Status updates
Traffic
Now 11:56
Find a postcode, place or road
A40
[A40] WESTERN AVENUE (UB6 ,W5 ) (Ealing)
From: Monday 28 April 2025
To: Monday 12 May 2025
Last updated 12:22 Tuesday 06 May 2025 : Traffic is slow moving on the approach to the works
Works | Utility works
[A40] Western Avenue (Eastbound) between Bideford Avenue and [B456] Alperton Lane - One lane closed (of three) to facilitate utility works.
A12
[A12] EASTERN AVENUE EAST (RM2 ,RM3 ) (Havering)
From: Saturday 15 March 2025
To: Wednesday 21 May 2025
Last updated 08:18 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
Gallows Corner Flyover Refurbishment - [A12] Eastern Avenue East (Both directions) between [A12] Colchester Road and [A127] Southend Arterial Road - Various restrictions, including some overnight closures, to facilitate the refurbishment of Gallows Corner Flyover.
- [A127] SOUTHEND ARTERIAL ROAD (RM2 ,RM3 ) (Westbound)
- [A12] EASTERN AVENUE EAST (RM2 ,RM3 ) (Westbound)
A13
[A13] NEWHAM WAY (E14 ,E16 ) (Newham)
From: Wednesday 19 February 2025
To: Saturday 24 May 2025
Last updated 12:46 Tuesday 06 May 2025 : Traffic is flowing well.
Works | TfL works
Canning Town Flyover Refurbishment Works - [A13] Newham Way (Westbound) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works.
- [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Both directions)
- [A13] NEWHAM WAY (E16) (Both directions)
A13
[A13] COMMERCIAL ROAD (E14 ) (Tower Hamlets)
From: Wednesday 30 April 2025
To: Sunday 08 June 2025
Last updated 08:16 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A13] Commercial Road (Eastbound) between Salmon Lane and Three Colt Street - Lane one (of two) closed for TfL works.
A205
[A205] DULWICH COMMON (SE21,SE22) (Southwark)
From: Sunday 01 June 2025
To: Friday 06 June 2025
Last updated 11:38 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A205] Dulwich Common (Both directions) at the junction of [A2216] Lordship Lane - Restrictions and temporary signals in place to facilitate maintenance works.
A3
[A243] LEATHERHEAD ROAD (KT9 ) (Kingston upon Thames)
From: Monday 05 May 2025
To: Ongoing
Last updated 10:16 Tuesday 06 May 2025 : Traffic is flowing well. Use caution on approach.
Asset issues | Traffic signal fault
[A243] Leatherhead Road (All directions) at the junction of [B280] Rushett Lane - The traffic signals are not working. The central reservation has been closed for safety.
A316
[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)
From: Thursday 19 December 2024
To: Monday 21 July 2025
Last updated 08:54 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - Various road closures and Lane restrictions will be in place for junction improvement works.
- [A310] LONDON ROAD (TW1 ) (Both directions)
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 08 July 2024
To: Thursday 30 April 2026
Last updated 08:31 Tuesday 06 May 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)
Inner Ring
[A4] PICCADILLY (SW1X,W1J,W1K,W2) (Westminster)
From: Monday 17 February 2025
To: Friday 18 July 2025
Last updated 12:16 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Borough works
Piccadilly Underpass - [A4] Piccadilly (Eastbound) at the junction of [A4] Duke Of Wellington Place - Underpass closure to facilitate maintenance works.
- [A4] PICCADILLY (SW1X,W1J,W1K,W2) (Eastbound)
Inner Ring
[A501] PENTONVILLE ROAD (N1,WC1X) (Camden,Islington)
From: Thursday 30 January 2025
To: Thursday 08 May 2025
Last updated 08:34 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A501] Pentonville Road (Eastbound) at the junction of [A201] Kings Cross Road - Temporary signals and restrictions in place to facilitate works.
