Status updates
- Now 17:40
- This weekend
-
May 2024 Next month05/05/24 2024 May 5
Find a postcode, place or road
A205
[A205] LONDON ROAD (SE23) (Lewisham)
From: Friday 03 May 2024
To: Tuesday 07 May 2024
Last updated 17:07 Sunday 05 May 2024 : Traffic is slow on approach. Expect delays.
Works | Utility works
[A205] London Road (Both directions) at the junction of [A205] Devonshire Road - Temporary traffic signals in operation during emergency Thames Water works.
A205
A3
[A3] WEST HILL (SW15,SW18) (Wandsworth)
From: Sunday 05 May 2024
To: Friday 10 May 2024
Last updated 17:07 Sunday 05 May 2024 : Traffic is slow on approach. Expect delays.
Works | Utility works
[A3] West Hill (Both directions) at the junction of Holm Oak Close - Temporary traffic signals are in place for SGN works.
[A312] MANDEVILLE ROAD (UB5) (Ealing)
From: Saturday 04 May 2024
To: Sunday 05 May 2024
Last updated 14:25 Sunday 05 May 2024 : Traffic is slow moving through the works. Expect delays.
Works | Utility works
[A312] Mandeville Road (All directions) at the junction of Eastcote Lane - Temporary traffic signals are in place to facilitate electrical maintenance works. Weekend works only (Saturday 0700hrs - Sunday 2100hrs)
[A213] SELHURST ROAD (SE25) (Croydon)
From: Sunday 05 May 2024
To: Ongoing
Last updated 16:51 Sunday 05 May 2024 : Use other route.
Collisions | Vehicle collision
[A213] Selhurst Road (Both directions) at the junction of Dagnall Park - Road is closed due to a collision.
- [A213] SELHURST ROAD (SE25) (Both directions)
A12
[A12] A12 (E11) (Waltham Forest)
From: Saturday 04 May 2024
To: Ongoing
Last updated 16:24 Sunday 05 May 2024 : Approach with caution. Traffic is flowing well.
Weather | Flooding
[A12] A 12 (Northbound) near Leytonstone Station - Surface water at location.
A2
[A2] NEW CROSS ROAD (SE14) (Lewisham)
From: Sunday 05 May 2024
To: Ongoing
Last updated 16:58 Sunday 05 May 2024 : Approach with caution.
Collisions | Vehicle collision
[A2] New Cross Road (Eastbound) at the junction of Harts Lane - Bus Lane blocked due to a collision.
A205
[A3] BATTERSEA RISE (SW11,SW18) (Wandsworth)
From: Friday 03 May 2024
To: Wednesday 08 May 2024
Last updated 15:47 Sunday 05 May 2024 : Traffic is flowing well.
Works | Utility works
[A3] Battersea Rise (Both directions) at the junction of Bolingbroke Grove - Temporary traffic signals are in operation to facilitate emergency Thames Water works.
- BOLINGBROKE GROVE (SW11) (Both directions)
A23
[A23] BRIGHTON ROAD (CR5,CR8) (Croydon)
From: Wednesday 17 April 2024
To: Thursday 09 May 2024
Last updated 07:55 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A23] Brighton Road (Both directions) at the junction of [B2030] Smitham Downs Road - From Monday 22 April until Thursday 09 May, lane one closed northbound.
A23
[A23] LONDON ROAD (SW16) (Croydon)
From: Sunday 05 May 2024
To: Ongoing
Last updated 16:24 Sunday 05 May 2024 : Traffic is flowing well.
Works | Network Rail works
[A23] London Road (Both directions) between Norbury Avenue and Roche Road - Single alternate lane working under temporary traffic signal control during Network Rail maintenance.
A316
[A316] LOWER RICHMOND ROAD (TW9) (Richmond upon Thames)
From: Wednesday 09 August 2023
To: Friday 16 August 2024
Last updated 07:55 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
[A316] Lower Richmond Road (Both directions) at the junction of [A316] Lower Mortlake Road - Various restrictions in place to facilitate street works. Sandycombe Road is closed southbound.
- [A316] LOWER MORTLAKE ROAD (TW9) (Eastbound)
- [A316] LOWER RICHMOND ROAD (TW9) (Westbound)
- [B353] SANDYCOMBE ROAD (TW9) (Southbound)
- [B353] MANOR ROAD (TW9) (Northbound)
- [B353] MANOR ROAD (TW9) (Southbound)
A4
[A306] HAMMERSMITH BRIDGE (W6,SW13) (Hammersmith & Fulham,Richmond upon Thames)
From: Thursday 11 April 2019
To: Saturday 01 June 2024
Last updated 15:13 Sunday 05 May 2024 : Use an alternative route. Delays are possible.
