Status Updates

Find a postcode, place or road

A21

[A21] Bromley Common (BR2) (Bromley)

  Closures

From: Saturday 27 August 2016
To: Ongoing

Last updated 14:31 Wednesday 31 August 2016 : No reported delays on diversion.

Hazard(s) | Burst Water Main

[A21] Bromley Common (BR2) (Both Directions) at the junction of Walpole Road - Road is closed in both directions between Crown Lane Spur and Homesdale Road due to a water main that has burst at several points in the vicinity. A diversion for large vehicles is in place between Widmore Road and Crown Lane in both directions. Drivers of large vehicles should be aware that Homesdale Road has a low bridge and Hayes Lane has width restrictions.

  • [A21] Bromley Common (BR2) (Both Directions)
  • Chantry Lane (BR2) (All Directions)
  • Johnson Road (BR2) (All Directions)
  • Walpole Road (BR2) (All Directions)

A4

Inner Ring

[A302,A4] Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (W2) (Westminster)

  Closures

From: Monday 09 November 2015
To: Monday 31 October 2016

Last updated 14:23 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (All Directions) - Various restrictions during Cycle Superhighway works. Find out more East West Cycle Superhighway travel advice.

  • A4 (W1J,SW1X) (All Directions)
  • Albert Gate (SW1X) (All Directions)
  • Bathurst Street (W2) (All Directions)
  • Birdcage Walk (SW1H,SW1E) (All Directions)
  • [A4206] Bishop's Bridge Road (W2) (All Directions)
  • Brook Street (W2) (All Directions)
  • [B323] Buckingham Gate (SW1E) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Constitution Hill (SW1A,SW1W) (North Bound)
  • [B410] Craven Road (W2) (All Directions)
  • Gloucester Terrace (W2) (All Directions)
  • [B310] Grosvenor Crescent (SW1X) (All Directions)
  • [A302,A4] Grosvenor Place (SW1X,SW1W) (All Directions)
  • Horse Guards Road (SW1H,SW1A) (All Directions)
  • Hyde Park Gardens (W2) (All Directions)
  • Kensington Gardens (W2) (All Directions)
  • North Carriage Drive (W2) (Westbound)
  • Orsett Terrace (W2) (All Directions)
  • Queen Anne's Gate (SW1H) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • South Carriage Drive (SW1X,W2,W1J,SW7) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stanhope Terrace (W2) (All Directions)
  • Storey's Gate (SW1H) (All Directions)
  • Sussex Gardens (W2) (All Directions)
  • The Mall (SW1A) (All Directions)
  • West Carriage Drive (W2) (North Bound)
  • Westbourne Terrace (W2) (All Directions)

A406

[A315] High Street (TW8) (Hounslow)

  Closures

From: Tuesday 23 August 2016
To: Friday 02 September 2016

Last updated 15:06 Wednesday 31 August 2016 : Traffic is flowing well on diversion.

Works | Utility

[A315] High Street (Both Directions) between Pottery Road and Holland Gardens - Road closed for urgent Thames Water work. Diversion route is Kew Bridge Road. Chiswick High Road, A4 and Ealing Road.

  • A205 (TW9,TW8) (All Directions)
  • Albany Road (TW8) (All Directions)
  • Brook Road South (TW8) (All Directions)
  • [B455] Ealing Road (TW8) (All Directions)
  • Goat Wharf (TW8) (All Directions)
  • Green Dragon Lane (TW8) (All Directions)
  • High Street (TW8) (Both Directions)
  • [A315] High Street (TW8) (All Directions)
  • Holland Gardens (TW8) (All Directions)
  • Kew Bridge Court (W4) (All Directions)
  • Kew Bridge Road (TW8) (All Directions)
  • [A315] Kew Bridge Road (TW8) (All Directions)
  • [A315] Kew Road (TW8) (All Directions)
  • Lionel Road South (TW8) (All Directions)
  • Mafeking Avenue (TW8) (All Directions)
  • North Road (TW8) (All Directions)
  • Pottery Road (TW8) (All Directions)
  • Pump House Crescent (TW8) (All Directions)
  • Spring Grove (W4) (All Directions)
  • Strand-On-The-Green (W4) (All Directions)
  • Walnut Tree Road (TW8) (All Directions)
  • Wilkes Road (TW8) (All Directions)

Bishopsgate Cross Route

[A3] King William Street (EC3R,EC4R) (City Of London)

  Closures

From: Saturday 29 August 2015
To: Sunday 31 December 2017

Last updated 08:56 Wednesday 31 August 2016 : Expect some delay in the area.

Works | TfL

[A3] King William Street (EC3R/EC4R) (Both Directions) between London Bridge and Arthur Street - Lane one closed from the bus stop at the north end of London Bridge to Arthur Street until 2021 during several projects, including the on-going Bank station capacity upgrade works. Sunday 25 September, [A3] King William Street (London Bridge) (Northbound), closed between approximately 0900hrs and 1700hrs during a crane operation. Find out more about the Bank & Monument capacity upgrade on the TfL website.

  • [A3] Arthur Street (EC3R,EC4R) (All Directions)

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Closures

From: Monday 16 March 2015
To: Friday 31 July 2020

Last updated 08:57 Wednesday 31 August 2016 : Use other routes.

Works | TfL

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed Find out more about Bank and Monument works

  • [A3] Fish Street Hill (EC4R,EC3R) (All Directions)
  • [A3] King William Street (EC4R,EC3R) (All Directions)

City Route

[A3211] Victoria Embankment (SW1A) (Westminster)

  Closures

From: Monday 29 August 2016
To: Sunday 20 November 2016

Last updated 14:23 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A3211] Victoria Embankment (SW1) (Northbound) between [A302] Bridge Street and Horse Guards Avenue - Width restrictions during the removal of bus and coach bays.

  • A302 (SE1,SW1A) (All Directions)
  • A3211 (SW1A) (All Directions)
  • Canon Row (SW1A) (All Directions)
  • Horse Guards Avenue (SW1A) (All Directions)
  • Richmond Terrace (SW1A) (All Directions)
  • [A3211] Victoria Embankment (SW1A) (Eastbound)

Farringdon Cross Route

Farringdon Road (Islington,Camden)

  Closures

From: Monday 22 July 2013
To: Monday 31 December 2018

Last updated 08:58 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | Other

[A201] Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Farringdon Road is restricted southbound. Find out more about Crossrail works

  • Farringdon Street (EC1A) (All Directions)
  • Greville Street (EC1N,EC1M) (All Directions)

Inner Ring

[A40] North Carriage Drive (W2) (Westminster)

  Closures

From: Monday 29 August 2016
To: Friday 16 September 2016

Last updated 11:16 Wednesday 31 August 2016 : No reported delays in the area.

Special and Planned Events | Other

North Carriage Drive (W2 ) (All Directions) - Road closed to facilitate build for an event. North Carriage Drive will be closed from midnight on Monday 29 August until Friday 16 September to facilitate event traffic and public safety. South Carriage Drive may be subject to ad-hoc closures between Queen Elizabeth Gates and Prince of Wales Gate in order to facilitate the safe ingress and egress on Saturday 10 September.

  • [A402] Bayswater Road (W2) (All Directions)
  • [A40] Cumberland Gate (W2) (All Directions)
  • North Carriage Drive (W2) (All Directions)
  • West Carriage Drive (W2) (All Directions)

Southern River Route

Bishopsgate Cross Route

[A200] Tooley Street (SE1) (Southwark)

  Closures

From: Saturday 30 April 2016
To: Wednesday 28 February 2018

Last updated 08:01 Wednesday 31 August 2016 : Delays are possible throughout the area while traffic is on diversion.

Works | Other

London Bridge mainline rail station upgrade, [A200] Tooley Street and Duke Street Hill (SE1) (Eastbound) between [A3] Borough High Street and [A2205] Bermondsey Street - The road is closed between Borough High Street and Bermondsey Street. Find out more about the London Bridge mainline station upgrade and Tooley Street.

  • Counter Street (SE1) (All Directions)
  • [A200] Duke Street Hill (SE1) (All Directions)
  • Duke Street Hill (SE1) (All Directions)
  • Montague Close (SE1) (All Directions)
  • Shipwright Yard (SE1) (All Directions)
  • [A200] Tooley Street (SE1) (Both Directions)
  • Tooley Street (SE1) (All Directions)

Western Cross Route

Ariel Way (W12) (Hammersmith & Fulham)

  Closures

From: Wednesday 14 October 2015
To: Saturday 31 December 2016

Last updated 08:55 Wednesday 31 August 2016 : Use other routes and expect delays during these works

Works | Other

Westfield North Project, Ariel Way (W12) (Both Directions) between [A219] Wood Lane and [A3220] West Cross Route - No access between [A219] and [A3220] until late 2016 during the redevelopment of Westfield shopping centre. [A219] Wood Lane (All Directions) at the junction of Ariel Way, from approximately 0800hrs Wednesday 24 August until 1700hrs Sunday 4 September, temporary traffic signals in operation during National Grid gas works related to the Westfield development. Click for more information on the Westfield website.

  • Ariel Way (W12) (Both Directions)
  • Olaf Street (W11) (All Directions)
  • Silver Road (W12) (All Directions)
  • [A219] Wood Lane (W12) (All Directions)

Western Cross Route

[A308,A3217] King's Road (SW10,SW6) (Hammersmith & Fulham,Kensington & Chelsea)

  Closures

From: Monday 01 February 2016
To: Friday 30 September 2016

Last updated 15:05 Wednesday 31 August 2016 : Traffic is flowing well in the area.

Works | Utility

[A3217] King's Road (SW6) (Westbound) between [A3220] Edith Grove and [B318] Harwood Road - Closed westbound with temporary traffic signals in operation at the junction of [A3220] Gunter Grove during on-going National Grid Gas works.

  • A3220 (SW10) (All Directions)
  • Britannia Way (SW6) (All Directions)
  • Cambria Street (SW6) (All Directions)
  • Edith Row (SW6) (All Directions)
  • Fernshaw Road (SW10) (All Directions)
  • Holmead Road (SW6) (All Directions)
  • Hortensia Road (SW10) (All Directions)
  • King's Road (All Directions)
  • [A308,A3217] King's Road (SW10,SW6) (West Bound)
  • Lots Road (SW10) (All Directions)
  • Maxwell Road (SW6) (All Directions)
  • Maynard Close (SW6) (All Directions)
  • Rewell Street (SW6) (All Directions)
  • Rumbold Road (SW6) (All Directions)
  • Sandford Street (SW6) (All Directions)
  • Tadema Road (SW10) (All Directions)
  • Tetcott Road (SW10) (All Directions)
  • Thorndike Close (SW10) (All Directions)
  • Wandon Road (SW6) (All Directions)

[A5204] Wigmore Street (W1U) (Westminster)

  Closures

From: Thursday 25 August 2016
To: Thursday 01 September 2016

Last updated 06:54 Wednesday 31 August 2016 : Local delays are expected whilst works remain in place.

Works | Utility

[A5204] Wigmore Street (W1U) at the junction of Welbeck Street - Wigmore Street is closed to westbound traffic, which is on diversion around the works.

  • B524 (W1U) (All Directions)
  • Duke Street (W1U,W1H) (All Directions)
  • Duke's Mews (W1U) (All Directions)
  • Edwards Mews (W1H) (All Directions)
  • Gray's Yard (W1U) (All Directions)
  • Marylebone Lane (W1U) (All Directions)
  • Seymour Mews (W1H) (All Directions)
  • [B406] Welbeck Street (W1G,W1U) (All Directions)
  • Welbeck Street (All Directions)
  • Wigmore Place (W1U) (All Directions)
  • [A5204] Wigmore Street (W1U) (Eastbound)
  • Wimpole Street (W1G) (All Directions)

[B138] Wightman Road (N4 ,N8) (Haringey)

  Closures

From: Monday 21 March 2016
To: Monday 05 September 2016

Last updated 08:53 Wednesday 31 August 2016 : Use other routes.

Works | Other

[B138] Wightman Road (N8) (Both Directions) between Cyprus Close and Lothair Road South - Road closed until 1st September for bridge replacement works.

