closed on all sides. From Monday 20th July there will be lane closures on Kennington Park Road southbound, Brixton Road northbound and southbound. The left turn from Camberwell New Road to Brixton Road will be banned. There will also be temporary traffic signals overnight at Kennington Park Road / Brixton Road, Find out more about Oval Triangle works

  • A202 (SE11) (All Directions)
  • [A3] Kennington Park Road (SE11) (North Bound)
  • Magee Street (SE11) (All Directions)

A20

[A20] Lewisham Way (SE14) (Lewisham)

  Moderate

From: Wednesday 29 July 2015
To: Thursday 30 July 2015

Last updated 13:53 Wednesday 29 July 2015 : Traffic flowing well.

Works | Utility

[A20] Lewisham Way (Northbound) at the junction of Amersham Road - Lane three closed to facilitate water works. All lanes remain open at present.

  • [A20] Lewisham Way (SE14) (All Directions)

A20

[A20] Loampit Vale (SE13) (Lewisham)

  Moderate

From: Monday 28 July 2014
To: Thursday 30 June 2016

Last updated 13:45 Wednesday 29 July 2015 : Traffic is flowing well in the area

Works | TfL

[A20] Loampit Vale (SE13) (Westbound) between Molesworth Street / Lewisham High Street and Thurston Road (Lewisham Gateway Development Works) - Intermittent lane closures on all approaches to the Lewisham northern roundabout. Phase 5 works involve the replacement of the existing northern roundabout (A20, A21 and A2211) with a new road layout and new buildings and also the diversion of the rivers Quaggy and Ravensbourne. Lane closures, footway works and off carriageway works in all phases and impacting all directions. New gyratory with minimum of two circulatory lanes. A new slip road will be opened between Molesworth Street and Loampit Vale. There will be restricted access pedestrian crossing on the south side of the gyratory.

  • Station Road (SE13) (All Directions)

A205

[A205] Cavendish Road (SW4) (Lambeth)

  Moderate

From: Monday 22 June 2015
To: Thursday 20 August 2015

Last updated 07:45 Wednesday 29 July 2015 : Local delays possible whilst the works are in place.

Works | TfL

[A205] Cavendish Road (SW4) (All Directions) at the junction of Hazelbourne Road - temporary traffic signals will operate for signal modernisation work.

  • Cavendish Road (SW4) (All Directions)
  • Hazelbourne Road (SW12) (All Directions)
  • Poynders Road (SW4) (All Directions)

A205

[A306] Roehampton Lane (SW15) (Wandsworth)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 13:53 Wednesday 29 July 2015 : Expect delays on approach.

Works | Utility

[A306] Roehampton Lane (SW15) (Northbound) at the junction of Danebury Avenue - lane closures to facilitate telecoms works (1000hrs to 1530hrs daily).

  • Holybourne Avenue (SW15) (All Directions)
  • Roehampton High Street (SW15) (All Directions)
  • [A306] Roehampton Lane (SW15) (North Bound)

A205

[A205] Upper Richmond Road West (SW14) (Richmond Upon Thames)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 13:54 Wednesday 29 July 2015 : Minor restrictions in parking bay. Traffic flowing well.

Works | TfL

[A205] Upper Richmond Road West (SW14) (Westbound) at the junction of Portman Avenue - Transport For London will be carrying out footway works at this location. Traffic management will consist of a part lane closure.

A205

A406

[A117] Woolwich Ferry (E16) (Newham)

  Moderate

From: Friday 26 September 2014
To: Wednesday 30 September 2015

Last updated 13:29 Wednesday 29 July 2015 : No reported delays

Works | TfL

Woolwich Ferry (Both Directions) - lane restrictions at both ferry terminals during refurbishment of the boarding ramps.

  • A2204 (SE18) (All Directions)
  • [A117] Pier Road (E16) (All Directions)
  • Pier Road (All Directions)

A21

[A21] Hastings Road (BR2) (Bromley)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 08:38 Wednesday 29 July 2015 : No reported delays.

Works | Utility

[A21] Hastings Road (BR2) (Both Directions) at the junction of Lakeside Drive - Contractors on behalf of Thames Water will be carrying out works to repairs leaking water mains at the above location; they will be using two way temporary traffic lights with single alternate line working.

  • Lakeside Drive (BR2) (All Directions)

A21

[A222] Widmore Road (BR1) (Bromley)

  Moderate

From: Tuesday 26 May 2015
To: Saturday 10 October 2015

Last updated 13:32 Wednesday 29 July 2015 : Traffic flowing well, expect local delays during the course of these works.

Works | Borough

[A222] Widmore Road (Both Directions) between Tweedy Road and East Street - footpath and road resurfacing works as part of the on-going "Bromley North Village" scheme on behalf of Bromley council.

  • Church Road (BR1 ,BR2) (All Directions)
  • Courtstreet (BR1) (All Directions)
  • East Street (BR1) (All Directions)
  • [A222] High Street (BR1) (All Directions)
  • [A222] Market Square (BR1) (All Directions)
  • Park Road (BR1) (All Directions)
  • [A222] Tweedy Road (BR1) (All Directions)
  • Walters Yard (BR1) (All Directions)
  • West Street (BR1) (All Directions)
  • [A222] Widmore Road (BR1) (Both Directions)

A23

[A23] Brixton Road (SW9) (Lambeth)

  Moderate

From: Monday 27 July 2015
To: Wednesday 29 July 2015

Last updated 13:50 Wednesday 29 July 2015 : Traffic is flowing well.

Works | Emergency

[A23] Brixton Road (SW9) (Northbound) at the junction of Stockwell Road - Lane one (of two) is closed to facilitate emergency BT works.

  • [A23] Brixton Road (SW9) (North Bound)
  • [A203] Stockwell Road (SW9) (All Directions)

A23

[A23] Kennington Road (SE11) (Lambeth)

  Moderate

From: Monday 16 March 2015
To: Monday 30 November 2015

Last updated 13:31 Wednesday 29 July 2015 : Traffic flowing well.

Works | TfL

[A23] Kennington Road (SE11) (Northbound) at the junction of Clayton Street - Traffic is reduced to one lane in each direction to facilitate Northern line extension works.

  • Clayton Street (SE11) (All Directions)
  • Kennington Road (All Directions)
  • [A23] Kennington Road (SE11) (North Bound)

A23

[A23] Brixton Hill (SW2) (Lambeth)

  Moderate

From: Monday 06 July 2015
To: Thursday 20 August 2015

Last updated 07:41 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

[A23] Brixton Hill (SW2) (All Directions) at the junction of Brixton Water Lane - Temporary signals in use periodically during junction improvement works.

  • Brixton Hill (All Directions)
  • [A23] Brixton Hill (SW2) (All Directions)
  • Brixton Water Lane (SW2) (All Directions)
  • Josephine Avenue (SW2) (All Directions)
  • Lambert Road (SW2) (All Directions)
  • St Matthew's Road (SW2) (All Directions)
  • St Saviour's Road (SW2) (All Directions)
  • Trent Road (SW2) (All Directions)

A23

[A23] Brixton Hill (SW2) (Lambeth)

  Moderate

From: Monday 20 July 2015
To: Thursday 27 August 2015

Last updated 07:44 Wednesday 29 July 2015 : Expect delays when carriageway restrictions are in use.

Works | TfL

[A23] Brixton Hill (SW2) (All Directions) at the junction of New Park Road - temporary traffic signals in operation during traffic signal upgrade works.

  • Brixton Hill Place (SW2) (All Directions)
  • Dumbarton Road (SW2) (All Directions)
  • Holmewood Road (SW2) (All Directions)
  • Jebb Avenue (SW2) (All Directions)
  • Morrish Road (SW2) (All Directions)
  • New Park Road (SW2) (All Directions)
  • Tudor Close (SW2) (All Directions)

A24

[A24] High Street Collier's Wood (SW19) (Merton)

  Moderate

From: Tuesday 23 June 2015
To: Monday 19 October 2015

Last updated 13:51 Wednesday 29 July 2015 : Traffic is moving well in the area.

Works | TfL

[A24] High Street Collier's Wood (SW19) (All Directions) between Christchurch Road and Marlborough Road - Major Improvement works. Variable lane restrictions.

  • Baltic Close (SW19) (All Directions)
  • Byegrove Road (SW19) (All Directions)
  • Cavendish Road (SW19) (All Directions)
  • Christchurch Road (SW19) (All Directions)
  • College Road (SW19) (All Directions)
  • [A24] High Street Collier's Wood (SW19) (All Directions)
  • Marlborough Road (SW19) (All Directions)
  • Park Road (SW19) (All Directions)
  • Valley Gardens (SW19) (All Directions)

A24

[A297] St Helier Avenue (SM4) (Merton)

  Moderate

From: Tuesday 28 July 2015
To: Thursday 30 July 2015

Last updated 13:35 Wednesday 29 July 2015 : No reports of congestion

Works | Emergency

[A297] St Helier Avenue (SM4) (Northbound) near the junction of Middleton Road - Lane restriction to facilitate emergency telecoms works

A24

[A3] Kennington Park Road (SE11) (Southwark,Lambeth)

  Moderate

From: Saturday 21 February 2015
To: Ongoing

Last updated 13:52 Wednesday 29 July 2015 : Traffic is moving well in the area.

Works | TfL

[A3] Kennington Park Road (SE11) (Both Directions) between Kennington Oval and Ravensdon Street - Cycle Superhighway 5 - Construction work for the Cycle Superhighway 5 is in progress in the Kennington Oval Area. Lane closures in place on Kennington Park Road with a contraflow operating in the southbound carriageway. Find out more about Cycle Superhighway 5.

  • Kennington Park Place (SE11) (All Directions)
  • [A3] Kennington Park Road (SE11) (North Bound)
  • [A23] Kennington Road (SE11) (All Directions)
  • Ravensdon Street (SE11) (All Directions)

A24

[A24] Priory Road (SW19) (Merton)

  Moderate

From: Monday 20 April 2015
To: Saturday 19 September 2015

Last updated 13:40 Wednesday 29 July 2015 : Delays possible while restrictions are in place.