Asset issues | Service disruption
[A306] Hammersmith Bridge (W6) (Both Directions) - The bridge is closed to all modes of transport apart from pedestrians and cyclists.
- [A306] HAMMERSMITH BRIDGE (W6,SW13) (Both Directions)
A40
[A40] WESTERN AVENUE (W3) (Ealing)
From: Friday 08 March 2024
To: Saturday 18 May 2024
Last updated 15:08 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
[A40] Western Avenue (All directions) at the junction of [A4000] Horn Lane - Temporary signals in place to facilitate works.
- [A40] WESTERN AVENUE (W3) (Northbound)
Bishopsgate Cross Route
[A10] GRACECHURCH STREET (EC3V,EC4N,EC4R) (City of London)
From: Friday 09 February 2024
To: Sunday 05 May 2024
Last updated 14:37 Sunday 05 May 2024 : Use an alternative route. No reported delays.
Works | TfL works
[A10] Gracechurch Street (Both directions) at the junction of Cornhill - Temporary traffic signals in operation during junction improvement works. Leadenhall Street is closed.
- LEADENHALL STREET (EC3A,EC3V) (All directions)
Blackwall Tunnel
[A102] BLACKWALL TUNNEL SOUTHERN APPROACH (SE10) (Greenwich)
From: Monday 25 March 2024
To: Wednesday 25 September 2024
Last updated 07:52 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
[A102] Blackwall Tunnel Southern Approach (Northbound) at the junction of [A2203] Blackwall Lane - The on-slip from Blackwall Lane is restricted due to Silvertown Tunnel works.
City Route
[A3211] VICTORIA EMBANKMENT SLIP ROAD (N) (EC4V,EC4Y) (City of London)
From: Wednesday 04 January 2017
To: Monday 30 September 2024
Last updated 10:31 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A3211] Victoria Embankment Slip Road N (Both directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions are in place for the Tideway works. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street. The Cycle Superhighway has a new layout.. Find out more about the road changes at Victoria Embankment.
- [A201] VICTORIA EMBANKMENT (EC4V,EC4Y,SE1) (Both Directions)
- [A3211] VICTORIA EMBANKMENT (EC4Y,EC4V) (Both Directions)
- [A3211] BLACKFRIARS UNDERPASS (EC4Y,EC4V) (Eastbound)
Farringdon Cross Route
[A201] BLACKFRIARS BRIDGE (EC4V,SE1) (City of London)
From: Saturday 06 April 2024
To: Wednesday 15 May 2024
Last updated 10:35 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A201] Blackfriars Bridge (Both directions) between [A201] Blackfriars Road and [A3211] Blackfriars Underpass - Cycle lane and lane 2 closures in place in both directions to facilitate works by City of London. New Bridge Street southbound lane 1 and Queen Victoria Street southbound lane 2 also closed.
Western Cross Route
[A3212] CHELSEA EMBANKMENT (SW11,SW1W,SW3) (Westminster,Kensington & Chelsea)
From: Friday 27 July 2018
To: Sunday 30 June 2024
Last updated 10:30 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions during Tideway Tunnel Project works. A new road layout remains in place for the duration of the works. More information on the Thames Tideway website.
- CHELSEA EMBANKMENT (SW3) (Both Directions)
THE MALL (SW1A) (Westminster)
From: Monday 06 May 2024
To: Ongoing
Last updated 13:08 Sunday 05 May 2024 : Traffic is moving well.
Planned events | Celebration
The Changing of the Guard - The Mall (All directions) at the junction of Queens Gardens - The Changing of the Guard will take place from 1100. Constitution Hill, the Queen Victoria Memorial, Spur Road, Link Road and The Mall (up to the junction with Marlborough Road) will be closed to vehicles between approximately 10.45am and 12.30pm on the days of Changing of the Guard. Expect crowds and increased traffic congestion.
- THE MALL (SW1A) (All directions)
- CONSTITUTION HILL (SW1A,SW1W) (Both directions)
- SPUR ROAD (SW1A,SW1E) (Both directions)
- SPUR ROAD (SW1A,SW1E) (Both directions)
- BIRDCAGE WALK (SW1A,SW1E,SW1H) (Both directions)
- QUEENS GARDENS (SW1A) (Both directions)
- [B323] BUCKINGHAM GATE (SW1A,SW1E,SW1W) (Both directions)
- [A3214] BUCKINGHAM PALACE ROAD (SW1E,SW1W) (Both directions)
[A219] WOOD LANE (W12) (Hammersmith & Fulham)
From: Monday 29 April 2024
To: Tuesday 07 May 2024
Last updated 16:27 Sunday 05 May 2024 : Use caution. Traffic is flowing well.
Works | Utility works
[A219] Wood Lane (Both directions) at the junction of Macfarlane Road - Temporary signals in place to facilitate UK Power Networks works.