- [A501] PENTONVILLE ROAD (N1,WC1X) (Westbound)
- [A201] KINGS CROSS ROAD (N1,WC1X) (Southbound)
Southern River Route
[A3203] LAMBETH BRIDGE (SE1 ,SW1P ) (Lambeth,Westminster)
From: Saturday 31 August 2024
To: Friday 19 December 2025
Last updated 08:28 Tuesday 06 May 2025 : Use an alternative route. Delays are possible.
Works | TfL works
[A3203] Lambeth Bridge (Eastbound) between [A3036] A 3036 and [A3212] Millbank - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. The bridge is closed eastbound.
- [A3203] LAMBETH BRIDGE (SE1,SW1P) (Eastbound)
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Monday 24 February 2025
To: Friday 30 May 2025
Last updated 08:53 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A3220] Battersea Bridge Road (Both directions) at the junction of [B305] Westbridge Road - Temporary traffic signals and lane restrictions in place to facilitate works scheme. Additional carriageway restrictions to allow further overnight works.
HORSE GUARDS AVENUE (SW1A ) (Westminster)
From: Wednesday 30 April 2025
To: Wednesday 07 May 2025
Last updated 12:17 Tuesday 06 May 2025 : Horse Guards Avenue remains closed to traffic. Traffic is flowing well.
Planned events | Celebration
Horse Guards Avenue (Both directions) between Whitehall Court and [A3211] Victoria Embankment - Road is closed to facilitate a compound area for VE Day 80 celebrations.
- HORSE GUARDS AVENUE (SW1A ) (Both directions)
- HORSE GUARDS AVENUE (SW1A ) (Both directions)
- CONSTITUTION HILL (SW1A ,SW1W ) (Both directions)
- THE MALL (SW1A ,SW1Y ,WC2N ) (Both directions)
- QUEENS GARDENS (SW1A ) (Both directions)
- HORSE GUARDS ROAD (SW1A ,SW1H ,SW1Y ) (Both directions)
[A118] ROMFORD ROAD (E12 ) (Newham)
From: Friday 18 April 2025
To: Saturday 31 May 2025
Last updated 08:19 Tuesday 06 May 2025 : Delays are possible.
Works | Borough works
[A118] Romford Road (Both directions) at the junction of Oregon Avenue - Temporary traffic signals and lane restrictions are in place for Borough works.
A10
[A10] HIGH ROAD (N15 ,N16 ) (Haringey)
From: Tuesday 06 May 2025
To: Thursday 08 May 2025
Last updated 09:33 Tuesday 06 May 2025 : There are no reported delays
Works | Utility works
[A10] High Road (Both directions) at the junction of Gladesmore Road - Lane restrictions in use to facilitate BT Openreach works (09:30 to 15:30 daily).
A20
[A202] CAMBERWELL CHURCH STREET (SE5 ) (Southwark)
From: Tuesday 22 April 2025
To: Friday 16 May 2025
Last updated 12:49 Tuesday 06 May 2025 : Traffic is slow moving on approach. Expect delays.
Works | Utility works
[A202] Camberwell Church Street (All directions) at the junction of Kimpton Road - Temporary traffic signals to be implemented to facilitate Thames Water works.
A205
[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)
From: Thursday 19 December 2024
To: Friday 11 July 2025
Last updated 08:13 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.
A205
[A217] ARMOURY WAY (SW18 ) (Wandsworth)
From: Friday 25 April 2025
To: Wednesday 11 March 2026
Last updated 08:11 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A217] Armoury Way (All approaches) at the junction of [A217] Wandsworth Plain - Lane closure for Thames Water works.
A23
[A23] STREATHAM HIGH ROAD (SW16) (Lambeth)
From: Sunday 08 June 2025
To: Ongoing
Last updated 08:14 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A23] Streatham High Road (All directions) at the junction of [A214] Streatham Common North - Temporary traffic signals are in place during works to upgrade the permanent signals.
