Hammersmith Bridge
Request ID: FOI-1188-2021
Date published: 27 October 2020
You asked
- Amount spent on Hammersmith Bridge maintenance and monitoring since (and including) 2010. Please break this information down by year.
- Details of annual payments made to engineering firms, construction companies or architects in relation to Hammersmith Bridge since (and including) 2010..
We answered
TfL Ref: FOI-1188-2021
Thank you for your request received by Transport for London (TfL) on 25 September 2020.
Your request has been considered in accordance with the requirements of the Environmental Information Regulations (EIRs) and our information access policy. I can confirm that we hold some of the information you require. You asked:
- Amount spent on Hammersmith Bridge maintenance and monitoring since (and including) 2010. Please break this information down by year.
Please note that the LB Hammersmith & Fulham is the owner and highway authority for Hammersmith Bridge and we do not hold details of any expenditure they have incurred on the bridge. However, we have been supporting the LB Hammersmith & Fulham for a number of years in developing refurbishment plans for the bridge and, in total, have spent £16.7m on assessments, feasibility, inspections and surveys, designs and other matters. A breakdown is provided in the table below:
|
Amount (£m)
|
Reason
|
2007/08
|
£0.08
|
Assessment
|
2008/09
|
£0.13
|
Assessment
|
2010/11
|
£0.15
|
Investigation of weight limit enforcement and barrier/width restriction enhancement/improvements
|
2011/12
|
£0.34
|
Barrier/width restriction enhancement/improvements
|
2014/15
|
£0.20
|
Panels design
|
2015/16
|
£0.55
|
Reactive deck panel replacement
|
2016/17
|
£0.79
|
Reactive deck panel replacement / Pathway Stage 1 – Outcome definition, surveys and data collection
|
2017/18
|
£1.02
|
Pathway Stage 2 – Feasibility of options for repairing the bridge
|
2018/19
|
£1.70
|
Pathway Stage 2 – Feasibility of options for repairing the bridge
|
2019/20
|
£5.80
|
Pathway Stage 3 - Concept design for main bridge, investigation and early works on pedestals, design of temporary bridge and ongoing monitoring and inspections.
|
2020/21
|
£5.90
|
Pathway Stage 3 - Concept design for main bridge, detailed design for stabilisation works to make the bridge safe for the mainworks, investigation and early works on pedestals, concept design of temporary bridge and ongoing monitoring and inspections.
|
- Details of annual payments made to engineering firms, construction companies or architects in relation to Hammersmith Bridge since (and including) 2010.
As highlighted above, we do not have details of any payments made by the LB Hammersmith & Fulham. However, since taking responsibility for developing the designs for refurbishing the bridge in 2019/20, we have made the following payments to engineering firms and contractors working for us:
External Contracts
|
Activities
|
VOWD from P3 19/20 up to P7 20/21
|
Atkins
|
Responsible for Cat 2 and Cat 3 checks on mechanical equipment, structure, etc
|
£ 380,000
|
Mott MacDonald
|
Feasibility, surveys, monitoring, options assessment and technical approvals
|
£ 1,268,687
|
Pell Frischmann
|
Concept design for the Hammersmith Bridge strengthening and temporary bridge, together with detailed design for stabilisation works, planning and environmental assessments
|
£ 1,731,629
|
Costain
|
Construction and contracting advice for the main bridge works and temporary bridge
|
£ 786,559
|
Kier
|
Early investigative works to the bridge pedestals.
|
£ 3,438,064
|
If you are considering submitting a further request please think carefully about whether the request is essential at this current time, as answering FOI requests will require the use of limited resources and the attention of staff who could be supporting other essential activity. Where requests are made, please note that our response time may be impacted by the current situation.
If this is not the information you are looking for, or if you are unable to access it for any reason, please do not hesitate to contact me.
Please see the attached information sheet for details of your right to appeal as well as information on copyright and what to do if you would like to re-use any of the information we have disclosed.
Yours sincerely
Eva Hextall
FOI Case Officer