Status updates

Find a postcode, place or road

Inner Ring

[A501] EUSTON ROAD (N1C,NW1,WC1H) (Camden)

  Serious

From: Monday 06 January 2025
To: Thursday 27 February 2025

Last updated 19:10 Sunday 19 January 2025 : Traffic is slow from St Pancras station.

Works | Utility works

[A501] Euston Road (Both directions) at the junction of [A4200] Upper Woburn Place - TfL drainage works - starts Upper Woburn Place, with temporary signals and will then progress onto Euston Road with lane restrictions to Gower Street.

[A118] ROMFORD ROAD (E12) (Newham,Redbridge)

  Serious

From: Friday 17 January 2025
To: Tuesday 21 January 2025

Last updated 18:24 Sunday 19 January 2025 : Congestion on the approach with queues to Ilford Hill westbound. Eastbound delays are back to Woodgrange Park

Works | Utility works

[A118] Romford Road (All directions) between Colchester Avenue and [B165] Little Ilford Lane - Single alternate lane and temporary traffic signals in operation to facilitate Thames Water works.

A12

A13

[A1205] BURDETT ROAD (E14,E3) (Tower Hamlets)

  Moderate

From: Thursday 16 January 2025
To: Sunday 16 March 2025

Last updated 17:50 Sunday 19 January 2025 : Traffic is flowing well through the works.

Works | Utility works

[A1205] Burdett Road (Both directions) between Thomas Road and Agnes Street - A contraflow is in place due to Thames Water works.

A13

[A13] NEWHAM WAY (E16) (Newham)

  Moderate

From: Thursday 19 December 2024
To: Sunday 25 May 2025

Last updated 17:49 Sunday 19 January 2025 : Traffic is flowing normally for the time of day.

Works | TfL works

Canning Town Flyover Refurbishment Works - [A13] Newham Way (Both directions) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works.

A4

[A4] GREAT WEST ROAD (TW8) (Hounslow)

  Moderate

From: Wednesday 08 January 2025
To: Tuesday 21 January 2025

Last updated 14:00 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

[A4] Great West Road (All approaches) at the junction of Clayponds Lane - Lane restrictions and Clayponds Avenue is closed due to Cadent Gas Works.

  • CLAYPONDS AVENUE (TW8) (Both directions)

A41

[A41] BAKER STREET (NW1,W1H,W1U) (Westminster)

  Moderate

From: Monday 13 January 2025
To: Wednesday 22 January 2025

Last updated 16:36 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

[A41] Baker Street (Both directions) at the junction of Blandford Street - Temporary traffic signals are in use to facilitate Utility works.

Bishopsgate Cross Route

KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)

  Moderate

From: Monday 08 July 2024
To: Wednesday 31 December 2025

Last updated 16:38 Sunday 19 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Borough works

King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.

  • KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)

Farringdon Cross Route

[A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (City of London)

  Moderate

From: Monday 06 January 2025
To: Saturday 22 March 2025

Last updated 16:43 Sunday 19 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Utility works

[A201] New Bridge Street (Southbound) between Fleet Street and Tudor Street - Road closure to facilitate gas works from 06 January to 22 March.

  • [A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (Southbound)

Southern River Route

[A200] JAMAICA ROAD (SE1,SE16) (Southwark)

  Moderate

From: Sunday 19 January 2025
To: Ongoing

Last updated 18:49 Sunday 19 January 2025 : Use alternative route. Traffic is flowing well on diversion.

Collisions | Vehicle collision

[A200] Jamaica Road (Westbound) at the junction of [B202] Abbey Street - Road is blocked westbound due to a road traffic collision

  • [A200] JAMAICA ROAD (SE1,SE16) (Westbound)
  • [A200] JAMAICA ROAD (SE1,SE16) (Westbound)

Western Cross Route

[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)

  Moderate

From: Monday 13 January 2025
To: Saturday 31 May 2025

Last updated 18:48 Sunday 19 January 2025 : Traffic is flowing well on approach.