A24
[A24] MORDEN ROAD (SW19 ) (Merton)
From: Wednesday 23 April 2025
To: Friday 13 June 2025
Last updated 08:52 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A24] Morden Road (Both directions) at the junction of [A24] Merantun Way - Various lane restrictions in place to facilitate TFL works.
A3
[A3] KINGSTON ROAD (SW15 ,SW19 ) (Wandsworth)
From: Sunday 04 May 2025
To: Tuesday 06 May 2025
Last updated 11:42 Tuesday 06 May 2025 : The traffic is flowing well past the works.
Works | Utility works
[A3] Kingston Road (Northbound) at the junction of [A306] Roehampton Lane - Lane one (of three) blocked due to Thames Water works.
A40
[A40] WESTWAY (W10 ,W12 ) (Hammersmith & Fulham,Kensington & Chelsea)
From: Wednesday 23 April 2025
To: Wednesday 27 August 2025
Last updated 08:06 Tuesday 06 May 2025 : Use an alternative route. Delays are possible.
Works | TfL works
[A40] Westway (Eastbound) at the junction of [A3220] West Cross Route - The exit slip road to the Northern Roundabout is closed to facilitate repair works.
[A400] CAMDEN HIGH STREET (NW1 ) (Camden)
From: Thursday 01 May 2025
To: Friday 30 October 2026
Last updated 12:02 Tuesday 06 May 2025 : Use an alternative route. Traffic is flowing well on diversion.
Works | Borough works
[A400] Camden High Street (Northbound) between [A4201] Parkway and Hawley Crescent - Road closed to facilitate a pilot pedestrianisation scheme by Camden Council.
- [A400] CAMDEN HIGH STREET (NW1 ) (Northbound)
WESTFIELD AVENUE (E20 ) (Newham)
From: Monday 31 March 2025
To: Saturday 20 December 2025
Last updated 08:22 Tuesday 06 May 2025 : Delays are possible.
Works | Borough works
Westfield Avenue (Both directions) between Olympic Park Avenue and Montfichet Road - Various restrictions including lane closures, temporary signals and cycle lane closures are in place for carriageway refurbishment works.
[A105] GREEN LANES (N15 ,N4 ,N8 ) (Haringey)
From: Thursday 10 April 2025
To: Friday 16 May 2025
Last updated 08:04 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A105] Green Lanes (Both directions) at the junction of Salisbury Road - Temporary traffic signals in place during TfL works.
[A200] CREEK ROAD (SE10 ,SE8 ) (Greenwich)
From: Tuesday 06 May 2025
To: Friday 20 June 2025
Last updated 09:42 Tuesday 06 May 2025 : There are no reported delays.
Works | TfL works
[A200] Creek Road (All directions) at the junction of [A200] Greenwich Church Street - Temporary traffic signals are in operation to facilitate traffic signal upgrade works. In addition, between 09:30 and 15:30 only, lane restrictions are in place.
[A302] VICTORIA STREET (SW1E ,SW1H ,SW1P ) (Westminster)
From: Monday 24 March 2025
To: Wednesday 14 May 2025
Last updated 08:34 Tuesday 06 May 2025 : Use an alternative route. Delays are possible.
Works | Utility works
[A302] Victoria Street (All directions) at the junction of Storeys Gate - Multi-way temporary traffic signals are in place to facilitate urgent gas main repairs by Cadent. In addition, Storey's Gate will be closed to all road users throughout, Including cyclists and pedestrians.
- STOREYS GATE (SW1H ,SW1P ) (Both directions)
[A107] AMHURST ROAD (E5 ,E8 ) (Hackney)
From: Saturday 29 March 2025
To: Friday 06 June 2025
Last updated 08:15 Tuesday 06 May 2025 : Delays are possible.
Works | Borough works
[A107] Amhurst Road (All directions) at the junction of Marcon Place - Multi-phase borough works to facilitate a major highway scheme. Amhurst Road is reduced to a single-lane contraflow in each direction with the bus lane suspended. Kenmure Road is also closed to all traffic whilst the works are in progress.