Works | TfL

[A24] Priory Road (Both Directions) between Merton High Street and Christchurch Close - Major improvement works including; drainage, traffic signals, street lighting, kerb and footway. From Tuesday 23rd June there will be temporary traffic signals in operation at the junction.

  • Christchurch Close (SW19) (All Directions)
  • [A238] Merton High Street (SW19) (All Directions)
  • [A24] Priory Road (SW19) (Both Directions)

A24

[A3] Clapham Road (SE11,SW9) (Lambeth)

  Moderate

From: Wednesday 22 July 2015
To: Tuesday 11 August 2015

Last updated 08:27 Wednesday 29 July 2015 : Local delays possible whilst the works are in place.

Works | Utility

[A3] Clapham Road (SW9) (Southbound) at the junction of Prima Road - Thames Water are carrying out urgent repair works at the above location . Traffic management consist of a carriageway lane closure in the southbound direction. Working hours: 08:00 -17:00 (Mon-Fri), 09:00 - 14:00 (Sat)

  • [A3] Clapham Road (SE11,SW9) (South Bound)
  • Elias Place (SE11) (All Directions)
  • [A3] Kennington Park Road (SE11,SW9) (All Directions)

A3

A3 (KT6 ,KT9) (Kingston Upon Thames)

  Moderate

From: Thursday 16 July 2015
To: Friday 31 July 2015

Last updated 13:45 Wednesday 29 July 2015 : Traffic is slow moving on the westbound slip to Hook Roundabout.

Works | TfL

[A3] Kingston-By-Pass (Both Directions) at the junction of Hook Road (Hook Junction). - There are lane closures on the westbound exit-slip and the eastbound entry-slip at the roundabout.

  • A3 (KT6 ,KT9) (All Directions)

A3

Inner Ring

Vauxhall Cross (SE1 ,SW8) (Lambeth,Wandsworth)

  Moderate

From: Monday 13 April 2015
To: Ongoing

Last updated 13:54 Wednesday 29 July 2015 : Traffic is flowing normally.

Works | TfL

Vauxhall Cross - Cycle Superhighway 5 - Construction work for the Cycle Superhighways 5 is in progress in the Vauxhall Cross area. The carriageway has been reduced by one lane on all approaches to the junction with Millbank. Lane one (of five) is closed eastbound on the north side of the gyratory. Harleyford Road is reduced to one lane approaching Vauxhall Cross. There is also a lane closure eastbound on Kennington Lane Find out more about Cycle Superhighway 5

  • Bondway (SW8) (All Directions)
  • Bridgefoot (SE1) (All Directions)
  • Harleyford Road (SE11) (All Directions)
  • Kennington Lane (SE11,SE1) (All Directions)
  • Langley Lane (SW8) (All Directions)
  • Nine Elms Lane (SW8) (All Directions)
  • Parry Street (SW8) (All Directions)
  • South Lambeth Road (SE11,SW8) (All Directions)
  • Vauxhall Grove (SW8) (All Directions)

A316

A316 (TW1) (Richmond Upon Thames)

  Moderate

From: Monday 20 July 2015
To: Friday 14 August 2015

Last updated 13:46 Wednesday 29 July 2015 : Traffic is flowing well on approach to the roundabout.

Works | TfL

A316 (TW1) (Both directions) at the junction of St Margarets Roundabout - Lane restrictions on approach to the roundabout between 9.30am and 4pm.

  • A316 (TW1) (West Bound)

A316

[A316] Lower Mortlake Road (TW9) (Richmond Upon Thames)

  Moderate

From: Wednesday 17 June 2015
To: Friday 07 August 2015

Last updated 13:43 Wednesday 29 July 2015 : Local delays are expected, when restrictions are in place.

Works | TfL

[A316] Lower Mortlake Road (Both Directions) between Duncan Road and [B353] Manor Road (Manor Circus) - The carriageway will be restricted for footpath works.

  • Duncan Road (TW9) (All Directions)
  • Evelyn Gardens (TW9) (All Directions)
  • Evelyn Road (TW9) (All Directions)
  • [A307] Kew Road (TW9) (All Directions)
  • [A316] Kew Road (TW9) (All Directions)
  • Larkfield Road (TW9) (All Directions)
  • [A316] Lower Mortlake Road (TW9) (Both Directions)
  • Michelsdale Drive (TW9) (All Directions)
  • North Road (TW9) (All Directions)
  • Pagoda Avenue (TW9) (All Directions)
  • Parkshot (TW9) (All Directions)
  • Raleigh Road (TW9) (All Directions)
  • [A316] Richmond Circus (TW9) (All Directions)
  • Rosedale Road (TW9) (All Directions)
  • Salisbury Road (TW9) (All Directions)
  • Selwyn Avenue (TW9) (All Directions)
  • Shaftesbury Road (TW9) (All Directions)
  • Sheendale Road (TW9) (All Directions)
  • St George's Road (TW9) (All Directions)
  • St John's Grove (TW9) (All Directions)
  • St John's Road (TW9) (All Directions)
  • Stanmore Gardens (TW9) (All Directions)
  • Tersha Street (TW9) (All Directions)
  • Trinity Road (TW9) (All Directions)
  • [A316] Twickenham Road (TW9) (All Directions)
  • Victoria Villas (TW9) (All Directions)
  • West Sheen Vale (TW9) (All Directions)

A4

[A4] Bath Road (UB3 ,TW6) (Hillingdon)

  Moderate

From: Monday 27 July 2015
To: Wednesday 29 July 2015

Last updated 13:49 Wednesday 29 July 2015 : No visible delays in the area.

Works | Utility

[A4] Bath Road (UB3/TW6) (Westbound) at the junction of Bolton's Lane - Lane one closure to facilitate works in telecoms cabinet and pole swap. (Daily between 1000 - 1530)

  • [A4] Bath Road (UB3 ,TW6) (West Bound)
  • Bolton's Lane (UB3) (All Directions)

A4

Inner Ring

Hyde Park Corner (W1J) (Westminster)

  Moderate

From: Wednesday 01 July 2015
To: Friday 28 August 2015

Last updated 10:15 Wednesday 29 July 2015 : Delays possible when restrictions are in place.

Works | Borough

Hyde Park Corner - The carriageway may be restricted for works between the hours of 8pm - 5am.

  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Grosvenor Crescent (SW1X) (All Directions)
  • Hyde Park Corner (W1J) (All Directions)
  • Park Lane (W1J) (All Directions)
  • Piccadilly (W1J) (All Directions)

A406

[A105] Green Lanes (N13) (Enfield)

  Moderate

From: Monday 23 March 2015
To: Wednesday 02 December 2015

Last updated 15:23 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A105] Green Lanes (N13) (All Directions) at the junction of Regents Avenue - The carriageway is reduced to a single lane in each direction during Thames Water's repair of a collapsed sewer.

  • Broadway Mews (N13) (All Directions)

A406

[A205] Kew Bridge Road (TW9 ,TW8) (Richmond Upon Thames,Hounslow)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 14:08 Wednesday 29 July 2015 : Traffic is flowing well in the area.

Infrastructure Issue | Signal Timing

[A205] Kew Bridge Road (TW8) (All Directions) at the junction of Kew Road and Chiswick High Road - Traffic signals are not under computer control. Possible resulting delays.

  • [A205] Kew Bridge Road (TW9 ,TW8) (All Directions)
  • [A205] Kew Road (TW9 ,TW8) (All Directions)
  • [A315] Kew Road (TW8) (All Directions)
  • Spring Grove (W4) (All Directions)

A41

[A41] Park Road (NW8) (Westminster)

  Moderate

From: Monday 20 July 2015
To: Friday 31 July 2015

Last updated 13:39 Wednesday 29 July 2015 : Delays are possible on approach.

Works | TfL

[A41] Park Road (NW8) (Southbound) at the junction of Alpha Close - Partial lane one closure during off-peak hours (weekdays only) for footway works.

A41

[A41] Watford Way (NW4) (Barnet)

  Moderate

From: Monday 22 June 2015
To: Friday 07 August 2015

Last updated 17:07 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | TfL

[A41] Watford Way (NW4) (All Directions) at the junction of The Burroughs and Station Road - Various lane restrictions north and southbound on the A41 and lane restrictions on Station Road for kerb realignment and construction of a new central island. Night works between 2000hrs - 0500hrs throughout. A 24 hour southbound lane three closure is in place until 1st August.

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Moderate

From: Monday 16 March 2015
To: Friday 31 July 2020

Last updated 15:23 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Intermittent road closure to facilitate Bank Station upgrade works. Northbound diversion for buses via Great Tower Street, Eastcheap and Cannon Street. Southbound diversion for local traffic via Gracechurch Street, Fenchurch Street, Mincing Lane, Great Tower Street, Eastcheap, King William Street (south), Monument Street, Fish Street Hill and Lower Thames Street Find out more about Bank and Monument works

Bishopsgate Cross Route

[A10] Leadenhall Street (EC2N,EC3V) (City Of London)

  Moderate

From: Wednesday 08 July 2015
To: Sunday 30 August 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible on diversion routes, especially at peak times.

Works | Utility

Leadenhall Street (EC3V/EC2N) (Eastbound) at the junction of Gracechurch Street - Road closure in place to enable gas mains replacement works. Access to Leadenhall Street is currently available from Gracechurch Street but the road is closed from St Mary Axe.

Bishopsgate Cross Route

Southern River Route

[A3] Southwark Street (SE1) (Southwark)

  Moderate

From: Wednesday 11 March 2015
To: Saturday 31 October 2015

Last updated 13:38 Wednesday 29 July 2015 : Expect delays on approach.

Works | Other

[A3] Southwark Street (Eastbound) at the junction of Stoney Street - The carriageway is restricted both ways for bridge work.

  • Borough High Street (SE1) (All Directions)
  • [A3200] Southwark Street (SE1) (All Directions)

Blackwall Tunnel

[A102] Blackwall Tunnel (BOTH BORES) (E14) (Tower Hamlets)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 13:50 Wednesday 29 July 2015 : Traffic slow moving on approach.

