[A12] EASTERN AVENUE (IG1 ,IG2 ,IG4 ) (Redbridge)
From: Friday 21 March 2025
To: Friday 18 April 2025
Last updated 14:25 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A12] Eastern Avenue (Eastbound) between [B192] Beehive Lane and [A123] Cranbrook Road - Lane one closed to facilitate urgent Thames Water works.
A12
[A12] EASTERN AVENUE EAST (RM2,RM3) (Havering)
From: Saturday 15 March 2025
To: Wednesday 21 May 2025
Last updated 14:29 Monday 07 April 2025 : Traffic is flowing well.
Works | TfL works
[A12] Eastern Avenue East (All directions) between [A12] Colchester Road and [A127] Southend Arterial Road - Various restrictions, including some overnight closures, to facilitate the refurbishment of Gallows Corner Flyover.
- [A127] SOUTHEND ARTERIAL ROAD (RM2 ,RM3 ) (Westbound)
- [A12] EASTERN AVENUE EAST (RM2 ,RM3 ) (Westbound)
A13
[A13] NEWHAM WAY (E16) (Newham)
From: Wednesday 19 February 2025
To: Saturday 24 May 2025
Last updated 14:27 Monday 07 April 2025 : Traffic is flowing well.
Works | TfL works
Canning Town Flyover Refurbishment Works - [A13] Newham Way (Both directions) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works. On the night of Saturday 12 April, the westbound carriageway will be closed (from 22:00).
- [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Both directions)
- [A13] NEWHAM WAY (E16) (Both directions)
A205
[A205] DULWICH COMMON (SE21,SE22) (Southwark)
From: Monday 03 March 2025
To: Friday 06 June 2025
Last updated 12:53 Monday 07 April 2025 : There are no reported delays
Works | TfL works
[A205] Dulwich Common (Both directions) at the junction of [A2216] Lordship Lane - Restrictions and temporary signals in place to facilitate maintenance works.
A316
[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)
From: Thursday 19 December 2024
To: Monday 21 July 2025
Last updated 14:12 Monday 07 April 2025 : Use an alternative route. Currently traffic in the area is flowing normally.
Works | TfL works
[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - London Road closed in both directions and Lane restrictions in place for junction improvement works.
A41
[A41] FINCHLEY ROAD (NW3 ) (Camden)
From: Monday 17 March 2025
To: Thursday 24 April 2025
Last updated 07:11 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A41] Finchley Road (Northbound) at the junction of Frognal Court - Lanes one and two (of three) are closed for UKPN works.
A41
[A41] FINCHLEY ROAD (NW3,NW8) (Camden,Westminster)
From: Monday 24 March 2025
To: Monday 21 April 2025
Last updated 07:17 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A41] Finchley Road (Both directions) at the junction of Queens Grove - Lane restrictions with two-way temporary traffic lights in place to facilitate Thames Water works.
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 08 July 2024
To: Thursday 30 April 2026
Last updated 14:21 Monday 07 April 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)
Bishopsgate Cross Route
Southern River Route
[A3200] SOUTHWARK STREET (SE1 ) (Southwark)
Monday 07 April 2025
Last updated 14:57 Monday 07 April 2025 : Use other route. No reported delays on diversion.
Hazards | Fire
[A3200] Southwark Street (Both directions) at the junction of Redcross Way - Road is closed due to a building fire.
- [A3200] SOUTHWARK STREET (SE1 ) (Both directions)
Inner Ring
[A501] PENTONVILLE ROAD (N1,WC1X) (Camden,Islington)
From: Thursday 30 January 2025
To: Friday 02 May 2025
Last updated 13:48 Monday 07 April 2025 : Traffic is flowing well.
Works | TfL works
[A501] Pentonville Road (Eastbound) at the junction of [A201] Kings Cross Road - Temporary signals and restrictions in place to facilitate works.
- [A501] PENTONVILLE ROAD (N1,WC1X) (Westbound)
- [A201] KINGS CROSS ROAD (N1,WC1X) (Southbound)
Inner Ring
[A4] PICCADILLY (SW1X,W1J,W1K,W2) (Westminster)
From: Monday 17 February 2025
To: Friday 18 July 2025
Last updated 14:11 Monday 07 April 2025 : Use alternative routes. No reported delays on diversion.
Works | TfL works
Piccadilly Underpass - [A4] Piccadilly (Eastbound) at the junction of [A4] Duke Of Wellington Place - Underpass closure to facilitate maintenance works.
- [A4] PICCADILLY (SW1X,W1J,W1K,W2) (Eastbound)
Southern River Route
[A3203] LAMBETH BRIDGE (SE1 ,SW1P ) (Lambeth,Westminster)
From: Saturday 31 August 2024
To: Friday 19 December 2025
Last updated 14:18 Monday 07 April 2025 : Use an alternative route. Delays are possible on diversion.
Works | TfL works
[A3203] Lambeth Bridge (Eastbound) between [A3036] A 3036 and [A3212] Millbank - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. The bridge is closed eastbound.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Monday 24 February 2025
To: Friday 30 May 2025
Last updated 14:48 Monday 07 April 2025 : Possible delays.