  • Allison Road (N8) (All Directions)
  • Atterbury Road (N4) (All Directions)
  • B150 (N4) (All Directions)
  • Beresford Road (N8) (All Directions)
  • Burgoyne Road (N4) (All Directions)
  • Cavendish Road (N4) (All Directions)
  • Cyprus Close (N4) (All Directions)
  • Denmark Road (N8) (All Directions)
  • Duckett Road (N4) (All Directions)
  • Effingham Road (N8) (All Directions)
  • Fairfax Road (N8) (All Directions)
  • Falkland Road (N8) (All Directions)
  • Frobisher Road (N8) (All Directions)
  • Hampden Road (N8) (All Directions)
  • Hewitt Road (N8) (All Directions)
  • [B138] Hornsey Park Road (N4 ,N8) (All Directions)
  • Lausanne Road (N8) (All Directions)
  • Lothair Road South (N4) (All Directions)
  • Mattison Road (N4) (All Directions)
  • Pemberton Road (N4) (All Directions)
  • Railway Approach (N4) (All Directions)
  • Raleigh Road (N8) (All Directions)
  • Seymour Road (N8) (All Directions)
  • Sydney Road (N8) (All Directions)
  • [A504] Turnpike Lane (N8) (All Directions)
  • Umfreville Road (N4) (All Directions)
  • Warham Road (N4) (All Directions)
  • [B138] Wightman Road (N4 ,N8) (Both Directions)

[A4201] Albany Street (NW1) (Camden)

  Closures

From: Monday 22 August 2016
To: Monday 12 September 2016

Last updated 11:24 Wednesday 31 August 2016 : Use other routes.

Works | Utility

[A4201] Albany Street (NW1) (Northbound) at the junction of Osnaburgh Terrace - Thames Water will be carrying out Victoria Mains Replacement work. Due to the location of the work, northbound Albany Street will be closed to all vehicles.

  • [A4201] Albany Street (NW1) (Northbound)

Engineers Way (HA9) (Brent)

  Closures

From: Monday 29 August 2016
To: Friday 30 September 2016

Last updated 07:56 Wednesday 31 August 2016 : Works have been postponed. The road currently remains open.

Works | Utility

Engineers Way (HA9) (Both Directions) between First Way and Wembley Retail Park - The road will be closed due to sewage works.

  • First Way (HA9) (All Directions)

[A501] Moorgate (EC2A,EC2M) (City Of London,Islington)

  Closures

From: Saturday 23 July 2016
To: Friday 31 March 2017

Last updated 08:24 Wednesday 31 August 2016 : Use other routes.

Works | Other

[A501] Moorgate (EC2M) (Southbound) at the junction of South Place - Moorgate is closed southbound for Crossrail works.

  • [A501] Moorgate (EC2A,EC2M) (Southbound)

[A40] Newgate Street (EC4M,EC1A) (City Of London)

  Closures

From: Saturday 11 June 2016
To: Friday 07 October 2016

Last updated 08:43 Wednesday 31 August 2016 : Drivers are advised to seek other routes and expect delays.

Works | Utility

[A40] Newgate Street (EC4) (Westbound) between King Edward Street and Old Bailey - Closed until early October due to National Grid's replacement of a gas main. Westbound traffic is diverted via New Change, Cannon Street, St Paul's Churchyard, Ludgate Hill, Ludgate Circus, Fleet Street, Fetter Lane, New Fetter Lane and Holborn Circus.

  • Cock Lane (EC1A) (All Directions)
  • Green Arbour Court (EC4M) (All Directions)
  • [A40] Newgate Street (EC4M,EC1A) (Westbound)
  • Snow Hill (EC1A) (All Directions)
  • St Georges's Court (EC4M) (All Directions)
  • [A40] St Martin's Le Grand (EC4M,EC1A) (All Directions)
  • Warwick Lane (EC4M) (All Directions)
  • Warwick Square (EC4M) (All Directions)

[B453] Neasden Lane (NW10) (Brent)

  Closures

From: Tuesday 30 August 2016
To: Saturday 03 September 2016

Last updated 15:03 Wednesday 31 August 2016 : Use other routes whilst closure is in place. Traffic is flowing well in the surrounding areas.

Works | Borough

[B453] Neasden Lane (NW10) (Both Directions) between Denzil Road and Lansdowne Grove - Road closed to facilitate carriageway repairs.

  • Neasden Close (NW10) (All Directions)
  • [B453] Neasden Lane (NW10) (Both Directions)
  • Severn Way (NW10) (All Directions)

Upper Park Road (N11) (Enfield)

  Closures

From: Monday 20 June 2016
To: Saturday 01 October 2016

Last updated 08:41 Wednesday 31 August 2016 : Use other routes and expect delays during these works

Works | Utility

Upper Park Road (N11) (All Directions) at the junction of Weld Place - Road closure due to various works in the area.

  • Inverforth Road (N11) (All Directions)
  • Upper Park Road (N11) (All Directions)
  • Weld Place (N11) (All Directions)

Central London, Great Fire of London

  Closures

From: Tuesday 30 August 2016
To: Sunday 04 September 2016

Last updated 15:22 Monday 22 August 2016

Special and Planned Events | Parade/Celebration

Date for this event has been confirmed. Further travel information will be available closer to the time.

A1

[A400] Archway (N19) (Islington)

  Moderate

From: Monday 01 February 2016
To: Sunday 29 January 2017

Last updated 13:18 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | TfL

Archway Gyratory (All Directions) - Various lane restrictions during phased junction improvement works. Monday 22 August until Sunday 4 September, Archway Gyratory at the junction of [A400] Junction Road , temporary traffic signals in operation between approxmately 0730hrs and 1700hrs each day. Find out more Archway gyratory travel advice

  • A1 (N19) (All Directions)
  • [A400] Junction Road (N19) (All Directions)
  • St John's Way (N19) (All Directions)
  • Windermere Road (N19) (All Directions)

A1

[A1] Holloway Road (N7 ,N5 ,N1) (Islington)

  Moderate

From: Monday 06 October 2014
To: Tuesday 31 January 2017

Last updated 08:58 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | TfL

Highbury Corner Bridge, [A1] Holloway Road (N7) (Both Directions) at Highbury Corner - Holloway Road reduced to one lane in each direction, with a northbound bus lane suspension in place for bridge replacement works. Monday 22 August until Monday 31 October, lane one (of three) on north side of Highbury Corner closed. Christmas Day, Sunday 25 December until Sunday 15 January, [A1] Holloway Road (Both Directions), closed in both directions. Find out more about the works.

  • Highbury Corner (N1) (All Directions)
  • [A1] Holloway Road (N7 ,N5 ,N1) (Both Directions)

A1

[A1] Holloway Road (N19) (Islington)

  Moderate

From: Monday 26 October 2015
To: Friday 30 September 2016

Last updated 14:21 Wednesday 31 August 2016 : Delays are possible while restrictions are in place.

Works | TfL

Upper Holloway Bridge, [A1] Holloway Road (Both Directions) at the junction of Fairbridge Road near Upper Holloway station - Reduced to one lane in each direction until approximately September during the replacement of the Upper Holloway railway bridge. Click for further information about the Upper Holloway Bridge project.

  • A400 (N19) (All Directions)
  • Alexander Road (N19) (All Directions)
  • [A1] Archway Road (N19) (All Directions)
  • Archway Road (N19) (All Directions)
  • Davenant Road (N19) (All Directions)
  • Elthorne Road (N19) (All Directions)
  • Fortnam Road (N19) (All Directions)
  • [A1] Holloway Road (N19) (Both Directions)
  • Kingsdown Road (N19) (All Directions)
  • Pemberton Gardens (N19) (All Directions)
  • Rupert Road (N19) (All Directions)
  • [A1] Sandridge Street (N19) (All Directions)
  • [A1] St John's Way (N19) (All Directions)
  • St John's Way (N19) (All Directions)
  • Tavistock Terrace (N19) (All Directions)
  • [A1] Tollhouse Way (N19) (All Directions)
  • Tollington Way (N19) (All Directions)
  • Wedmore Gardens (N19) (All Directions)
  • Wedmore Mews (N19) (All Directions)
  • Wedmore Street (N19) (All Directions)
  • Windermere Road (N19) (All Directions)
  • Witley Road (N19) (All Directions)

A1

[A1] Upper Street (N1) (Islington)

  Moderate

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 07:33 Wednesday 31 August 2016 : Traffic is flowing well past the restriction.

Works | Utility

[A1] Upper Street (N1) (Northbound) at the junction of Islington Park Street near the town hall - Lane restrictions during National Grid Gas' emergency repair of a leaking gas main.

  • Canonbury Lane (N1) (All Directions)
  • Cobble Lane (N1) (All Directions)
  • Compton Avenue (N1) (All Directions)
  • Compton Terrace (N1) (All Directions)
  • Edward's Cottages (N1) (All Directions)
  • Edwards Mews (N1) (All Directions)
  • Hyde's Place (N1) (All Directions)
  • Islington Park Mews (N1) (All Directions)
  • Islington Park Street (N1) (All Directions)
  • Laycock Street (N1) (All Directions)
  • Purley Place (N1) (All Directions)
  • Richmond Grove (N1) (All Directions)
  • Tyndale Lane (N1) (All Directions)
  • Tyndale Terrace (N1) (All Directions)
  • [A1] Upper Street (N1) (Northbound)

A1

[A1] Falloden Way (N2,NW11) (Barnet)

  Moderate

From: Monday 29 August 2016
To: Monday 05 September 2016

Last updated 08:00 Wednesday 31 August 2016 : Traffic is flowing well in the area.

Works | Emergency

[A1] Falloden Way (NW11) (Westbound) between Norrice Lea and Hill Rise - Lane one restriction in place following a gas leak.

  • Deacons Rise (N2) (All Directions)
  • [A1] Falloden Way (N2,NW11) (Westbound)
  • Greenhalgh Walk (N2) (All Directions)
  • Gurney Drive (N2) (All Directions)
  • Hill Rise (NW11) (All Directions)
  • Kingsley Way (N2) (All Directions)
  • [A1] Lyttelton Road (N2,NW11) (All Directions)
  • Norrice Lea (N2) (All Directions)
  • Northway (NW11) (All Directions)
  • Vivian Way (N2) (All Directions)
  • Widecombe Way (N2) (All Directions)

A10

[A10] Kingsland Road (E2) (Hackney)

  Moderate

From: Friday 26 August 2016
To: Friday 02 September 2016

Last updated 08:01 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | Utility

[A10] Kingsland Road (E2 ) (Northbound) at the junction of Caroline Gardens - Bus lane closure due to emergency UKPN works

  • Basing Place (E2) (All Directions)
  • Caroline Gardens (E2) (All Directions)
  • [A10] Kingsland Road (E2) (Northbound)

A10

[A10] Bruce Grove (N17) (Haringey)

  Moderate

From: Tuesday 30 August 2016
To: Friday 02 September 2016

Last updated 07:52 Wednesday 31 August 2016 : Traffic is flowing well past the restrictions.

Works | Utility

[A10] Bruce Grove (N17) (All Directions) at the junction of Woodside Gardens - UK Power Network will be carrying out emergency repairs on Bruce Grove near the junction with Woodside Gardens on the above dates and times. During these works and as part of the traffic management a safe walk way will be provided in the carriageway.

  • Forest Gardens (N17) (All Directions)

A12

[A127] Southend Arterial Road (RM2) (Havering)

  Moderate

From: Sunday 13 March 2016
To: Saturday 25 February 2017

Last updated 14:23 Wednesday 31 August 2016 : Delays possible during the course of these works.

Works | TfL

Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Carriageway restrictions for bridge replacement works. A contraflow arrangement (a single lane in each direction) is in place on the A127, meaning that the Essex-bound carriageway will be closed completely and two-way traffic will operate on the other side of the road. This arrangement will be in place on the Essex-bound carriageway of the A127 from Gallows Corner to Squirrels Heath Road until May 2017 to allow us to complete the works. In addition, there is no access from Bryant Avenue on to the A127 until May 2017 while demolition and replacement of the eastern half of the bridge takes place. Click for more information on the TfL website.

  • Bryant Avenue (RM2,RM3) (All Directions)
  • [A127] Southend Arterial Road (RM2) (Both Directions)

A12

Burdett Road (E3 ,E14) (Tower Hamlets)

  Moderate

From: Tuesday 28 May 2013
To: Sunday 04 February 2018

Last updated 08:16 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Other

A1205 Burdett Road (Both directions) between St Paul's Way and Bow Common Lane - Carriageway restrictions for Crossrail works. Find out more about Crossrail works

  • St Paul's Way (E3 ,E14) (All Directions)

A2

Inner Ring

[A100] Tower Bridge Road (SE1) (Southwark)

  Moderate

From: Monday 22 August 2016
To: Thursday 15 September 2016

Last updated 08:18 Wednesday 31 August 2016 : Possible delays during the course of these works

Works | Utility

[A100] Tower Bridge Road (SE1) (Both Directions) at the junction of Leroy Street - Lane restriction in place due to Thames Water works.

  • Leroy Street (SE1) (All Directions)
  • [A100] Tower Bridge Road (SE1) (Both Directions)

A2

A2 (SE8,SE14) (Greenwich,Lewisham)

  Moderate

From: Monday 01 August 2016
To: Friday 25 November 2016

Last updated 09:25 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A2] New Cross Road (SE8/SE14) (Both directions) between Goodwood Road and [A2] Deptford Broadway - Various closures and restrictions between approximately 1000hrs and 1530hrs each day and 2100hrs and 0500hrs each night during footpath and junction improvement works.