- KENMURE ROAD (E8 ) (All directions)
A1
[A1] UPPER STREET (N1) (Islington)
From: Friday 25 April 2025
To: Tuesday 06 May 2025
Last updated 08:01 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A1] Upper Street (Both directions) at the junction of Waterloo Terrace - Contraflow in place to facilitate water works.
A205
[A205] WESTHORNE AVENUE (SE12 ,SE9 ) (Greenwich,Lewisham)
From: Tuesday 11 March 2025
To: Thursday 08 May 2025
Last updated 08:53 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Westbound) between [A20] Sidcup Road and Alnwick Road - Lane two is closed owing to burst water main repairs.
A21
[A21] LEWISHAM HIGH STREET (SE13,SE6) (Lewisham)
From: Monday 24 March 2025
To: Wednesday 28 May 2025
Last updated 08:13 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A21] Lewisham High Street (Both directions) at the junction of George Lane - TfL resurfacing and line marking. Lane closures are in place.
A24
[A3] KENNINGTON PARK ROAD (SE11 ,SE17 ) (Lambeth,Southwark)
From: Tuesday 06 May 2025
To: Monday 30 June 2025
Last updated 12:21 Tuesday 06 May 2025 : Traffic remains flowing well.
Works | Utility works
[A3] Kennington Park Road (Northbound) at the junction of Penton Place - Nortbound lane one (of two) closure to be implemented to facilitate gas works.
A24
[A24] UPPER TOOTING ROAD (SW17 ) (Wandsworth)
From: Friday 25 April 2025
To: Friday 16 May 2025
Last updated 08:11 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A24] Upper Tooting Road (Both directions) at the junction of Lynwood Road - 2- way temporary traffic signals and lane restrictions in order to facilitate Thames Water works.
A3
Inner Ring
[A3205] NINE ELMS LANE (SW11 ,SW8 ) (Lambeth,Wandsworth)
From: Tuesday 06 May 2025
To: Ongoing
Last updated 12:33 Tuesday 06 May 2025 : Traffic is flowing well.
Works | TfL works
[A3205] Nine Elms Lane (Eastbound) at the junction of [A3036] Wandsworth Road - Lane restrictions to be implemented to facilitate urban realm works.
A3
Inner Ring
[A3205] NINE ELMS LANE (SW11 ,SW8 ) (Lambeth,Wandsworth)
From: Monday 28 April 2025
To: Sunday 02 August 2026
Last updated 08:15 Tuesday 06 May 2025 : Delays are possible.
Works | Collaborative works
[A3205] Nine Elms Lane (Both directions) at the junction of Ponton Road - Lane closures in place to facilitate Urban Realm Works.
A4
[A4] KNIGHTSBRIDGE (SW1X ,SW3 ,SW7 ,W1J ) (Kensington & Chelsea,Westminster)
From: Tuesday 06 May 2025
To: Tuesday 09 September 2025
Last updated 12:33 Tuesday 06 May 2025 : Restrictions are confined to the pavement.
Works | Borough works
[A4] Knightsbridge (All approaches) at the junction of [A4] Piccadilly - Segregation barriers to facilitate works to Wellesley Hotel.
A40
[A40] WESTWAY (W2 ,W9 ) (Westminster)
From: Monday 28 April 2025
To: Friday 09 May 2025
Last updated 08:11 Tuesday 06 May 2025 : Delays are possible.
Works | TfL works
[A40] Westway (Westbound) between Harrow Road and the Paddington entry slip road - The hard shoulder is blocked due to emergency repair works.
A406
[A406] NORTH CIRCULAR ROAD (NW10 ,NW2 ,NW4 ) (Barnet)
From: Monday 28 April 2025
To: Thursday 08 May 2025
Last updated 12:01 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Utility works
[A406] North Circular Road (Westbound) at the junction of [A41] Brent Cross Roundabout - Lane one westbound off-ramp from Brent Cross flyover is closed to facilitate emergency Cadent Gas works.
