Status updates
Traffic
Now 02:13
Find a postcode, place or road
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 08 July 2024
To: Wednesday 31 December 2025
Last updated 09:37 Sunday 01 September 2024 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)
Silvertown Tunnel, Greenwich Peninsula () ()
From: Friday 25 February 2022
To: Saturday 01 February 2025
Last updated 16:17 Friday 13 December 2024 : Delays are possible throughout the duration of the works.
Works | TfL works
Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. Millennium Way is currently closed. There are associated lane closures on the northbound A102 Blackwall Tunnel Southern Approach. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.
- MILLENNIUM WAY (SE10) (Southbound)
- WEST PARKSIDE (SE10) (Northbound)
- EDMUND HALLEY WAY (SE10) (Eastbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Southbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Both directions)
- TUNNEL AVENUE (SE10) (Southbound)
[A118] HIGH STREET (E15,E3) (Newham,Tower Hamlets)
From: Monday 09 September 2024
To: Saturday 01 February 2025
Last updated 16:24 Friday 13 December 2024 : Possible delays during the works.
Works | TfL works
[A118] High Street (All approaches) at the junction of [A11] Bow Road - Lane closures on all approaches and on the roundabout, and closure of the link road under the flyover due to Sivertown Tunnel works.
A316
[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)
From: Monday 16 September 2024
To: Friday 27 June 2025
Last updated 15:22 Friday 13 December 2024 : Delays are possible.
Works | TfL works
[A316] Chertsey Road (All directions) at the junction of [A310] London Road - Various lane closures to facilitate roadworks.
A4
[A306] HAMMERSMITH BRIDGE (W6,SW13) (Hammersmith & Fulham,Richmond upon Thames)
From: Thursday 11 April 2019
To: Friday 01 January 2027
Last updated 15:31 Friday 13 December 2024 : Resolved
Asset issues | Service disruption
[A306] Hammersmith Bridge (W6) (Both Directions) - The bridge is closed to all modes of transport apart from pedestrians and cyclists.
- [A306] HAMMERSMITH BRIDGE (W6,SW13) (Both Directions)
A12
[A12] COLCHESTER ROAD (RM3) (Havering)
From: Wednesday 27 July 2022
To: Sunday 31 August 2025
Last updated 16:11 Friday 13 December 2024 : Delays are possible.
Works | Motorways works
[A12] Colchester Road (Both directions) between Petersfield Avenue and M25 J28 Brook Street Roundabout. - Single lane restrictions in operation to facilitate the creation of a new slip road and redesign of the Brook Street Roundabout. For more information see https://nationalhighways.co.uk/our-roads/south-east/m25-junction-28-improvements/
A2
Inner Ring
[A201] NEW KENT ROAD (SE1,SE17) (Southwark)
From: Thursday 21 November 2024
To: Friday 20 December 2024
Last updated 14:59 Friday 13 December 2024 : Works are complete.
Works | TfL works
[A201] New Kent Road (Both directions) between Elephant Road and [B240] Harper Road - Lane closures to facilitate roadworks.
A40
Western Cross Route
[A3220] WEST CROSS ROUTE (W10,W11,W12) (Hammersmith & Fulham,Kensington & Chelsea)
From: Sunday 21 July 2024
To: Saturday 28 June 2025
Last updated 23:21 Sunday 01 September 2024 : Use an alternative route. Traffic is flowing well on diversion.
Works | TfL works
A40 Westway Refurbishment Scheme - A3220 West Cross Route - [A3220] West Cross Route (Southbound) between A40 Westway and Ariel Way - A40 Westway eastbound off-slip to Northern Roundabout remains closed. From Monday 2 September until Saturday 12 October, West Cross Route northbound and the slip road to Wood Lane will be closed.
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Northbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
[A3216] SLOANE STREET (SW1X) (Kensington & Chelsea)
From: Wednesday 28 December 2022
To: Tuesday 31 December 2024
Last updated 09:44 Sunday 01 September 2024 : Use an alternative route. Possible delays on diversion.
Works | Borough works
"Sloane Street Future" - [A3216] Sloane Street (Northbound) between Sloane Square and Knightsbridge. - Road closed and temporary signals in place to facilitate Urban Realms Works.
- [A3216] LOWER SLOANE STREET (SW1W) (Northbound)
- [A3216] SLOANE STREET (SW1X) (Northbound)
- [A3216] SLOANE STREET (SW1X,SW3) (Northbound)
[A1020] SILVERTOWN WAY (E16) (Newham)
From: Friday 29 December 2023
To: Tuesday 30 September 2025
Last updated 13:28 Friday 13 December 2024 : Works complete.
Works | Borough works
[A1020] Silvertown Way (All approaches) at the junction of Caxton Street North - Temporary signals and lane restrictions in place. Nightly closures at 20:00 until 27/08/24.
- [A1020] SILVERTOWN WAY (E16) (Both directions)
[A1206] PRESTONS ROAD ROUNDABOUT (E14) (Tower Hamlets)
From: Monday 16 September 2024
To: Saturday 01 February 2025
Last updated 16:08 Friday 13 December 2024 : Delays are possible. Ongoing until February 2025
Works | TfL works
Silvertown Tunnel Scheme - Preston's Roundabout - [A1206] Prestons Road Roundabout (All directions) between [A1206] Prestons Road and [A1261] Aspen Way - Lane restrictions are in place to facilitate Silvertown Tunnel related works.
[A1206] MANCHESTER ROAD (E14) (Tower Hamlets)
From: Thursday 27 June 2024
To: Friday 07 February 2025
Last updated 16:18 Friday 13 December 2024 : Delays are possible. Ongoing until 2025.
Works | Utility works
[A1206] Manchester Road (Both directions) at the junction of Stebondale Street - Temporary signals in use for long term utility works.
A20
A21
LEWISHAM HIGH STREET (SE13) (Lewisham)
From: Saturday 03 August 2024
To: Monday 31 March 2025
Last updated 16:17 Friday 13 December 2024 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.
- LEWIS GROVE (SE13) (Northbound)
Southern River Route
[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)
From: Saturday 31 August 2024
To: Wednesday 29 January 2025
Last updated 00:28 Monday 02 September 2024 : Traffic is flowing well.
Works | TfL works
[A3203] Lambeth Bridge (Both directions) between [A3212] Millbank and [A3036] A 3036 - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place at the junction of Millbank. From 9th September, restrictions will be in place on the roundabout at the junction of Lambeth Palace road.