Works | TfL works

[A3220] Battersea Bridge Road (Both directions) at the junction of Battersea Church Road - Road restricted due to the Battersea Bridge Safety Improvements Scheme works.

SPRULES ROAD (SE4) (Lewisham)

  Moderate

From: Wednesday 15 January 2025
To: Tuesday 21 January 2025

Last updated 08:40 Sunday 19 January 2025 : Use alternate route

Works | Utility works

Sprules Road (Both directions) at the junction of [B2142] Drakefell Road - Road is closed due to a burst water main

  • SPRULES ROAD (SE4) (Both directions)

[A118] HIGH STREET (E15,E3) (Newham,Tower Hamlets)

  Moderate

From: Monday 09 September 2024
To: Friday 28 February 2025

Last updated 10:57 Sunday 19 January 2025 : Delays are possible for the duration of the works.

Works | TfL works

[A118] High Street (All approaches) at the junction of [A11] Bow Road - Lane closures on all approaches and on the roundabout, and closure of the link road under the flyover due to Sivertown Tunnel works.

[A112] CHINGFORD MOUNT ROAD (E4) (Waltham Forest)

  Moderate

From: Friday 17 January 2025
To: Tuesday 21 January 2025

Last updated 17:50 Sunday 19 January 2025 : Expect delays on the approaches to the temporary traffic signals.

Works | Utility works

[A112] Chingford Mount Road (Both directions) at the junction of Frances Road - Temporary signals in place due to BT Openreach works.

[A1206] PRESTONS ROAD ROUNDABOUT (E14) (Tower Hamlets)

  Moderate

From: Monday 16 September 2024
To: Saturday 01 March 2025

Last updated 10:56 Sunday 19 January 2025 : Delays are possible throughout the course of these works.

Works | TfL works

Silvertown Tunnel Scheme - Preston's Roundabout - [A1206] Prestons Road Roundabout (All directions) between [A1206] Prestons Road and [A1261] Aspen Way - Lane restrictions are in place to facilitate Silvertown Tunnel related works.

Silvertown Tunnel, Greenwich Peninsula () ()

  Moderate

From: Friday 25 February 2022
To: Friday 28 February 2025

Last updated 08:45 Sunday 19 January 2025 : Delays are possible.

Works | TfL works

Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. Millennium Way is currently closed. There are associated lane closures on the northbound A102 Blackwall Tunnel Southern Approach. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.

  • MILLENNIUM WAY (SE10) (Southbound)
  • WEST PARKSIDE (SE10) (Northbound)
  • EDMUND HALLEY WAY (SE10) (Eastbound)
  • MILLENNIUM WAY (SE10) (Northbound)
  • MILLENNIUM WAY (SE10) (Southbound)
  • MILLENNIUM WAY (SE10) (Northbound)
  • MILLENNIUM WAY (SE10) (Both directions)
  • TUNNEL AVENUE (SE10) (Southbound)

A40

Western Cross Route

[A3220] WEST CROSS ROUTE (W10,W11,W12) (Hammersmith & Fulham,Kensington & Chelsea)

  Moderate

From: Sunday 21 July 2024
To: Saturday 28 June 2025

Last updated 16:17 Sunday 19 January 2025 : Use an alternative route. Eastbound traffic slow moving from Heathstan Road. Expect delays.

Works | TfL works

A40 Westway Refurbishment Scheme - A3220 West Cross Route - [A3220] West Cross Route (Southbound) between A40 Westway and Ariel Way - A40 Westway eastbound off-slip to Northern Roundabout remains closed. From Monday 2 September until Saturday 12 October, West Cross Route northbound and the slip road to Wood Lane will be closed.

  • [A40] WESTWAY (W10,W12) (Eastbound)
  • [A40] WESTWAY (W10,W12) (Eastbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Northbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
  • [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)

A406

[A406] NORTH CIRCULAR ROAD (NW10,NW2) (Brent)

  Moderate

From: Sunday 19 January 2025
To: Ongoing

Last updated 17:37 Sunday 19 January 2025 : Traffic is slow from Staples Corner.