[A404] HARROW ROAD (NW10) (Brent,Hammersmith & Fulham,Kensington & Chelsea)
From: Thursday 25 April 2024
To: Sunday 11 August 2024
Last updated 15:04 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A404] Harrow Road (Both directions) between Letchford Gardens and Wrottesley Road. - Use of temporary traffic signals to facilitate works.
[A400] HAMPSTEAD ROAD (NW1) (Camden)
From: Saturday 06 October 2018
To: Sunday 31 May 2026
Last updated 15:00 Sunday 05 May 2024 : Delays are possible.
Works | Service disruption
A400 Hampstead Road NW1 (Both Directions) between Granby Terrace and Robert Street - Lane restrictions and temporary signals at various junctions during junction improvement works in collaboration with HS2 works.
- [A400] HAMPSTEAD ROAD (NW1) (Both Directions)
- [A400] HAMPSTEAD ROAD (NW1) (Northbound)
[A118] ROMFORD ROAD (E15,E7) (Newham)
From: Tuesday 09 April 2024
To: Thursday 31 October 2024
Last updated 09:16 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A118] Romford Road (All approaches) at the junction of Hamfrith Road - Temporary traffic signals in place for Newham Council works.
[B272] ROWAN ROAD (SW16) (Lambeth,Merton)
From: Sunday 05 May 2024
To: Ongoing
Last updated 16:51 Sunday 05 May 2024 : Use other route
Collisions | Vehicle collision
[B272] Rowan Road (Both directions) at the junction of Meopham Road - Road is closed due to a collision.
Silvertown Tunnel, Greenwich Peninsula () ()
From: Friday 25 February 2022
To: Wednesday 31 December 2025
Last updated 07:54 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.
- MILLENNIUM WAY (SE10) (Southbound)
- WEST PARKSIDE (SE10) (Northbound)
- EDMUND HALLEY WAY (SE10) (Eastbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Southbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Both directions)
[A4127] GREENFORD ROAD (UB5,UB6) (Ealing)
From: Monday 02 October 2023
To: Tuesday 14 May 2024
Last updated 15:07 Sunday 05 May 2024 : Delays are possible.
Works | Network Rail works
[A4127] Greenford Road (All directions) at the junction of Rockware Avenue - Temporary traffic signals are in place for HS2 works.
[A4205] PRAED STREET (W2) (Westminster)
From: Monday 22 January 2024
To: Friday 10 May 2024
Last updated 10:36 Sunday 05 May 2024 : Delays are possible.
Works | Collaborative works
[A4205] Praed Street (All approaches) at the junction of London Street - Temporary traffic signals and various lane restrictions in place for development works.
[A112] HIGH STREET (E13) (Newham)
From: Monday 11 December 2023
To: Friday 31 May 2024
Last updated 09:20 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A112] High Street (Both directions) at the junction of [A114] Clegg Street - Temporary traffic signals in use to facilitate collaborative works.
LEADENHALL STREET (EC3A,EC3M,EC3V) (City of London)
From: Monday 08 April 2024
To: Monday 20 May 2024
Last updated 10:36 Sunday 05 May 2024 : Use alternative route. Delays are possible on diversion.
Works | Utility works
Leadenhall Street (Both directions) at the junction of Creechurch Lane - Road is closed due to gas connection works.
- LEADENHALL STREET (EC3A,EC3M,EC3V) (Both directions)
[A4000] VICTORIA ROAD (NW10,W3) (Ealing)
From: Sunday 04 February 2024
To: Wednesday 08 May 2024
Last updated 15:03 Sunday 05 May 2024 : Delays are possible.
Works | Network Rail works
[A4000] Victoria Road (All directions) at the junction of [A4000] Wales Farm Road - Temporary traffic signals in use to facilitate rail works.
A12
[A12] COLCHESTER ROAD (RM3) (Havering)
From: Wednesday 27 July 2022
To: Sunday 31 August 2025
Last updated 09:21 Sunday 05 May 2024 : Delays are possible.
Works | Motorways works
[A12] Colchester Road (Both directions) between Petersfield Avenue and M25 J28 Brook Street Roundabout. - Single lane restrictions in operation to facilitate the creation of a new slip road and redesign of the Brook Street Roundabout. For more information see https://nationalhighways.co.uk/our-roads/south-east/m25-junction-28-improvements/
A205
[A205] DULWICH COMMON (SE21,SE22) (Southwark)
From: Thursday 02 May 2024
To: Sunday 05 May 2024
Last updated 07:57 Sunday 05 May 2024 : Delays are possible
Works | Utility works
[A205] Dulwich Common (All approaches) at the junction of [A2216] Lordship Lane - Temporary traffic signals are in place to facilitate UKPN works.
