Status updates
Traffic
Now 21:15
Find a postcode, place or road
A1
Inner Ring
[A501] CITY ROAD (EC1V) (Islington)
From: Thursday 23 January 2025
To: Friday 02 May 2025
Last updated 21:01 Thursday 23 January 2025 : Traffic is flowing well.
Works | TfL works
[A501] City Road (Eastbound) at the junction of Colebrooke Row - Lane one (of two) closed during works.
A12
A13
[A1205] BURDETT ROAD (E14,E3) (Tower Hamlets)
From: Thursday 16 January 2025
To: Sunday 16 March 2025
Last updated 08:53 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A1205] Burdett Road (Both directions) between Thomas Road and Agnes Street - A contraflow is in place due to Thames Water works.
A13
[A13] NEWHAM WAY (E16) (Newham)
From: Thursday 19 December 2024
To: Sunday 25 May 2025
Last updated 19:24 Thursday 23 January 2025 : Traffic is flowing steadily through the restrictions in place. Expect delays at peak times.
Works | TfL works
Canning Town Flyover Refurbishment Works - [A13] Newham Way (Both directions) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works. Thursday 23 January two lanes closed in both directions (2200-0600) Friday 24 and Saturday 25 January, East India Dock Tunnel, closed eastbound between 21:00 and 08:00 each night and A13 reduced to one lane westbound.
- [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Eastbound)
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 08 July 2024
To: Wednesday 31 December 2025
Last updated 08:26 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)
Farringdon Cross Route
[A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (City of London)
From: Monday 06 January 2025
To: Saturday 22 March 2025
Last updated 08:27 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A201] New Bridge Street (Southbound) between Fleet Street and Tudor Street - Road closure to facilitate gas works from 06 January to 22 March.
- [A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (Southbound)
Inner Ring
[A501] EUSTON ROAD (N1C,NW1,WC1H) (Camden)
From: Monday 06 January 2025
To: Thursday 27 February 2025
Last updated 21:02 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A501] Euston Road (Both directions) at the junction of [A4200] Upper Woburn Place - TfL drainage works - starts Upper Woburn Place, with temporary signals and will then progress onto Euston Road with lane restrictions to Gower Street.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Wandsworth)
From: Monday 13 January 2025
To: Saturday 31 May 2025
Last updated 08:58 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
Battersea Bridge Road - [A3220] Battersea Bridge Road (Both directions) at the junction of Petworth Street - Road restricted due to the Battersea Bridge Safety Improvements Scheme works.
[A404] HIGH ROAD (HA9) (Brent)
From: Monday 13 January 2025
To: Monday 19 May 2025
Last updated 20:58 Thursday 23 January 2025 : There are no reported delays.
Works | Borough works
[A404] High Road (Both directions) at the junction of [B4565] Wembley Hill Road - Temporary traffic signals in place to facilitate roadworks.
Silvertown Tunnel, Greenwich Peninsula () ()
From: Friday 25 February 2022
To: Friday 28 February 2025
Last updated 09:10 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. Millennium Way is currently closed. There are associated lane closures on the northbound A102 Blackwall Tunnel Southern Approach. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.
- MILLENNIUM WAY (SE10) (Southbound)
- WEST PARKSIDE (SE10) (Northbound)
- EDMUND HALLEY WAY (SE10) (Eastbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Southbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Both directions)
- TUNNEL AVENUE (SE10) (Southbound)
[A118] HIGH STREET (E15,E3) (Newham,Tower Hamlets)
From: Monday 09 September 2024
To: Friday 28 February 2025
Last updated 08:48 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
[A118] High Street (All approaches) at the junction of [A11] Bow Road - Lane closures on all approaches and on the roundabout, and closure of the link road under the flyover due to Sivertown Tunnel works.