Works | Utility works

[A406] North Circular Road (Westbound) at the junction of Randall Avenue - Lane one (of three) closed to facilitate repairs to a gas leak.

A10

[A503] MONUMENT WAY (N15,N17) (Haringey)

  Minimal

From: Wednesday 15 January 2025
To: Sunday 26 January 2025

Last updated 14:01 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

[A503] Monument Way (Westbound) at the junction of [A1055] The Hale - Lane restrictions westbound to facilitate electrical cable placement works.

A2

Inner Ring

[A201] NEW KENT ROAD (SE1,SE17) (Southwark)

  Minimal

From: Monday 06 January 2025
To: Thursday 06 March 2025

Last updated 16:47 Sunday 19 January 2025 : Delays are possible.

Works | TfL works

[A201] New Kent Road (Both directions) between Elephant Road and Balfour Street - Various restrictions to facilitate TfL improvement works. Between 06 January - 22 January, lane closures in both directions. Full westbound closure in place on the nights of 03, 04 March. Full eastbound closure in place on the nights of 04, 05 March.

A205

[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)

  Minimal

From: Thursday 19 December 2024
To: Monday 07 April 2025

Last updated 08:44 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.

A24

[A24] UPPER TOOTING ROAD (SW17) (Wandsworth)

  Minimal

From: Friday 17 January 2025
To: Sunday 26 January 2025

Last updated 18:48 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A24] Upper Tooting Road (Both directions) at the junction of Beechcroft Road - Single alternate lane operated by temporary signals for utility works.

A316

[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)

  Minimal

From: Thursday 19 December 2024
To: Friday 25 July 2025

Last updated 18:49 Sunday 19 January 2025 : There are eastbound delays on the approach to London Road Roundabout

Works | TfL works

[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - There are lane restrictions in place due to junction improvement works.

A4

Western Cross Route

[A3220] WARWICK ROAD (SW5,W14,W8) (Kensington & Chelsea)

  Minimal

From: Thursday 09 January 2025
To: Sunday 19 January 2025

Last updated 19:04 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A3220] Warwick Road (Northbound) at the junction of Longridge Road - Lane 3 (of 3) closed to facilitate UKPN works.

Inner Ring

[A202] VAUXHALL BRIDGE (SE1,SW1V) (Lambeth,Westminster)

  Minimal

From: Sunday 19 January 2025
To: Ongoing

Last updated 19:05 Sunday 19 January 2025 : Traffic is flowing well.

Works | Borough works

[A202] Vauxhall Bridge (Northbound) at the junction of [A3212] Grosvenor Road - Assured Traffic Solutions Ltd. Northbound lane 1 (bus lane) and lane 2 closures.

Inner Ring

[A501] EUSTON ROAD (NW1,WC1H) (Camden,Westminster)

  Minimal

From: Thursday 09 January 2025
To: Thursday 30 January 2025

Last updated 16:37 Sunday 19 January 2025 : Delays are possible.

Works | Borough works

[A501] Euston Road (Eastbound) at the junction of [A400] Hampstead Road - Eastbound footway and carriageway restrictions during Euston Tower Development. Lane 1 of 3 will be closed.

Western Cross Route

[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)

  Minimal

From: Thursday 16 January 2025
To: Wednesday 22 January 2025

Last updated 18:48 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A3220] Battersea Bridge Road (Both directions) at the junction of Ethelburga Street - Temporary traffic signal in place to facilitate emergency water works.

[A5200] GRAYS INN ROAD (EC1N,WC1N,WC1R,WC1X) (Camden)

  Minimal

From: Wednesday 15 January 2025
To: Ongoing

Last updated 19:03 Sunday 19 January 2025 : Traffic is flowing well on diversion.

Works | Borough works

[A5200] Grays Inn Road (Southbound) at the junction of [A5201] Clerkenwell Road - Lane closures to facilitate Local Authority improvement works.

[A503] SEVEN SISTERS ROAD (N4,N7) (Hackney,Haringey,Islington)

  Minimal

From: Thursday 16 January 2025
To: Monday 20 January 2025

Last updated 18:28 Sunday 19 January 2025 : Traffic is flowing well past the works.