  • A2 (SE8,SE14) (Eastbound)
  • Admiralty Close (SE8) (All Directions)
  • Alpha Road (SE14) (All Directions)
  • [A2209] Deptford Church Street (SE8) (All Directions)
  • Tanner's Hill (SE8) (All Directions)
  • Wilshaw Street (SE14) (All Directions)

A2

[A2] Deptford Bridge (SE10) (Greenwich)

  Moderate

From: Monday 29 August 2016
To: Friday 09 September 2016

Last updated 07:58 Wednesday 31 August 2016 : Local delays are possible while restrictions are in place.

Works | Utility

[A2] Deptford Bridge (All Directions) at the junction of Greenwich High Road - Lane closure in place to facilitate works.

  • [A2] Deal's Gateway (SE10) (All Directions)
  • Deal's Gateway (SE10) (All Directions)
  • [A206] Greenwich High Road (SE10) (All Directions)

A20

[A20] Lee High Road (SE12,SE3) (Lewisham,Greenwich)

  Moderate

From: Wednesday 03 August 2016
To: Friday 30 September 2016

Last updated 14:29 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A20] Lee High Road (SE12/SE3) (All Directions) at the junction of Burnt Ash Road - Lane closures to facilitate junction modification works (1030hrs to 1530hrs Monday to Friday).

  • [A2212] Burnt Ash Road (SE12) (All Directions)
  • [A20] Eltham Road (SE12,SE3) (All Directions)
  • [A20] Lee High Road (SE12,SE3) (All Directions)
  • [B212] Lee Road (SE3) (All Directions)
  • Osborn Terrace (SE3) (All Directions)
  • St Peters Court (SE3) (All Directions)

A205

[A217] Armoury Way (SW18) (Wandsworth)

  Moderate

From: Monday 29 August 2016
To: Friday 16 September 2016

Last updated 05:31 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Utility

[A217] Armoury Way (Eastbound) between Frogmore and Ram Street - Lane one (of four) restriction in place to facilitate gas works.

  • [A217] Armoury Way (SW18) (Eastbound)
  • Dormay Street (SW18) (All Directions)
  • Frogmore (SW18) (All Directions)
  • [A217] Old York Road (SW18) (All Directions)
  • [A217] Ram Street (SW18) (All Directions)
  • The Causeway (SW18) (All Directions)
  • [A217] Wandsworth One Way System (SW18) (All Directions)

A205

[A204] Hardel Rise (SW2) (Lambeth)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 14:53 Wednesday 31 August 2016 : Traffic is returning to normal for the time of day.

Traffic Incidents | Collision

[A205] Hardel Rise (SW2) (Eastbound) at the junction of Tulse Hill - Hardel Rise has reopened following the repositioning of the vehicles involved in the collision.

  • [A204] Hardel Rise (SW2) (All Directions)
  • Jemma Knowles Close (SW2) (All Directions)
  • Perran Road (SW2) (All Directions)
  • [A205] Tulse Hill (SE27,SE24,SW2) (All Directions)

A205

[A205] Upper Richmond Road (SW15) (Wandsworth)

  Moderate

From: Wednesday 31 August 2016
To: Tuesday 06 September 2016

Last updated 14:10 Wednesday 31 August 2016 : Traffic is moving well on approach.

Works | Utility

[A205] Upper Richmond Road (SW15) (Both Directions) at the junction of Oakhill Road - Temporary traffic signals in use to facilitate UKPN works.

  • Keswick Road (SW15) (All Directions)
  • [A205] Upper Richmond Road (SW15) (Both Directions)
  • Woodlands Way (SW15) (All Directions)

A205

A21

[A21] Rushey Green (SE6) (Lewisham)

  Moderate

From: Monday 08 August 2016
To: Friday 21 October 2016

Last updated 08:39 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A21] Rushey Green (SE6) (All Directions) at the junction of Brownhill Road - Lane closures and temporary signals will be used for junction upgrade works (nightly, 2100hrs to 0500hrs).

  • [A205] Brownhill Road (SE6) (All Directions)
  • [A21] Rushey Green (SE6) (All Directions)

A205

[A3] Wandsworth High Street (SW18) (Wandsworth)

  Moderate

From: Tuesday 02 February 2016
To: Friday 07 October 2016

Last updated 06:59 Wednesday 31 August 2016 : Delays possible.

Special and Planned Events | Construction Activity

[A3] Wandsworth High Street (SW18) (Westbound) at the junction of [A217] Ram Street by the old Young's brewery - Lane four (of four), the right filter lane, closed between 1000 and 1400 each weekday and occasional Saturdays to allow deliveries for the "Ram Quarter" development.

  • A217 (SW18) (All Directions)
  • All Saints Passage (SW18) (All Directions)
  • [A218] Buckhold Road (SW18) (All Directions)
  • Newton's Yard (SW18) (All Directions)
  • [A3] Wandsworth High Street (SW18) (West Bound)

A205

[A3] Battersea Rise (SW11,SW18) (Wandsworth)

  Moderate

From: Monday 22 August 2016
To: Monday 05 September 2016

Last updated 09:18 Wednesday 31 August 2016 : Possible delays during the course of these works

Works | Utility

[A3] Battersea Rise (SW11/SW18) (All Directions) at the junction of Spencer Park - Lane closures are in place to facilitate works.

  • Auckland Road (SW11) (All Directions)
  • Bolingbroke Grove (SW11) (All Directions)
  • Boutflower Road (SW11) (All Directions)
  • Buckmaster Road (SW11) (All Directions)
  • Chivalry Road (SW11) (All Directions)
  • [A3] Marcilly Road (SW11,SW18) (All Directions)
  • Spanish Road (SW18) (All Directions)
  • Spencer Park (All Directions)
  • Spencer Road (SW18) (All Directions)
  • Strathblaine Road (SW18) (All Directions)
  • [A214] Trinity Road (SW18) (All Directions)
  • Vardens Road (SW11) (All Directions)

A205

[A217] Wandsworth Roundabout (SW18) (Wandsworth)

  Moderate

From: Sunday 13 March 2016
To: Sunday 04 September 2016

Last updated 07:03 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | TfL

[A217] Wandsworth Roundabout (SW18) (All Directions) - Lane restriction to inner circle of Roundabout for constructions works.

  • Eltringham Street (SW18) (All Directions)
  • Jews Row (SW18) (All Directions)
  • Marl Road (SW18) (All Directions)
  • [A214] Trinity Road (SW18) (All Directions)
  • [A3205] York Road (SW18) (All Directions)

A21

[A21] Bromley Road (SE6) (Lewisham)

  Moderate

From: Tuesday 30 August 2016
To: Ongoing

Last updated 14:10 Wednesday 31 August 2016 : Take care on approach, traffic is currently flowing well.

Hazard(s) | Burst Water Main

[A21] Bromley Road (SE6) (Northbound) at the junction of Canadian Avenue - There is excess surface water across the carriageway due to a Burst Water Main.

  • Bargery Road (SE6) (All Directions)
  • Canadian Avenue (SE6) (All Directions)

A23

[A23] Brixton Road (SW9) (Lambeth)

  Moderate

From: Tuesday 02 August 2016
To: Tuesday 06 September 2016

Last updated 09:18 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Utility

[A23] Brixton Road (SW9) (Both Directions) at the junction of Mostyn Road - The carriageway has been reduced to one lane in both directions for utility works. Also the right turn to Mostyn Road from the northbound A23 Brixton Road has been banned.

  • [A23] Brixton Road (SW9) (Both Directions)
  • Mostyn Road (SW9) (All Directions)

A23

[A23] Streatham High Road (SW16,SW2) (Lambeth)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 15:01 Wednesday 31 August 2016 : Traffic is queuing on approach

Traffic Incidents | Collision

[A23] Streatham High Road (SW16) (Northbound) at the junction of Leigham Court Road - Lane one restriction due to a collision

A23

[A203] South Lambeth Road (SW8) (Lambeth)

  Moderate

From: Tuesday 23 August 2016
To: Wednesday 31 August 2016

Last updated 09:26 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A203] South Lambeth Road (SW8) (Northbound) at the junction of Walton Close - Bus lane restricted due to emergency gas escape.

  • Old South Lambeth Road (SW8) (All Directions)
  • [A203] South Lambeth Road (SW8) (Northbound)

A23

[A214] Ambleside Avenue (SW16) (Lambeth)

  Moderate

From: Monday 25 July 2016
To: Friday 16 September 2016

Last updated 09:19 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A214] Ambleside Avenue (SW16) (Northbound) at the junction of [A216] Mitcham Lane - Various restrictions, including nightly closures, to facilitate junction improvement works. Click for more information on the TfL website.

  • Babington Road (SW16) (All Directions)
  • [A214] Gleneagle Road (SW16) (All Directions)
  • Rydal Road (SW16) (All Directions)
  • Stanthorpe Road (SW16) (All Directions)
  • [A23] Streatham High Road (SW16) (All Directions)
  • Tooting Bec Gardens (SW16) (All Directions)

A23

[A23] Thornton Heath Pond (CR7) (Croydon)

  Moderate

From: Monday 22 August 2016
To: Sunday 20 November 2016

Last updated 08:17 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A23] Thornton Heath Pond (All Directions) at the junction of London Road - There will be various lane restrictions to facilitate traffic light upgrade works on the Thornton Heath Pond roundabout. Overnight lane closures will be in place on the southern side of the roundabout from 22 August for approximately 2 weeks, beginning at 21:00 each night until 05:00 the following morning. Overnight lane closures will be in place on the northern side of the roundabout from late August for approximately one week, beginning at 21:00 each night until 05:00 the following morning. Temporary lights will be used at the junction while works are being completed. Footway works will take place between 08:00 and 17:00.

  • Alma Place (CR7) (All Directions)
  • [B266] Brigstock Road (CR7) (All Directions)
  • Colliers Water Lane (CR7) (All Directions)
  • Fairlands Avenue (CR7) (All Directions)
  • [A235] London Road (CR7) (All Directions)
  • Raymead Avenue (CR7) (All Directions)
  • [A23] Thornton Heath Pond (CR7) (All Directions)
  • [A23] Thornton Road (CR7) (All Directions)
  • Thornton Row (CR7) (All Directions)
  • Whitehall Road (CR7) (All Directions)
  • Willett Place (CR7) (All Directions)
  • Willett Road (CR7) (All Directions)

A24

A23

[A203] Stockwell Road (SW9) (Lambeth)

  Moderate

From: Monday 05 October 2015
To: Wednesday 31 August 2016

Last updated 08:38 Wednesday 31 August 2016 : Possible delays during the course of these works

Works | TfL

[A203] Stockwell Road (All Directions) at the junction of South Lambeth Road and Clapham Road - Various carriageway restrictions off-peak and overnight for major junction remodelling works. The gyratory has now been replaced by a junction. The section of [A203] South Lambeth Road, adjacent to the west side of the Memorial Garden, is permanently closed to traffic and is being transformed into a new public space. Click for more information on the Stockwell project.

  • [A203] South Lambeth Road (SW9) (Northbound)
  • [A203] Stockwell Road (SW9) (All Directions)

A3

[A298,A3] Bushey Road (SW20,KT3) (Merton)

  Moderate

From: Monday 18 July 2016
To: Monday 31 October 2016

Last updated 09:15 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A298] Bushey Road (KT3/SW20) (All Directions) at the junction of Beverley Way (Kingston By Pass) - Various restrictions will be in place, which may impact A3 Beverley Way slip roads, the A298 Bushey Road and associated slip roads, Burlington Road/A3 Shannon Corner. This is to facilitate junction upgrade works

  • B282 (KT3) (All Directions)

A3

[A3205] Battersea Park Road (SW11) (Wandsworth)

  Moderate

From: Tuesday 30 August 2016
To: Thursday 01 September 2016

Last updated 14:22 Wednesday 31 August 2016 : Expect possible delays on the approach to the restrictions, when they are in place. Currently, traffic is flowing well.

Works | Utility

[A3205] Battersea Park Road (SW11) (Westbound) at the junction of Home Road - Lane one closure and contraflow system in operation to facilitate telecommunication works.

  • Bullen Street (SW11) (All Directions)
  • Home Road (SW11) (All Directions)

A3

[A243] Hook Road (KT9) (Kingston Upon Thames)

  Moderate

From: Wednesday 31 August 2016
To: Friday 02 September 2016

Last updated 14:28 Wednesday 31 August 2016 : Traffic is flowing well past the restrictions.