Asset issues | Asset maintenance
[A3220] Battersea Bridge Road (Both directions) at the junction of [B305] Westbridge Road - Temporary traffic signals and lane restrictions in place to facilitate traffic light works.
[A4020] UXBRIDGE ROAD (W12 ) (Hammersmith & Fulham)
From: Wednesday 19 March 2025
To: Thursday 17 April 2025
Last updated 12:47 Monday 07 April 2025 : Traffic is flowing well.
Works | Borough works
[A4020] Uxbridge Road (Eastbound) at the junction of [A402] A 402 - Lane closure for Borough works.
[A310] TWICKENHAM ROAD (TW7 ) (Hounslow)
From: Sunday 23 March 2025
To: Monday 07 April 2025
Last updated 07:23 Monday 07 April 2025 : Delays are possible.
Works | Borough works
[A310] Twickenham Road (All directions) at the junction of [B363] St Johns Road - Temporary traffic signals are in place for borough works.
ROCKWARE AVENUE (UB6 ) (Ealing)
From: Saturday 29 March 2025
To: Sunday 13 April 2025
Last updated 07:11 Monday 07 April 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
Rockware Avenue (Westbound) at the junction of [A4127] Greenford Road - Road closed westbound due to Cadent Gas works.
- ROCKWARE AVENUE (UB6 ) (Westbound)
[B4565] WEMBLEY HILL ROAD (HA9 ) (Brent)
From: Monday 13 January 2025
To: Monday 19 May 2025
Last updated 07:16 Monday 07 April 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
[B4565] Wembley Hill Road (Both directions) at the junction of [A404] High Road - Two way signals are in place on Wembley High Road. Wembley Hill Road is also shut in both directions between High Road and Eccleston Place.
- [A404] HIGH ROAD (HA9) (Eastbound)
- [B4565] WEMBLEY HILL ROAD (HA9) (Both directions)
- [B4565] WEMBLEY HILL ROAD (HA9) (Both directions)
[A4020] THE VALE (W12 ,W3 ) (Ealing,Hammersmith & Fulham)
Monday 07 April 2025
Last updated 11:08 Monday 07 April 2025 : Traffic is flowing well.
Collisions | Vehicle collision
[A4020] The Vale (Eastbound) at the junction of Old Oak Road - The road is blocked due to a collision.
- [A4020] THE VALE (W12 ,W3 ) (Eastbound)
A13
A406
[A13] ALFREDS WAY (IG11 ) (Barking & Dagenham,Newham)
Monday 07 April 2025
Last updated 14:24 Monday 07 April 2025 : Use caution on the approach. Westbound traffic is slow with queues back towards Lodge Avenue. Expect delays.
Breakdowns | Vehicle breakdown
[A13] Alfreds Way (Westbound) at the junction of Jenkins Lane - Lane one of three is blocked due to a broken down vehicle
A4
Western Cross Route
[A3220] EARLS COURT ROAD (SW5 ,W8 ) (Kensington & Chelsea)
From: Tuesday 01 April 2025
To: Wednesday 21 May 2025
Last updated 14:57 Monday 07 April 2025 : Southbound traffic is slow moving from the junction of Pembroke Road. Expect delays.
Works | TfL works
Earls Court Road - [A3220] Earls Court Road (Southbound) at the junction of Hogarth Road - Lane one (of two) is closed to facilitate works.
WHARF ROAD (EC1V ,N1 ) (Hackney,Islington)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 09:00 Tuesday 25 March 2025 : Delays possible
Planned events | Abnormal load
An abnormal load will travel from Tilbury Docks to Wharf Road, Islington N1 - Wharf Road (All directions) at the junction of [A501] City Road - An abnormal load will travel from Tilbury Docks to Wharf Road, Islington N1
A12
[A12] COLCHESTER ROAD (CM14 ,RM3 ) (Havering)
From: Friday 04 April 2025
To: Monday 14 April 2025
Last updated 14:26 Monday 07 April 2025 : Works continue Friday 11th April at 10pm.
Works | Motorways works
[A12] Colchester Road (Both directions) at the junction of [M25] M 25 - Road closure is in place to facilitate carriageway maintenance works taking place from Friday 4 April until Monday 7 April and from Friday 11 April until Monday 14 April.
- [A12] COLCHESTER ROAD (CM14 ,RM3 ) (Both directions)
A12
[A12] EAST CROSS ROUTE (E3 ,E9 ) (Hackney,Tower Hamlets)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 00:07 Monday 07 April 2025 : Works continue at 10pm.
Works | TfL works
[A12] East Cross Route (Eastbound) between Trego Road and Monier Road - Directional closures overnight to facilitate TfL works.
- [A12] EAST CROSS ROUTE (E3 ,E9 ) (Northbound)
A2
[A2] OLD KENT ROAD (SE14 ,SE15 ) (Lewisham,Southwark)
From: Thursday 03 April 2025
To: Monday 07 April 2025
Last updated 14:44 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A2] Old Kent Road (Both directions) at the junction of Ilderton Road - Lane restrictions in place to facilitate telecommunication works.