A3
[A243] LEATHERHEAD ROAD (KT9) (Kingston upon Thames)
From: Monday 22 April 2024
To: Friday 21 June 2024
Last updated 07:54 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A243] Leatherhead Road (Southbound) at the junction of Chalky Lane - Lane closure due to water works.
A4
[A4] BROMPTON ROAD (SW1X,SW3,SW7) (Kensington & Chelsea,Westminster)
From: Thursday 11 April 2024
To: Tuesday 14 May 2024
Last updated 10:32 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A4] Brompton Road (Westbound) at the junction of [A4] Knightsbridge - Lane one restrictions in place to facilitate UKPN works.
A40
[A40] WESTWAY (W10,W12) (Hammersmith & Fulham,Kensington & Chelsea)
From: Saturday 12 August 2023
To: Saturday 12 October 2024
Last updated 15:14 Sunday 05 May 2024 : Use an alternative route. Delays are possible.
Works | TfL works
[A40] Westway (Eastbound) at the junction of [A3220] West Cross Route - Closure of off-slip to Northern Roundabout from the A40 to facilitate critical structural repairs. Traffic has to divert via the off slip at Wood Lane and back on the On slip from Wood Lane to access the roundabout. From 21/07-28/08 the A40 eastbound entry slip from Wood Lane and A3220 West Cross Route southbound are closed. From 02/09 until 12/10, the A3220 northbound West Cross Route and A40 westbound Wood Lane exit slip are closed. Lane restrictions will also be in in place at Wood Lane.
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A40] WESTWAY (W10,W12) (Eastbound)
A41
[A41] BAKER STREET (NW1,W1U) (Westminster)
From: Monday 16 January 2023
To: Thursday 23 May 2024
Last updated 10:36 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
[A41] Baker Street (Southbound) between Allsop Place and Melcombe Street, between Allsop Place and Melcombe Street - Various restrictions in place to facilitate London Underground upgrade works. Currently lane one (of two) closed southbound on Baker Street between Allsop Place Melcombe Street.
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Saturday 04 May 2024
To: Sunday 05 May 2024
Last updated 13:18 Sunday 05 May 2024 : Use an alternative route. There are no reported delays on diversion.
Works | Collaborative works
King William Street (Both directions) between Cannon Street and Lombard Street - Road closed to facilitate collaborative works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Both directions)
Inner Ring
[A202] VAUXHALL BRIDGE ROAD (SW1E,SW1P,SW1V) (Westminster)
From: Monday 18 March 2024
To: Friday 17 May 2024
Last updated 10:33 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
[A202] Vauxhall Bridge Road (Northbound) at the junction of [A202] Neathouse Place - Lane one of three northbound closed due to roadworks.
Inner Ring
[A5201] OLD STREET (E1,E2,EC1V,EC1Y,EC2A) (Hackney,Islington)
From: Friday 03 May 2024
To: Sunday 05 May 2024
Last updated 14:34 Sunday 05 May 2024 : Use alternative routes. Traffic is flowing well
Works | Construction activity
[A5201] Old Street (Both directions) at the junction of [A1202] Great Eastern Street - Road closed to facilitate a crane operation.
- [A5201] OLD STREET (EC1V,EC2A) (Both directions)
Inner Ring
[A100] TOWER BRIDGE ROAD (EC3N,SE1,SE16) (Southwark,Tower Hamlets)
From: Thursday 02 May 2024
To: Sunday 05 May 2024
Last updated 08:48 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A100] Tower Bridge Road (Southbound) at the junction of Druid Street - Lane restrictions are in place to facilitate Thames Water works.
Inner Ring
OLD STREET ROUNDABOUT (EC1Y) (Islington,Hackney)
From: Saturday 19 August 2023
To: Friday 31 May 2024
Last updated 13:50 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
Old Street Junction - Works for new road layout continue. Lane and footway restrictions are in place on Old Street and City Road. From Monday 22 April until Friday 31 May, various lane and directional closures will be in place between 22:00 and 05:00 each night.
- CITY ROAD (EC1V,EC1Y) (Northbound)
- OLD STREET (EC1V,EC1Y) (Westbound)
- PROVOST STREET (EC1V,N1) (All approaches)
MOORGATE (EC2M,EC2R,EC2Y) (City of London,Islington)
From: Saturday 04 May 2024
To: Sunday 05 May 2024
Last updated 08:50 Sunday 05 May 2024 : Use an alternative route. There are no reported delays on diversion.
Works | Collaborative works
Moorgate (Both directions) between Princes Street and [A1211] London Wall - Road closed to facilitate collaborative works.
- MOORGATE (EC2M,EC2R,EC2Y) (Both directions)
[A4205] PRAED STREET (W2) (Westminster)
From: Saturday 04 May 2024
To: Monday 06 May 2024
Last updated 13:17 Sunday 05 May 2024 : Use an alternative route. There are no reported delays on diversion.