Works | TfL

[A243] Hook Road (KT9) (All Directions) at the junction of Clayton Road - Lane one (of two) closure to facilitate crossover installation works. (Day Works - 10:00 to 15:00)

  • Clayton Road (KT9) (All Directions)
  • [A243] Hook Road (KT9) (All Directions)
  • Hook Road (All Directions)

A3

[A3205] Nine Elms Lane (SW8) (Wandsworth)

  Moderate

From: Tuesday 23 August 2016
To: Sunday 30 April 2017

Last updated 08:51 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A3205] Nine Elms Lane (SW8) (Both Directions) at the junction of Ponton Road - Various restrictions in place to facilitate major water works. Carriageway is currently restricted eastbound.

  • [A3205] Nine Elms Lane (SW8) (Both Directions)

A4

A306 (W6) (Hammersmith & Fulham)

  Moderate

From: Saturday 28 May 2016
To: Saturday 31 December 2016

Last updated 08:44 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | Other

A306 (W6) (Both Directions) Hammersmith Bridge - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished.

  • Rutland Grove (W6) (All Directions)
  • Worlidge Street (W6) (All Directions)

A4

[A30] Great South-West Road (TW14,TW6) (Hillingdon,Hounslow)

  Moderate

From: Friday 05 August 2016
To: Monday 05 September 2016

Last updated 15:06 Wednesday 31 August 2016 : Traffic is flowing well.

Works | Utility

[A30] Great South-west Road (TW14/TW6) (Both Directions) between Hatton Road and Girling Way - The carriageway has been reduced to two lanes eastbound for National Grid Works.

  • Dick Turpin Way (TW14) (All Directions)
  • Eastern Perimeter Road (TW6) (All Directions)
  • Girling Way (TW14) (All Directions)
  • Hatton Road (TW14,TW6) (All Directions)

A4

[A4] Brompton Road (SW3) (Westminster,Kensington & Chelsea)

  Moderate

From: Wednesday 31 August 2016
To: Thursday 01 September 2016

Last updated 14:22 Wednesday 31 August 2016 : Lane restriction in place. Traffic is slow moving westbound.

Works | Utility

[A4] Brompton Road (SW3) (Westbound) at the junction of Hans Crescent. Lane restriction due to Footway works.

  • [A4] Brompton Road (SW3) (Westbound)
  • Lancelot Place (SW3) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Moderate

From: Tuesday 03 May 2016
To: Tuesday 30 April 2019

Last updated 15:06 Wednesday 31 August 2016 : Westbound traffic is slow with tailbacks towards the Piccadilly Underpass and Hyde Park Corner. Expect delays.

Works | Borough

[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - Various restrictions until approximately April 2019 during the redevelopment of 55-91 Knightsbridge. Westbound bus lane closed until approximately April 2019. More information available on Westminster council's website.

  • [A4] Knightsbridge (SW1X) (Westbound)
  • Wilton Place (SW1X) (All Directions)

A40

[A40] Western Avenue (UB6) (Ealing)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 15:06 Wednesday 31 August 2016 : Traffic is slow moving westbound with congestion back to Hanger Lane.

Works | TfL

[A40] Western Avenue (UB6) (Westbound) at the junction of Alperton Lane - Lane one (of three) is closed due to hedge cutting works.

  • [B456] Alperton Lane (UB6) (All Directions)
  • [A40] Western Avenue (UB6) (Westbound)

A406

[A406] North Circular Road (NW2) (Brent)

  Moderate

From: Saturday 13 August 2016
To: Monday 05 September 2016

Last updated 14:59 Wednesday 31 August 2016 : Traffic is slow moving on approach, expect delays.

Works | TfL

[A406] North Circular Road (NW2) (Eastbound) between Heather Road and Brook Road - Various lane closures in place from 13th August until 5th September to facilitate carriageway repairs and drainage works. Nightly lane one and two closure in place from 13th August until 5th September (22:00 to 05:00).

  • Heather Road (NW2) (All Directions)

A406

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W3,W4) (Hounslow)

  Moderate

From: Monday 20 June 2016
To: Monday 01 May 2017

Last updated 11:41 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | TfL

[A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - During this stage of the works, lane one (of two) is closed northbound until 13th September.

A41

[A41] Park Road (NW1) (Westminster)

  Moderate

From: Monday 01 August 2016
To: Monday 19 September 2016

Last updated 07:00 Wednesday 31 August 2016 : Delays possible.

Works | Utility

[A41] Park Road (NW1) (Both Directions) at the junction of Gloucester Place - A contraflow is in operation to facilitate National Grid Gas works.

  • [A41] Gloucester Place (NW1) (All Directions)
  • [A41] Park Road (NW1) (Southbound)

A41

[A41] Gloucester Place (NW1) (Westminster)

  Moderate

From: Tuesday 30 August 2016
To: Thursday 01 September 2016

Last updated 15:01 Wednesday 31 August 2016 : Traffic is flowing well.

Works | Utility

[A41] Gloucester Place (Northbound) at the junction of Taunton Place - Lane one closure in place to facilitate Thames Water works.

A41

[A41] Finchley Road (NW6,NW3) (Camden)

  Moderate

From: Monday 18 July 2016
To: Wednesday 31 August 2016

Last updated 06:58 Wednesday 31 August 2016 : Delays possible.

Works | Utility

[A41] Finchley Road (NW3/NW6) (All Directions) between Canfield Gardens and Lymington Road - Various lane restrictions in place for collaborative Utility Works. At present the bus lane is closed in both directions.

  • Alvanley Gardens (NW6,NW3) (All Directions)
  • [A41] Finchley Road (NW6,NW3) (All Directions)
  • Frognal Lane (NW3) (All Directions)
  • Hampstead Gate (NW3) (All Directions)
  • Langland Gardens (NW3) (All Directions)
  • Lithos Road (NW3) (All Directions)
  • Lymington Road (NW6) (All Directions)
  • Netherhall Gardens (NW3) (All Directions)
  • Rosemont Road (NW3) (All Directions)

A41

[A41] Swiss Cottage (NW3 ,NW6) (Camden)

  Moderate

From: Monday 10 August 2015
To: Saturday 31 December 2016

Last updated 07:02 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A41] Finchley Road (NW3) (All Directions) at the junction of [B511] College Crescent (Swiss Cottage) - Various lane restrictions in place until late September during collaborative utility works. [A41] Finchley Road near the O2 Centre, lane one (bus lane) closed in both directions.

  • [B511] College Crescent (NW3) (All Directions)
  • [A41] Finchley Road (NW3 ,NW6) (All Directions)

A41

[A41] Finchley Road (NW8) (Camden,Westminster)

  Moderate

From: Monday 16 May 2016
To: Friday 30 September 2016

Last updated 14:22 Wednesday 31 August 2016 : Traffic is flowing well past the restrictions.

Works | TfL

[A41] Finchley Road (Both Directions) between Acacia Road and Boundary Road - Various restrictions in use during major cycle lane and footway improvement works.

  • Acacia Road (NW8) (All Directions)
  • Finchley Place (NW8) (All Directions)
  • [A41] Finchley Road (NW8) (Both Directions)
  • Grove End Road (NW8) (All Directions)
  • Marlborough Place (NW8) (All Directions)
  • Queen's Grove (NW8) (All Directions)
  • Queen's Terrace (NW8) (All Directions)
  • [A41] Wellington Road (NW8) (All Directions)

Bishopsgate Cross Route

[A3] Borough High Street (SE1) (Southwark)

  Moderate

From: Wednesday 06 April 2016
To: Friday 01 September 2017

Last updated 09:15 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A3] Borough High Street (SE1) (Northbound) at the junction of Marshalsea Road - Intermittent bus lane restriction due to works.

  • [A3201] Marshalsea Road (SE1) (All Directions)

City Route

[A3211] Victoria Embankment (EC4V,EC4Y) (City Of London)

  Moderate

From: Thursday 08 January 2015
To: Wednesday 14 December 2016

Last updated 07:01 Wednesday 31 August 2016 : Delays possible.

Special and Planned Events | Construction Activity

[A3211] Victoria Embankment (EC4Y) (Eastbound) at the junction of Temple Avenue - The exit slip-road to Blackfriars Bridge is partially restricted for construction works.

  • [A3211] Blackfriars Underpass (EC4V,EC4Y) (All Directions)

Inner Ring

[A100] Tower Bridge (EC3N) (Tower Hamlets)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 14:28 Wednesday 31 August 2016 : Expect local delays when bridge lifts are in place.

Special and Planned Events | Bridge Lift

[A100] Tower Bridge (EC3N) (All Directions) - The bridge will lift at 0930hrs, 1450hrs, 1845hrs, 2200hrs and 2245hrs.

  • [A100] Tower Bridge (EC3N) (All Directions)

Inner Ring

[A40] Marble Arch (W1H) (Westminster)

  Moderate

From: Monday 27 June 2016
To: Sunday 27 November 2016

Last updated 07:02 Wednesday 31 August 2016 : Delays are possible.

Works | Other

[A40] Marble Arch (All Directions) at the junction of Edgware Road - Restrictions on the footway for building works. In addition, there may also be southbound night time (2000hrs to 0600hrs) restrictions on Edgware Road.

  • [A40] Marble Arch (W1H) (All Directions)

Inner Ring

Farringdon Cross Route

[A3] Elephant And Castle Roundabout (SE1) (Southwark)

  Moderate

From: Tuesday 07 April 2015
To: Wednesday 31 August 2016

Last updated 08:53 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A3] Elephant & Castle Roundabout (All Directions) - A new two-way traffic system has been introduced closing one side of the roundabout between [A201] New Kent Road and the Elephant and Castle Link Road, outside the Tube station. The following permanent changes: No left turn from [A3] Newington Causeway towards [A201] New Kent Road, and no right turn from [A201] New Kent Road to [A3] Newington Causeway. Elephant & Castle Link Road southbound lanes will provide access to Newington Butts and Walworth Road from Central London or New Kent Road.

  • A201 (SE1) (All Directions)
  • [A3] Elephant And Castle (SE1) (All Directions)
  • [A3] Elephant And Castle Roundabout (SE1) (East Bound)
  • [A3] Newington Causeway (SE1) (All Directions)
  • [A302] St George's Road (SE1) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Moderate

From: Friday 29 April 2016
To: Monday 28 November 2016

Last updated 09:25 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A3036] Albert Embankment (SE1) (Eastbound) at the junction of New Spring Gardens Walk - Lane one (bus lane) restrictions in place to facilitate utility works. Working hours are 08:00 to 18:00 Monday to Friday and 08:00 to 16:00 Saturdays (continuous traffic management will remain in place).

Southern River Route

[A3200] York Road (SE1) (Lambeth)

  Moderate

From: Wednesday 09 December 2015
To: Wednesday 30 November 2016

Last updated 06:57 Wednesday 31 August 2016 : Delays possible.

Works | Other

[A3200] York Road (SE1) (Northbound) between Chicheley Street and Waterloo Roundabout - The footway and bus lane are restricted to facilitate construction works.

  • Chicheley Street (SE1) (All Directions)
  • Concert Hall Approach (SE1) (All Directions)
  • Leake Street (SE1) (All Directions)
  • Mepham Street (SE1) (All Directions)
  • Tenison Way (SE1) (All Directions)
  • [A301] Waterloo Roundabout (SE1) (All Directions)
  • Waterloo Station (SE1) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Moderate

From: Tuesday 07 April 2015
To: Saturday 10 December 2016

Last updated 06:59 Wednesday 31 August 2016 : Delays possible.

Special and Planned Events | Construction Activity

[A3036] Albert Embankment (SE1) (Both Directions) at the junction of Tinworth Street - Intermittent lane restrictions to facilitate construction works. On 6th September the bus lane will be closed southbound (08:00 to 16:30).

  • Randall Road (SE11) (All Directions)
  • Tinworth Street (SE11) (All Directions)

Western Cross Route

[A3212] Chelsea Embankment (SW3,SW1W) (Westminster,Kensington & Chelsea)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 15:07 Wednesday 31 August 2016 : Traffic is slow on approach.

Infrastructure Issue | Traffic Signal

[A3212] Chelsea Embankment (SW3) (All Directions) at the junction of Chelsea Bridge Road and Chelsea Bridge - The traffic signals at this location are all out. Approach with caution.

  • A3216 (SW3,SW1W) (All Directions)
  • [A3212] Chelsea Embankment (SW3,SW1W) (All Directions)
  • [A3212] Grosvenor Road (SW3,SW1W) (All Directions)

Western Cross Route

[A3220] Warwick Road (SW5) (Kensington & Chelsea)

  Moderate

From: Tuesday 30 August 2016
To: Friday 02 September 2016

Last updated 14:22 Wednesday 31 August 2016 : Traffic is flowing well past the restrictions.

Works | Utility

[A3220] Warwick Road (SW5) (Northbound) between Earl's Court Square and Kempsford Gardens - Lane one closure in place to facilitate gas works.