A205
[A205] LONDON ROAD (SE23 ) (Lewisham)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 09:57 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A205] London Road (All approaches) at the junction of Taymount Rise - Three-way temporary traffic signals in operation to facilitate Thames Water works.
A205
A21
[A21] RUSHEY GREEN (SE6 ) (Lewisham)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 05:34 Sunday 06 April 2025 : Works will recommence on Monday 07th Apr 2025 at 21:00hrs.
Works | TfL works
[A21] Rushey Green (All approaches) between [A205] Catford Road and [A21] Bromley Road - Various lane restrictions in place nightly on Catford Road, Rushey Green and Brownhill Road to facilitate TfL works.
A205
[A3] CLAPHAM COMMON NORTH SIDE (SW11 ,SW4 ) (Wandsworth)
From: Monday 17 March 2025
To: Sunday 20 April 2025
Last updated 14:46 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A3] Clapham Common North Side (Eastbound) between Marney Road and Sisters Avenue - Lane restrictions in place to facilitate SGN works.
A205
[A205] STANSTEAD ROAD (SE23 ,SE6 ) (Lewisham)
From: Monday 07 April 2025
To: Thursday 10 April 2025
Last updated 14:49 Monday 07 April 2025 : Traffic is currently flowing well.
Works | Utility works
[A205] Stanstead Road (Eastbound) at the junction of Park Rise Road - Lane restrictions in place to facilitate UKPN works.
A205
[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)
From: Thursday 19 December 2024
To: Friday 11 July 2025
Last updated 14:42 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.
A23
[A23] STREATHAM HIGH ROAD (SW16 ) (Lambeth)
From: Wednesday 02 April 2025
To: Tuesday 08 April 2025
Last updated 03:18 Monday 07 April 2025 : Works continue at 8pm.
Works | TfL works
[A23] Streatham High Road (Both directions) at the junction of [A214] Streatham Common North - Various lane restrictions in place to facilitate TfL works.
A23
[A23] BRIXTON HILL (SW2 ) (Lambeth)
From: Saturday 05 April 2025
To: Monday 07 April 2025
Last updated 12:30 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A23] Brixton Hill (Northbound) at the junction of Somers Road - Lane restrictions in place to facilitate emergency SGN works.
A24
[A3] KENNINGTON PARK ROAD (SE11 ,SE17 ) (Lambeth,Southwark)
From: Monday 07 April 2025
To: Wednesday 16 April 2025
Last updated 14:08 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A3] Kennington Park Road (Northbound) at the junction of Penton Place - Lane restrictions are in place to facilitate SGN works taking place.
A24
[A24] STONECOT HILL (SM3 ,SM4 ) (Sutton)
From: Monday 31 March 2025
To: Monday 05 May 2025
Last updated 14:45 Monday 07 April 2025 : Delays are possible.
Works | TfL works
[A24] Stonecot Hill (Both directions) at the junction of Burleigh Road - Temporary traffic signals in operation to facilitate works.
A3
[A3216] QUEENSTOWN ROAD (SW11 ,SW1V ,SW8 ) (Wandsworth)
From: Monday 24 February 2025
To: Thursday 15 January 2026
Last updated 14:46 Monday 07 April 2025 : Delays are possible.
Works | Borough works
[A3216] Queenstown Road (Both directions) at the junction of Sopwith Way - Bus lane closed to facilitate roadworks by Wandsworth Council.
A3
[A243] HOOK ROAD (KT9 ) (Kingston upon Thames)
From: Thursday 03 April 2025
To: Tuesday 08 April 2025
Last updated 14:43 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A243] Hook Road (Northbound) at the junction of Cecil Close - Lane one closed to facilitate urgent Thames Water works.
A4
[A4] BROMPTON ROAD (SW1X,SW3,SW7) (Kensington & Chelsea,Westminster)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 13:52 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A4] Brompton Road (Westbound) at the junction of Yeomans Row - Lane one (of three) closure is in place to facilitate UKPN works.
A4
[A4] GREAT WEST ROAD (TW3 ,TW5 ,TW7 ) (Hounslow)
From: Thursday 20 March 2025
To: Saturday 12 April 2025
Last updated 07:12 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A4] Great West Road (Eastbound) at the junction of [A3005] Heston Road - Lane restrictions in both directions.
A406
[A406] SOUTHEND ROAD (E17 ,E4 ) (Waltham Forest)
From: Thursday 03 April 2025
To: Tuesday 08 April 2025
Last updated 01:38 Monday 07 April 2025 : Traffic flow is considered to be normal for the time of day.
Works | Utility works
Works - [A406] Southend Road (Westbound) at the junction of Harbet Road - Completed works.
Bishopsgate Cross Route
[A10] GRACECHURCH STREET (EC3V ,EC4N ,EC4R ) (City of London)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 12:02 Thursday 03 April 2025 : Delays are possible.
Works | Utility works
[A10] Gracechurch Street (Both directions) at the junction of Talbot Court - Contraflow is in place to facilitate Vodafone works taking place.