Traffic Incidents | Breakdown

[A102] Blackwall Tunnel (Southbound Exit) (E14) - broken down vehicle blocking lane two (of two) on the exit of the tunnel

  • [A102] Blackwall Tunnel (Both Bores) (E14) (South Bound)

City Route

Southern River Route

[A23] Westminster Bridge Road (SE1) (Lambeth)

  Moderate

From: Wednesday 29 July 2015
To: Thursday 30 July 2015

Last updated 13:43 Wednesday 29 July 2015 : Traffic is flowing well.

Special and Planned Events | Other

[A23] Westminster Bridge Road (SE1) (All Directions): There will be a photography shoot on the pavement only at this location.

  • [A23] Westminster Bridge Road (SE1) (All Directions)
  • York Road (SE1) (All Directions)

City Route

[A3211] Victoria Embankment (EC4V,EC4Y) (City Of London)

  Moderate

From: Thursday 08 January 2015
To: Tuesday 31 May 2016

Last updated 10:21 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Special and Planned Events | Construction Activity

[A3211] Victoria Embankment (EC4Y) (Eastbound) at the junction of Temple Avenue - The exit slip-road to Blackfriars Bridge is partially restricted for construction works.

  • [A3211] Victoria Embankment (EC4V,EC4Y) (All Directions)

Farringdon Cross Route

Farringdon Road (Islington,Camden)

  Moderate

From: Monday 22 July 2013
To: Monday 31 December 2018

Last updated 15:21 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Other

A201 Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Farringdon Road is restricted southbound. Find out more about Crossrail works

  • Charterhouse Street (EC1N,EC1A) (All Directions)
  • Cowcross Street (EC1M) (All Directions)
  • Farringdon Road (EC1M) (All Directions)
  • Farringdon Street (EC1A) (All Directions)
  • Saffron Hill (EC1N) (All Directions)

Farringdon Cross Route

Inner Ring

[A3] Elephant And Castle Roundabout (SE1) (Southwark)

  Moderate

From: Tuesday 07 April 2015
To: Saturday 30 April 2016

Last updated 13:51 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

[A3] Elephant And Castle Roundabout (All Directions) - Due to road modernisation works the outer ring of the roundabout is closed. St Georges Road is reduced to one lane, and Newington Causeway (northbound) also has a lane restriction in place. Find out more about Elephant & Castle works

  • A201 (SE1) (All Directions)
  • [A3] Elephant And Castle Roundabout (SE1) (All Directions)
  • [A3] Newington Causeway (SE1) (All Directions)
  • [A302] St George's Road (SE1) (All Directions)

Farringdon Cross Route

[A201] Farringdon Road (WC1X,EC1R) (Islington,Camden)

  Moderate

From: Monday 13 July 2015
To: Thursday 06 August 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A201] Farringdon Road (EC1R/WC1X) (Southbound) between Margery Street and Rosebery Avenue - Lane restrictions in place to facilitate gas mains replacement works.

  • Attneave Street (WC1X) (All Directions)
  • [B502] Calthorpe Street (WC1X) (All Directions)
  • [A201] King's Cross Road (WC1X,EC1R) (All Directions)
  • Lloyd Baker Street (WC1X) (All Directions)
  • Margery Street (WC1X) (All Directions)
  • [A401] Rosebery Avenue (EC1R) (All Directions)

Inner Ring

Southern River Route

Western Cross Route

[A202] Vauxhall Bridge (SW1V,SE1 ,SW1P) (Lambeth,Westminster)

  Moderate

From: Monday 09 February 2015
To: Ongoing

Last updated 13:42 Wednesday 29 July 2015 : Traffic is currently flowing well.

Works | TfL

[A202] Vauxhall Bridge Road (Millbank Junction) (SW1) (Both Directions) between Vauxhall Bridge and Rampayne Street - Cycle Super Highway 5 construction works. Various restrictions on Vauxhall Bridge Road, Vauxhall Bridge, Millbank, John Islip Street and Grosvenor Road. "http://www.tfl.gov.uk/travel-information/improvements-and-projects/cycle-superhighway-5">Find out more about Cycle Superhighway 5

  • A3212 (SW1V,SW1P) (All Directions)
  • [A202] Bessborough Gardens (SW1V,SE1 ,SW1P) (All Directions)

Inner Ring

[A100] Tower Bridge Road (SE1) (Southwark)

  Moderate

From: Friday 12 June 2015
To: Friday 31 July 2015

Last updated 13:34 Wednesday 29 July 2015 : Expect delays during the peak periods.

Works | TfL

[A100] Tower Bridge Road (SE1) (All Directions) at the junction of Grange Road and Bermondsey Street - Road closure in place and temporary traffic signals are in use overnight to facilitate junction improvement works.

  • [A100] Bermondsey Square (SE1) (All Directions)
  • [A100] Caledonian Market (SE1) (All Directions)
  • [A2206] Grange Road (SE1) (All Directions)
  • [A2206] Tower Bridge Road (SE1) (All Directions)
  • [A100] Tower Bridge Road (SE1) (All Directions)

Inner Ring

[A5201] Pitfield Street (EC1V) (Hackney)

  Moderate

From: Thursday 23 July 2015
To: Friday 18 December 2015

Last updated 17:06 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A5201] Pitfield Street (Northbound) intersecting Old Street - The road is closed northbound for works.

  • [A5201] Old Street (EC1V) (All Directions)

Inner Ring

[A501] Seymour Place (NW1 ,W1H) (Westminster)

  Moderate

From: Sunday 12 July 2015
To: Sunday 28 August 2016

Last updated 10:14 Wednesday 29 July 2015 : Use alternate route whilst closure is in place. Local delays possible.

Works | Other

Seymour Place (W1H/NW1) (Both Directions) between Marylebone Road and York Street - full road closure to facilitate long-term construction works.

  • Virgil Place (W1H) (All Directions)
  • Walmer Place (W1H) (All Directions)
  • York Street (W1H) (All Directions)

Inner Ring

[A11] Aldgate High Street (E1 ,EC3N) (Tower Hamlets,City Of London)

  Moderate

From: Monday 22 December 2014
To: Friday 28 August 2015

Last updated 14:15 Wednesday 29 July 2015 : No reports of delays in the area.

Works | Borough

[A11] Aldgate High Street (EC3N) (All Directions) at the junction of Mansell Street and Whitechapel High Street - Carriageway restrictions for a Major Borough Scheme. Aldgate High Street has been reduced to two lanes. St Botolph Street is reduced to one lane for the left turn onto Whitechapel High Street, and one lane for the right turn onto Aldgate High Street. Whitechapel High Street is reduced to one lane westbound. Mansell Street is reduced to two lanes northbound. Find out more about Aldgate Gyratory works

  • [A11] St Botolph Street (E1 ,EC3N) (All Directions)
  • [A11] Whitechapel High Street (E1 ,EC3N) (All Directions)

Inner Ring

[A10] Shoreditch High Street (E1) (Hackney)

  Moderate

From: Sunday 19 July 2015
To: Ongoing

Last updated 14:06 Wednesday 29 July 2015 : Traffic is flowing well.

Infrastructure Issue | Signal Timing

[A10] Shoreditch High Street (E1 ) (All Directions) at the junction of Commercial Street - Traffic signals are not under central computer control.

  • Plough Yard (EC2A) (All Directions)
  • [A10] Shoreditch High Street (E1) (All Directions)

Southern River Route

[A3200] Stamford Street (SE1) (Southwark)

  Moderate

From: Monday 22 June 2015
To: Thursday 15 October 2015

Last updated 13:53 Wednesday 29 July 2015 : Traffic is flowing well.

Works | Other

[A3200] Stamford Street (SE1) (Both directions) between Hatfields and Rennie Street - Carriageway restrictions to facilitate footway works to take place between 8am and 6pm Monday to Saturday.

  • Paris Garden (SE1) (All Directions)
  • Rennie Street (SE1) (All Directions)
  • [A3200] Stamford Street (SE1) (East Bound)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Moderate

From: Tuesday 07 April 2015
To: Saturday 10 December 2016

Last updated 10:21 Wednesday 29 July 2015 : Delays possible when restrictions are in place.

Special and Planned Events | Construction Activity

[A3036] Albert Embankment (SE1) (Southbound) at the junction of Tinworth Street - Intermittent lane one (of two) restriction to facilitate construction works.

  • [A3036] Albert Embankment (SE1) (South Bound)
  • Randall Road (SE11) (All Directions)
  • Tinworth Street (SE11) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Moderate

From: Wednesday 22 July 2015
To: Monday 03 August 2015

Last updated 10:09 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Utility

[A3036] Albert Embankment (SE1) (Southbound) at the junction of Tinworth Street - lane one (of two) restriction to facilitate electrical works.

  • Tinworth Street (SE11) (All Directions)

Western Cross Route

[A3220] Edith Grove (SW10) (Kensington & Chelsea)

  Moderate

From: Saturday 18 July 2015
To: Sunday 02 August 2015

Last updated 10:13 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Utility

[A3220] Edith Grove (Southbound) at the junction of Cremorne Road - Various lane restrictions in place to facilitate electricity works.

  • [A3220] Cremorne Road (SW10) (All Directions)
  • [A3220] Edith Grove (SW10) (South Bound)

Cannon Street (EC4M,EC4V,EC4N) (City Of London)

  Moderate

From: Tuesday 06 May 2014
To: Friday 06 November 2015

Last updated 15:21 Tuesday 28 July 2015 : Expect delays at peak times during the course of these works.

Special and Planned Events | Construction Activity

Cannon Street (EC4) (Eastbound) between Bread Street and Queen Victoria Street - Lane one (of two) will be closed intermittently for building works.

  • Cannon Street (EC4M,EC4V,EC4N) (East Bound)
  • Distaff Lane (EC4M) (All Directions)
  • Friday Street (EC4V,EC4M) (All Directions)
  • Great Trinity Lane (EC4M) (All Directions)
  • New Change (EC4M) (All Directions)
  • Queen Victoria Street (EC4V,EC4M,EC4N) (All Directions)
  • St Paul's Church Yard (EC4M) (All Directions)
  • Watling Court (EC4M) (All Directions)

[A5] Kilburn High Road (NW6) (Brent)

  Moderate

From: Monday 27 July 2015
To: Thursday 30 July 2015

Last updated 10:08 Wednesday 29 July 2015 : Delays are possible on approach.