A41
[A41] FINCHLEY ROAD (NW3,NW6) (Camden)
From: Wednesday 23 April 2025
To: Friday 23 May 2025
Last updated 07:59 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A41] Finchley Road (Northbound) at the junction of Frognal Court - Lane 1 of 3 closed to facilitate works.
Bishopsgate Cross Route
Southern River Route
[A3] BOROUGH HIGH STREET (SE1 ) (Southwark)
From: Friday 02 May 2025
To: Monday 12 May 2025
Last updated 12:41 Tuesday 06 May 2025 : Use an alternative route. No reported delays.
Works | Utility works
[A3] Borough High Street (Northbound) at the junction of [A3200] Southwark Street - Road is closed to facilitate Thames Water Works.
- [A3] BOROUGH HIGH STREET (SE1 ) (Both directions)
- [A3200] SOUTHWARK STREET (SE1 ) (Westbound)
Farringdon Cross Route
[A201] FARRINGDON STREET (EC1A,EC1N,EC4A) (City of London,Islington)
From: Tuesday 06 May 2025
To: Saturday 10 May 2025
Last updated 12:14 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Borough works
[A201] Farringdon Street (All approaches) at the junction of [A40] Holborn Viaduct - Maylim Paving works. Carriageway incursion.
Farringdon Cross Route
Inner Ring
[A201] KINGS CROSS ROAD (N1 ,WC1X ) (Camden,Islington)
From: Tuesday 06 May 2025
To: Friday 09 May 2025
Last updated 12:22 Tuesday 06 May 2025 : Traffic flowing well passed the lane restriction.
Works | Utility works
[A201] Kings Cross Road (Southbound) at the junction of Field Street - Lane one (of two) is closed due to Thames Water works. In addition, Field Street is closed with no access from King's Cross Road.
Farringdon Cross Route
[A201] FARRINGDON STREET (EC1A ,EC1N ,EC4A ) (City of London,Islington)
From: Monday 05 May 2025
To: Wednesday 14 May 2025
Last updated 12:18 Tuesday 06 May 2025 : The traffic is flowing well through the works.
Works | Utility works
[A201] Farringdon Street (Both directions) at the junction of West Smithfield - Various lane restrictions, two-way temporary traffic signals in operation to facilitate utility works. Additionally West Smithfield is closed.
Inner Ring
[A501] CITY ROAD (EC1V ,EC1Y ,N1 ) (Hackney,Islington)
From: Friday 02 May 2025
To: Wednesday 07 May 2025
Last updated 12:17 Tuesday 06 May 2025 : The traffic is flowing well past the works.
Works | Collaborative works
[A501] City Road (Eastbound) at the junction of Wellesley Terrace - Lane one (of two) is closed to facilitate utility work.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW10 ,SW11 ) (Kensington & Chelsea,Wandsworth)
From: Tuesday 06 May 2025
To: Monday 19 May 2025
Last updated 12:26 Tuesday 06 May 2025 : Traffic is flowing well.
Works | TfL works
[A3220] Battersea Bridge Road (Southbound) nearby junction of Hester Road - Lane restriction in place to facilitate Urban Realm Works.
[A4205] PRAED STREET (W2) (Westminster)
From: Monday 05 May 2025
To: Wednesday 07 May 2025
Last updated 12:22 Tuesday 06 May 2025 : Traffic diversion are in place due to the road closure.
Works | Borough works
[A4205] Praed Street (Both directions) between London Street and Spring Street - Road closed to facilitate carriageway repair works.
[A222] HURST ROAD (DA14 ,DA15 ,DA5 ) (Bexley)
From: Wednesday 30 April 2025
To: Thursday 08 May 2025
Last updated 09:36 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A222] Hurst Road (Westbound) at the junction of Foots Cray Lane - The road is closed due to SGN emergency Gas works.