Inner Ring
[A202] BRIDGEFOOT (SE1 ,SW8 ) (Lambeth)
Monday 07 April 2025
Last updated 11:42 Monday 07 April 2025 : Traffic is flowing well.
Breakdowns | Vehicle breakdown
[A202] Bridgefoot (Southbound) at the junction of [A202] Vauxhall Bridge - Lane one (of two) is blocked due to a broken down vehicle,
Inner Ring
[A400] HAMPSTEAD ROAD (NW1 ) (Camden)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 08:10 Monday 07 April 2025 : Traffic is flowing well.
Works | Network Rail works
[A400] Hampstead Road (Both directions) at the junction of William Road - Lane restrictions in place to facilitate resurfacing works.
Inner Ring
[A3] ELEPHANT AND CASTLE (SE1 ) (Southwark)
From: Monday 07 April 2025
To: Wednesday 09 April 2025
Last updated 04:01 Thursday 03 April 2025 : Delays are possible.
Works | Utility works
[A3] Elephant And Castle (Both directions) at the junction of [A201] New Kent Road - Lane closures to facilitate works.
Southern River Route
[A200] TOOLEY STREET (SE1 ) (Southwark)
From: Friday 04 April 2025
To: Tuesday 08 April 2025
Last updated 13:55 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A200] Tooley Street (All directions) at the junction of Shand Street - Temporary traffic signals are in place to facilitate Thames Water works taking place.
Southern River Route
[A101] ROTHERHITHE TUNNEL (E1W,SE16) (Southwark,Tower Hamlets)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 15:58 Saturday 05 April 2025 : Traffic is flowing well.
Works | TfL works
Rotherhithe Tunnel - [A101] Rotherhithe Tunnel (Both directions) between Branch Road and Jamaica Road - Tunnel closed for overnight maintenance works.
- [A101] ROTHERHITHE TUNNEL (E14,E1W,SE16) (Both directions)
WESTFIELD AVENUE (E20 ) (Newham)
From: Monday 31 March 2025
To: Saturday 20 December 2025
Last updated 14:01 Monday 07 April 2025 : Delays are possible.
Works | Borough works
Westfield Avenue (Both directions) between Olympic Park Avenue and Montfichet Road - Various restrictions including lane closures, temporary signals and cycle lane closures are in place for carriageway refurbishment works.
[A4] PICCADILLY (SW1A ,W1J ,W1K ,W1S ) (Westminster)
From: Monday 07 April 2025
To: Wednesday 24 December 2025
Last updated 12:47 Sunday 30 March 2025 : Delays are possible.
Works | Construction activity
[A4] Piccadilly (Westbound) at the junction of Stratton Street - Lane restrictions are in place to facilitate maintenance works taking place.
[A107] AMHURST ROAD (E5 ,E8 ) (Hackney)
From: Saturday 29 March 2025
To: Friday 06 June 2025
Last updated 14:19 Monday 07 April 2025 : Delays are possible.
Works | Borough works
[A107] Amhurst Road (All directions) at the junction of Marcon Place - Multi-phase borough works until 05 June 2026 to facilitate a major highway scheme. Until 06 June 2025, Amhurst Road is reduced to a single-lane contraflow in each direction with the bus lane suspended. Kenmure Road is also closed to all traffic whilst the works are in progress.
[A4200] SOUTHAMPTON ROW (WC1A ,WC1B ,WC1N ,WC1V ) (Camden)
Monday 07 April 2025
Last updated 08:13 Monday 07 April 2025 : Traffic is normal for this time of day.
Breakdowns | Vehicle breakdown
[A4200] Southampton Row (Northbound) at the junction of [A40] Vernon Place - Road blocked due to a broken down bus.
- [A4200] SOUTHAMPTON ROW (WC1A ,WC1B ,WC1N ,WC1V ) (Northbound)
[A232] CHEAM ROAD (SM1 ,SM2 ) (Sutton)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 14:44 Monday 07 April 2025 : Traffic delays are possible throughout the course of the works
Works | Utility works
[A232] Cheam Road (All directions) at the junction of Gander Green Lane - Temporary traffic signals are in place to facilitate Sutton and East Surrey Water taking place.
[A206] BERESFORD STREET (SE18 ) (Greenwich)
From: Wednesday 12 March 2025
To: Friday 25 April 2025
Last updated 14:47 Monday 07 April 2025 : Delays are possible.
Works | Borough works
[A206] Beresford Street (Both directions) at the junction of Macbean Street - Temporary signals in operation to facilitate works by Greenwich Council.
[A112] HOE STREET (E10 ,E17 ) (Waltham Forest)
From: Monday 07 April 2025
To: Thursday 17 April 2025
Last updated 14:31 Monday 07 April 2025 : There are currently minor delays reported in the local area.
Works | Utility works
[A112] Hoe Street (All directions) at the junction of [A104] Lea Bridge Road - Lane restrictions are in place to facilitate utility works.
