You asked

Dear Sir/Madam, I am partaking in a Risk Analysis, Management, & Mitigation project which focuses on your station. The aims are to determine the most effective risk mitigation processes to lead to a successful conclusion re time, quality and cost. I am aware and pleased that the project will be completed soon. For the project I am kindly requesting recorded information about Bam Nuttal's (£30million?) work at London Victoria Station which started around September 2022 please. The information required includes: The Risk Register? The value considerations (a subset of risk) re time, cost and quality? The high level programme works and schedules, with the challenges that caused changes to them and if possible by how much please? Your procurement route, the number of steps/stages to determine the winner of the contract? The project's BIM maturity level? Thank you for your time and I look forward to hearing from you and passing through your station again. [Received 28 February 2024]: Thank you for your reply. I thought it was just to say yes, you had gotten my request for information sorry. It's a good change to do a redesign that actually adds value instead of decreasing it, re increasing the number of gates. Re below, if you are able to, the method statements (based on the risk register) and programmes including the time and resources to do the demolition of the old retail stores to increase the thoroughfare and for installing the new gates and customer information systems sitting above them would be greatly appreciated. It will be nice to know what caused the delay as well. Theoretically, as a student, I would come up with my own opinion/'solution' to add in my paper. I will await your response, fingers crossed what I've asked for is allowed, and thank you.

We answered

TfL Ref: FOI-4280-2324
Thank you for the clarified request received by Transport for London (TfL) on 28 February 2024 asking for information about works completed at London Victoria Station.

Your request has been considered in accordance with the requirements of the Freedom of Information Act and our information access policy. 

Unfortunately we do not hold the information you have requested as the project referred to is a Network Rail project.

You may wish to contact Network Rail using the details provided in the link below:

https://www.networkrail.co.uk/who-we-are/transparency-and-ethics/freedom-of-information-foi/

Please see the attached information sheet for details of your right to appeal.

Yours sincerely

Mary Abidakun
FOI Case Officer
FOI Case Management Team
General Counsel
Transport for London
 