Please provide a figure in pounds for the total monies spent by TFL on repairs to Hammersmith bridge since January 1 2000. Please break this figure down into monies spent each year of the period 2000-2020, with a one line explanation for each year of how the monies were spent.

We answered

Our Ref:         FOI-0864-2021

Thank you for your request received on 20 August 2020 asking for information about the amount spent by TfL on repairs to Hammersmith Bridge.

Your request has been considered in accordance with the requirements of the Freedom of Information Act and our information access policy. I can confirm we do hold the information you require. You asked:
 
Please provide a figure in pounds for the total monies spent by TFL on repairs to Hammersmith bridge since January 1 2000.
Please break this figure down into monies spent each year of the period 2000-2020, with a one line explanation for each year of how the monies were spent.
 
TfL has committed £16.7m in total to date; a breakdown of this detailing where these costs have gone is provided in the table below:
 
  Amount (£m) Reason
2007/08 £0.08 Assessment
2008/09 £0.13 Assessment
2010/11 £0.15 Investigation of weight limit enforcement and barrier/width restriction enhancement/improvements
2011/12 £0.34 Barrier/width restriction enhancement/improvements
2014/15 £0.20 Panels design
2015/16 £0.55 Reactive deck panel replacement
2016/17 £0.79 Reactive deck panel replacement / Pathway Stage 1 – Outcome definition, surveys and data collection
2017/18 £1.02 Pathway Stage 2 – Feasibility of options for repairing the bridge
2018/19 £1.70 Pathway Stage 2 – Feasibility of options for repairing the bridge
2019/20 £5.80 Pathway Stage 3 - Concept design for main bridge, investigation and early works on pedestals, design of temporary bridge and ongoing monitoring and inspections.
2020/21 £5.90 Pathway Stage 3 - Concept design for main bridge, detailed design for stabilisation works to make the bridge safe for the main  works, investigation and early works on pedestals, concept design of temporary bridge and ongoing monitoring and inspections.
 
No monies were spent between 2001/02 – 2006/07, in 2009/10, or between 2012/13 – 2013/14.
 
If this is not the information you are looking for please feel free to contact me.
 
The impact of current circumstances on TfL’s resources means we are not able to answer FOI requests readily and we ask that you please do not make a request to us at present.
 
Answering FOI requests will require the use of limited resources and the attention of staff who could be supporting other essential activity. In any event, please note that our response time will be affected by the current situation.
 
Please see the attached information sheet for details of your right to appeal.

Yours sincerely

Gemma Jacob
Senior FOI Case Officer
FOI Case Management Team
General Counsel
Transport for London

[email protected]

Back to top

Want to make a request?

We'll email you the response within 20 working days.


We'll publish the response online without disclosing any personal information.