[A3036] ST JOHNS HILL (SW11 ) (Wandsworth)
From: Monday 07 April 2025
To: Thursday 17 April 2025
Last updated 14:46 Monday 07 April 2025 : Delays are possible on approach.
Works | Utility works
[A3036] St Johns Hill (All directions) at the junction of Prested Road - Lane restrictions are in place to facilitate Thames Water works.
[A1] ALDERSGATE STREET (EC1A,EC1M,EC2Y) (City of London)
From: Wednesday 05 March 2025
To: Friday 18 April 2025
Last updated 14:18 Monday 07 April 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A1] Aldersgate Street (Southbound) at the junction of [B100] Beech Street - Road closed southbound only at the junction with Beech Street due to emergency works.
- [A1] ALDERSGATE STREET (EC1A,EC1M,EC2Y) (Southbound)
[A503] FOREST ROAD (E17) (Waltham Forest)
From: Monday 03 March 2025
To: Friday 30 May 2025
Last updated 14:08 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A503] Forest Road (All directions) at the junction of [B160] Fulbourne Road - Temporary traffic signals and lane restrictions are in place to facilitate Thames Water works.
[A302] VICTORIA STREET (SW1E ,SW1H ,SW1P ) (Westminster)
From: Monday 24 March 2025
To: Wednesday 14 May 2025
Last updated 14:17 Monday 07 April 2025 : Use alternative route. Delays are possible on diversion.
Works | Utility works
[A302] Victoria Street (All directions) at the junction of Storeys Gate - Multi-way temporary traffic signals are in place to facilitate urgent gas main repairs by Cadent. In addition, Storey's Gate will be closed to all road users throughout, Including cyclists and pedestrians.
- STOREYS GATE (SW1H ,SW1P ) (Both directions)
A1
[A1] ISLINGTON HIGH STREET (EC1V,N1) (Islington)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 14:54 Monday 07 April 2025 : Eastbound traffic is slow moving from the junction of Penton Rise. Westbound traffic is slow moving from Goswell Road from the junction of Wakley Street. Southbound traffic is slow on Upper Street from the junction of Essex Road. Expect delays.
Works | Utility works
[A1] Islington High Street (Both directions) at the junction of [A501] Pentonville Road - Contraflow as well as multiway temporary traffic lights to be implemented to facilitate UK Power Network works.
A10
[A10] HIGH ROAD (N15 ,N17 ) (Haringey)
From: Sunday 06 April 2025
To: Wednesday 16 April 2025
Last updated 12:46 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A10] High Road (All directions) at the junction of [B153] Philip Lane - Temporary traffic lights in operation to facilitate UKPN works.
A12
A13
[A1205] BURDETT ROAD (E14,E3) (Tower Hamlets)
From: Thursday 16 January 2025
To: Friday 18 April 2025
Last updated 14:15 Monday 07 April 2025 : No reported delays.
Works | Utility works
[A1205] Burdett Road (Both directions) between Thomas Road and Agnes Street - Restrictions in place for Utility works.
A12
[A11] MILE END ROAD (E1,E3) (Tower Hamlets)
From: Monday 10 February 2025
To: Sunday 25 May 2025
Last updated 14:11 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A11] Mile End Road (Westbound) whitman Road - Bus lane closure in operation to facilitate Thames Water works.
A12
A406
[A406] NORTH CIRCULAR ROAD (IG1 ,IG4 ) (Redbridge)
Monday 07 April 2025
Last updated 09:38 Monday 07 April 2025 : All lanes have now reopened with only residual delays.
Breakdowns | Vehicle breakdown
[A406] North Circular Road (Southbound) at the junction of [A12] Eastern Avenue - There is a broken down HGV in lane 1.
A12
[A12] A12 (E10 ,E11 ) (Waltham Forest)
Monday 07 April 2025
Last updated 08:17 Monday 07 April 2025 : Traffic is flowing well.
Breakdowns | Vehicle breakdown
[A12] A 12 (Southbound) at the junction of [A106] Grove Green Road - There is a broken down vehicle in lane 1
A13
[A13] ALFREDS WAY (IG11 ) (Barking & Dagenham)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 15:21 Thursday 03 April 2025 : Use other routes
Works | TfL works
[A13] Alfreds Way (Westbound) at the junction of Movers Lane - Westbound slip road closed to facilitate overnight works.
A13
[A13] RIPPLE ROAD (IG11 ,RM9 ) (Barking & Dagenham)
Monday 07 April 2025
Last updated 08:49 Monday 07 April 2025 : All lanes are now open and traffic is flowing well.
Collisions | Vehicle collision
[A13] Ripple Road (Westbound) at the junction of [A13] Alfreds Way - There has been a collision at this location and lane restrictions are in place.
A2
[A2] BLACKHEATH HILL (SE10 ) (Greenwich,Lewisham)
From: Friday 04 April 2025
To: Tuesday 08 April 2025
Last updated 12:51 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A2] Blackheath Hill (Eastbound) at the junction of [A2211] Lewisham Road - Lane restrictions eastbound to facilitate gas works.