  • Kempsford Gardens (SW5) (All Directions)
  • [A3220] Warwick Road (SW5) (Northbound)

[A107] Lower Clapton Road (E5) (Hackney)

  Moderate

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 08:18 Wednesday 31 August 2016 : Possible delays during the course of these works.

Works | Emergency

[A107] Lower Clapton Road (E5 ) (Northbound) at the junction of Atherden Road - Lanes one (of two) currently restricted due to emergency gas works.

  • Atherden Road (E5) (All Directions)
  • [A107] Lower Clapton Road (E5) (Northbound)

[A232] Carshalton Road (SM1) (Sutton)

  Moderate

From: Wednesday 31 August 2016
To: Friday 02 September 2016

Last updated 14:11 Wednesday 31 August 2016 : Traffic is slow moving in both directions.

Works | Emergency

[A232] Carshalton Road (SM1) (Both directions) between Reading Road and Langley Park Road - Temporary traffic signals in operation to facilitate emergency high voltage cable repairs by South Eastern Power Networks.

[A210] Eltham High Street (SE9) (Greenwich)

  Moderate

From: Monday 01 February 2016
To: Sunday 30 April 2017

Last updated 08:52 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Well Hall Road - Various lane restrictions and closures in place to facilitate Eltham High Street improvement works. Phase 1 (1st Feb to Sept) consists of lane suspensions. Phase 2 (Sept to Nov) will consist of lane and road closures due to re-surfacing works. Phase 3 (Nov to April) will consist of lane suspensions.

  • A208 (SE9) (All Directions)
  • [A210] Eltham High Street (SE9) (All Directions)

[A300] Southwark Bridge Road (SE1) (Southwark)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 14:35 Wednesday 31 August 2016 : Traffic is flowing well.

Works | Other

[A300] Southwark Bridge Road (SE1) (All Directions) at the junction of Union Street - Temporary traffic signals in operation to facilitate road works.

  • [A300] Southwark Bridge Road (SE1) (All Directions)
  • [B300] Union Street (SE1) (All Directions)
  • Union Street (All Directions)

[A104] Ball's Pond Place (N1) (Islington)

  Moderate

From: Tuesday 30 August 2016
To: Wednesday 12 October 2016

Last updated 14:52 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A104] Balls Pond Road (All Directions) at the junction of [A1199] St Paul's Road (N1 )- Restrictions are in operation to facilitate junction improvement works. Traffic will be unable to turn left from Newington Green Road into Balls Pond Road on weekends only between 30 August and 12 October. The diversion route will be clearly signed via Essex Road, Dove Road and Southgate Road. The works are planned between 08:00 and 18:00 on Mondays to Fridays and between 08:00 and 16:00 on Saturdays and Sundays.

  • A104 (N1) (All Directions)

[A4201] Regent Street (W1J ,W1B) (Westminster)

  Moderate

From: Monday 01 February 2016
To: Monday 31 October 2016

Last updated 07:01 Wednesday 31 August 2016 : Delays possible.

Works | Borough

[A4201] Regent Street (W1) (Both Directions) at the junction of Air Street - Various restrictions during public realm works on behalf of the Crown Estates and Westminster council. From approximately 1000hrs Monday 1 August until 1700hrs Thursday 8 September, [A4201] Regent Street (Both Directions) between Piccadilly Circus and Vigo Street, closed northbound with the southbound carriageway reduced to one lane. From approximately 1000hrs Friday 9 September until 1700hrs Thursday 6 October, [A4201] Regent Street (Both Directions) between Glasshouse Street and Piccadilly Circus, lane two (of two) closed. Click for more information on the Westminster council website.

  • Air Street (W1J ,W1B) (All Directions)
  • [A4201] Regent Street (W1J ,W1B) (Both Directions)

[B519] Hampstead Lane (N6) (Haringey)

  Moderate

From: Wednesday 31 August 2016
To: Monday 05 September 2016

Last updated 08:20 Wednesday 31 August 2016 : Delays are possible in the area.

Works | Utility

[B519] Hampstead Lane (N6 ) (All Directions) at the junction of Bishopswood Road - Two way temporary to facilitate water mains works.

  • Bishopswood Road (N6) (All Directions)
  • [B519] Hampstead Lane (N6) (All Directions)

[A222] Cherry Orchard Road (CR0,CR9) (Croydon)

  Moderate

From: Tuesday 30 August 2016
To: Sunday 04 September 2016

Last updated 07:57 Wednesday 31 August 2016 : Possible delays on approach while restrictions remain in place.

Special and Planned Events | Construction Activity

[A222] Cherry Orchard Road (CR0/CR9) (All Directions) at the junction of Cross Road - Two way temporary traffic signals in operation to facilitate a crane operation.

[A104] High Road Woodford Green (IG8) (Redbridge)

  Moderate

From: Tuesday 30 August 2016
To: Wednesday 31 August 2016

Last updated 08:16 Wednesday 31 August 2016 : Delays possible whilst temporary signals are in use.

Works | Utility

[A104] High Road Woodford Green (IG8) (All Directions) at the junction of Sydney Road - Temporary traffic lights are in operation to facilitate Thames Water works.

  • [A104] High Road Woodford Green (IG8) (All Directions)
  • Sydney Road (IG8) (All Directions)

[A1055] Meridian Way (N18) (Enfield)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 15:05 Wednesday 31 August 2016 : Approach with care

Infrastructure Issue | Traffic Signal

[A1055] Meridian Way (N18) (All Directions) at the junction of Glover Drive - The traffic signals are all out at this junction

  • Glover Drive (N18) (All Directions)
  • [A1055] Meridian Way (N18) (All Directions)

[A4020] Uxbridge Road (UB4,UB1) (Hillingdon)

  Moderate

From: Monday 29 August 2016
To: Friday 23 September 2016

Last updated 07:58 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Utility

[A4020] Uxbridge Road (UB4/UB1) (Westbound) between Delamere Road and Springfield Road - Lane closure in place to facilitate high voltage cable works by Southern Electric. From September 5th, the works will be off-peak only.

  • Delamere Road (UB4) (All Directions)
  • Springfield Road (UB4) (All Directions)
  • [A4020] Uxbridge Road (UB4,UB1) (Westbound)

Park Lane ()

  Moderate

From: Saturday 03 September 2011
To: Monday 04 February 2019

Last updated 07:00 Wednesday 31 August 2016 : Extra parking places are available north of the restrictions while these works continue.

Works | Borough

A4202 Park Lane (Northbound) at the junction with Stanhope Gate - The coach parking bays are suspended northbound at Stanhope Gate for Crossrail works.

Victoria Street ()

  Moderate

From: Tuesday 03 May 2011
To: Friday 31 August 2018

Last updated 07:04 Wednesday 31 August 2016 : Traffic delays are possible.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (the Victoria Station Upgrade and the Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system: Bressenden Place is reduced to one lane at times; Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place; Victoria Street has restrictions between Bressenden Place and Buckingham Palace Road. Hudson's Place is restricted to taxis only; Allington Street is closed. Find out more about Victoria Station upgrade works

[A5109] Marsh Lane (NW7) (Barnet)

  Moderate

From: Tuesday 30 August 2016
To: Ongoing

Last updated 13:29 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Utility

[A5109] Marsh Lane (NW7) (All Directions) at the junction of Highwood Hill - Temporary traffic signals in operation to facilitate emergency gas works.

  • [B552] Highwood Hill (NW7) (All Directions)
  • [A5109] Marsh Lane (NW7) (All Directions)

[A219] Wood Lane (W12) (Hammersmith & Fulham)

  Moderate

From: Wednesday 24 August 2016
To: Thursday 08 September 2016

Last updated 08:03 Wednesday 31 August 2016 : Delays are possible when restrictions are in place.

Works | Utility

[A219] Wood Lane (W12) (All Directions) at the junction of Ariel Way - Temporary traffic lights in operation from 24th August until 8th September to facilitate National Grid Gas works. Works will be suspended between 27th-30th August to facilitate the Notting Hill Carnival..

  • Ariel Way (W12) (All Directions)
  • [A219] Wood Lane (W12) (All Directions)

[A315] Staines Road (TW14) (Hounslow)

  Moderate

From: Monday 29 August 2016
To: Friday 02 September 2016

Last updated 08:00 Wednesday 31 August 2016 : Delays possible whilst temporary traffic signals are in operation.

Works | Utility

[A315] Staines Road (TW14) (All Directions) near the junction of Grovestile Waye - Temporary traffic lights are in operation due to electricity works.

[A2211] Lewisham Road (SE13) (Greenwich,Lewisham)

  Moderate

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 09:26 Wednesday 31 August 2016 : Local delays are possible while restrictions are in place.

Works | Emergency

[A2211] Lewisham Road (SE13) (All Directions) at the junction of Quince Road - Temporary traffic signals in operation to facilitate emergency gas works.

  • [A2211] Lewisham Road (SE13) (All Directions)
  • Quince Road (SE13) (All Directions)

[A1306] New Road (RM13) (Havering)

  Moderate

From: Tuesday 30 August 2016
To: Wednesday 07 September 2016

Last updated 12:51 Wednesday 31 August 2016 : Delays possible whilst temporary traffic signals are in use.

Works | Emergency

[A1306] New Road (RM13) (All Directions) at the junction of New Road - Temporary traffic signals in operation to facilitate traffic signal upgrade works

  • Chandlers Corner (RM13) (All Directions)
  • Upminster Road South (RM13) (All Directions)

[A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Waltham Forest,Hackney)

  Moderate

From: Friday 08 January 2016
To: Friday 26 January 2018

Last updated 08:16 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Borough

[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Waltham Forest Council will be carrying out works as part of the Mayor's Mini Holland Cycle scheme. The works will involve the installation of a cycle lane from Whipps Cross to the borough boundary near the Lea Valley Ice Rink. Other works will include of a new bus stand at Whipps Cross and the removal of Whipps Cross Roundabout to create a new junction.

  • A1006 (E17 ,E10) (All Directions)
  • A107 (E5) (All Directions)
  • Avondale Road (E10) (All Directions)
  • Blyth Road (E17) (All Directions)
  • Bromley Road (E10) (All Directions)
  • Butterfields (E17) (All Directions)
  • Chatsworth Road (E5) (All Directions)
  • College Road (E17) (All Directions)
  • Connaught Close (E10) (All Directions)
  • Copeland Road (E10) (All Directions)
  • Cornthwaite Road (E5) (All Directions)
  • Dagenham Road (E10) (All Directions)
  • Elm Park Road (E10) (All Directions)
  • Essex Road (E17 ,E10) (All Directions)
  • Ferndale Avenue (E17) (All Directions)
  • Forest Rise (E17) (All Directions)
  • Heybridge Way (E10) (All Directions)
  • Hillstowe Street (E5) (All Directions)
  • Hitcham Road (E10) (All Directions)
  • Kettlebaston Road (E10) (All Directions)
  • Knotts Green Road (E10) (All Directions)
  • Lammas Road (E10) (All Directions)
  • [B159] Leyton Green Road (E10) (All Directions)
  • Manor Road (E10) (All Directions)
  • Melbourne Road (E10) (All Directions)
  • Merton Road (E17) (All Directions)
  • Millicent Road (E10) (All Directions)
  • Morieux Road (E10) (All Directions)
  • Poplars Road (E17) (All Directions)
  • Raglan Road (E17) (All Directions)
  • Rigg Approach (E10) (All Directions)
  • Rochdale Road (E17) (All Directions)
  • Sanderstead Road (E10) (All Directions)
  • Seymour Road (E10) (All Directions)
  • Shortlands Road (E10) (All Directions)
  • Shrubland Road (E10) (All Directions)
  • Snaresbrook Road (E11) (All Directions)
  • Stanley Road (E10) (All Directions)
  • Theobald Road (E10) (All Directions)
  • Vicarage Road (E10) (All Directions)
  • Wattisfield Road (E5) (All Directions)
  • West End Avenue (E10) (All Directions)
  • Westerham Road (E10) (All Directions)
  • [A104] Woodford New Road (E17 ,E11 ,E10 ,E5) (All Directions)
  • Woodside Park Avenue (E17) (All Directions)

[A213] Parish Lane (SE20) (Bromley)

  Moderate

From: Wednesday 31 August 2016
To: Ongoing

Last updated 14:51 Wednesday 31 August 2016 : The road is closed. Please seek alternative routes.

Traffic Incidents | Collision

[A213] Parish Lane (SE20) (All Directions) at the junction of Penge Lane - The road is blocked due to a collision.

  • Penge Lane (SE20) (All Directions)

[A2209] Deptford Church Street (SE8) (Lewisham)

  Moderate

From: Friday 22 April 2016
To: Friday 28 April 2017

Last updated 09:11 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Giffin Street - Various lane restrictions in place to facilitate Thames Tideway sewer works.

