You asked

Note: Please do not include 20mph limit schemes that did not also involve cycle-specific measures Question % 1 Approximately what percentage of your tranche 1 funding has been used to install schemes aimed primarily at cycle travel? Number 2 How many schemes of this kind have you installed? 3 Of these schemes, how many have been: a Not yet installed? b Installed and left unchanged? c Installed but somewhat modified? d Installed but substantially modified? e Installed and removed?

We answered

TfL Ref: FOI-1189-2021

Thank you for your request received by Transport for London (TfL) on 25 September 2020, asking about the Emergency Active Travel Fund (EATF) Tranche 1 allocation.

Your request has been considered in accordance with the requirements of the Environmental Information Regulations (EIR) and our information access policy.  I can confirm that we hold the information you require.

A total of £5m of the EATF – 1 has come to London from the Department for Transport (DfT), of which £2m was allocated to TfL and 3m went directly to London boroughs. Please see the full breakdown in the table below.  

TfL also received £55m from the DfT as part of the emergency funding settle for TfL in May 2020 for schemes on borough and TfL roads.  The Streetspace programme comprises of temporary schemes which are being delivered at significant pace by TfL and London’s boroughs. However, this is separate from EATF – 1 funding.

Note: Please do not include 20mph limit schemes that did not also involve cycle-specific measures

 

Question

%

1

Approximately what percentage of your tranche 1 funding has been used to install schemes aimed primarily at cycle travel?

96%

 

 

Number

2

How many schemes of this kind have you installed?*

29

 

 

 

3

Of these schemes, how many have been:

 

a

Not yet installed?**

13

b

Installed and left unchanged?

16

c

Installed but somewhat modified?

0

d

Installed but substantially modified?

0

e

Installed and removed?

0

*Please note, this includes schemes we have in design and have not yet installed, because question 3 indicates they are to be included.

** The Emergency Active Travel Fund 1 funding spend deadline for TfL is the end of December 2020, therefore not all schemes have yet been delivered.

If you are considering submitting a further request please think carefully about whether the request is essential at this current time, as answering FOI requests will require the use of limited resources and the attention of staff who could be supporting other essential activity. Where requests are made, please note that our response time may be impacted by the current situation.

If this is not the information you are looking for, or if you are unable to access it for any reason, please do not hesitate to contact me.

Please see the attached information sheet for details of your right to appeal as well as information on copyright and what to do if you would like to re-use any of the information we have disclosed.

Yours sincerely

Eva Hextall

FOI Case Management Team

General Counsel

Transport for London

Back to top

Want to make a request?

We'll email you the response within 20 working days.


We'll publish the response online without disclosing any personal information.