Works | Other

[A5] Kilburn High Road (NW6) (All Directions) at the junction of Brondesbury Road - Minor restrictions in place due to works.

[B2230] High Street (SM1) (Sutton)

  Moderate

From: Monday 27 July 2015
To: Thursday 30 July 2015

Last updated 13:26 Wednesday 29 July 2015 : Expect delays.

Works | Utility

[B2230] High Street (SM1) (All Directions) at the junction of Vale Road - Four way temporary traffic lights in place due to electricity works

  • [B2230] High Street (SM1) (All Directions)
  • Vale Road (SM1) (All Directions)

[A244] Hounslow Road (TW13) (Hounslow)

  Moderate

From: Wednesday 01 April 2015
To: Friday 28 August 2015

Last updated 15:23 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A244] Hounslow Road (TW13) (Both Directions) at the junction of Hanworth Road - The road will be closed for the Hounslow Council High Street improvement scheme.

  • [B3377] Hanworth Road (TW13) (All Directions)

[A112] High Road Leyton (E10) (Waltham Forest)

  Moderate

From: Monday 27 July 2015
To: Saturday 08 August 2015

Last updated 07:04 Wednesday 29 July 2015 : Expect delays when restrictions are in place.

Works | Utility

[A112] High Road Leyton (E10) (All Directions) at the junction of Hainault Road - National Grid Gas will be working at the junction with High Road Leyton and Hainault Road to install an new gas supply to the development site. During the works 3 way temporary traffic lights will be in operation to control single lane alternate working.

  • [A112] High Road Leyton (E10) (All Directions)
  • King Edward Road (E10) (All Directions)

Station Road (CR0) (Croydon)

  Moderate

From: Thursday 23 July 2015
To: Friday 07 August 2015

Last updated 13:35 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

Station Road (CR0) (All Directions) at the junction of North End - Transport for London will be carrying out signals upgrade works at this location. To facilitate the works traffic will be managed using three way temporary traffic signals, during evenings (excluding weekends).

  • Derby Road (CR0) (All Directions)
  • North End (CR0) (All Directions)
  • Tamworth Road (CR0) (All Directions)

Prince's Street (EC2R) (City Of London)

  Moderate

From: Saturday 28 March 2015
To: Monday 30 November 2015

Last updated 15:23 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

Prince's Street (EC2R) (Both Directions) between Lothbury and Threadneedle Street - Possible carriageway restrictions to facilitate works.

  • Coleman Street (EC2V) (All Directions)
  • Mansion House Place (EC4N) (All Directions)
  • Prince's Street (EC2R) (Both Directions)

[A1200] Canonbury Road (N1) (Islington)

  Moderate

From: Monday 06 April 2015
To: Sunday 16 August 2015

Last updated 15:23 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A1200] Canonbury Road (N1) (All Directions) between Canonbury Square and Essex Road - The carriageway will be restricted and temporary traffic signals will operate for gas works.

  • Alwyne Villas (N1) (All Directions)

[A222] Hurst Road (DA5) (Bexley)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 13:52 Wednesday 29 July 2015 : Expect delays on approach.

Works | Utility

[A222] Hurst Road (DA5) (All Directions) at the junction of Eynsford Crescent - Two way temporary traffic signals in operation to facilitate water works.

  • Eynsford Crescent (DA5) (All Directions)
  • [A222] Hurst Road (DA5) (All Directions)

Operation Stack () (Outside Gla)

  Moderate

From: Wednesday 22 July 2015
To: Ongoing

Last updated 13:53 Wednesday 29 July 2015 : M20 coastbound is closed between J8 (Hollingbourne) and Junction 11 (Hythe). Junctions 9 to 8 are also closed London bound.Tourist traffic for the Channel Tunnel can join M20 at J11 (Ashford).

Traffic Incidents | Other

Operation Stack is currently in place on the M20 coastbound between Junction 8 (Hollingbourne) and Junction 11 (Hythe). Junctions 9 to 8 London bound are also closed. This is due to a high volume of freight traffic and continued disruption in Calais. Further information here: http://www.kent.police.uk/news/latest_news/000000_op_stack.html

[A1200] East Road (N1) (Hackney)

  Moderate

From: Friday 24 July 2015
To: Ongoing

Last updated 13:52 Wednesday 29 July 2015 : No reported delays.

Infrastructure Issue | Traffic Signal

[A1200] East Road (N1 ) (All Directions) at the junction of Chart Street - Traffic signals are not working - Please approach with caution.

  • Chart Street (N1) (All Directions)
  • [A1200] East Road (N1) (All Directions)

Fenchurch Street (EC3M) (City Of London)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 13:52 Wednesday 29 July 2015 : Traffic is flowing well in the area.

Infrastructure Issue | Traffic Signal

Fenchurch Street (EC3M) (All Directions) at the junction of Lime Street - Traffic signals are not working - Please approach with caution.

  • Fenchurch Street (EC3M) (All Directions)
  • Philpot Lane (EC3M) (All Directions)
  • Rood Lane (EC3M) (All Directions)

[B281] Durham Road (SW20) (Merton)

  Moderate

From: Wednesday 22 July 2015
To: Friday 14 August 2015

Last updated 08:28 Wednesday 29 July 2015 : No reported delays.

Works | Borough

[B281] Durham Road (SW20) (All Directions) at the junction of Spencer Road - Temporary traffic signals in operation to facilitate ducting works. Works complete.

[B453] Neasden Lane (NW10) (Brent)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 12:09 Wednesday 29 July 2015 : Possible delays during the course of these works.

Works | Utility

[B453] Neasden Lane (NW10) (All Directions) at the junction of Wharton Close - Temporary traffic signals in operation to facilitate Thames Water works.

  • Knapp Close (NW10) (All Directions)
  • Wharton Close (NW10) (All Directions)

[B111] Northwold Road (N16) (Hackney)

  Moderate

From: Tuesday 21 July 2015
To: Saturday 08 August 2015

Last updated 17:06 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[B111] Northwold Road (N16) (Both Directions) at the junction of Fountayne Road - Road closed to facilitate roadworks.

  • Fountayne Road (N16) (All Directions)
  • Maury Road (N16) (All Directions)
  • [B111] Northwold Road (N16) (Both Directions)

[A4020] Uxbridge Road (W13) (Ealing)

  Moderate

From: Sunday 26 July 2015
To: Friday 31 July 2015

Last updated 17:02 Tuesday 28 July 2015 : Possible delays during the course of these works.

Works | Utility

[A4020] Uxbridge Road (W13) (Westbound) between Dane Road and Broomfield Road- the nearside bus lane will be closed for essential water works.

  • Broomfield Road (W13) (All Directions)
  • Broughton Road (W13) (All Directions)
  • Dane Road (W13) (All Directions)
  • [A4020] Uxbridge Road (W13) (West Bound)

[A437] Station Road (UB3) (Hillingdon)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 14:06 Wednesday 29 July 2015 : No reported delays.

Infrastructure Issue | Traffic Signal

[A437] Station Road (UB3) (All Directions) at the junction of Millington Road - Traffic signals are not working - Please approach with caution.

  • Station Road (All Directions)

[A114] Whipps Cross Road (E11) (Waltham Forest)

  Moderate

From: Monday 27 July 2015
To: Saturday 01 August 2015

Last updated 07:04 Wednesday 29 July 2015 : Delays are possible.

Works | TfL

[A114] Whipps Cross Road (E11) (All Directions) at the junction of James Lane - Temporary traffic lights in operation to facilitate works.

  • James Lane (E11) (All Directions)
  • [A114] Whipps Cross Road (E11) (All Directions)

[A232] High Street (SM5) (Sutton)

  Moderate

From: Monday 27 July 2015
To: Friday 07 August 2015

Last updated 13:28 Wednesday 29 July 2015 : Expect delays on approach.

Works | TfL

[A232] High Street (SM5) (All Directions) at the junction of Rotherfield Road - temporary traffic signals and lane restrictions in use to facilitate signal modernisation works. Daily works: 1000 - 0500hrs.

  • Rotherfield Road (SM5) (All Directions)

[B266] Whitehorse Lane (SE25) (Croydon)

  Moderate

From: Friday 24 July 2015
To: Friday 28 August 2015

Last updated 13:33 Wednesday 29 July 2015 : Expect delays while restrictions are in place.

Works | Utility

[B266] Whitehorse Lane (SE25) (Both Directions) between Park Road and Nugent Road - Three way temporary traffic signals in operation to facilitate gas mains replacement works.

  • Canham Road (SE25) (All Directions)
  • Claret Gardens (SE25) (All Directions)
  • Cranleigh Gardens (SE25) (All Directions)
  • Crystal Palace Fc, Selhurst Park (SE25) (All Directions)
  • Egerton Road (SE25) (All Directions)
  • Nugent Road (SE25) (All Directions)
  • Park Road (SE25) (All Directions)
  • Wrights Road (SE25) (All Directions)

[A4] Haymarket (SW1Y,W1J) (Westminster)

  Moderate

From: Monday 28 April 2014
To: Ongoing

Last updated 10:22 Wednesday 29 July 2015 : Delays are possible during the course of these works, especially at peak periods.

Works | Borough

[A4] Haymarket (SW1) (Southbound) at the junction with Jermyn Street - The carriageway will be restricted for "Piccadilly Two-Way Scheme" works by Westminster council as part of the "Better City, Better Lives" initiative. Haymarket is reduced to two lanes between Charles II Street and Pall Mall. There is also no right turn from Haymarket into Pall Mall.

  • Coventry Street (W1D) (All Directions)
  • Great Windmill Street (W1J) (All Directions)
  • [A4] Piccadilly (SW1Y,W1J) (All Directions)

[A232] Sutton Court Road (SM1) (Sutton)

  Moderate

From: Tuesday 28 July 2015
To: Wednesday 27 April 2016

Last updated 13:34 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

[A232] Sutton Court Road (All Directions) intersecting Orme Road - Intermittent lane three (of three) restrictions for Loading/Unloading. Hours of operation: 1000-1500.