[A307] Petersham Road (TW10) (Richmond Upon Thames)

  Moderate

From: Monday 01 August 2016
To: Sunday 04 September 2016

Last updated 08:50 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A307] Petersham Road (TW10) (Both Directions) between Cedar Heights and Nightingale Lane - Road closed to facilitate gas works. Signed diversions in place.

  • Nightingale Lane (TW10) (All Directions)

[A232] Wickham Road (CR0) (Croydon)

  Moderate

From: Monday 08 August 2016
To: Thursday 29 September 2016

Last updated 08:06 Wednesday 31 August 2016 : Possible delays during the course of these works

Works | Utility

[A232] Wickham Road (CR0) (All Directions) at the junction of Langland Gardens - The carriageway will be restricted for works. Langland Gardens will also be closed at times.

  • Addison's Close (CR0) (All Directions)

[A104] Pembury Road (E5) (Hackney)

  Moderate

From: Monday 01 August 2016
To: Friday 14 October 2016

Last updated 08:16 Wednesday 31 August 2016 : Delays possible when temporary signals are in operation.

Works | Borough

[A104] Pembury Road (E5 ) (All Directions) at the junction of Downs Park Road - Temporary traffic lights in place daily between 0800-1600hrs to facilitate pedestrian crossing improvements

  • Bodney Road (E8) (All Directions)
  • [A104] Cricketfield Road (E5) (All Directions)
  • Downs Park Road (E5) (All Directions)
  • [A104] Pembury Road (E5) (All Directions)
  • Queens Down Road (E5) (All Directions)

[A3036] Wandsworth Road (SW4,SW8) (Lambeth)

  Moderate

From: Monday 22 August 2016
To: Friday 02 September 2016

Last updated 08:17 Wednesday 31 August 2016 : Possible delays during the course of these works.

Works | Utility

[A3036] Wandsworth Road (SW8/SW4) (Westbound) at the junction of Victoria Rise - Temporary traffic lights in operation from 22nd August until 2nd September to facilitate carriageway works.

  • Victoria Rise (SW4) (All Directions)
  • [A3036] Wandsworth Road (SW4,SW8) (Westbound)
  • Willard Street (SW8) (All Directions)

[A215] Norwood Road (SE27) (Lambeth)

  Moderate

From: Monday 01 August 2016
To: Friday 30 September 2016

Last updated 08:41 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A215] Norwood Road (SE27) (Southbound) at the junction of Avenue Park Road - Lane closure in place from 1st August until 30th September to facilitate footway works.

  • Avenue Park Road (SE27) (All Directions)
  • [A215] Norwood Road (SE27) (Southbound)

[A222] Bromley Road (BR7) (Bromley)

  Moderate

From: Monday 01 August 2016
To: Wednesday 31 August 2016

Last updated 09:11 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A222] Bromley Road (BR7) (All Directions) at the junction of Prince Imperial Road - Daily single alternate temporary traffic lights in operation from 1st until 31st August to facilitate footway works (09:00 to 16:00).

  • [A222] Bromley Road (BR7) (All Directions)

[A311] High Street (TW12) (Richmond Upon Thames)

  Moderate

From: Monday 07 March 2016
To: Friday 14 October 2016

Last updated 08:51 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A311] High Street (TW12) (Both Directions) between Uxbridge Road and Hampton Road - Various restrictions in use to faciltiate major roadworks.

  • Deerhurst Crescent (TW12) (All Directions)
  • Falstaff Mews (TW12) (All Directions)
  • Holly Road (TW12) (All Directions)
  • Howard Close (TW12) (All Directions)
  • Park Place (TW12) (All Directions)
  • [A312] Uxbridge Road (TW12) (All Directions)
  • Warwick Close (TW12) (All Directions)
  • Windmill Road (TW12) (All Directions)

[A118] Romford Road (E7) (Newham)

  Moderate

From: Tuesday 26 July 2016
To: Tuesday 06 September 2016

Last updated 08:14 Wednesday 31 August 2016 : Delays possible whilst temporary signals are in operation.

Works | Utility

A118 Romford Road (E7) (All Directions) at the junction of Green Street - Four-way temporary traffic signals are in place for gas main replacement works.

  • [B167] Green Street (E7) (All Directions)
  • Green Street (All Directions)
  • [A118] Romford Road (E7) (All Directions)

[A232] Addiscombe Road (CR0) (Croydon)

  Moderate

From: Monday 22 August 2016
To: Sunday 04 September 2016

Last updated 09:24 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A232] Addiscombe Road (CR0) (All Directions) at the junction of Sandilands - three-way temporary traffic signals and carriageway reductions will be in place to facilitate utility works.

[A217] Holborn Way (CR4) (Merton)

  Moderate

From: Monday 25 July 2016
To: Friday 29 September 2017

Last updated 08:52 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A217] Holborn Way (All Directions) - Various restrictions in place including lane closures and temporary traffic signals to facilitate Mitcham town centre regeneration. Roads affected include London Road, Raleigh Gardens, Upper Green (East & West) and Holborn Way.

  • A236 (CR4) (All Directions)
  • [A217] Holborn Way (CR4) (All Directions)
  • [A217] London Road (CR4) (All Directions)
  • [A217] Raleigh Gardens (CR4) (All Directions)
  • Raleigh Gardens (CR4) (All Directions)
  • Upper Green West (CR4) (All Directions)

[A207] Hook Lane (DA16) (Bexley)

  Moderate

From: Thursday 25 August 2016
To: Friday 02 September 2016

Last updated 08:02 Wednesday 31 August 2016 : Use an alternative route.

Works | Borough

Hook Lane (DA16) (All Directions) between Welling High Street and Westwood Lane - Road closure to facilitate carriageway resurfacing. (Weekday Works - 09:30 to 15:30, not Bank Holidays)

  • A207 (DA16) (All Directions)
  • Churchfield Road (DA16) (All Directions)
  • Hook Lane (DA16) (All Directions)
  • Huxley Road (DA16) (All Directions)
  • Merlin Road North (DA16) (All Directions)
  • St Leonards Close (DA16) (All Directions)
  • [A209] Upper Wickham Lane (DA16) (All Directions)
  • Westwood Lane (DA16) (All Directions)

Croydon Underpass (CR0 ,CR9) (Croydon)

  Moderate

From: Wednesday 06 July 2016
To: Monday 19 September 2016

Last updated 09:25 Wednesday 31 August 2016 : Delays are possible.

Works | Emergency

A212 Croydon Underpass (Northbound) - The underpass is reduced to one lane due to essential repairs to the carriageway.

  • Croydon Underpass (CR0 ,CR9) (Northbound)

[A2015] Southend Road (BR3) (Bromley)

  Moderate

From: Monday 11 July 2016
To: Monday 05 September 2016

Last updated 08:39 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A2015] Southend Road (BR3) (All Directions) at the junction of Albemarle Road and Rectory Road - There will be temporary signals and lane restrictions in place due to works in the area.

  • Albemarle Road (BR3) (All Directions)
  • Copers Cope Road (BR3) (All Directions)
  • [A2015] High Street (BR3) (All Directions)
  • [A2015] Rectory Road (BR3) (All Directions)
  • The Avenue (BR3) (All Directions)

[A400] Charing Cross Road (WC2H,WC1B,W1T) (Camden,Westminster)

  Moderate

From: Thursday 17 March 2016
To: Monday 17 October 2016

Last updated 06:58 Wednesday 31 August 2016 : Next road closures planned for 2nd September 2200hrs.

Works | TfL

Tottenham Court Road station upgrade, [A400] Charing Cross Road (WC2) (Northbound) at the junction of [A40] New Oxford Street - In order to resurface the junction at St Giles Circus and a section of Charing Cross Road there will be diversions and road closures in place from Friday 2 September 22:00 to Monday 5 September 06:00. Activity will take place continuously over the weekend in order to complete the work during the consented timescales for the junction closure. During this period westbound traffic will be diverted from Oxford St to Newman St, Gower and Bloomsbury St, and westbound traffic is being diverted via Shaftsbury Avenue. The northbound diversion on Charing Cross Road also utilises Bloomsbury St. Click for more information about the Tottenham Court Road station upgrade project

  • A401 (WC1A,WC2H) (All Directions)
  • [A400] Bloomsbury Street (WC2H,WC1B,W1T) (All Directions)
  • Bucknall Street (WC1A,WC2H) (All Directions)
  • Falconberg Mews (W1D) (All Directions)
  • Goslett Yard (WC2H) (All Directions)
  • Grape Street (WC2H) (All Directions)
  • Great Russell Street (WC1B) (All Directions)
  • Greek Street (W1D) (All Directions)
  • Little Russell Street (WC1A) (All Directions)
  • Manette Street (W1D) (All Directions)
  • New Compton Street (WC2H) (All Directions)
  • New Oxford Street (WC2H) (All Directions)
  • Old Compton Street (W1D) (All Directions)
  • Phoenix Street (WC2H) (All Directions)
  • Soho Square (W1D) (All Directions)
  • Stacey Street (WC2H) (All Directions)
  • Stedham Place (WC1A) (All Directions)
  • Streatham Street (WC1B,WC1A) (All Directions)
  • Sutton Row (W1D) (All Directions)
  • [A400] Tottenham Court Road (WC2H,WC1B,W1T) (All Directions)
  • West Central Street (WC1A) (All Directions)
  • Willoughby Street (WC1B) (All Directions)

[B227] Perry Vale (SE23) (Lewisham)

  Moderate

From: Wednesday 27 July 2016
To: Thursday 22 September 2016

Last updated 08:51 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[B227] Perry Vale (All Directions) at the junction of Church Vale - Three way temporary traffic signals in operation to facilitate sewer works.

  • B227 (SE23) (All Directions)
  • Church Vale (SE23) (All Directions)
  • [B227] Perry Vale (SE23) (All Directions)

Highfield Avenue (NW11) (Barnet)

  Moderate

From: Monday 27 June 2016
To: Sunday 27 November 2016

Last updated 08:28 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

Highfield Avenue (NW11) (Both Directions) at the junction of Heathfield Gardens - Temporary traffic signals by Brent Cross LU station for maintenance works. Works between 0800 to 2000hrs.

  • Heathfield Gardens (NW11) (All Directions)
  • Highfield Avenue (NW11) (Both Directions)

[A315] Staines Road (TW4) (Hounslow)

  Moderate

From: Wednesday 25 May 2016
To: Friday 21 October 2016

Last updated 08:48 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | Emergency

[A315] Staines Road (TW4) (Eastbound) between Cranbrook Road and Wellington Road South - The bus lane is blocked due to emergency sewer works. From 30th August there will be lane restrictions in both directions.

  • Cranbrook Road (TW4) (All Directions)
  • Midsummer Avenue (TW4) (All Directions)

[A212] Wellesley Road (CR9,CR0) (Croydon)

  Moderate

From: Wednesday 06 April 2016
To: Wednesday 30 November 2016

Last updated 08:16 Wednesday 31 August 2016 : Possible delays during the course of these works

Works | Borough

[A212] Wellesley Road (CR0/CR9) (Both Directions) intersecting Bedford Park and Poplar Walk - Single lane closures on A212 Wellesley Road to facilitate Bedford Park Pedestrian & Cycle Crossing Scheme.

  • Bedford Park (CR9) (All Directions)
  • Poplar Walk (CR0) (All Directions)
  • St Michael's Road (CR0) (All Directions)
  • [A212] Wellesley Road (CR9,CR0) (Both Directions)

A13 (RM15)

  Moderate

From: Monday 16 May 2016
To: Monday 31 October 2016

Last updated 08:17 Wednesday 31 August 2016 : Delays possible whilst restrictions are in place.

Works | Other

[A13] A13 (RM15) (Eastbound) at the junction of M25 Junction 30 - major improvement scheme on the roundabout at Junction 30 with lane restrictions. Overnight A13 carriageway closures will continue to allow the remaining re-surfacing works to be completed. During closures, diversion signs will be in place. Click for further information on the Highways England website.

  • A13 (RM15) (All Directions)

[A404] Harrow Road (W9) (Westminster)

  Moderate

From: Monday 25 April 2016
To: Friday 16 September 2016

Last updated 07:02 Wednesday 31 August 2016 : Delays are possible.

Works | Borough

[A404] Harrow Road (W9 ) (All Directions) at the junction of Elgin Avenue - Contractors are working on behalf of WSP and Westminster City Council to install a diagonal pedestrian crossing.

  • Fernhead Road (W9) (All Directions)
  • [A4207] Great Western Road (W9) (All Directions)
  • [A404] Harrow Road (W9) (All Directions)

[A232] Sutton Court Road (SM1) (Sutton)

  Moderate

From: Thursday 04 August 2016
To: Friday 21 April 2017

Last updated 08:19 Wednesday 31 August 2016 : Delays are possible.

