Status updates
Traffic
Now 17:36
Find a postcode, place or road
A13
[A13] NEWHAM WAY (E16) (Newham)
From: Thursday 19 December 2024
To: Sunday 25 May 2025
Last updated 17:00 Tuesday 21 January 2025 : Traffic is slow moving on approach to the works. Expect delays.
Works | TfL works
Canning Town Flyover Refurbishment Works - [A13] Newham Way (Both directions) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works. Friday 24 and Saturday 25 January, A1261 East India Dock Tunnel, closed eastbound between approximately 21:00 and 08:00 each night and A13 reduced to one lane westbound.
- [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Eastbound)
A205
A3
[A3] WEST HILL (SW15,SW18) (Wandsworth)
From: Monday 20 January 2025
To: Saturday 25 January 2025
Last updated 17:19 Tuesday 21 January 2025 : Traffic is slow moving on all approaches to the works. Expect delays.
Works | Utility works
[A3] West Hill (All directions) at the junction of [A205] Upper Richmond Road - Temporary signals in operation to facilitate repairs to a burst water main.
A3
[A240] KINGSTON ROAD (KT19,KT4,KT5,KT9) (Kingston upon Thames,UNK)
From: Monday 20 January 2025
To: Ongoing
Last updated 16:05 Tuesday 21 January 2025 : Miner delays on approaches.
Asset issues | Traffic signal fault
[A240] Kingston Road (All approaches) at the junction of Jubilee Way - Temporary traffic signals are in place due to vandalism on the ULEZ camera network.
A3
[A3] HOOK RISE SOUTH (KT6,KT9) (Kingston upon Thames)
From: Monday 20 January 2025
To: Ongoing
Last updated 17:06 Tuesday 21 January 2025 : Traffic is slow moving on approach with queues now beyond Tolworth Junction. Expect delays.
Works | TfL works
[A3] Hook Rise South (Westbound) at the junction of [A243] Hook Road - Lane one (of two) is closed due to works.
Inner Ring
[A501] EUSTON ROAD (N1C,NW1,WC1H) (Camden)
From: Monday 06 January 2025
To: Thursday 27 February 2025
Last updated 16:12 Tuesday 21 January 2025 : Traffic is slow on the approach to the works. Westbound queues are back to Gray's Inn Road. Expect delays.
Works | Utility works
[A501] Euston Road (Both directions) at the junction of [A4200] Upper Woburn Place - TfL drainage works - starts Upper Woburn Place, with temporary signals and will then progress onto Euston Road with lane restrictions to Gower Street.
A12
A13
[A1205] BURDETT ROAD (E14,E3) (Tower Hamlets)
From: Thursday 16 January 2025
To: Sunday 16 March 2025
Last updated 13:43 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A1205] Burdett Road (Both directions) between Thomas Road and Agnes Street - A contraflow is in place due to Thames Water works.
A4
[A4] GREAT WEST ROAD (TW8) (Hounslow)
From: Wednesday 08 January 2025
To: Thursday 23 January 2025
Last updated 13:41 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A4] Great West Road (All approaches) at the junction of Clayponds Lane - Lane restrictions and Clayponds Avenue is closed due to Cadent Gas Works.
A41
[A41] BAKER STREET (NW1,W1H,W1U) (Westminster)
From: Monday 13 January 2025
To: Wednesday 22 January 2025
Last updated 14:52 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A41] Baker Street (Both directions) at the junction of Blandford Street - Temporary traffic signals are in use to facilitate Utility works.
Bishopsgate Cross Route
KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 08 July 2024
To: Wednesday 31 December 2025
Last updated 14:53 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.
- KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)
Farringdon Cross Route
[A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (City of London)
From: Monday 06 January 2025
To: Saturday 22 March 2025
Last updated 14:53 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A201] New Bridge Street (Southbound) between Fleet Street and Tudor Street - Road closure to facilitate gas works from 06 January to 22 March.
- [A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (Southbound)
Western Cross Route
[A3220] REDCLIFFE GARDENS (SW10,SW5) (Kensington & Chelsea)
From: Tuesday 21 January 2025
To: Ongoing
Last updated 14:44 Tuesday 21 January 2025 : Delays are possible when works are in place.
Works | TfL works
[A3220] Redcliffe Gardens (Southbound) between [A3218] Old Brompton Road and [A308] Fulham Road - Various lane restrictions in place, 0800-1700, due to junction improvement works. Overnight road closures 22:00 to 05:00 26-28 January 2025, 16-19 February 2025 and 16-19 March 2025.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Monday 13 January 2025
To: Saturday 31 May 2025
Last updated 14:34 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A3220] Battersea Bridge Road (Both directions) at the junction of Battersea Church Road - Road restricted due to the Battersea Bridge Safety Improvements Scheme works.
[A1206] PRESTONS ROAD ROUNDABOUT (E14) (Tower Hamlets)
From: Monday 16 September 2024
To: Saturday 01 March 2025
Last updated 13:43 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
Silvertown Tunnel Scheme - Preston's Roundabout - [A1206] Prestons Road Roundabout (All directions) between [A1206] Prestons Road and [A1261] Aspen Way - Lane restrictions are in place to facilitate Silvertown Tunnel related works.