Works | Collaborative works
[A4205] Praed Street (All approaches) at the junction of London Street - Temporary traffic signals and various lane restrictions in place for development works. Phase 5: (WEEKEND 21:00-05:00) 03/05/2024 - 06/05/2024 and 10/05/2024 - 13/05/2024.
- [A4205] PRAED STREET (W2) (Both directions)
[A112] CONNAUGHT ROAD (E16) (Newham)
From: Tuesday 23 April 2024
To: Monday 06 May 2024
Last updated 09:15 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
Airport Roundabout - [A112] Connaught Road (All directions) between Connaught Bridge and North Woolwich Roundabout - Lane restrictions in place to facilitate borough works.
[A1020] SILVERTOWN WAY (E16) (Newham)
From: Friday 29 December 2023
To: Thursday 06 June 2024
Last updated 09:25 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A1020] Silvertown Way (All approaches) at the junction of Caxton Street North - Temporary signals and lane restrictions in place.
[A217] LONDON ROAD (CR4) (Merton)
From: Sunday 28 April 2024
To: Friday 10 May 2024
Last updated 15:46 Sunday 05 May 2024 : No reported delays.
Works | Utility works
[A217] London Road (Both directions) at the junction of [A217] Holborn Way - Temporary traffic signals in use to facilitate emergency SGN gas works.
[B112] HOMERTON ROAD (E10,E9) (Hackney)
From: Friday 03 May 2024
To: Sunday 05 May 2024
Last updated 17:22 Sunday 05 May 2024 : Traffic delays are possible,
Works | Utility works
[B112] Homerton Road (All directions) at the junction of Lee Conservancy Road - Temporary signals in place to facilitate Thames Water works.
[A1010] HIGH STREET (EN3,N9) (Enfield)
From: Friday 19 April 2024
To: Thursday 01 August 2024
Last updated 15:00 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A1010] High Street (All directions) at the junction of Lincoln Road - Temporary signals in operation for roadworks.
CHAMBERLAYNE ROAD (NW10,NW6,W10) (Brent)
From: Thursday 02 May 2024
To: Friday 14 June 2024
Last updated 15:27 Sunday 05 May 2024 : Traffic is flowing well.
Works | Borough works
Chamberlayne Road (All approaches) between [B451] Harvist Road and [B451] Mortimer Road - Temporary traffic signals in place to facilitate Brent council works.
[A217] LONDON ROAD (CR4) (Merton)
From: Sunday 21 April 2024
To: Sunday 14 July 2024
Last updated 15:32 Sunday 05 May 2024 : Use an alternative route. Delays are possible on diversion routes.
Works | Utility works
[A217] London Road (Northbound) between Downe Road and Locks Lane - Road closure to facilitate ongoing gas main replacement works. In addition Bond Road is also closed.
- [A217] LONDON ROAD (CR4) (Northbound)
- BOND ROAD (CR4) (Northbound)
[A400] HAMPSTEAD ROAD (NW1) (Camden)
From: Wednesday 17 April 2024
To: Wednesday 08 May 2024
Last updated 15:09 Sunday 05 May 2024 : Use an alternative route. Delays are possible on diversion.
Works | Collaborative works
[A400] Hampstead Road (Southbound) at the junction of Mornington Crescent - UKPN / Thames Water & HS2 collaborative works taking place with directional lane closures.
- [A400] HAMPSTEAD ROAD (NW1) (Southbound)
[A2208] ROTHERHITHE NEW ROAD (SE16) (Southwark)
From: Monday 22 April 2024
To: Saturday 11 May 2024
Last updated 07:55 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A2208] Rotherhithe New Road (All directions) at the junction of Galleywall Road - Temporary traffic signals are in place to facilitate UKPN works
[A3216] SLOANE STREET (SW1X) (Kensington & Chelsea)
From: Wednesday 28 December 2022
To: Tuesday 31 December 2024
Last updated 10:35 Sunday 05 May 2024 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
[A3216] Sloane Street (Northbound) between Sloane Square and Knightsbridge. - Road closure in place to facilitate Urban Realms Works.
- [A3216] SLOANE STREET (SW1X) (Northbound)
- [A3216] LOWER SLOANE STREET (SW1W) (Northbound)
- [A3216] SLOANE STREET (SW1X,SW3) (Northbound)
A1
[A1] UPPER STREET (N1) (Islington)
From: Thursday 02 May 2024
To: Ongoing
Last updated 13:20 Sunday 05 May 2024 : Traffic is flowing well.
Works | Utility works
UPPER STREET ISLINGTON, N1 - [A1] Upper Street (Southbound) between [A104] Islington Green and Gaskin Street - Lane one (of two) closed to facilitate utility works.