- [A222] HURST ROAD (DA14 ,DA15 ,DA5 ) (Westbound)
[A105] NEWINGTON GREEN (N1 ,N16 ) (Hackney,Islington)
From: Tuesday 22 April 2025
To: Friday 09 May 2025
Last updated 08:02 Tuesday 06 May 2025 : Delays are possible.
Works | Borough works
[A105] Newington Green (Southbound) at the junction of [A105] Newington Green Road - Left turn onto Newington Green Road closed to facilitate Islington Council roadworks.
[A503] CAMDEN ROAD (N7 ,NW1 ) (Camden,Islington)
From: Tuesday 29 April 2025
To: Tuesday 20 May 2025
Last updated 12:01 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Utility works
[A503] Camden Road (Southbound) at the junction of Middleton Grove - Lane one closure to facilitate water works.
[B363] ST JOHNS ROAD (TW7 ) (Hounslow)
From: Wednesday 30 April 2025
To: Wednesday 07 May 2025
Last updated 08:10 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[B363] St Johns Road (Both directions) at the junction of [A315] London Road - Temporary traffic signals in operation to facilitate Cadent Gas works.
LUPUS STREET (SW1V ) (Westminster)
From: Wednesday 30 April 2025
To: Friday 09 May 2025
Last updated 12:19 Tuesday 06 May 2025 : Use an alternative route. The traffic is flowing well on diversion.
Works | Utility works
Lupus Street (Westbound) at the junction of [A3213] Bessborough Street - There are temporary signals in place for emergency works. Lupus Street is also closed westbound as part of the works.
- [A3213] LUPUS STREET (SW1V ) (Westbound)
- [A3213] BESSBOROUGH STREET (SW1V ) (Westbound)
[A5] CRICKLEWOOD BROADWAY (NW2 ) (Barnet,Brent,Camden)
From: Wednesday 30 April 2025
To: Tuesday 20 May 2025
Last updated 08:08 Tuesday 06 May 2025 : Use an alternative route where possible. Delays are possible.
Works | Utility works
[A5] Cricklewood Broadway (Northbound) at the junction of [A407] Chichele Road - Road closed for emergency sewer works.
- [A5] CRICKLEWOOD BROADWAY (NW2 ) (Northbound)
[A598] BALLARDS LANE (N12 ) (Barnet)
From: Tuesday 06 May 2025
To: Ongoing
Last updated 09:26 Tuesday 06 May 2025 : There are no reported delays
Works | Utility works
[A598] Ballards Lane (Northbound) at the junction of [A1003] Kingsway - Lane restrictions in place to facilitate telecommunications works.
[A504] HIGH STREET (N8 ) (Haringey)
From: Friday 25 April 2025
To: Sunday 18 May 2025
Last updated 08:06 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A504] High Street (All directions) at the junction of [A103] Church Lane - Temporary traffic signal are in use to facilitate Thames Water works.
EDGWAREBURY LANE (HA8 ) (Barnet)
From: Tuesday 06 May 2025
To: Ongoing
Last updated 11:58 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Borough works
Edgwarebury Lane (Both directions) between [A41] Edgware Way and Fairview Way - Temporary traffic signals in place to facilitate LB Barnet carriageway repairs.
[A11] MILE END ROAD (E1 ,E3 ) (Tower Hamlets)
From: Monday 10 February 2025
To: Sunday 25 May 2025
Last updated 08:21 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A11] Mile End Road (Westbound) between [A1205] Burdett Road and Harford Street - Bus lane closure in operation to facilitate Thames Water works.
ARIEL WAY (W12 ) (Hammersmith & Fulham)
From: Thursday 01 May 2025
To: Friday 30 May 2025
Last updated 12:04 Tuesday 06 May 2025 : Use an alternative route. Traffic is flowing well on diversion.
Works | Construction activity
Ariel Way (Both directions) at the junction of [A219] Wood Lane - Ariel Way is closed to allow construction works to take place.
