FOI request detail

Freedom of Information: Cycleway 9

Request ID: FOI-3115-2223
Date published: 17 April 2023

You asked

I request that you provide me with the following information relating to Cycleway 9 in Chiswick. a) The total cost of the initial installation of phase 3a. b) The cost of subsequent changes to those elements of phase 3a which were required in the interests of road safety c) The estimated cost of phase 3b d) The cost to date of work on phase 3b

We answered

Our ref: FOI-3115-2223/GH
 
Thank you for clarifying your request about Cycleway 9.

Your request has been considered under the requirements of the Freedom of Information Act 2000 and our information access policy. I can confirm that we do hold some of the information you require.

The total cost of the initial installation of phase 3a
The total construction cost of the Temporary C9 scheme built in 2020 on Chirwick High Road between Heathfield Terrace and Goldhawk Road was £600k. We do not hold information on the separate costs for the section 3a.

The cost of subsequent changes to those elements of phase
The total construction cost for the upgraded temporary scheme on Chiswick High Road between Goldhawk Road and Chiswick Lane completed in 2022 was £3.1m.
 
The estimated cost of phase 3b
The estimated construction costs of the upgraded temporary scheme on Chiswick High Road between Chiswick Lane and Heathfield Terrace completed in 2023 is £656k. The costs are due to be finalised in the coming weeks.

If this is not the information you are looking for, or if you are unable to access it for some reason, please do not hesitate to contact me.

If you are not satisfied with this response please see the attached information sheet for details of your right to appeal.

Yours sincerely

Graham Hurt

FOI Case Officer
FOI Case Management Team
General Counsel
Transport for London