Never Ending Planned Engineering Work on the Metropolitan Line

Request ID: FOI-0557-2122
Date published: 28 June 2021

You asked

In the last ten years, how many times has a part or the whole of the Metropolitan Line been closed for "Planned Engineering Work". You may call it planned engineering work, others would call it "Failing to provide a service"

We answered


TfL Ref: 0557-2122

Thank you for your request received by Transport for London (TfL) on 19 June 2021 asking for information about planned engineering works on the Metropolitan Line over the last ten years.

Your request has been considered in accordance with the requirements of the Freedom of Information Act and our information access policy. I can confirm that we hold the information you require.

Closures for engineering works are vital for the maintenance and upgrade of the network. The Metropolitan Line is also part of the current “Four Lines Modernisation” project (4LM). This will see obsolete equipment, dating back to the 1920s in some places, replaced with modern, computerised signalling and control systems, as well as a new fleet of air-conditioned trains, faster journeys and reduced waiting times. More information about the project and its benefits can be found on our website here: https://tfl.gov.uk/travel-information/improvements-and-projects/four-lines-modernisation.

Below is a summary of weekend closures since 2011 on the Metropolitan line. Aside from the items in the ‘Notes’ column there were no weekday closures.

The data in the ‘Closures’ column represents how many weekends had a closure in that year; the closure limits vary each weekend and sometimes within the same weekend.
So for example, in 2011, there were 21 weekends of Metropolitan line closures which would consist of a variety of limits (Baker Street to Aldgate closed, Wembley Park to Aldgate closed etc.).


 
Year Closures Notes
2011 21  
2012 17  
2013 20  
2014 21 Also Ruislip to Uxbridge on the weekdays from 21st July until 11th Aug
2015 13  
2016 15 Also Mon-Wed Aldgate to Wembley Park from 22:00 16th May 2016 - 20th Dec 2018
2017 14 Also 6x Aldgate to Wembley Park until 09:00 and after 21:00 Sunday
2018 17 Also 13x Aldgate to Wembley Park until 09:00 and after 21:00 Sunday
2019 15  
2020 9  
2021 7 Up until July




If this is not the information you are looking for, or if you are unable to access it for any reason, please do not hesitate to contact me.

Please see the attached information sheet for details of your right to appeal as well as information on copyright and what to do if you would like to re-use any of the information we have disclosed.

Yours sincerely


Sara Thomas
FOI Case Management Team
General Counsel
Transport for London
 

Back to top

Want to make a request?

We'll email you the response within 20 working days.


We'll publish the response online without disclosing any personal information.