Request ID: FOI-0284-2425 Date published: 21 May 2024
You asked
Follow-up to FOI-4736-2324: Thank you
Can you fully itemise out the costs from numbers :-
11
18
24
26
Best wishes
We answered
TfL Ref: EIR-0284-2425
Thank you for your further request received by Transport for London (TfL) on 23rd April 2024 asking for information about 20mph speed limits.
Your request has been considered in accordance with the requirements of the Environmental Information Regulations and our information access policy.
Specifically you asked the following, further to case reference EIR-4736-2425:
“Can you fully itemise out the costs from numbers :-
11 18 24 26”.
I can confirm that we hold some of the information you require. The further breakdown of these figures that we are able to provide is shown in the table below. Please note that these figures are taken from the cost plan for these specific projects as of 20th May 2024. These costs plans are live documents and so the figures can fluctuate based on a number of factors such as current forecasts, invoices received and paid etc. The comments column helps differentiate the difference in scope for each project which will impact on costs, and includes some non-itemised spending. Beyond the figures below we cannot break down the costs any further:
Project
Cost Plan total
Detailed design cost (Invoices received to date from third party design contractor)
Construction cost (Invoices received to date from third party construction contractor)
Comments
20mph Westminster TLRN Borough-wide
£850,249
Sign and line: £19,652.66
Sign and line: £81,214.49
Project includes civil engineering design and construction costs including resurfacing, trial holes, additional design work including traffic signals and drainage as well as non-itemised surveys such as lamp column testing and electrics and non core project team staff time
Raised tables: £50,621.38
Raised tables:
Vauxhall Bridge Rd/Chapter St £49,943.33
Vauxhall Bridge Rd/Francis St £62,075.28
Park Rd/Kent Terrace £5,000 (abortive costs)
Park Rd/Lodge Rd £88,974.22
St Johns Wood/Pavilion £55,769.69
St Johns Wood/Oak Tree £56,590.55
20mph Lambeth TLRN Borough-wide
£342,155
£32,791.24
£148,087.78
Project includes design by third party supplier, as well as non-itemised surveys such as lamp column testing and electrics and non core project team staff time
A24 Wandsworth & Merton 20mph
£109,687
£18,449.12
£72,665.66
Project includes non-itemised surveys such as lamp column testing and electrics and non core project team staff time
Wandsworth TLRN 20mph
£149,847
£31,129.76
£77,035.41
Project includes non-itemised surveys such as lamp column testing and electrics and non core project team staff time
If this is not the information you are looking for please do not hesitate to contact me.
Please see the attached information sheet for details of your right to appeal as well as information on copyright and what to do if you would like to re-use any of the information we have disclosed.
Yours sincerely,
David Wells FOI Case Officer FOI Case Management Team General Counsel Transport for London