- ARIEL WAY (W12 ) (Both directions)
[A4003] WILLESDEN LANE (NW10,NW2) (Brent)
From: Wednesday 26 February 2025
To: Tuesday 06 May 2025
Last updated 08:00 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A4003] Willesden Lane (Both directions) at the junction of [A407] Walm Lane - Three way temporary traffic signals to be implemented to facilitate Thames Water works.
[A1211] BEVIS MARKS (EC3A ) (City of London)
From: Tuesday 06 May 2025
To: Friday 16 May 2025
Last updated 12:16 Tuesday 06 May 2025 : Possible delays during the works.
Works | Utility works
[A1211] Bevis Marks (Both directions) at the junction of [A1211] Dukes Place - Lane restrictions to facilitate utility works.
[A214] TOOTING BEC ROAD (SW17 ) (Wandsworth)
From: Saturday 05 April 2025
To: Sunday 15 June 2025
Last updated 08:55 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A214] Tooting Bec Road (Both directions) between [A214] Trinity Road, [A24] Upper Tooting Road and [A24] Balham High Road - Multi-way temporary traffic signals are in place to facilitate Thames Water works.
[A502] CHALK FARM ROAD (NW1 ) (Camden)
From: Monday 05 May 2025
To: Friday 16 May 2025
Last updated 12:03 Tuesday 06 May 2025 : Traffic is flowing well.
Works | Utility works
[A502] Chalk Farm Road (Both directions) at the junction of Belmont Street - Two temporary traffic lights in operation to facilitate utility works.
[A1] GOSWELL ROAD (EC1A ,EC1M ,EC1V ) (City of London,Islington)
From: Friday 11 April 2025
To: Sunday 25 May 2025
Last updated 08:35 Tuesday 06 May 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A1] Goswell Road (Both directions) at the junction of [A5201] Clerkenwell Road - Road closure to facilitate gas works.
- [A1] GOSWELL ROAD (EC1A ,EC1M ,EC1V ) (Northbound)
- [A1] GOSWELL ROAD (EC1M ,EC1V ) (Both directions)
[A1200] EAST ROAD (EC1V ,N1 ) (Hackney)
From: Monday 28 April 2025
To: Friday 09 May 2025
Last updated 08:28 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A1200] East Road (Southbound) at the junction of [A501] City Road - Lane closure to facilitate electrical works.
[B108] NEW ROAD (E1 ) (Tower Hamlets)
From: Tuesday 08 April 2025
To: Friday 09 May 2025
Last updated 08:17 Tuesday 06 May 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[B108] New Road (Both directions) at the junction of [A11] Whitechapel Road - The road is closed due to emergency Thames Water works. The designated turns for New Road are also closed on Whitechapel Road.
- [B108] NEW ROAD (E1 ) (Both directions)
[A212] CRYSTAL PALACE PARADE (SE19 ,SE26 ) (Bromley,Lambeth,Southwark)
From: Monday 07 April 2025
To: Sunday 18 May 2025
Last updated 12:33 Tuesday 06 May 2025 : There are no reported delays.
Works | Utility works
[A212] Crystal Palace Parade (Both directions) at the junction of [A2199] College Road - Lane restrictions and temporary signals in place to facilitate gas main replacement works.
[A312] NORTHOLT ROAD (HA2 ) (Harrow)
From: Monday 28 April 2025
To: Monday 19 May 2025
Last updated 08:07 Tuesday 06 May 2025 : Delays are possible.
Works | Utility works
[A312] Northolt Road (Both directions) at the junction of Wyvenhoe Road - Lane restrictions in place to facilitate Thames Water works.
[A4020] UXBRIDGE ROAD (W13 ,W5 ) (Ealing)
From: Monday 05 May 2025
To: Ongoing
Last updated 11:24 Tuesday 06 May 2025 : Traffic is flowing well
Asset issues | Infrastructure damage
[A4020] Uxbridge Road (Eastbound) at the junction of [B452] Drayton Green Road - The traffic signals have been damaged after a collision.