Works | Utility works

Thames Water works - [A503] Seven Sisters Road (Eastbound) at the junction of Durham Road - Bus lane closed due to Thames Water works.

[A3] PORTSMOUTH ROAD (GU23,KT11) (UNK)

  Minimal

From: Friday 17 January 2025
To: Monday 20 January 2025

Last updated 18:48 Sunday 19 January 2025 : Use an alternative route.

Works | Motorways works

[A3] Portsmouth Road (Both directions) at the junction of [M25] M 25 - The road is closed between the A247 and the M25 Junction 10 for National Highways works.

[A2216] LORDSHIP LANE (SE22) (Southwark)

  Minimal

From: Saturday 18 January 2025
To: Tuesday 28 January 2025

Last updated 18:49 Sunday 19 January 2025 : There are no reported delays.

Works | Utility works

[A2216] Lordship Lane (All directions) at the junction of Heber Road - Temporary traffic signals are in operation to facilitate Thames Water works.

[A400] ST MARTINS PLACE (WC2N) (Westminster)

  Minimal

From: Sunday 19 January 2025
To: Friday 24 January 2025

Last updated 19:07 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A400] St Martins Place (All directions) at the junction of [A400] Charing Cross Road - Temporary signals in operation to facilitate Cadent Gas works.

SURREY QUAYS ROAD (SE16) (Southwark)

  Minimal

From: Monday 06 January 2025
To: Monday 27 January 2025

Last updated 08:48 Sunday 19 January 2025 : Use an alternative route, possible delays.

Works | Utility works

Surrey Quays Road (Both directions) between [A200] Lower Road and Deal Porters Way - Road closure due to UKPN works.

  • SURREY QUAYS ROAD (SE16) (Both directions)

[A3216] LOWER SLOANE STREET (SW1W) (Kensington & Chelsea,Westminster)

  Minimal

From: Tuesday 07 January 2025
To: Friday 07 February 2025

Last updated 16:49 Sunday 19 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Utility works

[A3216] Lower Sloane Street (Northbound) between Sloane Gardens and [A3216] Sloane Square - Road closed due to Cadent Gas works.

  • [A3216] LOWER SLOANE STREET (SW1W) (Northbound)

[A2217] COLDHARBOUR LANE (SE24,SE5,SW9) (Lambeth,Southwark)

  Minimal

From: Saturday 18 January 2025
To: Monday 20 January 2025

Last updated 18:49 Sunday 19 January 2025 : Use an alternative route. Road remains closed until 10pm on Monday 20/01/2025

Planned events | Abnormal load

[A2217] Coldharbour Lane (Both directions) between [A215] Denmark Hill and Herne Hill Road - The road will be closed until approximately 10pm on Monday 20/01/2025, to facilitate the delivery of an abnormal load.

  • [A2217] COLDHARBOUR LANE (SE24,SE5,SW9) (Both directions)

Blackwall Tunnel

[A12] BLACKWALL TUNNEL NORTHERN APPROACH (E14,E3) (Tower Hamlets)

  Moderate

From: Sunday 19 January 2025
To: Tuesday 21 January 2025

Last updated 18:22 Sunday 19 January 2025 : Caution on approach. Traffic is slowing leading into the restrictions.

Works | Utility works

[A12] Blackwall Tunnel Northern Approach (Southbound) at the junction of Gillender Street - Lane one of three is closed for Thames Water works

A12

[A12] EASTERN AVENUE (IG2,IG3,RM6) (Redbridge)

  Minimal

From: Sunday 19 January 2025
To: Ongoing

Last updated 16:27 Sunday 19 January 2025 : Caution on approach.

Asset issues | Traffic signal fault

[A12] Eastern Avenue (All approaches) at the junction of Aldborough Road North - Traffic signals are not working due to a fault

A2

[A2] SHOOTERS HILL ROAD (SE3) (Greenwich,Lewisham)

  Minimal

From: Sunday 19 January 2025
To: Ongoing

Last updated 18:49 Sunday 19 January 2025 : Traffic is flowing well

Works | Utility works

[A2] Shooters Hill Road (Both directions) at the junction of [A2213] Kidbrooke Park Road - Telecommunications Works. Lane closure.