Special and Planned Events | Construction Activity

[A232] Sutton Court Road (Westbound) between Chalk Pit Way and [B2230] High Street Sutton - Lane three closed to facilitate building works at a nearby development.

  • Bank Mews (SM1) (All Directions)
  • [A232] Chalk Pit Way (SM1) (All Directions)
  • [A232] Cheam Road (SM1) (All Directions)
  • Grove Road (SM1) (All Directions)
  • [A232] Grove Road (SM1) (All Directions)
  • [B2230] High Street (SM1) (All Directions)
  • Orme Road (SM1) (All Directions)
  • Sutton Court Road (SM1) (Westbound)
  • [A232] Sutton Court Road (SM1) (All Directions)

[A4] Strand (WC2E,WC2R) (Westminster)

  Moderate

From: Wednesday 31 August 2016
To: Wednesday 07 September 2016

Last updated 15:07 Wednesday 31 August 2016 : Traffic is slow moving past the restrictions

Works | Utility

[A4] Strand (WC2) (Eastbound) at the junction of Exeter Street - Lane one (of two) closed for works.

[A204] Tulse Hill (SW2) (Lambeth)

  Moderate

From: Tuesday 30 August 2016
To: Thursday 01 September 2016

Last updated 07:57 Wednesday 31 August 2016 : Delays are possible in the area while restrictions are in place.

Works | Utility

[A204] Tulse Hill (SW2) (All Directions) at the junction of Brailsford Road - Temporary traffic signals in operation to facilitate Virgin Media works.

  • Brailsford Road (SW2) (All Directions)
  • Dewey Lane (SW2) (All Directions)
  • [A204] Tulse Hill (SW2) (All Directions)

[A214] Tooting Bec Road (SW17) (Wandsworth)

  Moderate

From: Wednesday 31 August 2016
To: Friday 02 September 2016

Last updated 14:34 Wednesday 31 August 2016 : Possible delays when restrictions are in place.

Works | Utility

[A214] Tooting Bec Road (SW17) (Both Directions) at the junction of Romberg Road - Contraflow in operation to enable works by Thames Water (daily 1000 to 1530hrs).

  • Romberg Road (SW17) (All Directions)
  • [A214] Tooting Bec Road (SW17) (Both Directions)

[A501] City Road (EC1Y) (Islington)

  Moderate

From: Monday 08 August 2016
To: Sunday 30 October 2016

Last updated 08:23 Wednesday 31 August 2016 : Delays are possible during peak travel times.

Works | Utility

[A501] City Road (EC1Y) (Both Directions) at the junction of Worship Street - The carriageway has been reduced to one lane both ways for National Grid works

  • [A501] City Road (EC1Y) (All Directions)
  • Tabernacle Street (EC2A) (All Directions)

[A400] Gower Street (WC1B,WC1E) (Camden)

  Moderate

From: Monday 22 August 2016
To: Thursday 01 September 2016

Last updated 06:57 Wednesday 31 August 2016 : Local delays are possible while restrictions are in place.

Works | Other

[A400] Gower Street (WC1E) (Southbound) at the junction of Bedford Square - Lane one of three (bus lane) closed for works.

  • B506 (WC1B,WC1E) (All Directions)
  • [A400] Bedford Square (WC1B,WC1E) (All Directions)
  • [A400] Gower Street (WC1B,WC1E) (Southbound)

[A3218] Thurloe Place (SW7) (Kensington & Chelsea)

  Moderate

From: Thursday 18 August 2016
To: Friday 16 September 2016

Last updated 07:01 Wednesday 31 August 2016 : Delays possible.

Works | Borough

[A3218] Thurloe Place (All Directions) at the junction of Cromwell Place - Lane closures to facilitate various improvement works.

  • Cromwell Place (SW7) (All Directions)
  • [A3218] Cromwell Place (SW7) (All Directions)
  • [A3218] Thurloe Place (SW7) (All Directions)

Eastbourne Terrace (W2) (Westminster)

  Moderate

From: Monday 01 July 2013
To: Tuesday 02 January 2018

Last updated 06:58 Wednesday 31 August 2016 : Delays are possible.

Works | Other

Eastbourne Terrace (Both Directions) between Cleveland Terrace and [A4205] Praed Street - Various long-term restrictions and, at times, closures during Crossrail works.

  • Chilworth Mews (W2) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Conduit Mews (W2) (All Directions)
  • Conduit Place (W2) (All Directions)
  • Craven Road (W2) (All Directions)
  • Eastbourne Mews (W2) (All Directions)
  • Eastbourne Terrace (W2) (All Directions)
  • Gloucester Mews (W2) (All Directions)
  • Praed Street (W2) (All Directions)

[A5204] Seymour Street (W1H) (Westminster)

  Moderate

From: Monday 22 August 2016
To: Tuesday 04 October 2016

Last updated 07:00 Wednesday 31 August 2016 : Delays possible.

Works | TfL

[A5204] Seymour Street (W1H) (All Directions) at the junction of Great Cumberland Place - Temporary traffic signals in operation to facilitate traffic signals upgrade works.

[A124] Barking Road (E13,E6) (Newham)

  Moderate

From: Monday 22 August 2016
To: Wednesday 07 September 2016

Last updated 08:19 Wednesday 31 August 2016 : Delays possible while temporary signals are in operation.

Works | Utility

[A124] Barking Road (E13/E6 ) (All Directions) at the junction of Green Street - Temporary traffic signals are in use to facilitate National Grid works.

  • B167 (E13,E6) (All Directions)
  • [A124] Barking Road (E13,E6) (All Directions)
  • Boundary Road (E13) (All Directions)

[B509] Adelaide Road (NW3) (Camden)

  Moderate

From: Wednesday 31 August 2016
To: Wednesday 07 September 2016

Last updated 14:22 Wednesday 31 August 2016 : Local delays possible whilst restrictions are in place. At present no reported delays.

Works | Utility

[B509] Adelaide Road (NW3) (All Directions) at the junction of Harley Road - Temporary traffic signals are in operation to facilitate telecommunication works.

  • [B509] Adelaide Road (NW3) (All Directions)

[B266] Whitehorse Lane (SE25) (Croydon)

  Moderate

From: Tuesday 30 August 2016
To: Wednesday 31 August 2016

Last updated 08:02 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[B266] Whitehorse Lane (SE25) (All Directions) at the junction of Park Road - Temporary traffic lights in operation to facilitate works.

  • Crystal Palace Fc, Selhurst Park (SE25) (All Directions)
  • Egerton Road (SE25) (All Directions)
  • [B266] Whitehorse Lane (SE25) (All Directions)

[B411] Queensway (W2) (Westminster)

  Moderate

From: Monday 22 August 2016
To: Tuesday 13 September 2016

Last updated 06:55 Wednesday 31 August 2016 : Delays possible.

Works | TfL

[B411] Queensway (W2 ) (All Directions) at the junction of Redan Place - Temporary traffic signals in operation to facilitate traffic signals upgrade works.

  • Inver Court (W2) (All Directions)
  • [B411] Queensway (W2) (All Directions)
  • Redan Place (W2) (All Directions)

[A2043] Kingston Road (KT3) (Kingston Upon Thames)

  Moderate

From: Monday 22 August 2016
To: Thursday 01 September 2016

Last updated 08:51 Wednesday 31 August 2016 : Delays are possible.

Works | Utility

[A2043] Kingston Road (KT3) (All Directions) at the junction of Dickerage Lane - Temporary traffic signals in operation to facilitate water connection works.

  • Avenue Terrace (KT3) (All Directions)
  • Dickerage Lane (KT3) (All Directions)
  • [A2043] Kingston Road (KT3) (All Directions)

A10

[A10] Kingsland Road (E8) (Hackney)

  Minimal

From: Tuesday 16 August 2016
To: Ongoing

Last updated 09:31 Wednesday 31 August 2016 : Traffic is flowing well.

Infrastructure Issue | Signal Timing

[A10] Kingsland Road (E8 ) (All Directions) at the junction of St Peter's Way and Middleton Road - Traffic signals are not under central computer control.

  • Glebe Road (E8) (All Directions)
  • Haggerston Road (E8) (All Directions)
  • Kingsland Road (All Directions)
  • [A10] Kingsland Road (E8) (All Directions)
  • Middleton Road (E8) (All Directions)
  • St Peter's Way (E8,N1) (All Directions)

A2

Blackwall Tunnel

A102 (SE3,SE10,SE7) (Greenwich)

  Minimal

From: Monday 01 August 2016
To: Sunday 04 December 2016

Last updated 07:01 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A102] (SE3/SE7) (Both Directions) Sun-in-the-sands and Tunnel Avenue - Street lighting works between the A102 Sun in the Sands Roundabout and Tunnel House (Blackwall Tunnel). The works are planned for 20 weeks between 1 August and late November. Daytime works Mondays to Fridays between 10:00 and 15:00, hard shoulder of the A102 will be temporarily closed. Night time lane closure Mondays to Fridays between 22:00 and 05:00.

  • A2 (SE3) (All Directions)
  • A206 (SE10) (All Directions)
  • A2203 (SE10) (All Directions)
  • Bellfield Close (SE3) (All Directions)
  • Boord Street (SE10) (All Directions)
  • Bramshot Avenue (SE7) (All Directions)
  • Bugsby's Way (SE10) (All Directions)
  • [B210] Charlton Road (SE3,SE7) (All Directions)
  • Combedale Road (SE10) (All Directions)
  • Dreadnought Street (SE10) (All Directions)
  • Eastcombe Avenue (SE7) (All Directions)
  • Farmdale Road (SE10) (All Directions)
  • Invicta Road (SE3) (All Directions)
  • Langton Way (SE3) (All Directions)
  • Morden Wharf Road (SE10) (All Directions)
  • [B211] Old Dover Road (SE3) (All Directions)
  • Pavillion Lane (SE10) (All Directions)
  • Peterboat Close (SE10) (All Directions)
  • Siebert Road (SE3) (All Directions)
  • St Johns Park (SE3) (All Directions)
  • Tunnel Avenue (SE10) (All Directions)
  • Westcombe Hill (SE3,SE10) (All Directions)
  • Westerdale Road (SE10) (All Directions)

A2

[A2213] Kidbrooke Park Road (SE3,SE12) (Greenwich)

  Minimal

From: Tuesday 30 August 2016
To: Friday 24 February 2017

Last updated 09:17 Wednesday 31 August 2016 : Currently there are no restrictions in place, traffic is flowing well.

Works | TfL

[A2213] Kidbrooke Park Road (SE3/SE12) (All Directions) at the junction of Weigall Road - Improvement works on the A2213 Kidbrooke Park Road from 30 August. The improvements, which form part of the Kidbrooke Village development, will be completed in stages over the next year to keep disruption to a minimum. They include: Reconstructing and changing the road layout of Kidbrooke Park Road, between the junctions with Old Post Office Lane and Weigall Road, to remove the need for width and weight restrictions in the area in future. Replacing the pedestrian subway near Kidbrooke station with a surface-level signalised crossing. Introducing other improvements for pedestrians, including a new signalised crossing at the junction of Kidbrooke Park Road and Weigall Road. Installing new footways, street furniture, street lighting and drainage systems. Temporary traffic management changes will apply while the works take place. 30 August-2 September 2016 - Overnight lane closures will be needed on Kidbrooke Park Road. Vehicle access will be maintained in both directions controlled by temporary traffic lights. Works will take place between 21:00 each night until 05:00 the following morning - During the day, Kidbrooke Park Road will be open as normal, although the lanes will be narrower than usual. From 5 September onwards works to widen the road and build new kerbs will be done in two stages: - 5 September until December 2016: on the northbound side of Kidbrooke Park Road - November 2016 until February 2017: on the southbound side of Kidbrooke Park Road - Kidbrooke Park Road will be open with one lane in each direction as normal, although the lanes will be narrower than usual.

  • [A2213] Kidbrooke Park Road (SE3,SE12) (All Directions)
  • Weigall Road (SE12,SE3) (All Directions)

A2

[A2] Old Kent Road (SE15,SE1) (Southwark)

  Minimal

From: Wednesday 31 August 2016
To: Monday 19 September 2016

Last updated 09:09 Wednesday 31 August 2016 : Possible delays when restrictions are in place.

Works | TfL

[A2] Old Kent Road (SE1) (Southbound) near the junction of [A2208] Rotherhithe New Road - Lane one closed during footpath works.