[A1206] PRESTONS ROAD ROUNDABOUT (E14) (Tower Hamlets)
From: Monday 16 September 2024
To: Saturday 01 March 2025
Last updated 08:47 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
Silvertown Tunnel Scheme - Preston's Roundabout - [A1206] Prestons Road Roundabout (All directions) between [A1206] Prestons Road and [A1261] Aspen Way - Lane restrictions are in place to facilitate Silvertown Tunnel related works.
[A222] BROMLEY ROAD (BR3) (Bromley)
From: Thursday 23 January 2025
To: Tuesday 28 January 2025
Last updated 18:35 Thursday 23 January 2025 : No delays are being reported on diversion routes.
Works | Utility works
[A222] Bromley Road (Both directions) at the junction of Oakwood Avenue - Road closed between Oakwood Avenue and Downs Bridge Road for emergency works.
- [A222] BROMLEY ROAD (BR3) (Both directions)
A205
A3
[A3] WEST HILL (SW15,SW18) (Wandsworth)
From: Monday 20 January 2025
To: Saturday 25 January 2025
Last updated 18:42 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A3] West Hill (All directions) at the junction of [A205] Upper Richmond Road - All lanes are now clear following a burst water main.
Western Cross Route
[A3220] REDCLIFFE GARDENS (SW10,SW5) (Kensington & Chelsea)
Friday 24 January 2025
Last updated 16:55 Thursday 23 January 2025 : Traffic is flowing well.
Works | TfL works
[A3220] Redcliffe Gardens (Southbound) between [A3218] Old Brompton Road and [A308] Fulham Road - Various lane restrictions in place, 0800-1700, due to junction improvement works. Overnight road closures 22:00 to 05:00 26-28 January 2025, 16-19 February 2025 and 16-19 March 2025.
A10
[A503] MONUMENT WAY (N15,N17) (Haringey)
From: Wednesday 15 January 2025
To: Sunday 26 January 2025
Last updated 17:11 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A503] Monument Way (Westbound) at the junction of [A1055] The Hale - Lane restrictions westbound to facilitate electrical cable placement works.
A2
Inner Ring
[A201] NEW KENT ROAD (SE1,SE17) (Southwark)
From: Monday 06 January 2025
To: Thursday 06 March 2025
Last updated 08:27 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
[A201] New Kent Road (Both directions) between Elephant Road and Balfour Street - Various restrictions to facilitate TfL improvement works. Between 06 January - 22 January, lane closures in both directions. Full westbound closure in place on the nights of 03, 04 March. Full eastbound closure in place on the nights of 04, 05 March.
A2
Blackwall Tunnel
[A102] BLACKWALL TUNNEL SOUTHERN APPROACH (SE10,SE3,SE7) (Greenwich)
Friday 24 January 2025
Last updated 16:56 Thursday 23 January 2025 : Works are scheduled to resume at 0800hrs.
Works | TfL works
[A102] Blackwall Tunnel Southern Approach (Northbound) between Charlton Road and Westcombe Park rail bridge - Lane one is closed to facilitate noise barrier installation works.
A20
[A20] SIDCUP ROAD (SE9) (Bexley,Bromley,Greenwich)
From: Friday 24 January 2025
To: Saturday 25 January 2025
Last updated 05:34 Tuesday 21 January 2025 : Please find alternative route.
Works | TfL works
[A20] Sidcup Road (Northbound) at the junction of [A20] Sidcup Bypass, between Frognal Roundabout and Clifton Roundabout - Various restrictions are in place to facilitate carriageway maintenance works.
- [A20] SIDCUP ROAD (SE12,SE9) (Westbound)
- [A20] SIDCUP BYPASS (DA14,SE9) (Westbound)
A205
[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)
From: Thursday 19 December 2024
To: Monday 07 April 2025
Last updated 09:10 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.
A24
[A24] UPPER TOOTING ROAD (SW17) (Wandsworth)
From: Friday 17 January 2025
To: Sunday 26 January 2025
Last updated 09:23 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A24] Upper Tooting Road (Both directions) at the junction of Beechcroft Road - Single alternate lane operated by temporary signals for utility works.