A2
A20
[A20] AMERSHAM ROAD (SE14 ) (Lewisham)
From: Friday 04 April 2025
To: Monday 07 April 2025
Last updated 14:41 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A20] Amersham Road (Southbound) at the junction of [A2] Parkfield Road - Lane restrictions southbound due to Thames Water works.
A2
[A2] SHOOTERS HILL ROAD (SE10 ,SE3 ) (Greenwich,Lewisham)
Monday 07 April 2025
Last updated 13:57 Monday 07 April 2025 : Traffic is flowing well.
Breakdowns | Vehicle breakdown
[A2] Shooters Hill Road (Eastbound) at the junction of [B212] Stratheden Road - Lanes clear of an earlier breakdown
A2
A20
[A202] QUEENS ROAD (SE14 ,SE15 ) (Lewisham,Southwark)
From: Thursday 03 April 2025
To: Monday 07 April 2025
Last updated 14:42 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A202] Queens Road (Both directions) at the junction of Waller Road - Contraflow traffic control in place to facilitate electrical repairs works.
A20
A21
LEWISHAM HIGH STREET (SE13) (Lewisham)
From: Saturday 03 August 2024
To: Friday 25 April 2025
Last updated 12:27 Monday 07 April 2025 : Traffic is flowing well.
Works | Borough works
Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.
- LEWIS GROVE (SE13) (Northbound)
- [A21] LEWISHAM HIGH STREET (SE13) (Northbound)
A205
[A205] WESTHORNE AVENUE (SE12 ,SE9 ) (Greenwich,Lewisham)
From: Tuesday 11 March 2025
To: Wednesday 30 April 2025
Last updated 14:48 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Westbound) between [A20] Sidcup Road and Alnwick Road - Lane two is closed owing to burst water main repairs.
A205
[A217] SWANDON WAY (SW18 ) (Wandsworth)
From: Thursday 27 March 2025
To: Monday 28 April 2025
Last updated 14:45 Monday 07 April 2025 : Delays are possible.
Works | TfL works
[A217] Swandon Way (Both directions) at the junction of Smugglers Way - Lane restrictions in operation to facilitate maintenance works.
A21
[A21] LEWISHAM HIGH STREET (SE13,SE6) (Lewisham)
From: Monday 24 March 2025
To: Friday 06 June 2025
Last updated 14:47 Monday 07 April 2025 : Delays are possible.
Works | TfL works
[A21] Lewisham High Street (Both directions) at the junction of George Lane - TfL resurfacing and line marking. Lane closures are in place.
A21
[A21] LEWISHAM HIGH STREET (SE13 ,SE6 ) (Lewisham)
From: Monday 07 April 2025
To: Wednesday 09 April 2025
Last updated 14:06 Monday 07 April 2025 : Traffic is flowing well.
Works | TfL works
[A21] Lewisham High Street (Both directions) at the junction of Mount Pleasant Road - Earlier lane restrictions for works have been cleared
A23
[A23] STREATHAM HIGH ROAD (SW16 ) (Lambeth)
From: Thursday 03 April 2025
To: Thursday 10 April 2025
Last updated 14:42 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A23] Streatham High Road (Northbound) at the junction of Norfolk House Road - Part Bus Lane closure in place to facilitate Thames Water works.
A24
[A24] HIGH STREET COLLIERS WOOD (SW17 ,SW19 ) (Merton,Wandsworth)
From: Saturday 05 April 2025
To: Monday 21 April 2025
Last updated 14:41 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A24] High Street Colliers Wood (Both directions) at the junction of University Road - Contraflow traffic control in place to facilitate Thames Water works.
A3
Inner Ring
[A3205] NINE ELMS LANE (SW11 ,SW8 ) (Lambeth,Wandsworth)
From: Friday 04 April 2025
To: Tuesday 08 April 2025
Last updated 14:08 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A3205] Nine Elms Lane (Westbound) at the junction of [A3205] Parry Street - Lane restrictions in place due to Thames Water works.
A4
[A4] BROMPTON ROAD (SW1X ,SW3 ) (Kensington & Chelsea,Westminster)
From: Friday 04 April 2025
To: Friday 11 April 2025
Last updated 14:06 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A4] Brompton Road (Northbound) at the junction of [A4] Knightsbridge - Lane restriction (bus lane) due to Thames Water works.
Blackwall Tunnel
[A102] BLACKWALL TUNNEL SOUTHERN APPROACH (SE10 ) (Greenwich)
Monday 07 April 2025
Last updated 14:51 Monday 07 April 2025 : Traffic is currently flowing normally.
Planned events | Demonstration/March
Tunnels Protests - [A102] Blackwall Tunnel Southern Approach (All approaches) between [A1026] Silvertown Tunnel and [A1026] Silvertown Tunnel Southern Approach - Static protests may take place.
Inner Ring
[A501] PENTONVILLE ROAD (N1 ,WC1X ) (Camden,Islington)
From: Monday 31 March 2025
To: Tuesday 08 April 2025
Last updated 14:16 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A501] Pentonville Road (Eastbound) at the junction of [A5200] York Way - Lane restriction to facilitate Thames Water and UKPN works.