A20

[A20] LEE HIGH ROAD (SE12,SE13,SE3) (Lewisham)

  Minimal

From: Wednesday 15 January 2025
To: Thursday 23 January 2025

Last updated 08:42 Sunday 19 January 2025 : Traffic is flowing well

Works | Utility works

[A20] Lee High Road (Both directions) at the junction of Glenton Road - SGN works. Two-way signals.

A20

A21

LEWISHAM HIGH STREET (SE13) (Lewisham)

  Minimal

From: Saturday 03 August 2024
To: Monday 31 March 2025

Last updated 08:46 Sunday 19 January 2025 : Use an alternative route. Delays are possible

Works | Borough works

Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.

  • LEWIS GROVE (SE13) (Northbound)
  • [A21] LEWISHAM HIGH STREET (SE13) (Northbound)

A23

EPSOM ROAD (CR0) (Croydon)

  Minimal

From: Saturday 04 January 2025
To: Tuesday 21 January 2025

Last updated 08:47 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

Epsom Road (Northbound) at the junction of [A232] Stafford Road - Lane restrictions are in place to facilitate a pedestrian walkway in the carriageway during UKPN works. In addition, there will be no left turn from Stafford Road to Epsom Road while these works take place.

A3

[A3] ROEHAMPTON VALE (SW15) (Kingston upon Thames,Wandsworth)

  Minimal

From: Wednesday 08 January 2025
To: Wednesday 29 January 2025

Last updated 08:50 Sunday 19 January 2025 : Use an alternative route. Delays are possible.

Works | Utility works

[A3] Roehampton Vale (Westbound) at the junction of [A3] Kingston Vale - Thames Water works. The slip road from westbound A3 Roehampton Vale into A308 Kingston Vale is closed.

A316

HAMPTON ROAD WEST (TW13) (Hounslow)

  Minimal

From: Thursday 16 January 2025
To: Wednesday 22 January 2025

Last updated 18:29 Sunday 19 January 2025 : Traffic is flowing well through the works.

Works | Utility works

Hampton Road West (Both directions) at the junction of [B391] Hounslow Road - Multi way temporary traffic signals in operation to facilitate Thames Water works.

A40

A41

Inner Ring

[A5] EDGWARE ROAD (NW1,NW8,W1H,W2) (Westminster)

  Minimal

From: Saturday 18 January 2025
To: Saturday 25 January 2025

Last updated 19:06 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A5] Edgware Road (Northbound) at the junction of [A4209] Sussex Gardens - Northbound lane one of two closed to facilitate BT works.

A40

[A40] WESTERN AVENUE (NW10,W3,W5) (Brent,Ealing)

  Minimal

From: Sunday 12 January 2025
To: Ongoing

Last updated 18:27 Sunday 19 January 2025 : Traffic is flowing well past the works.

Hazards | Burst water main

[A40] Western Avenue (Westbound) at the junction of Concord Road - Lane one ( of three) is closed due to a Burst Water Main

A40

[A40] WESTWAY (W10,W11,W2,W9) (Kensington & Chelsea,Westminster)

  Minimal

From: Friday 17 January 2025
To: Monday 20 January 2025

Last updated 18:06 Sunday 19 January 2025 : Use an alternative route. These works are continuing over the weekend.

Works | TfL works

[A40] Westway (Eastbound) between West Cross Route and Edgware Road - The road is closed from Friday night 2200 until Monday morning 0500 for A40 Refurbishment Works

  • [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
  • [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
  • [A404] HARROW ROAD (W2) (Eastbound)

A406

[A1009] HALL LANE (E4) (Enfield,Waltham Forest)

  Minimal

From: Sunday 19 January 2025
To: Ongoing

Last updated 17:51 Sunday 19 January 2025 : Caution on the approach.