A10
[A503] MONUMENT WAY (N15,N17) (Haringey)
From: Monday 08 April 2024
To: Thursday 20 June 2024
Last updated 15:07 Sunday 05 May 2024 : Delays are possible.
Asset issues | Asset maintenance
[A503] Monument Way (Eastbound) at the junction of [A1055] The Hale - Footway restrictions in place whilst renewal works are being carried out.
A13
[A13] COMMERCIAL ROAD (E1) (Tower Hamlets)
From: Thursday 25 April 2024
To: Wednesday 15 May 2024
Last updated 10:29 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A13] Commercial Road (Both directions) between Batty Street and Back Church Lane - Lane closures in place to facilitate emergency works by Thames Water. Traffic is flowing under a contraflow system.
A21
[A21] BROMLEY COMMON (BR2) (Bromley)
From: Friday 03 May 2024
To: Thursday 20 June 2024
Last updated 07:56 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A21] Bromley Common (Both directions) at the junction of [B265] Hayes Lane - Lane restrictions during emergency SGN works.
A21
[A21] BROMLEY ROAD (SE6) (Lewisham)
From: Wednesday 01 May 2024
To: Monday 06 May 2024
Last updated 07:56 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A21] Bromley Road (Northbound) at the junction of Callander Road - Lane one (of two) is blocked to facilitate emergency Thames Water works.
A23
[A23] PURLEY WAY (CR0) (Croydon)
From: Monday 29 April 2024
To: Wednesday 12 June 2024
Last updated 16:23 Sunday 05 May 2024 : Traffic is flowing well.
Works | TfL works
[A23] Purley Way (Both directions) at the junction of Waddon Road - Various restrictions including temporary signals during traffic signal improvement works. Thursday 18 April until Wednesday 1 May, inclusive, A23 Purley Way (Both directions) width restrictions. Thursday 2 until Wednesday 15 May, A23 (Northbound), lane one closed and A232 Croydon Road (Westbound), lane two closed. Thursday 16 until Wednesday 29 May, A23 (Both directions), lane three closed.
A24
[A24] BALHAM HIGH ROAD (SW12,SW17) (Wandsworth)
From: Thursday 11 April 2024
To: Tuesday 07 May 2024
Last updated 07:55 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A24] Balham High Road (Both directions) between Ravenstone Street and Ritherdon Road - Lane restrictions in operation to facilitate Thames Water works.
A4
[A4] KNIGHTSBRIDGE (SW1X,SW3,SW7,W1J,W2) (Kensington & Chelsea,Westminster)
From: Wednesday 03 April 2024
To: Wednesday 29 May 2024
Last updated 10:31 Sunday 05 May 2024 : Delays are possible when restrictions are in place.
Works | Collaborative works
The Berkeley Hotel refurbishment. - [A4] Knightsbridge (Westbound) between Old Barrack Yard and Wilton Place - Various restrictions during ongoing refurbishment works at The Berkeley Hotel. Reduced to one lane. Thursday 2 until Tuesday 14 May, Wilton Place (Both directions), closed. Tuesday 28 and Wednesday 29 May, A4 Piccadilly Underpass (Westbound), closed.
A4
[A4] BATH ROAD (TW6,UB3) (Hillingdon)
From: Monday 08 April 2024
To: Tuesday 18 June 2024
Last updated 15:14 Sunday 05 May 2024 : Traffic is flowing well.
Works | TfL works
[A4] Bath Road (All approaches) at the junction of Hatton Road North - Various restrictions in place to facilitate junction modernising work.
A40
A406
[A40] WESTERN AVENUE (NW10,UB6,W3,W5) (Ealing)
From: Saturday 04 May 2024
To: Thursday 09 May 2024
Last updated 15:25 Sunday 05 May 2024 : There are no reported delays.
Works | Utility works
[A40] Western Avenue (Westbound) at the junction of [A406] Hanger Lane Gyratory - Burst watermain in lane one (of three)
A406
[A4] SURREY CRESCENT (W4) (Hounslow)
From: Saturday 04 May 2024
To: Ongoing
Last updated 15:28 Sunday 05 May 2024 : Approach with caution. Expect delays.
Asset issues | Traffic signal fault
[A4] Surrey Crescent (All approaches) at the junction of [A4] Chiswick Roundabout - Signals are currently not working.
Inner Ring
[A501] CITY ROAD (EC1V,EC1Y,N1) (Hackney,Islington)
From: Sunday 05 May 2024
To: Ongoing
Last updated 14:35 Sunday 05 May 2024 : Minor delays on approaches.
Works | Construction activity
[A501] City Road (Both directions) between [B144] Bath Street and [B144] Shepherdess Walk - Temporary traffic signals in place to facilitate Crane works.