  • Ainsdale Drive (SE1) (All Directions)
  • Avondale Square (SE1) (All Directions)
  • [A2] Canal Bridge (SE15,SE1) (All Directions)
  • Canal Grove (SE15) (All Directions)
  • Cooper's Road (SE1) (All Directions)
  • Fortune Place (SE1) (All Directions)
  • Glengall Road (SE15) (All Directions)
  • Livesey Place (SE15) (All Directions)
  • Lovegrove Street (SE1) (All Directions)
  • Malt Street (SE1) (All Directions)
  • Marlborough Grove (SE1) (All Directions)
  • Mawbey Place (SE1) (All Directions)
  • Mawbey Road (SE1) (All Directions)
  • Nile Terrace (SE15) (All Directions)
  • Oakley Place (SE1) (All Directions)
  • Old Canal Mews (SE15) (All Directions)
  • [A2] Old Kent Road (SE15,SE1) (Southbound)
  • [A2208] Old Kent Road (SE1,SE15,SE16) (All Directions)
  • Olmar Street (SE1) (All Directions)
  • Ossory Road (SE1) (All Directions)
  • [B216] Peckham Park Road (SE15) (All Directions)
  • Sandgate Street (SE15) (All Directions)
  • Shard's Square (SE15) (All Directions)
  • [A2208] St James's Road (SE1,SE15,SE16) (All Directions)
  • St James's Road (SE15) (All Directions)
  • [B215] Trafalgar Avenue (SE15) (All Directions)
  • Verney Road (SE16) (All Directions)

A20

[A20] Loampit Vale (SE13) (Lewisham)

  Minimal

From: Monday 28 July 2014
To: Friday 09 December 2016

Last updated 07:03 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

Lewisham Gateway, [A20] Loampit Vale (SE13) (All directions) - Intermittent lane closures on all approaches to the Lewisham northern roundabout. Phase 5 works involve the replacement of the existing northern roundabout (A20, A21 and A2211) with a new road layout, and also the diversion of the rivers Quaggy and Ravensbourne. A road layout is in operation with a minimum of two circulatory lanes, and a restricted access pedestrian crossing on the south side. A new slip road will also be opened between Molesworth Street and Loampit Vale. More information on the new road layout in Lewisham from approximately 0400hrs Sunday 28 August.

  • [A20] Loampit Vale (SE13) (West Bound)
  • Station Road (SE13) (All Directions)

A205

[A205] Lordship Lane (SE22,SE23) (Lewisham,Southwark)

  Minimal

From: Sunday 28 August 2016
To: Monday 05 September 2016

Last updated 09:17 Wednesday 31 August 2016 : Delays are possible while restrictions are in place.

Hazard(s) | Burst Water Main

[A205] Lordship Lane (SE22) (Westbound) at the junction of Wood Vale - Lane one/Bus lane (of two) is closed due to a burst water main.

  • Highwood Close (SE22) (All Directions)
  • [A205] London Road (SE22,SE23) (All Directions)
  • Wood Vale (SE23) (All Directions)

A24

[A24] Balham High Road (SW12) (Wandsworth)

  Minimal

From: Tuesday 30 August 2016
To: Thursday 01 September 2016

Last updated 10:13 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A24] Balham High Road (SW12) (Southbound) at the junction of Old Devonshire Road - Daily lane restrictions in place to facilitate bus shelter works.

  • [A24] Balham High Road (SW12) (Southbound)
  • Caister Mews (SW12) (All Directions)
  • Caistor Road (SW12) (All Directions)
  • Old Devonshire Road (SW12) (All Directions)

A316

[A316] Twickenham Road (TW1,TW9) (Richmond Upon Thames)

  Minimal

From: Sunday 31 July 2016
To: Friday 14 October 2016

Last updated 07:00 Wednesday 31 August 2016 : Traffic is flowing well.

Works | Utility

A316] Twickenham Road (Both Directions) between Twickenham Bridge and Parkshot - Various lane closures in place (in different phases) to facilitate National Grid Gas works. Lane 1 is currently closed both ways approaching Twickenham Bridge.

  • Clarence Street (TW9) (All Directions)
  • Heathcote Road (TW1) (All Directions)
  • Kew Foot Road (TW9) (All Directions)
  • Parkshot (TW9) (All Directions)
  • Ranelagh Drive (TW1) (All Directions)
  • St Peter's Road (TW1) (All Directions)
  • [A316] The Avenue (TW1,TW9) (All Directions)
  • The Avenue (TW1) (All Directions)
  • [A316] Twickenham Bridge (TW1,TW9) (All Directions)
  • [A316] Twickenham Road (TW1,TW9) (Both Directions)

A406

[A406] North Circular Road (E6,IG11) (Newham)

  Minimal

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 14:50 Wednesday 31 August 2016 : No lane restrictions.

Hazard(s) | Fire

[A406] North Circular Road (E6 ) (Southbound) at the junction of Beckton Roundabout (A406 / A13) - All lanes have reopened following the earlier vehicle fire.

  • A13 (E6,IG11) (All Directions)
  • [A406] Beckton Roundabout (A406 / A13) (E6,IG11) (All Directions)
  • [A406] North Circular Road (E6,IG11) (Southbound)

A406

A12

[A406] North Circular Road (E11,IG4) (Redbridge)

  Minimal

From: Sunday 28 August 2016
To: Monday 05 September 2016

Last updated 14:50 Wednesday 31 August 2016 : No lane restrictions.

Traffic Incidents | Collision

[A406] North Circular Road (Westbound) at the junction of Redbridge Roundabout (A12) - Abandoned vehicle at the side of the road.

  • A12 (E11,IG4,IG1) (All Directions)
  • A406 (E11,IG4) (All Directions)
  • Eastern Avenue (IG4) (All Directions)
  • [A406] North Circular Road (E11,IG4) (Westbound)
  • [A406] Redbridge Flyover (A406) (E11,IG4) (All Directions)
  • Royston Gardens (IG1) (All Directions)

Bishopsgate Cross Route

City Route

[A3] London Bridge (EC4R,SE1,EC3R) (City Of London,Southwark)

  Minimal

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 07:52 Wednesday 31 August 2016 : Works are confined to the footway. Traffic is flowing well.

Works | Utility

[A3] London Bridge (SE1) (Southbound) 90meters south of Lower Thames Street - Utility works on the footway.

  • [A3] Arthur Street (EC4R,SE1,EC3R) (All Directions)
  • [A3] Fish Street Hill (EC4R,SE1,EC3R) (All Directions)
  • [A3] King William Street (EC4R,SE1,EC3R) (All Directions)
  • [A3] London Bridge (EC4R,SE1,EC3R) (Southbound)

Farringdon Cross Route

[A301] Cycle Superhighway North - South (Phase 1) (SE1) (Southwark)

  Minimal

From: Monday 09 March 2015
To: Wednesday 31 August 2016

Last updated 14:12 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

Cycle Superhighway North-South (Phase 1) (All Directions) - Construction work for the Cycle Superhighway North-South is in progress at various locations. Click for more information about North-South Cycle Superhighway.

  • A201 (SE1) (All Directions)
  • A3202 (SE1) (All Directions)
  • Dodson Street (SE1) (All Directions)
  • Gerridge Street (SE1) (All Directions)
  • [A3203] Lambeth Road (SE1) (All Directions)
  • Library Street (SE1) (All Directions)
  • Rotary Street (SE1) (All Directions)
  • [A301] Waterloo Road (SE1) (All Directions)

Inner Ring

[A3204] Kennington Lane (SE11) (Lambeth)

  Minimal

From: Tuesday 30 August 2016
To: Wednesday 07 September 2016

Last updated 06:59 Wednesday 31 August 2016 : Delays are possible while works continue.

Works | TfL

[A3204] Kennington Lane (SE11) (All Directions) at the junction of Renfrew Road - Temporary traffic lights in operation from 30th August until 7th September to facilitate traffic signal upgrade works.

  • [A3204] Kennington Lane (SE11) (All Directions)
  • Opal Street (SE11) (All Directions)
  • Renfrew Road (SE11) (All Directions)

Inner Ring

Farringdon Cross Route

[A302] St George's Road (SE1,SE11) (Southwark)

  Minimal

From: Wednesday 31 August 2016
To: Thursday 01 September 2016

Last updated 10:15 Wednesday 31 August 2016 : Traffic is flowing well.

Works | TfL

[A302] St George's Road (SE1) (Westbound) opposite the junction of Gladstone Street - Daily lane one (of two) closure in place to facilitate installation of a bus shelter (10:00 to 1630).

  • Colnbrook Street (SE1) (All Directions)
  • Elliott's Row (SE11,SE1) (All Directions)
  • [A302] Garden Row (SE1,SE11) (All Directions)
  • Geraldine Street (SE1) (All Directions)
  • Gladstone Street (SE1) (All Directions)
  • Hayles Street (SE11) (All Directions)
  • [A3203] Lambeth Road (SE1) (All Directions)
  • Oswin Street (SE11) (All Directions)
  • [A302] St George's Road (SE1,SE11) (Westbound)
  • West Square (SE11,SE1) (All Directions)

Western Cross Route

[A3220] Earl's Court Road (SW5) (Kensington & Chelsea)

  Minimal

From: Monday 29 August 2016
To: Thursday 22 September 2016

Last updated 14:23 Wednesday 31 August 2016 : Temporary signals not currently in use. Traffic is flowing well.

Works | TfL

[A3220] Earl's Court Road (SW5) (All Directions) at the junction of Kenway Road - There will be temporary traffic lights in operation to facilitate works.

  • Kenway Road (SW5) (All Directions)
  • Spear Mews (SW5) (All Directions)
  • Trebovir Road (SW5) (All Directions)

[A238] Kingston Road (SW20) (Merton)

  Minimal

From: Tuesday 30 August 2016
To: Monday 05 September 2016

Last updated 09:11 Wednesday 31 August 2016 : Local delays are possible while restrictions are in place.

Works | Emergency

[A238] Kingston Road (SW20) (All Directions) at the junction of Sydney Road - UKPN will be carrying out works to repair a fault at this location. To enable the works, two way temporary traffic lights will be used.

  • [A238] Kingston Road (SW20) (All Directions)
  • Sydney Road (SW20) (All Directions)
  • Whitfield Court (SW20) (All Directions)

[A404] Watford Road (HA3,HA1) (Harrow,Brent)

  Minimal

From: Tuesday 30 August 2016
To: Friday 02 September 2016

Last updated 07:51 Wednesday 31 August 2016 : No reported delays in the area.

Works | Borough

[A404] Watford Road (HA1) (All Directions) at the junction of Kenton Road - Lane restrictions to facilitate borough resurfacing works.

  • [A404,A4006] Kenton Road (HA1) (All Directions)
  • [A404] Kenton Road (HA3,HA1) (All Directions)
  • [A404] Kenton Road Roundabout (HA3,HA1) (All Directions)
  • [A409] Sheepcote Road (HA1) (All Directions)
  • [A404] Watford Road (HA3,HA1) (All Directions)

[A402] Bayswater Road (W2) (Westminster)

  Minimal

From: Wednesday 31 August 2016
To: Ongoing

Last updated 14:59 Wednesday 31 August 2016 : Approach with caution.

Infrastructure Issue | Traffic Signal

[A402] Bayswater Road (W2 ) (All Directions) at the junction of Brook Street - Traffic signals have been knocked over.

  • [A402] Bayswater Road (W2) (All Directions)

[A232] Croydon Road (SM6) (Sutton)

  Minimal

From: Tuesday 30 August 2016
To: Friday 30 September 2016

Last updated 08:12 Wednesday 31 August 2016 : Delays are possible.

Works | TfL

[A232] Croydon Road (SM6) (All Directions) at the junction of Church Road and Demesne Road - Temporary traffic lights in place whilst upgrade works are being carried out to existing traffic signals

  • Church Road (SM6) (All Directions)
  • Croydon Road (All Directions)
  • [A232] Croydon Road (SM6) (All Directions)
  • Demesne Road (SM6) (All Directions)

[A1] Aldersgate Street (EC2Y,EC1A) (City Of London)

  Minimal

From: Monday 22 August 2016
To: Tuesday 28 February 2017

Last updated 08:09 Wednesday 31 August 2016 : Delays are possible while restrictions are in place.

Works | Borough

[A1] Aldersgate Street (EC2Y/EC1A) (All Approaches) at the junction of Beech Street and Long Lane - Restrictions in place to facilitate heating pipe installation works into St Bart's Hospital. There will be **no** right turn from Aldersgate to Beech Street (northbound) and no right turn from Aldersgate into Long Lane (southbound). Works are suspended until mid-September.

  • [A1] Aldersgate Street (EC2Y,EC1A) (All Approaches)
  • [B100] Beech Street (EC2Y,EC1A) (All Directions)
  • Cloth Street (EC1A) (All Directions)
  • Long Lane (EC1A) (All Directions)
Favicon

My Lines

My Buses

My Roads

My River Buses

My Emirates Air Line

My Journeys

My Places

    Favicon

    Edit My Lines

    Edit My Buses

    Edit My Roads

    Edit My River Buses

    Edit My Emirates Air Line

    Edit My Journeys

    Edit My Places