- [A5200] YORK WAY (N1 ,N1C ,WC1X ) (Both directions)
Inner Ring
[A5] EDGWARE ROAD (NW1 ,W1H ,W2 ) (Westminster)
From: Friday 04 April 2025
To: Friday 11 April 2025
Last updated 07:27 Monday 07 April 2025 : Traffic is flowing well.
Works | Utility works
[A5] Edgware Road (Northbound) at the junction of Connaught Street - Thames Water works. Northbound lane 1 of 2 closure.
Inner Ring
[A3] ELEPHANT AND CASTLE (SE1 ) (Southwark)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 15:45 Thursday 03 April 2025 : Delays possible.
Works | Utility works
[A3] Elephant And Castle (Both directions) at the junction of [A3] Newington Butts - Overnight lane closures in place to facilitate utility chamber replacement works.
[A3217] KINGS ROAD (SW10 ,SW3 ,SW6 ) (Hammersmith & Fulham,Kensington & Chelsea)
Monday 07 April 2025
Last updated 08:53 Monday 07 April 2025 : Traffic is normal for this time of day.
Collisions | Vehicle collision
[A3217] Kings Road (All directions) at the junction of [A3220] Gunter Grove - Road reopened following an earlier collision.
- [A3220] GUNTER GROVE (SW10 ) (All directions)
- [A3220] TADEMA ROAD (SW10 ) (All directions)
- [A308] KINGS ROAD (SW10 ) (All directions)
[A215] NORWOOD ROAD (SE24 ) (Lambeth,Southwark)
From: Monday 07 April 2025
To: Sunday 20 April 2025
Last updated 14:49 Monday 07 April 2025 : Expect delays on the approach.
Works | Utility works
[A215] Norwood Road (All directions) at the junction of [A2214] Dulwich Road - Temporary traffic signals in operation to facilitate Thames Water works.
[A4200] WOBURN PLACE (WC1B,WC1H,WC1N) (Camden)
From: Monday 17 March 2025
To: Sunday 13 April 2025
Last updated 14:20 Monday 07 April 2025 : Delays are possible
Works | Utility works
[A4200] Woburn Place (All approaches) at the junction of Tavistock Square - Temporary traffic signals in use to facilitate Thames Water works. The temporary signals are not working.
INTERNATIONAL WAY (E20 ) (Newham)
From: Sunday 06 April 2025
To: Monday 05 May 2025
Last updated 19:19 Sunday 06 April 2025 : traffic is flowing well
Works | Borough works
International Way (Both directions) between Roundhouse Lane and Celebration Avenue - Temporary signals in place due to borough works. Paving to footways Inc. excavation for tree pits/planters , Kerb replacement, construction of raised table crossing, Construction of loading & parking bays
[A11] WHITECHAPEL ROAD (E1 ) (Tower Hamlets)
Monday 07 April 2025
Last updated 14:37 Monday 07 April 2025 : Traffic is flowing well.
Collisions | Vehicle collision
[A11] Whitechapel Road (Eastbound) at the junction of Davenant Street - There has been a collision at this location.
[A1020] TIDAL BASIN ROUNDABOUT (E16 ) (Newham)
Monday 07 April 2025
Last updated 12:07 Monday 07 April 2025 : Traffic is flowing well.
Breakdowns | Vehicle breakdown
[A1020] Tidal Basin Roundabout (Clockwise) at the junction of [A1020] Lower Lea Crossing - There is a broken down vehicle on the roundabout and a lane restriction is in place.
[B458] COLLEGE ROAD (HA1 ) (Harrow)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 17:47 Tuesday 01 April 2025 : Delays possible.
Works | Borough works
[B458] College Road (Both directions) at the junction of Headstone Road - Road closed due to Harrow Council carriageway resurfacing works.
- [B458] COLLEGE ROAD (HA1 ) (Both directions)
[A212] CRYSTAL PALACE PARADE (SE19 ,SE26 ) (Bromley,Lambeth,Southwark)
From: Monday 07 April 2025
To: Sunday 18 May 2025
Last updated 14:43 Monday 07 April 2025 : Traffic delays are possible for the duration of the works
Works | Utility works
[A212] Crystal Palace Parade (Both directions) at the junction of [A2199] College Road - Lane restrictions in place to facilitate gas main replacement works.
CORNHILL (EC2R ,EC3V ) (City of London)
Monday 07 April 2025
Last updated 14:22 Monday 07 April 2025 : Delays possible.
Planned events | Demonstration/March
Cut The Ties Protest - Cornhill (Both directions) at the junction of Princes Street - A static protest will take place.
[A110] SOUTHBURY ROAD (EN1 ) (Enfield)
From: Monday 07 April 2025
To: Friday 11 April 2025
Last updated 12:47 Monday 07 April 2025 : Use alternative routes. There are no reported delays on diversion.
Works | Utility works
[A110] Southbury Road (Eastbound) at the junction of [A105] Silver Street - Road closure in place to facilitate Thames Water works.