  • Grove Road (SM1) (All Directions)
  • [A232] Grove Road (SM1) (All Directions)
  • [B2230] High Street (SM1) (All Directions)
  • [A232] Sutton Court Road (SM1) (All Directions)

[A4209] Sussex Gardens (W2) (Westminster)

  Moderate

From: Wednesday 02 July 2014
To: Thursday 31 March 2016

Last updated 10:21 Wednesday 29 July 2015 : Use other routes. Delays are possible on diversion.

Works | Other

[A4209] Sussex Gardens (W2 ) (All Directions) at the junction of Spring Street - Road closed to facilitate Crossrail tunnelling works and subsequently Thames Water works.

  • Spring Street (W2) (All Directions)
  • [A4209] Sussex Gardens (W2) (All Directions)

[A400] Northumberland Avenue (WC2N) (Westminster)

  Moderate

From: Sunday 12 October 2014
To: Friday 21 August 2015

Last updated 10:21 Wednesday 29 July 2015 : Delays possible during peak periods.

Works | Borough

[A400] Northumberland Avenue (WC2N) (Both Directions) at the junction of Whitehall Place - The carriageway is reduced to one lane in both directions for maintenance works.

  • Embankment Place (WC2N) (All Directions)
  • [A400] Northumberland Avenue (WC2N) (Both Directions)
  • [A3211] Victoria Embankment (WC2N) (All Directions)

[A110] Enfield Road (EN2) (Enfield)

  Moderate

From: Monday 27 July 2015
To: Friday 07 August 2015

Last updated 17:04 Tuesday 28 July 2015 : Expect delays at peak times during the course of these works.

Works | Emergency

[A110] Enfield Road (EN2) (Both Directions) at the junction of Bincote Road - Temporary signals in operation due to a burst water main.

  • Bincote Road (EN2) (All Directions)

[B179] Billet Road (E17) (Waltham Forest)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 07:03 Wednesday 29 July 2015 : Traffic is moving well both ways approaching the works.

Works | Utility

[B179] Billet Road (E17) (Both Directions) at the junction of Ardleigh Road - Temporary signals in operation to facilitate gas works.

  • Ardleigh Road (E17) (All Directions)
  • [B179] Billet Road (E17) (Both Directions)

Eastbourne Terrace (W2) (Westminster)

  Moderate

From: Monday 01 July 2013
To: Tuesday 02 January 2018

Last updated 10:07 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Other

Eastbourne Terrace (Both Directions) - Long term restrictions in place for Crossrail related works.

  • Chilworth Mews (W2) (All Directions)
  • Cleveland Terrace (W2) (All Directions)
  • Conduit Mews (W2) (All Directions)
  • Craven Road (W2) (All Directions)
  • Eastbourne Mews (W2) (All Directions)
  • Eastbourne Terrace (W2) (All Directions)
  • Gloucester Mews (W2) (All Directions)
  • Spring Street (W2) (All Directions)

[A501] Moorgate (EC2M) (City Of London)

  Moderate

From: Friday 28 November 2014
To: Monday 30 November 2015

Last updated 15:22 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Other

[A501] Moorgate (EC2M) (Southbound) at the junction of Ropemaker Street - Crossrail works: Moorgate will be closed southbound from the junction with Finsbury Pavement to London Wall. Moorgate will be closed to all southbound traffic which will be diverted via South Place, Eldon and Blomfield Street. One lane of northbound traffic will remain. Pedestrian access will be maintained on both sides of the street. The lane closure is in place until late November, 2015.

  • [A501] Moorgate (EC2M) (South Bound)
  • Ropemaker Street (EC2Y,EC2M) (All Directions)

[A404,A4206] Harrow Road Underpass (PADDINGTON) (W2) (Westminster)

  Moderate

From: Tuesday 22 April 2014
To: Sunday 01 May 2016

Last updated 10:21 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Other

[A404] Harrow Road (Paddington) (W2) (Eastbound) at Paddington Green - The carriageway is restricted for Crossrail works.

[A217] Wandsworth Bridge Road (SW6) (Hammersmith & Fulham)

  Moderate

From: Wednesday 29 July 2015
To: Thursday 30 July 2015

Last updated 13:42 Wednesday 29 July 2015 : No reported delays.

Works | Utility

[A217] Wandsworth Bridge Road (SW6) (All Directions) at the junction of Hazlebury Road - Three way temporary traffic signals in operation to facilitate works.

  • Hazlebury Road (SW6) (All Directions)
  • [A217] Wandsworth Bridge Road (SW6) (All Directions)

[A217] Wandsworth Bridge Road (SW6) (Hammersmith & Fulham)

  Moderate

From: Tuesday 28 July 2015
To: Thursday 30 July 2015

Last updated 08:56 Wednesday 29 July 2015 : Delays are possible during the course of the works.

Works | Utility

[A217] Wandsworth Bridge Road (SW6) (Northbound) at the junction of Clancarty Road - Lane restriction to facilitate water mains work by Thames Water.

  • [A217] Wandsworth Bridge Road (SW6) (North Bound)

High Road (IG1) (Redbridge)

  Moderate

From: Tuesday 14 July 2015
To: Friday 07 August 2015

Last updated 07:02 Wednesday 29 July 2015 : Approach with caution.

Infrastructure Issue | Traffic Signal

High Road (Ilford) (IG1) (All Directions) at the junction of Clements Road - Traffic signals are not working and are not expected to be restored until 2 weeks from start date.

  • Clements Road (IG1) (All Directions)
  • High Road (IG1) (All Directions)

[A206] Beresford Street (SE18) (Greenwich)

  Moderate

From: Tuesday 28 July 2015
To: Friday 07 August 2015

Last updated 13:50 Wednesday 29 July 2015 : Traffic is flowing well.

Works | Utility

[A206] Beresford Street (SE18) (Eastbound) at the junction of Woolwich New Road - Lane one (of two) is closed to facilitate electricity works.

  • [A206] Beresford Street (SE18) (East Bound)
  • [A205] Woolwich New Road (SE18) (All Directions)

[A3218] Old Brompton Road (SW6 ,SW5) (Kensington & Chelsea,Hammersmith & Fulham)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 14:06 Wednesday 29 July 2015 : No reported delays.

Works | Other

[A3218] Old Brompton Road (SW6/SW5) (All Directions) intersecting Eardley Crescent - Temporary traffic signals in operation to facilitate works.

  • Eardley Crescent (SW5) (All Directions)
  • [A3218] Old Brompton Road (SW6 ,SW5) (All Directions)

[A504] East End Road (N2) (Barnet)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 13:50 Wednesday 29 July 2015 : No reported delays.

Works | Borough

[A504] East End Road (N2 ) (All Directions) at the junction of Church Lane - Temporary traffic signals in operation to facilitate works.

  • Church Lane (N2) (All Directions)
  • [A504] East End Road (N2) (All Directions)
  • Hampstead Heights (N2) (All Directions)
  • Park Farm Close (N2) (All Directions)

Marsh Wall (E14) (Tower Hamlets)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 08:03 Wednesday 29 July 2015 : Approach with caution, no reported delays in the area.

Works | Borough

Marsh Wall (E14) (All Directions) at the junction of Lawn House Close - Temporary traffic signals in operation to facilitate works.

  • Lawn House Close (E14) (All Directions)
  • Marsh Wall (E14) (All Directions)

[B408] Askew Road (W12) (Hammersmith & Fulham)

  Moderate

From: Monday 27 July 2015
To: Sunday 09 August 2015

Last updated 17:03 Tuesday 28 July 2015 : Expect local delays when restrictions are in place.

Works | Utility

[B408] Askew Road (W12) (All Directions) at the junction of Starfield Road - Lane restrictions to facilitate Thames Water works.

  • Ashchurch Grove (W12) (All Directions)
  • Ashchurch Terrace (W12) (All Directions)
  • [B408] Askew Road (W12) (All Directions)
  • Curwen Road (W12) (All Directions)
  • Starfield Road (W12) (All Directions)

[A304] Fulham Road (SW6) (Hammersmith & Fulham)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 10:09 Wednesday 29 July 2015 : Delays possible during peak periods.

Works | Utility

[A304] Fulham Road (SW6) (All Directions) at the junction of Britannia Road - Lane closure to facilitate UKPN works.

  • Britannia Road (SW6) (All Directions)

[A3217] King's Road (SW3) (Kensington & Chelsea)

  Moderate

From: Monday 20 July 2015
To: Monday 03 August 2015

Last updated 10:09 Wednesday 29 July 2015 : Delays possible during the course of these works.

Works | Utility

[A3217] King's Road (SW3) (All Directions) at the junction of Paultons Square - Contractors on behalf of National Grid will be working at the above location to carry out gas main replacement in Paultons Square and Kings Road.

  • Paultons Square (SW3) (All Directions)

[A501] Chapel Street (W2 ,NW1) (Westminster)

  Moderate

Incident resolved. Last updated 13:40 Wednesday 29 July 2015

Last updated 13:40 Wednesday 29 July 2015 : No restrictions in place, traffic is flowing well.

Works | Borough

[A501] Chapel Street (W2 /NW1) (Eastbound) at the junction of Cabbell Street - Lane closure to facilitate loop cutting works.

  • Cabbell Street (NW1) (All Directions)
  • [A501] Chapel Street (W2 ,NW1) (East Bound)

[A400] Camden High Street (NW1) (Camden)

  Moderate

From: Monday 16 March 2015
To: Friday 31 July 2015

Last updated 15:22 Tuesday 28 July 2015 : Expect delays at peak times during the course of these works.

Works | TfL

[A400] Camden High Street (All Directions) at the junction of [B512] Crowndale Road (Cobden Junction) near Mornington Crescent station - The carriageway will be restricted for junction improvement works by Camden council and TfL. The central island at this location will be removed and a new road layout put in place. There will be overnight resurfacing works taking place of the newly formed junction from 27th - 31st July between 2000hrs and 0500hrs. The work will take place with a closure of Crowndale Road between Bayham Street and Mornington Crescent Street and Eversholt Street from Oakley Square to Mornington Crescent Station.