Inner Ring
[A1210] MANSELL STREET (E1,EC3N) (City of London,Tower Hamlets)
From: Thursday 02 May 2024
To: Ongoing
Last updated 13:16 Sunday 05 May 2024 : Approach with caution. Traffic is flowing well.
Asset issues | Asset fault
[A1210] Mansell Street (All directions) at the junction of [A1211] Goodmans Yard - The traffic signals are out in all directions.
Southern River Route
[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)
From: Friday 03 May 2024
To: Sunday 05 May 2024
Last updated 16:55 Sunday 05 May 2024 : Traffic flowing well.
Works | TfL works
[A3203] Lambeth Bridge (Both directions) at the junction of [A3212] Millbank - Various lane restrictions during junction improvement works.
Western Cross Route
[A3220] REDCLIFFE GARDENS (SW10,SW5) (Kensington & Chelsea)
From: Wednesday 01 May 2024
To: Tuesday 07 May 2024
Last updated 12:47 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A3220] Redcliffe Gardens (Southbound) at the junction of Cathcart Road - Lane closure to facilitate emergency Thames Water works.
Western Cross Route
[A3220] PEMBROKE ROAD (W14,W8) (Kensington & Chelsea)
From: Sunday 28 April 2024
To: Saturday 18 May 2024
Last updated 12:47 Sunday 05 May 2024 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
[A3220] Pembroke Road (Both directions) at the junction of [A3220] Warwick Road - Road is closed due to structural repair works to an overbridge.
- [A3220] PEMBROKE ROAD (W14,W8) (Both directions)
[A315] HAMMERSMITH ROAD (W14,W6) (Hammersmith & Fulham)
From: Friday 03 May 2024
To: Sunday 05 May 2024
Last updated 08:54 Sunday 05 May 2024 : Use other routes. There are no reported delays on diversion.
Works | Construction activity
[A315] Hammersmith Road (Both directions) at the junction of [B317] North End Road - Road is closed due to crane operation.
- [A315] HAMMERSMITH ROAD (W14) (Both directions)
[A214] TRINITY ROAD (SW17) (Wandsworth)
From: Saturday 04 May 2024
To: Sunday 05 May 2024
Last updated 15:49 Sunday 05 May 2024 : No reported delays.
Works | Utility works
TRINITY ROAD WANDSWORTH, SW17 - [A214] Trinity Road (All directions) at the junction of Trinity Crescent - Temporary traffic lights in operation to facilitate utility work.
[B550] FRIERN BARNET LANE (N11,N12,N20) (Barnet)
From: Monday 08 April 2024
To: Monday 13 May 2024
Last updated 15:06 Sunday 05 May 2024 : Use an alternative route. Delays are possible in the surrounding area as traffic diverts.
Asset issues | Asset maintenance
[B550] Friern Barnet Lane (Northbound) between [A1003] Friern Barnet Road and Goldsmith Road - The road is closed due to a Burst Water Main.
- [B550] FRIERN BARNET LANE (N11,N12) (Northbound)
RED LION SQUARE (WC1B,WC1R,WC1V,WC1X) (Camden)
From: Monday 18 March 2024
To: Sunday 05 May 2024
Last updated 10:35 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
Red Lion Square (Eastbound) at the junction of [A40] Procter Street - Red Lion Square is closed and there are lane restrictions in Proctor Street
- [A40] DRAKE STREET (WC1R,WC1X) (Westbound)
- [A401] THEOBALDS ROAD (WC1B,WC1N,WC1R,WC1X) (Westbound)
- RED LION SQUARE (WC1B,WC1R,WC1V,WC1X) (Both directions)
TUNNEL AVENUE (SE10) (Greenwich)
From: Monday 17 July 2023
To: Friday 17 January 2025
Last updated 07:53 Sunday 05 May 2024 : Delays are possible.
Works | TfL works
Tunnel Avenue (Southbound) at the junction of [A102] Blackwall Tunnel Southern Approach - Road closed for Silvertown Tunnel works
- TUNNEL AVENUE (SE10) (All approaches)
- TUNNEL AVENUE (SE10) (Southbound)
THE MALL (SW1A,SW1Y) (Westminster)
From: Monday 02 October 2023
To: Thursday 30 May 2024
Last updated 10:31 Sunday 05 May 2024 : Use an alterative route. Delays are possible on diversion.
Works | Construction activity
The Mall (Westbound) at the junction of Spring Gardens - The road is closed during construction by Admiralty Arch
- THE MALL (SW1A,SW1Y) (Eastbound)
[B4557] SOUTH WAY (HA9) (Brent)
From: Sunday 05 May 2024
To: Ongoing
Last updated 14:35 Sunday 05 May 2024 : Possible delays during this event.