- [A110] SOUTHBURY ROAD (EN1 ) (Eastbound)
[A232] ADDISCOMBE ROAD (CR0 ) (Croydon)
From: Tuesday 01 April 2025
To: Tuesday 08 April 2025
Last updated 14:45 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A232] Addiscombe Road (Eastbound) at the junction of Cheyne Walk - Eastbound lane restriction in place to facilitate gas works.
[A4003] WILLESDEN LANE (NW10,NW2) (Brent)
From: Wednesday 26 February 2025
To: Wednesday 16 April 2025
Last updated 07:16 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A4003] Willesden Lane (Both directions) at the junction of [A407] Walm Lane - Three way temporary traffic signals to be implemented to facilitate Thames Water works.
[A315] LONDON ROAD (TW3 ,TW7 ) (Hounslow)
From: Saturday 05 April 2025
To: Sunday 13 April 2025
Last updated 12:45 Monday 07 April 2025 : There are minor eastbound delays along London Road approaching the works.
Works | Utility works
[A315] London Road (Westbound) at the junction of [B363] Spring Grove Road - Three way, three phase temporary traffic lights and additional pedestrian phase to be implemented to facilitate electrical works.
[A206] WOOLWICH ROAD (SE7) (Greenwich)
From: Monday 07 April 2025
To: Tuesday 08 April 2025
Last updated 12:26 Tuesday 01 April 2025 : Works resume Saturday 01/03/2025 at 21:00
Works | TfL works
[A206] Woolwich Road (Both directions) at the junction of Anchor And Hope Lane - restrictions in place to facilitate C4X between Anchotr & Hope Lane and Woolwich Ferry Roundabout
[A400] CHARING CROSS ROAD (W1D ,WC1A ,WC2H ,WC2N ) (Camden,Westminster)
From: Wednesday 02 April 2025
To: Friday 02 May 2025
Last updated 13:57 Monday 07 April 2025 : Use an alternative route. No reported delays on diversion.
Works | Borough works
[A400] Charing Cross Road (Southbound) at the junction of Cranbourn Street - Road closed to facilitate borough works.
- [B402] CRANBOURN STREET (WC2E ,WC2H ) (Westbound)
- [A400] CHARING CROSS ROAD (WC2H ,WC2N ) (Southbound)
[A402] NOTTING HILL GATE (W11 ,W2 ,W8 ) (Kensington & Chelsea)
From: Monday 07 April 2025
To: Wednesday 09 April 2025
Last updated 12:43 Monday 07 April 2025 : Minor delays through the restrictions.
Works | Utility works
[A402] Notting Hill Gate (Eastbound) at the junction of Pembridge Gardens - Lane restrictions eastbound to facilitate Thames Water works.
[A224] CRAY AVENUE (BR5) (Bromley)
From: Friday 07 March 2025
To: Friday 23 May 2025
Last updated 14:43 Monday 07 April 2025 : Delays are possible.
Works | Utility works
[A224] Cray Avenue (Both directions) at the junction of Lagoon Road - Lane closures and four way temporary traffic signals to be implemented to facilitate UKPN works.
[A404] PINNER ROAD (HA1 ) (Harrow)
From: Monday 07 April 2025
To: Wednesday 09 April 2025
Last updated 12:46 Monday 07 April 2025 : No reported delays.
Works | Utility works
[A404] Pinner Road (Both directions) at the junction of Neptune Road - Temporary traffic signals in operation to facilitate utility works.
[A1010] HIGH ROAD (N17 ) (Haringey)
From: Monday 24 March 2025
To: Friday 25 July 2025
Last updated 07:14 Monday 07 April 2025 : Delays are possible.
Works | Borough works
[A1010] High Road (Northbound) at the junction of Ruskin Road - Lane restrictions in operation northbound to facilitate utility works.
[A214] TOOTING BEC ROAD (SW17 ) (Wandsworth)
From: Saturday 05 April 2025
To: Sunday 15 June 2025
Last updated 14:47 Monday 07 April 2025 : Delays are possible
Works | Utility works
[A214] Tooting Bec Road (Both directions) between [A214] Trinity Road, [A24] Upper Tooting Road and [A24] Balham High Road - Multi way temporary traffic signals to be implemented to facilitate Thames Water works.
[A598] REGENTS PARK ROAD (N3 ) (Barnet)
From: Friday 04 April 2025
To: Thursday 10 April 2025
Last updated 13:03 Monday 07 April 2025 : No reported delays.
Works | Utility works
[A598] Regents Park Road (All directions) at the junction of [A504] Hendon Lane - Four way temporary traffic signals are in operation to facilitate UKPN works.
[A40] EARNSHAW STREET (WC1A ,WC2H ) (Camden)
From: Friday 28 March 2025
To: Sunday 06 July 2025
Last updated 09:49 Monday 07 April 2025 : Traffic is flowing well.
Works | Borough works
[A40] Earnshaw Street (Both directions) at the junction of [A40] New Oxford Street - Restrictions are in place to facilitate Camden Council improvement works.
- [A40] EARNSHAW STREET (WC1A ,WC2H ) (Both directions)