Asset issues | Asset fault

[A1009] Hall Lane (All approaches) at the junction of Sinclair Road - Traffic signals are currently not working following a fault under investigation

A406

[A205] MORTLAKE ROAD (SW14,TW9) (Richmond upon Thames)

  Minimal

From: Thursday 16 January 2025
To: Wednesday 22 January 2025

Last updated 18:48 Sunday 19 January 2025 : Use an alternative route.

Works | Utility works

[A205] Mortlake Road (Both directions) at the junction of High Park Road - Road is closed in both directions to allow for essential road maintenance to be carried out by Thames Water

  • [A205] MORTLAKE ROAD (TW9) (Both directions)

A41

[A41] FINCHLEY ROAD (NW8) (Camden,Westminster)

  Minimal

From: Sunday 12 January 2025
To: Ongoing

Last updated 18:07 Sunday 19 January 2025 : Traffic is flowing well though the works.

Works | Utility works

Utility Works - Thames Water - [A41] Finchley Road (Both directions) at the junction of [A41] Wellington Road - Side road closures will be implemented with local diversions from the 6th of January to 3rd February to allow for water works by Thames Water.

Bishopsgate Cross Route

[A3] LONDON BRIDGE (EC4R,SE1) (City of London,Southwark)

  Minimal

From: Thursday 16 January 2025
To: Monday 20 January 2025

Last updated 16:34 Sunday 19 January 2025 : Delays are possible.

Works | Utility works

[A3] London Bridge (Northbound) at the junction of Montague Close - Lane one closed northbound to facilitate UKPN works.

Inner Ring

[A1202] GREAT EASTERN STREET (E1,EC2A) (Hackney)

  Minimal

From: Saturday 18 January 2025
To: Monday 20 January 2025

Last updated 19:04 Sunday 19 January 2025 : Traffic is flowing well.

Works | Utility works

[A1202] Great Eastern Street (Westbound) at the junction of [A10] Shoreditch High Street - UKPN works. Lane closure westbound.

Southern River Route

[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)

  Minimal

From: Saturday 31 August 2024
To: Thursday 08 May 2025

Last updated 16:41 Sunday 19 January 2025 : Delays are possible.

Works | TfL works

[A3203] Lambeth Bridge (Both directions) between [A3212] Millbank and [A3036] A 3036 - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. From 30 January 21:30 until 07 February 05:00, there will be nightly road closures of Lambeth Bridge, Lambeth Palace Road, Lambeth Road & Albert Embankment, with diversions in place via Westminster and Vauxhall Bridges.

[A404] HIGH ROAD (HA9) (Brent)

  Minimal

From: Monday 13 January 2025
To: Monday 19 May 2025

Last updated 13:38 Sunday 19 January 2025 : Traffic is flowing well.

Works | Borough works

[A404] High Road (Both directions) at the junction of [B4565] Wembley Hill Road - Temporary traffic signals in place to facilitate roadworks.

[A1000] GREAT NORTH ROAD (EN5) (Barnet)

  Minimal

From: Wednesday 15 January 2025
To: Tuesday 21 January 2025

Last updated 14:01 Sunday 19 January 2025 : Possible delays during the works

Works | Utility works

[A1000] Great North Road (Both directions) at the junction of [A110] Station Road - Lane restriction to facilitate utility works.

[A215] WALWORTH ROAD (SE1,SE17) (Southwark)

  Minimal

From: Monday 13 January 2025
To: Friday 03 October 2025

Last updated 16:45 Sunday 19 January 2025 : Delays are possible.

Works | Construction activity

[A215] Walworth Road (Southbound) at the junction of [A3] Newington Butts - Lane restriction contained to southbound Walworth Road to facilitate scaffolding works.

[A107] LOWER CLAPTON ROAD (E5,E8,E9) (Hackney)

  Minimal

From: Sunday 19 January 2025
To: Friday 24 January 2025

Last updated 18:22 Sunday 19 January 2025 : Delays are possible on approach to the works.

Works | Utility works

[A107] Lower Clapton Road (Both directions) at the junction of Powerscroft Road - Temporary traffic signals are in operation to facilitate UKPN works.