A316
[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)
From: Thursday 19 December 2024
To: Friday 25 July 2025
Last updated 09:20 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - There are lane restrictions in place due to junction improvement works.
A316
[A316] LOWER MORTLAKE ROAD (TW9) (Richmond upon Thames)
From: Monday 20 January 2025
To: Friday 24 January 2025
Last updated 09:12 Thursday 23 January 2025 : Possible delays
Works | Utility works
[A316] Lower Mortlake Road (Westbound) at the junction of Salisbury Road - Lane one of two is closed to facilitate Cadent Gas works.
A40
Western Cross Route
[A3220] WEST CROSS ROUTE (W10,W11,W12) (Hammersmith & Fulham,Kensington & Chelsea)
From: Sunday 21 July 2024
To: Saturday 28 June 2025
Last updated 17:12 Thursday 23 January 2025 : Delays are possible
Works | TfL works
A40 Westway Refurbishment Scheme - A3220 West Cross Route - [A3220] West Cross Route (Southbound) between A40 Westway and Ariel Way - A40 Westway eastbound off-slip to Northern Roundabout remains closed. From Monday 2 September until Saturday 12 October, West Cross Route northbound and the slip road to Wood Lane will be closed.
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Northbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
- [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
A41
[A41] FINCHLEY ROAD (NW3) (Camden)
From: Friday 24 January 2025
To: Sunday 26 January 2025
Last updated 12:55 Tuesday 24 December 2024 : Delays are possible. Approach with caution.
Works | Utility works
[A41] Finchley Road (Southbound) at the junction of Langland Gardens - Lane one (of three) closure is in place to facilitate Thames Water works.
Inner Ring
[A501] EUSTON ROAD (NW1,WC1H) (Camden,Westminster)
From: Thursday 09 January 2025
To: Friday 07 March 2025
Last updated 08:29 Thursday 23 January 2025 : Delays are possible.
Works | Borough works
[A501] Euston Road (Eastbound) at the junction of [A400] Hampstead Road - Eastbound footway and carriageway restrictions during Euston Tower Development. Lane 1 of 3 will be closed. From 31/01 - 04/03 northbound lane 1 (of 2) is closed.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Monday 20 January 2025
To: Thursday 22 May 2025
Last updated 08:55 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
[A3220] Battersea Bridge Road (Both directions) at the junction of Parkgate Road - Lane closure in place to facilitate Urban Realm Works.
[A3216] SLOANE SQUARE (SW1W,SW1X,SW3) (Kensington & Chelsea,Westminster)
From: Monday 20 January 2025
To: Saturday 25 January 2025
Last updated 14:34 Thursday 23 January 2025 : There are no reported delays.
Works | Utility works
[A3216] Sloane Square (Eastbound) at the junction of Sedding Street - Road is closed due to emergency Thames Water and Cadent Gas works
- [A3216] SLOANE SQUARE (SW1W,SW1X,SW3) (Eastbound)
[A107] LOWER CLAPTON ROAD (E5,E8,E9) (Hackney)
From: Sunday 19 January 2025
To: Friday 24 January 2025
Last updated 14:15 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A107] Lower Clapton Road (Both directions) at the junction of Powerscroft Road - Temporary traffic signals are in operation to facilitate UKPN works.
[A4201] REGENT STREET (W1B,W1G,W1S,W1W) (Westminster)
From: Thursday 23 January 2025
To: Wednesday 29 January 2025
Last updated 19:49 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A4201] Regent Street (Both directions) at the junction of [A40] Oxford Street - Restrictions during UKPN electrical works.
[A2022] LITTLE WOODCOTE LANE (CR8,SM5) (Croydon,Sutton)
From: Tuesday 21 January 2025
To: Monday 10 February 2025
Last updated 09:15 Thursday 23 January 2025 : Possible delays.
Works | Utility works
[A2022] Little Woodcote Lane (All approaches) at the junction of [A2022] Foxley Lane - Temporary signals in place due to emergency SGN gas works.