Planned events | Sporting
Vanarama National League Promotion Final - [B4557] South Way (Both directions) at the junction of First Way - Vanarama National League Promotion Final: Bromley FC vs Solihull Moors FC - [B4557] South Way (All directions) at the junction of First Way
CHASE ROAD (NW10,W3) (Ealing)
From: Monday 22 April 2024
To: Sunday 22 September 2024
Last updated 15:01 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
Chase Road (All approaches) at the junction of [A4000] Victoria Road - SSE works taking place on Chase Road, NW10, parallel to Acton cemetery.
[A1055] MERIDIAN WAY (N17,N18) (Enfield,Haringey)
From: Sunday 05 May 2024
To: Ongoing
Last updated 17:06 Sunday 05 May 2024 : Delays possible.
Planned events | Concert
DRUMSHEDS LIVE - [A1055] Meridian Way (Both directions) between Leeside Road and [A406] Angel Road - Live Music Event
[A4020] HIGH STREET (W3) (Ealing)
From: Sunday 05 May 2024
To: Saturday 11 May 2024
Last updated 15:26 Sunday 05 May 2024 : Delays are possible while works are in place.
Works | Utility works
[A4020] High Street (All approaches) at the junction of Crown Street - Temporary traffic signals in use to facilitate Cadent Gas works.
[A315] HIGH STREET (TW8,TW9) (Hounslow)
From: Wednesday 13 December 2023
To: Tuesday 23 July 2024
Last updated 15:05 Sunday 05 May 2024 : Delays are possible .
Works | TfL works
Cycleway 9: Extension to Hounslow. - [A315] High Street (Both directions) between A205 Chiswick High Road and A3002 Half Acre. - Various restrictions during works related to the extension of Cycleway 9 to Hounslow until late July. Temporary traffic signals and lane restrictions will be in place at various junctions as works progress. Additionally, footpaths will be closed with pedestrians re-directed to alternative safe routes. From Monday 18 March, three-way temporary signals will be in operation at the junction of Ealing Road for approximately two months.
- ALEXANDRA ROAD (TW8) (Both directions)
IVYDALE ROAD (SE15) (Southwark)
From: Wednesday 01 May 2024
To: Tuesday 07 May 2024
Last updated 07:53 Sunday 05 May 2024 : Use alternative routes. Delays are possible on diversion.
Works | Borough works
IVYDALE ROAD SOUTHWARK, SE15 - Ivydale Road (Both directions) at the junction of Harlescott Road - The road is closed due to emergency works.
- IVYDALE ROAD (SE15) (Both directions)
MOVERS LANE (IG11) (Barking & Dagenham)
From: Tuesday 02 April 2024
To: Sunday 08 September 2024
Last updated 09:19 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
Movers Lane (Northbound) between [A13] Alfreds Way and [A123] Ripple Road - Temporary traffic signals to facilitate Cadent Gas works.
- MOVERS LANE (IG11) (Northbound)
[A4] TRAFALGAR SQUARE (SW1Y,WC2N) (Westminster)
From: Sunday 05 May 2024
To: Ongoing
Last updated 14:21 Sunday 05 May 2024 : Traffic is moving well in the area.
Planned events | Demonstration/March
A group will form up in Trafalgar Square for a demonstration. - Trafalgar Square - [A4] Trafalgar Square (All approaches) at the junction of [A400] St Martins Place - A group will hold a static demonstration in Trafalgar Square.
[A234] CRYSTAL PALACE PARK ROAD (SE20,SE26) (Bromley)
From: Thursday 02 May 2024
To: Friday 24 May 2024
Last updated 07:52 Sunday 05 May 2024 : Delays are possible.
Works | Utility works
[A234] Crystal Palace Park Road (Both directions) at the junction of Thicket Road - Temporary traffic signal in operation to facilitate Thames Water works.
[A1011] SILVERTOWN WAY (E16) (Newham)
From: Monday 29 April 2024
To: Saturday 22 June 2024
Last updated 09:35 Sunday 05 May 2024 : Delays are possible.
Works | Borough works
[A1011] Silvertown Way (All approaches) at the junction of [A124] Barking Road - London Borough of Newham will be carrying out Urban Realm Works on Silvertown Way at the junction of the southern entrance and exit of Canning Town Bus Station. Southern Exit and Entry Closure from 04:00 29/04/2024 until 00:01 23/06/2024.
[A219] FULHAM PALACE ROAD (SW6,W6) (Hammersmith & Fulham)
From: Thursday 18 April 2024
To: Ongoing
Last updated 16:59 Sunday 05 May 2024 : Traffic is flowing well.
Asset issues | Asset fault
[A219] Fulham Palace Road (All directions) at the junction of Greyhound Road - Temporary traffic signals are in use whilst repairs are undertaken on the permanent pedestrian signals.