  • [A4200] Camden High Street (NW1) (All Directions)
  • Carlow Street (NW1) (All Directions)
  • [B512] Crowndale Road (NW1) (All Directions)
  • [A4200] Eversholt Street (NW1) (All Directions)
  • [A400] Hampstead Road (NW1) (All Directions)
  • Harrington Square (NW1) (All Directions)
  • King's Terrace (NW1) (All Directions)
  • Miller Street (NW1) (All Directions)
  • [A400] Oakley Square (NW1) (All Directions)
  • Oakley Square (NW1) (All Directions)
  • Symes Mews (NW1) (All Directions)

[A1010] Hertford Road (EN3) (Enfield)

  Moderate

From: Monday 27 July 2015
To: Friday 18 September 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A1010] Hertford Road (EN3) (All Directions) at the junction of Ordnance Road - Contractors working on behalf of Enfield Council will be carrying out a Pavement Renewal Scheme on Hertford Road near the junction with Ordnance Road. During these works and as part of the traffic management two way temporary traffic lights will be in operation for the first 2 - 3 weeks then two way traffic will be maintained.

  • [A1010] Hertford Road (EN3) (All Directions)
  • Unity Road (EN3) (All Directions)

[A410] Uxbridge Road (HA5) (Harrow)

  Moderate

From: Wednesday 29 July 2015
To: Thursday 06 August 2015

Last updated 14:05 Wednesday 29 July 2015 : No reported delays.

Works | Other

[A410] Uxbridge Road (HA5) (All Directions) at the junction of Milne Field - Temporary traffic signals in operation to facilitate works.

  • [A410] Uxbridge Road (HA5) (All Directions)

[A315] Staines Road (TW4) (Hounslow)

  Moderate

From: Monday 22 June 2015
To: Friday 04 September 2015

Last updated 15:24 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A315] Staines Road (TW4) (Both Directions) between Barrack Road and Munster Avenue - Temporary traffic signals in operation during the daytime to facilitate roadworks

[B2230] Brighton Road (SM2) (Sutton)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 07:41 Wednesday 29 July 2015 : Expect delays when temporary traffic signals are in operation.

Works | Other

[B2230] Brighton Road (SM2) (All Directions) at the junction of Downs Road - Temporary traffic signals in operation to facilitate road works.

  • [B2230] Brighton Road (SM2) (All Directions)
  • Downs Road (SM2) (All Directions)

[A3212] Whitehall (SW1A) (Westminster)

  Moderate

From: Saturday 18 July 2015
To: Ongoing

Last updated 10:13 Wednesday 29 July 2015 : Possible delays during the course of these works.

Works | Borough

[A3212] Whitehall (SW1A) (Northbound) at the junction of Great Scotland Yard - the right turn for Great Scotland Yard is restricted.

  • Great Scotland Yard (SW1A) (All Directions)

[B515] Liverpool Road (N7) (Islington)

  Moderate

From: Monday 08 June 2015
To: Friday 31 July 2015

Last updated 15:24 Tuesday 28 July 2015 : Possible delays during the course of these works.

Works | Other

[B515] Liverpool Road (N7) (All Directions) at the junction of Mackenzie Road - temporary traffic signals in use to facilitate works.

[A117] High Street North (E6) (Newham)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 07:04 Wednesday 29 July 2015 : Expect local delays.

Works | Utility

[A117] High Street North (E6 ) (All Directions) at the junction of Clements Road - Temporary traffic lights in operation to facilitate water works.

  • Clements Road (E6) (All Directions)
  • [A117] Ron Leighton Way (E6) (All Directions)

Park Lane ()

  Moderate

From: Saturday 03 September 2011
To: Monday 04 February 2019

Last updated 10:07 Wednesday 29 July 2015 : Extra coach parking places have been made available north of the restriction.

Works | Borough

A4202 Park Lane (Northbound) at the junction with Stanhope Gate - The coach parking bays are suspended northbound at Stanhope Gate for Crossrail works.

  • Park Lane (All Directions)

[A112] Prince Regent Lane (E13) (Newham)

  Moderate

From: Monday 06 July 2015
To: Wednesday 29 July 2015

Last updated 07:02 Wednesday 29 July 2015 : Local delays possible whilst the works are in place.

Works | Utility

[A112] Prince Regent Lane (E13) (All Directions) at the junction of Glen Road - Lane restrictions in place to facilitate utility works.

[A4200] Southampton Row (WC1B) (Camden)

  Moderate

From: Tuesday 30 June 2015
To: Monday 03 August 2015

Last updated 10:15 Wednesday 29 July 2015 : Delays are possible should any carriageway restrictions be implemented.

Hazard(s) | Burst Water Main

[A4200] Southampton Row (WC1B) (All directions) at the junction of Vernon Place - There is water on the carriageway from a burst water main.

[A300] Southwark Bridge Road (SE1) (Southwark)

  Moderate

From: Monday 29 June 2015
To: Friday 18 September 2015

Last updated 13:37 Wednesday 29 July 2015 : Expect local delays.

Works | Other

[A300] Southwark Bridge Road (SE1) (All Directions) at the junction of America Street - Temporary traffic lights, lane closures and stop / go boards will be implemented to facilitated railway bridge works as part of the Thameslink Railway Project.

  • America Street (SE1) (All Directions)
  • [A300] Southwark Bridge Road (SE1) (All Directions)
  • Union Street (All Directions)
  • [B300] Union Street (SE1) (All Directions)

[A107] Mare Street (E8) (Hackney)

  Moderate

From: Monday 20 July 2015
To: Friday 14 August 2015

Last updated 07:03 Wednesday 29 July 2015 : Local delays possible when restrictions are in place.

Works | Borough

[A107] Mare Street (E8 ) (Southbound) between Well Street and King Edward's Road - Lane one restrictions to carry out essential footway renewal works.

  • Bayford Street (E8) (All Directions)
  • Bocking Street (E8) (All Directions)
  • Helmsley Street (E8) (All Directions)
  • King Edward's Road (E9) (All Directions)
  • [A107] Mare Street (E8) (South Bound)
  • Tudor Road (E9) (All Directions)
  • Warburton Road (E8) (All Directions)
  • [A106] Well Street (E8 ,E9) (All Directions)
  • Westgate Street (E8) (All Directions)
  • Weston Walk (E8) (All Directions)

[A302] Victoria Street (SW1H,SW1E) (Westminster)

  Moderate

From: Tuesday 02 June 2015
To: Sunday 02 August 2015

Last updated 10:07 Wednesday 29 July 2015 : Delays are possible at peak travel times.

Works | Emergency

[A302] Victoria Street (SW1H/SW1E) (All Approaches) at the junction of Buckingham Gate - Temporary signals in place for emergency gas works, with no access to Victoria Street from Buckingham Gate.

  • [B323] Buckingham Gate (SW1H,SW1E) (All Directions)
  • [A302] Victoria Street (SW1H,SW1E) (All Approaches)

[A214] Trinity Road (SW17,SW18) (Wandsworth)

  Moderate

From: Saturday 27 June 2015
To: Friday 04 September 2015

Last updated 13:33 Wednesday 29 July 2015 : Use an alternative route and expect delays on diversion.

Works | Utility

[A214] Trinity Road between Bellevue Road and St James's Drive (SW17/SW18) (Southbound) - Road closed for gas mains replacement and footway renewal works

  • B229 (SW17,SW18) (All Directions)
  • Brodrick Road (SW17) (All Directions)
  • Crockerton Road (SW17) (All Directions)
  • Dalebury Road (SW17) (All Directions)
  • Eatonville Road (SW17) (All Directions)
  • Hendham Road (SW17) (All Directions)
  • Nottingham Road (SW17) (All Directions)
  • St James's Close (SW17) (All Directions)
  • [B237] St James's Drive (SW17) (All Directions)
  • Upper Tooting Park (SW17) (All Directions)
  • Wiseton Road (SW17) (All Directions)

[A215] Herne Hill (SE24) (Southwark,Lambeth)

  Moderate

From: Monday 06 July 2015
To: Monday 14 September 2015

Last updated 08:40 Wednesday 29 July 2015 : Expect delays while restrictions are in place.

Works | Borough

[A215] Herne Hill (All Directions) at the junction of Half Moon Lane - lane restrictions during footpath works on behalf of the borough of Lambeth.

  • [A215] Half Moon Lane (SE24) (All Directions)
  • [A215] Herne Hill (SE24) (All Directions)
  • [B222] Milkwood Road (SE24) (All Directions)
  • [A215] Norwood Road (SE24) (All Directions)

Park Street (W1K) (Westminster)

  Moderate

From: Thursday 23 July 2015
To: Thursday 30 July 2015

Last updated 10:09 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Other

Park Street (W1K) (All Directions) at the junction of Upper Brook Street - Temporary traffic signals in place to facilitate works.

  • Park Street (W1K) (All Directions)

[A206] Pettman Crescent (SE28) (Greenwich)

  Moderate

From: Monday 13 July 2015
To: Sunday 27 September 2015

Last updated 13:40 Wednesday 29 July 2015 : Delays possible when restrictions are in place.

Works | Borough

[A206] Pettman Crescent (SE28) (All Directions) at the junction of Tom Cribb Road - Various lane restrictions and road closures to facilitate resurafcing works. These will be carried out in 5 phases.

  • [A206] Pettman Crescent (SE28) (All Directions)
  • Tom Cribb Road (SE28) (All Directions)

[A401] Theobald's Road (WC1X) (Camden)

  Moderate

From: Wednesday 29 July 2015
To: Monday 03 August 2015

Last updated 13:58 Wednesday 29 July 2015 : Traffic is currently slow on approach to these works with eastbound traffic back towards Southampton Row and westbound towards Gray's Inn Road.

Works | Borough

[A401] Theobald's Road (WC1X) (All Directions) at the junction of Red Lion Street - Temporary traffic signals in place to facilitate works, expect delays.

[A4201] Regent Street (W1S ,W1B) (Westminster)

  Moderate

From: Monday 29 June 2015
To: Sunday 30 August 2015

Last updated 10:15 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Borough

[A4201] Regent Street (W1S/W1B) (Northbound) at the junction of New Burlington Street - Lane one (of two) is closed for footway works.