[A400] ST MARTINS PLACE (WC2N) (Westminster)
From: Sunday 19 January 2025
To: Friday 24 January 2025
Last updated 19:49 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A400] St Martins Place (All directions) at the junction of [A400] Charing Cross Road - Temporary signals in operation to facilitate Cadent Gas works.
[A5] CRICKLEWOOD BROADWAY (NW2) (Barnet,Brent)
From: Tuesday 21 January 2025
To: Friday 24 January 2025
Last updated 17:11 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A5] Cricklewood Broadway (All directions) at the junction of Mora Road - Temporary traffic signals are in operation to facilitate Thames Water works.
[A4089] WEMBLEY PARK DRIVE (HA9) (Brent)
From: Thursday 23 January 2025
To: Monday 27 January 2025
Last updated 20:58 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A4089] Wembley Park Drive (All directions) at the junction of [A4089] Bridge Road - Lane restrictions are in operation to facilitate burst water main repair works.
SURREY QUAYS ROAD (SE16) (Southwark)
From: Monday 06 January 2025
To: Monday 27 January 2025
Last updated 09:17 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
Surrey Quays Road (Both directions) between [A200] Lower Road and Deal Porters Way - Road closure due to UKPN works.
- SURREY QUAYS ROAD (SE16) (Both directions)
[A2216] LORDSHIP LANE (SE22) (Southwark)
From: Saturday 18 January 2025
To: Tuesday 28 January 2025
Last updated 09:18 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A2216] Lordship Lane (All directions) at the junction of Heber Road - Temporary traffic signals are in operation to facilitate Thames Water works.
[A3216] LOWER SLOANE STREET (SW1W) (Kensington & Chelsea,Westminster)
From: Tuesday 07 January 2025
To: Friday 07 February 2025
Last updated 08:32 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A3216] Lower Sloane Street (Northbound) between Sloane Gardens and [A3216] Sloane Square - Road closed due to Cadent Gas works.
- [A3216] LOWER SLOANE STREET (SW1W) (Northbound)
A13
[A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Tower Hamlets)
From: Thursday 23 January 2025
To: Tuesday 04 February 2025
Last updated 21:05 Thursday 23 January 2025 : Possible delays during the works.
Works | TfL works
[A1261] East India Dock Road Tunnel (Both directions) at the junction of [A1261] Aspen Way - East India Dock Tunnel closure to facilitate maintenance works.
- [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Both directions)
A20
A21
LEWISHAM HIGH STREET (SE13) (Lewisham)
From: Saturday 03 August 2024
To: Monday 31 March 2025
Last updated 09:16 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.
- LEWIS GROVE (SE13) (Northbound)
- [A21] LEWISHAM HIGH STREET (SE13) (Northbound)
A20
[A20] ELTHAM ROAD (SE12,SE3) (Greenwich,Lewisham)
From: Friday 24 January 2025
To: Sunday 26 January 2025
Last updated 11:13 Thursday 09 January 2025 : Possible delays during the works.
Works | Utility works
[A20] Eltham Road (Both directions) at the junction of [B212] Lee Road - Multi-way temporary traffic signals in operation to facilitate utility works.
A205
[A205] THURLOW PARK ROAD (SE21,SE24,SE27) (Lambeth)
From: Tuesday 21 January 2025
To: Wednesday 29 January 2025
Last updated 09:10 Thursday 23 January 2025 : Possible delays.
Works | Utility works
[A205] Thurlow Park Road (Eastbound) at the junction of [A215] Norwood Road - Lane one closure eastbound to facilitate Thames Water works.
A205
[A205] WALDRAM PARK ROAD (SE23) (Lewisham)
From: Thursday 23 January 2025
To: Tuesday 28 January 2025
Last updated 18:38 Thursday 23 January 2025 : There are no reported delays.
Works | Utility works
[A205] Waldram Park Road (Both directions) at the junction of Westbourne Drive - SGN works. Contra-flow.
