Data requested on all road crossings (bridge & tunnel) of Tidal reach of River Thames from Woolwich to Teddington.

Request ID: FOI-2937-1819
Date published: 18 February 2019

You asked

1) Which Authority is responsible for the Operation and maintenance of each crossing ? 2) What is the annual financial cost of each crossing ? 3) Who is responsible for providing funding to satisfy those costs ?

We answered

TfL Ref: FOI-2937-1819

Thank you for your email received by Transport for London (TfL) on 4 February 2019.

Your request has been considered in accordance with the requirements of the Freedom of Information Act and our information access policy.  I can confirm we hold some of the information you require. You asked:

  1. Which Authority is responsible for the Operation and maintenance of each crossing ?

TfL is not responsible for every road crossing over the Thames from Woolwich to Teddington. Therefore we do not hold information on those which TfL does not own or manage.  

Please see listed below all the road crossings (bridges and tunnels) from Woolwich to Teddington for which TfL is responsible for maintaining the asset.

Blackwall Tunnel Northbound

Blackwall Tunnel Southbound

Rotherhithe Tunnel

Westminster Bridge

Lambeth Bridge

Vauxhall Bridge

Battersea Bridge

Chiswick Bridge

Kew Bridge

Twickenham Bridge

2)  What is the annual financial cost of each crossing ?

Our annual maintenance budget covers all our assets on the Transport for London Road Network (TLRN) therefore it is not possible for us to define the maintenance budget for each of the crossings. Overall TfL spends £5.7m on the maintenance of tunnels and structures and this is split into three categories of lump sum (£1.58m), ordered maintenance (£1.38m) and inspections (£2.8m). The budget maintains our entire stock of 1, 691 structures.

3)  Who is responsible for providing funding to satisfy those costs ?

TfL covers the cost.

If this is not the information you are looking for, or if you are unable to access it for some reason, please do not hesitate to contact me.

Please see the attached information sheet for details of your right to appeal as well as information on copyright and what to do if you would like to re-use any of the information we have disclosed.

Yours sincerely

Eva Hextall

FOI Case Officer

FOI Case Management Team

General Counsel

Transport for London

1)  Which Authority is responsible for the Operation and maintenance of each crossing ?

2)  What is the annual financial cost of each crossing ?

3)  Who is responsible for providing funding to satisfy those costs ?

Back to top