[A4206] Westbourne Grove (W2) (Westminster)

  Moderate

From: Tuesday 05 May 2015
To: Friday 31 July 2015

Last updated 10:20 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Borough

[A4206] Westbourne Grove (Both Directions) between [B411] Queensway and Westbourne Grove Terrace - stop-go boards and restrictions during road and footpath resurfacing works on behalf of Westminster council.

  • B411 (W2) (All Directions)
  • [A4206] Bishop's Bridge Road (W2) (All Directions)
  • Hatherley Grove (W2) (All Directions)
  • Inverness Terrace (W2) (All Directions)
  • Newton Road (W2) (All Directions)
  • Pickering Mews (W2) (All Directions)

A437 (UB3) (Hillingdon)

  Moderate

From: Monday 27 July 2015
To: Monday 31 August 2015

Last updated 17:03 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

A437 Dawley Road at the junction of North Hyde Road (UB3) (Southbound) - The road will be closed to facilitate gas mains replacement works.

  • A437 (UB3) (South Bound)

[B108] Vallance Road (E1) (Tower Hamlets)

  Moderate

From: Wednesday 10 June 2015
To: Tuesday 15 September 2015

Last updated 07:01 Wednesday 29 July 2015 : Expect local delays on diversion routes.

Works | Utility

[B108] Vallance Road (E1) (Both Directions) at the junction of Selby Street - Road closed to facilitate water main replacement by Thames Water.

  • Selby Street (E1) (All Directions)
  • [B108] Vallance Road (E1) (Both Directions)

[A410] The Broadway (HA7) (Harrow)

  Moderate

From: Monday 22 June 2015
To: Thursday 13 August 2015

Last updated 15:25 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A410] The Broadway (All Directions) intersecting Church Road and Stanmore Hill - Lane restrictions and three way temporary traffic signals (off peak) to facilitate works for Stanmore Broadway Pedestrian Scheme.

  • [A410] Church Road (HA7) (All Directions)

[A402] Bayswater Road (W2) (Westminster)

  Moderate

From: Monday 22 June 2015
To: Saturday 26 September 2015

Last updated 10:19 Wednesday 29 July 2015 : Delays possible when restrictions are in place.

Works | Borough

[A402] Bayswater Road (W2 ) (Both Directions) between Stanhope Place and Brook Street - Lane one restrictions in place to facilitate footway works. There will be a rolling westbound and eastbound lane one closures between 0800hrs and 1600hrs each weekday and between 0800hrs and 1300hrs each weekend.

Albert Road

  Moderate

From: Saturday 29 September 2012
To: Sunday 01 November 2015

Last updated 07:00 Wednesday 29 July 2015 : Possible delays whilst temporary signals in operation.

Works | Borough

A112 Albert Road (Eastbound) - Intermittent lane restrictions and temporary traffic lights in place for Crossrail works.

  • Albert Road (All Directions)

[B358] Hospital Bridge Road (TW2) (Richmond Upon Thames)

  Moderate

From: Monday 15 June 2015
To: Sunday 09 August 2015

Last updated 13:28 Wednesday 29 July 2015 : Expect delays on approach.

Works | TfL

[B358] Hospital Bridge Road (TW2) (All Directions) intersecting Percy Road and Powder Mill Lane is closed northbound- Three way temporary traffic signals in place manually controlled between the hours of 06:30 - 09:30 & 15:30 - 19:30 for junction improvements works.

  • Crane Park Road (TW2) (All Directions)
  • [B358] Hospital Bridge Road (TW2) (All Directions)
  • Woodlawn Crescent (TW2) (All Directions)

[A40] High Holborn (WC1A,WC1V) (Camden)

  Moderate

From: Thursday 25 June 2015
To: Sunday 02 August 2015

Last updated 10:15 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Utility

[A40] High Holborn (WC1V) (Westbound) at the junction of Newton Street - The carriageway has been reduced to one lane during UKPN electrical works.

  • Newton Street (WC2B) (All Directions)
  • [A40] Southampton Place (WC1A,WC1V) (All Directions)

[A1006] Blackhorse Road (E17) (Waltham Forest)

  Moderate

From: Monday 15 June 2015
To: Thursday 06 August 2015

Last updated 07:01 Wednesday 29 July 2015 : Possible delays when works are in place.

Works | Utility

[A1006] Blackhorse Road (E17) (All Directions) between Tenby Road and Coppermill Lane - Lane restrictions and temporary traffic signals in operation to facilitate Thames Water works.

  • [A1006] Blackhorse Road (E17) (All Directions)
  • Northcote Road (E17) (All Directions)

New Oxford Street ()

  Moderate

From: Monday 05 January 2009
To: Tuesday 05 January 2016

Last updated 10:06 Wednesday 29 July 2015 : Delays possible when restrictions are in place.

Works | Other

[A40] New Oxford Street (Westbound) at the junction with Earnshaw Street - Intermittent lane restrictions due to ongoing Crossrail works.

  • New Oxford Street (All Directions)

[A3216] Sloane Street (SW1X) (Kensington & Chelsea)

  Moderate

From: Sunday 19 July 2015
To: Friday 31 July 2015

Last updated 13:40 Wednesday 29 July 2015 : Local diversion whilst closure is in place. Traffic is flowing well.

Works | Emergency

[A3217] Sloane Street (SW1W) (Southbound) between Cadogan Place and Sloane Square - Road closed for emergency gas works.

  • Cadogan Gardens (SW3) (All Directions)
  • Cadogan Gate (SW1X) (All Directions)
  • Cadogan Square (SW1X) (All Directions)
  • Cadogan Street (SW1X,SW3) (All Directions)
  • Pavilion Road (SW1X,SW3) (All Directions)
  • Pavilion Street (SW1X) (All Directions)
  • [B319] Pont Street (SW1X) (All Directions)
  • [A3217] Sloane Square (SW1W) (All Directions)
  • [A3216] Sloane Street (SW1X) (All Directions)
  • Symons Street (SW1W) (All Directions)

[A114] Blake Hall Road (E11) (Redbridge)

  Moderate

From: Monday 20 July 2015
To: Friday 30 October 2015

Last updated 13:41 Wednesday 29 July 2015 : There are no reported delays in the area.

Works | Utility

[A114] Blake Hall Road (E11) (All Directions) at the junction of Aldersbrook Road and Centre Road - Temporary traffic signals in place to facilitate gas main replacement works by National Grid Gas.

  • [A116] Aldersbrook Road (E11) (All Directions)
  • [A114] Blake Hall Road (E11) (All Directions)

[A302] Victoria Street (SW1E) (Westminster)

  Moderate

From: Tuesday 26 May 2015
To: Friday 18 September 2015

Last updated 10:19 Wednesday 29 July 2015 : Delays possible at peak travel times.

Works | Utility

[A302] Victoria Street at the junction of Palace Street (SW1E) (Eastbound) - Lane one (of two) is restricted to facilitate utility works.

[A214] Tooting Bec Road (SW17) (Wandsworth)

  Moderate

From: Wednesday 29 July 2015
To: Friday 31 July 2015

Last updated 13:53 Wednesday 29 July 2015 : Delays possible when works are in place.

Works | Utility

[A214] Tooting Bec Road (SW17) (Westbound) at the junction of Franciscan Road - lane closure in place to enable works by Vodafone (1000-1500hrs daily).

  • Franciscan Road (SW17) (All Directions)
  • [A214] Tooting Bec Road (SW17) (West Bound)

[A400] Tottenham Court Road (W1D ,WC2H,W1T) (Westminster,Camden)

  Moderate

From: Monday 27 July 2015
To: Monday 17 August 2015

Last updated 13:41 Wednesday 29 July 2015 : Traffic is flowing well.

Works | TfL

[A400] Tottenham Court Road (W1) (Northbound) after the junction of [A40] Oxford Street - lane one (of three) is restricted as part of the on-going Tottenham Court Road station upgrade project.

  • A40 (W1D ,WC1B,WC2H) (All Directions)
  • [A400] Charing Cross Road (W1D ,WC2H,W1T) (All Directions)
  • [A400] St Giles Circus (W1D ,WC2H,W1T) (All Directions)
  • [A400] Tottenham Court Road (W1D ,WC2H,W1T) (North Bound)

[A107] Amhurst Park (N16) (Hackney)

  Moderate

From: Monday 27 July 2015
To: Friday 04 September 2015

Last updated 17:07 Tuesday 28 July 2015 : Delays possible, especially during peak travel times.

Works | Other

[A107] Amhurst Park (N16) (Both Directions) at the junction of East Bank - single alternate lane working under temporary traffic signal control during road works.

  • Holmdale Terrace (N16 ,N15) (All Directions)
  • Rav Pinter Close (N16) (All Directions)
  • Vartry Road (N15) (All Directions)
  • West Bank (N16) (All Directions)

[A23] Brighton Road (CR5)

  Moderate

From: Monday 27 July 2015
To: Tuesday 01 September 2015

Last updated 07:40 Wednesday 29 July 2015 : Expect delays

Works | Utility

[A23] Brighton Road (CR5) (All Directions) between Star Lane and Church Lane - Lane restrictions, speed restrictions and temporary traffic signals will be in operation to facilitate gas works.

  • Church Lane (CR5) (All Directions)
  • Forge Bridge Lane (CR5) (All Directions)
  • Star Lane (CR5) (All Directions)

[A2216] Kirkdale (SE26) (Lewisham)

  Moderate

From: Thursday 23 July 2015
To: Wednesday 29 July 2015

Last updated 13:32 Wednesday 29 July 2015 : Traffic is currently flowing well in the area.

Works | Utility

[A2216] Kirkdale (All Directions) at the junction of Dartmouth Road - Temporary traffic signals in operation to facilitate gas works.

  • [A2216] Kirkdale (SE26) (All Directions)

[A402] Bayswater Road (W2) (Kensington & Chelsea,Westminster)

  Moderate

From: Monday 11 May 2015
To: Saturday 10 October 2015

Last updated 10:06 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Utility

[A402] Bayswater Road between Black Lion Gate and Kensington Road (W2) (Westbound) - Lane closure due to National Grid maintenance works.