A205
[A3] WANDSWORTH HIGH STREET (SW18) (Wandsworth)
From: Monday 20 January 2025
To: Tuesday 04 February 2025
Last updated 18:38 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A3] Wandsworth High Street (Westbound) at the junction of [A217] Ram Street - Lanes two and three (of three) is blocked due to emergency Thames Water works.
A3
[A3] ROEHAMPTON VALE (SW15) (Kingston upon Thames,Wandsworth)
From: Wednesday 08 January 2025
To: Wednesday 29 January 2025
Last updated 09:29 Thursday 23 January 2025 : Use an alternative route. Delays are possible.
Works | Utility works
[A3] Roehampton Vale (Westbound) at the junction of [A3] Kingston Vale - Thames Water works. The slip road from westbound A3 Roehampton Vale into A308 Kingston Vale is closed.
A3
[A243] HOOK ROAD (KT9) (Kingston upon Thames)
From: Friday 24 January 2025
To: Saturday 25 January 2025
Last updated 19:22 Wednesday 22 January 2025 : Delays possible.
Works | TfL works
[A243] Hook Road (Northbound) at the junction of Elm Road - Lane restriction in place to facilitate carriageway resurfacing works.
A4
Western Cross Route
[A3220] WARWICK ROAD (SW10,SW5,W14,W8) (Kensington & Chelsea)
From: Wednesday 22 January 2025
To: Wednesday 05 February 2025
Last updated 19:50 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
[A3220] Warwick Road (Northbound) at the junction of Nevern Square - Lane closure in place to facilitate UKPN works.
A4
[A4] TALGARTH ROAD (W14,W6) (Hammersmith & Fulham)
From: Friday 24 January 2025
To: Monday 27 January 2025
Last updated 13:07 Tuesday 24 December 2024 : Some delays maybe experienced while this work takes place.
Works | Utility works
[A4] Talgarth Road (Eastbound) at the junction of [B317] North End Road - Lane one of four closed eastbound to facilitate Virgin Media works.
A4
[A4] BROMPTON ROAD (SW1X,SW3,SW7) (Kensington & Chelsea,Westminster)
From: Friday 24 January 2025
To: Sunday 26 January 2025
Last updated 12:08 Thursday 19 December 2024 : Delays possible.
Works | Utility works
[A4] Brompton Road (Eastbound) at the junction of [A4] Thurloe Place - Thames Water works. Eastbound lane 1 of 2 closure.
A40
[A40] WESTWAY (W10,W11,W2,W9) (Kensington & Chelsea,Westminster)
From: Friday 24 January 2025
To: Monday 27 January 2025
Last updated 04:53 Monday 20 January 2025 : These works are scheduled to recommence on Friday 24th January at 2200 hrs.
Works | TfL works
[A40] Westway (Eastbound) between West Cross Route and Edgware Road - The road is closed from Friday night 2200 until Monday morning 0500 for A40 Refurbishment Works
- [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
- [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
- [A404] HARROW ROAD (W2) (Eastbound)
A406
[A1020] ROYAL DOCKS ROAD (E6,IG11) (Newham)
Friday 24 January 2025
Last updated 20:43 Thursday 23 January 2025 : Works are scheduled to resume at 1000hrs.
Works | TfL works
TfL - Rail for London Infrastructure - [A1020] Royal Docks Road (Both directions) at the junction of Armada Way - TfL - Rail for London Infrastructure excavation works. Lane 1 of 2 closure northbound and southbound maintaining one running lane of traffic.
Bishopsgate Cross Route
[A10] GRACECHURCH STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 20 January 2025
To: Friday 31 January 2025
Last updated 19:49 Thursday 23 January 2025 : There are no reported delays.
Works | TfL works
[A10] Gracechurch Street (Both directions) at the junction of Leadenhall Street - Lane restrictions to facilitate collaborative works.
Farringdon Cross Route
[A201] FARRINGDON ROAD (EC1M,EC1N,EC1R) (Camden,Islington)
From: Thursday 23 January 2025
To: Friday 24 January 2025
Last updated 19:49 Thursday 23 January 2025 : Traffic is flowing well.
Works | Utility works
Farringdon Road - [A201] Farringdon Road (Both directions) at the junction of Ray Street - There are lane restrictions with temporary signals for Cadent Gas works. Ray Street is closed.
- RAY STREET (EC1R) (Both directions)
Farringdon Cross Route
Southern River Route
[A201] BLACKFRIARS ROAD (SE1) (City of London,Southwark)
Friday 24 January 2025
Last updated 14:29 Thursday 23 January 2025 : Delays are possible.
Planned events | Demonstration/March
[A201] Blackfriars Road (All directions) at the junction of [B300] Union Street - A group will form up to hold a static demonstration.
Inner Ring
[A501] PENTONVILLE ROAD (N1,WC1X) (Camden,Islington)
Friday 24 January 2025
Last updated 16:55 Thursday 23 January 2025 : Traffic is flowing well.
Works | TfL works
[A501] Pentonville Road (Both directions) at the junction of [A201] Kings Cross Road - Carriageway restrictions and the use of temporary traffic signals during these works.
Southern River Route
[A200] TOOLEY STREET (SE1) (Southwark)
From: Monday 20 January 2025
To: Friday 24 January 2025
Last updated 08:25 Thursday 23 January 2025 : Delays are possible.
Works | Utility works
[A200] Tooley Street (Both directions) at the junction of Boss Street - Lane restrictions in place to facilitate Southern Gas connection works.
Southern River Route
[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)
From: Saturday 31 August 2024
To: Thursday 08 May 2025
Last updated 08:50 Thursday 23 January 2025 : Delays are possible.
Works | TfL works
[A3203] Lambeth Bridge (Both directions) between [A3212] Millbank and [A3036] A 3036 - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. From 30 January 21:30 until 07 February 05:00, there will be nightly road closures of Lambeth Bridge, Lambeth Palace Road, Lambeth Road & Albert Embankment, with diversions in place via Westminster and Vauxhall Bridges.
[A503] SEVEN SISTERS ROAD (N4,N7) (Hackney,Haringey,Islington)
From: Thursday 23 January 2025
To: Sunday 26 January 2025
Last updated 20:58 Thursday 23 January 2025 : Minor delays on approach.
Works | Utility works
[A503] Seven Sisters Road (Eastbound) at the junction of Fonthill Road - Lane one (of two) closed to facilitate utility works.
[A4205] PRAED STREET (W2) (Westminster)
From: Wednesday 22 January 2025
To: Monday 27 January 2025
Last updated 08:24 Thursday 23 January 2025 : Delays are possible.
Works | Borough works
[A4205] Praed Street (Both directions) at the junction of Sale Place - Road works are being carried out at this location under temporary signals.
[A215] WALWORTH ROAD (SE1,SE17) (Southwark)
From: Monday 13 January 2025
To: Friday 03 October 2025
Last updated 08:35 Thursday 23 January 2025 : Delays are possible.
Works | Construction activity
[A215] Walworth Road (Southbound) at the junction of [A3] Newington Butts - Lane restriction contained to southbound Walworth Road to facilitate scaffolding works.
SEYMOUR PLACE (NW1,W1H) (Westminster)
Friday 24 January 2025
Last updated 11:18 Thursday 16 January 2025 : Expect an increase in pedestrians and traffic before and after the event
Planned events | Demonstration/March
Free Congo Demonstration - Seymour Place (All approaches) at the junction of York Street - Free Congo Demonstration. Expect an increase in pedestrians and traffic before and after the event.
[A4127] GREENFORD ROAD (UB5,UB6) (Ealing)
From: Thursday 23 January 2025
To: Monday 27 January 2025
Last updated 15:24 Thursday 23 January 2025 : Delays are possible.
Works | Borough works
[A4127] Greenford Road (Both directions) at the junction of Rockware Avenue - Temporary traffic signals in place to facilitate roadworks