  • [A402] Bayswater Road (W2) (West Bound)
  • Caroline Close (W2) (All Directions)

West Way (N18) (Enfield)

  Moderate

From: Monday 20 July 2015
To: Friday 31 July 2015

Last updated 17:06 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | TfL

West Way (N18) (All Directions) between Silver Street and A406 slip road - The carriageway will be restricted for works. Lane one is closed.

[A1112] Whalebone Lane North (RM6) (Barking & Dagenham)

  Moderate

From: Monday 20 July 2015
To: Monday 28 September 2015

Last updated 07:02 Wednesday 29 July 2015 : Expect local delays on diversion routes.

Works | Borough

[A1112] Whalebone Lane North (RM6) (All Directions) at the junction of Mill Lane - Barking and Dagenham Council will be undertaking a carriage way scheme at the above location. The works will be undertaken in various phases. From 20th July, Mill Lane will be closed for 2 weeks.

  • Mill Lane (RM6) (All Directions)
  • Millbrook Gardens (RM6) (All Directions)
  • [A1112] Whalebone Lane North (RM6) (All Directions)

[A118] High Road (IG3) (Redbridge)

  Moderate

From: Wednesday 15 July 2015
To: Friday 31 July 2015

Last updated 07:03 Wednesday 29 July 2015 : Expect local delays whilst works take place.

Works | Utility

[A118] High Road (IG3) (Westbound) between St Albans Road and Cameron Road - As part of the gas works scheme during the first phase contractors working on behalf of National Grid will be carrying out works on High Road Seven Kings between the junctions of Cameron Road and St Albans Road for nearly 3 weeks. During these works and as part of the traffic management lane restriction will be in place.

  • Balmoral Gardens (IG3) (All Directions)
  • Cambridge Road (IG3) (All Directions)
  • Cameron Road (IG3) (All Directions)
  • Elmstead Road (IG3) (All Directions)
  • Farley Drive (IG3) (All Directions)
  • Felbrigge Road (IG3) (All Directions)
  • [A118] High Road (IG3) (West Bound)
  • Lambourne Road (IG3) (All Directions)
  • Lansdowne Road (IG3) (All Directions)
  • Salisbury Road (IG3) (All Directions)
  • Seven Kings Road (IG3) (All Directions)
  • St Albans Road (IG3) (All Directions)
  • Swindon Close (IG3) (All Directions)
  • Telegraph Mews (IG3) (All Directions)
  • Vernon Road (IG3) (All Directions)

[A504] Muswell Hill (N10) (Haringey)

  Moderate

From: Wednesday 22 July 2015
To: Wednesday 29 July 2015

Last updated 17:06 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A504] Muswell Hill (N10) (All Directions) at the junction of Muswell Hill Broadway - The bus lane will be closed for utility works.

  • Dukes Avenue (N10) (All Directions)
  • [A504] Muswell Hill (N10) (All Directions)

[A233] Main Road (TN16) (Bromley)

  Moderate

From: Monday 27 July 2015
To: Friday 07 August 2015

Last updated 13:41 Wednesday 29 July 2015 : Local delays possible during these works.

Works | Utility

[A233] Main Road (TN16) (All Directions) at the junction of St Winifred's Road - Contractors will be carrying out repairs on a waste water sewer, whilst doing so they will be using three way temporary traffic lights with single alternate line working.

  • [A233] Main Road (TN16) (All Directions)
  • St Winifred's Road (TN16) (All Directions)

[A1010] High Road (N17) (Haringey)

  Moderate

From: Sunday 26 July 2015
To: Monday 10 August 2015

Last updated 17:03 Tuesday 28 July 2015 : Possible delays when restrictions are in place.

Works | Utility

[A1010] High Road (N17) (All Directions) between White Hart Lane and Park Lane - Thames Water and National Grid Gas for the new Tottenham Hotspur Football Club will be installing new ducts and connections across the High Road Tottenham between White Hart Lane and Park Lane. During these works and as part of the traffic management lane restrictions will be in place, two way traffic will be maintained under a single lane in each direction.

  • Lancaster Close (N17) (All Directions)
  • Moselle Place (N17) (All Directions)
  • Paxton Road (N17) (All Directions)
  • White Hart Lane (N17) (All Directions)
  • William Street (N17) (All Directions)

[A1010] Hertford Road (N9) (Enfield)

  Moderate

From: Saturday 25 July 2015
To: Sunday 09 August 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[A1010] Hertford Road (N9 ) (Southbound) at the junction of Rosemary Avenue - Lane restrictions in place to facilitate water works.

  • Bury Street (N9) (All Directions)
  • [A1010] Hertford Road (N9) (South Bound)
  • Rosemary Avenue (N9) (All Directions)

[A212] Gravel Hill (CR0 ,CR2) (Croydon)

  Moderate

From: Monday 27 July 2015
To: Friday 31 July 2015

Last updated 08:35 Wednesday 29 July 2015 : There may be delays while works are in place.

Works | TfL

[A212] Gravel Hill (CR2/CR0) (Both Directions) between Shirley Hills Road and Selsdon Park Road - Contractors working on behalf of TfL will be carrying out a track replacement program at the above location. To facilitate the event a full road closure will be in place between Shirley Hills Road and Kent Gate Way.

[A232] Crofton Road (BR6) (Bromley)

  Moderate

From: Monday 27 July 2015
To: Monday 31 August 2015

Last updated 08:27 Wednesday 29 July 2015 : Expect delays on approach.

Works | Utility

[A232] Crofton Road (BR6) (All Directions) at the junction of Crofton Lane - There will be temporary signals in operation due to works in the area.

  • [A232] Crofton Road (BR6) (All Directions)

[B510] West End Lane (NW6) (Camden)

  Moderate

From: Monday 27 July 2015
To: Monday 03 August 2015

Last updated 17:07 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[B510] West End Lane (NW6) (All Directions) at the junction of Blackburn Road - Thames Water will be carrying out a new connection and will have three phase temporary signals in operation.

[A312] Mandeville Road (UB5) (Ealing)

  Moderate

From: Monday 20 July 2015
To: Friday 11 September 2015

Last updated 17:06 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Borough

[A312] Mandeville Road (UB5) (All Directions) at the junction of Moat Farm Road - Ealing Council will be carrying out works to relocate the pedestrian crossing and bus stops on Mandeville Road outside Northolt LUL Station.

  • Belvue Close (UB5) (All Directions)

[A11] High Street (E15) (Newham)

  Moderate

From: Monday 13 July 2015
To: Friday 31 July 2015

Last updated 07:02 Wednesday 29 July 2015 : Local delays possible when restrictions are in place.

Works | Borough

[A11] High Street Stratford (Both directions) at the junction of Sugar House Lane - lane restrictions between 1000 and 1530 each day during investigatory works for upcoming junction improvement works.

  • Abbey Lane (E15) (All Directions)
  • Bisson Road (E15) (All Directions)
  • Blaker Road (E15) (All Directions)
  • [A11] Bow Flyover (E15) (All Directions)
  • [A11] High Street (E15) (West Bound)

[A4201] Albany Street (NW1) (Camden)

  Moderate

From: Monday 20 July 2015
To: Monday 10 August 2015

Last updated 10:10 Wednesday 29 July 2015 : Delays are possible during the course of these works.

Works | Utility

[A4201] Albany Street (NW1) (All Directions) at the junction of Longford Street - Temporary traffic signals in operation to facilitate water works.

  • Little Albany Street (NW1) (All Directions)

[A1006] St James's Street (E17) (Waltham Forest)

  Moderate

From: Wednesday 15 July 2015
To: Ongoing

Last updated 07:02 Wednesday 29 July 2015 : Expect local delays through the works.

Works | Other

[A1006] St James's Street (All Directions) at the junction of Pretoria Avenue - temporary traffic signals are in use to enable works.

  • Coppermill Lane (E17) (All Directions)

[B450] Ladbroke Grove (W10) (Kensington & Chelsea)

  Moderate

From: Monday 20 July 2015
To: Friday 31 July 2015

Last updated 17:05 Tuesday 28 July 2015 : Delays possible during the course of these works

Works | Utility

[B450] Ladbroke Grove (W10) (All Directions) at the junction of Canal Way - Temporary traffic signals in operation to facilitate utility works

  • Canal Way (W10) (All Directions)

[A207] London Road (DA5 ,DA1) (Bexley)

  Moderate

From: Monday 08 June 2015
To: Friday 28 August 2015

Last updated 13:44 Wednesday 29 July 2015 : No reported delays

Works | Borough

[A207] London Road (DA1/DA5) (All Directions) at the junction of Bourne Road- intermittent road closures and temporary signals will be in use for a roadworks scheme.

[A236] Mitcham Road (CR0) (Croydon)

  Moderate

From: Monday 20 July 2015
To: Tuesday 01 September 2015

Last updated 13:40 Wednesday 29 July 2015 : No reported delays.

Works | Borough

[A236] Mitcham Road (CR0) (All Directions) at the junction of Sumner Road - Temporary traffic lights in operation to facilitate junction improvement works.

  • [A236] Mitcham Road (CR0) (All Directions)
  • [A213] Sumner Road (CR0) (All Directions)
  • Sumner Road South (CR0) (All Directions)

[A1000] Underhill (EN5) (Barnet)

  Moderate

From: Wednesday 29 July 2015
To: Ongoing

Last updated 14:06 Wednesday 29 July 2015 : No reported delays.

Infrastructure Issue | Traffic Signal

Underhill (EN5) (All Directions) at the junction of Barnet Hill - Traffic signals are reportedly stuck - Please approach with caution.

  • [A1000] Barnet Hill (EN5) (All Directions)
  • Fairfield Way (EN5) (All Directions)
  • Underhill (EN5) (All Directions)

[A224] Sevenoaks Way (BR5) (Bromley)

  Moderate

From: Monday 20 July 2015
To: Friday 28 August 2015

Last updated 13:39 Wednesday 29 July 2015 : No reported delays

Works | Borough

[A224] Sevenoaks Way (BR5) (All Directions) at the junction of Leesons Hill and Station Road - Lane restrictions in place to facilitate carriageway works. Operational hours: 0930-1530.

  • [A224] Sevenoaks Way (BR5) (All Directions)
  • [B258] Station Road (BR5) (All Directions)