[A118] HIGH STREET (E15,E3) (Newham,Tower Hamlets)
From: Monday 09 September 2024
To: Friday 28 February 2025
Last updated 13:43 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A118] High Street (All approaches) at the junction of [A11] Bow Road - Lane closures on all approaches and on the roundabout, and closure of the link road under the flyover due to Sivertown Tunnel works.
[A112] CHINGFORD MOUNT ROAD (E4) (Waltham Forest)
From: Friday 17 January 2025
To: Tuesday 21 January 2025
Last updated 13:44 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A112] Chingford Mount Road (Both directions) at the junction of Frances Road - Temporary signals in place due to BT Openreach works.
Silvertown Tunnel, Greenwich Peninsula () ()
From: Friday 25 February 2022
To: Friday 28 February 2025
Last updated 14:35 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. Millennium Way is currently closed. There are associated lane closures on the northbound A102 Blackwall Tunnel Southern Approach. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.
- MILLENNIUM WAY (SE10) (Southbound)
- WEST PARKSIDE (SE10) (Northbound)
- EDMUND HALLEY WAY (SE10) (Eastbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Southbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Both directions)
- TUNNEL AVENUE (SE10) (Southbound)
[A2022] LITTLE WOODCOTE LANE (CR8,SM5) (Croydon,Sutton)
From: Tuesday 21 January 2025
To: Monday 10 February 2025
Last updated 16:32 Tuesday 21 January 2025 : Traffic is slow moving on Little Woodcote Lane. Expect delays.
Works | Utility works
[A2022] Little Woodcote Lane (All approaches) at the junction of [A2022] Foxley Lane - Temporary signals in place due to emergency SGN gas works.
A10
[A503] MONUMENT WAY (N15,N17) (Haringey)
From: Wednesday 15 January 2025
To: Sunday 26 January 2025
Last updated 13:42 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A503] Monument Way (Westbound) at the junction of [A1055] The Hale - Lane restrictions westbound to facilitate electrical cable placement works.
A2
Inner Ring
[A201] NEW KENT ROAD (SE1,SE17) (Southwark)
From: Monday 06 January 2025
To: Thursday 06 March 2025
Last updated 14:56 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A201] New Kent Road (Both directions) between Elephant Road and Balfour Street - Various restrictions to facilitate TfL improvement works. Between 06 January - 22 January, lane closures in both directions. Full westbound closure in place on the nights of 03, 04 March. Full eastbound closure in place on the nights of 04, 05 March.
A205
[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)
From: Thursday 19 December 2024
To: Monday 07 April 2025
Last updated 14:35 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.
A24
[A24] UPPER TOOTING ROAD (SW17) (Wandsworth)
From: Friday 17 January 2025
To: Sunday 26 January 2025
Last updated 14:39 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A24] Upper Tooting Road (Both directions) at the junction of Beechcroft Road - Single alternate lane operated by temporary signals for utility works.
A316
[A316] LOWER MORTLAKE ROAD (TW9) (Richmond upon Thames)
From: Monday 20 January 2025
To: Friday 24 January 2025
Last updated 14:29 Tuesday 21 January 2025 : Minor delays on approach.
Works | Utility works
[A316] Lower Mortlake Road (Westbound) at the junction of Salisbury Road - Lane one of two is closed to facilitate Cadent Gas works.
A316
[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)
From: Thursday 19 December 2024
To: Friday 25 July 2025
Last updated 14:38 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - There are lane restrictions in place due to junction improvement works.
A40
Western Cross Route
[A3220] WEST CROSS ROUTE (W10,W11,W12) (Hammersmith & Fulham,Kensington & Chelsea)
From: Sunday 21 July 2024
To: Saturday 28 June 2025
Last updated 13:41 Tuesday 21 January 2025 : Use alternative routes. Traffic is flowing well on diversion.
Works | TfL works
A40 Westway Refurbishment Scheme - A3220 West Cross Route - [A3220] West Cross Route (Southbound) between A40 Westway and Ariel Way - A40 Westway eastbound off-slip to Northern Roundabout remains closed. From Monday 2 September until Saturday 12 October, West Cross Route northbound and the slip road to Wood Lane will be closed.
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A40] WESTWAY (W10,W12) (Eastbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Northbound)
- [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
- [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)
Inner Ring
[A302] GROSVENOR GARDENS (SW1W) (Westminster)
From: Monday 20 January 2025
To: Friday 24 January 2025
Last updated 14:41 Tuesday 21 January 2025 : Traffic is flowing well.
Works | Utility works
[A302] Grosvenor Gardens (Northbound) at the junction of [B312] Beeston Place - Lane one (of three) closure due to UKPN works.
Inner Ring
[A501] EUSTON ROAD (NW1,WC1H) (Camden,Westminster)
From: Thursday 09 January 2025
To: Friday 07 March 2025
Last updated 14:57 Tuesday 21 January 2025 : Delays are possible.
Works | Borough works
[A501] Euston Road (Eastbound) at the junction of [A400] Hampstead Road - Eastbound footway and carriageway restrictions during Euston Tower Development. Lane 1 of 3 will be closed. From 31/01 - 04/03 northbound lane 1 (of 2) is closed.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Monday 20 January 2025
To: Thursday 22 May 2025
Last updated 14:34 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A3220] Battersea Bridge Road (Both directions) at the junction of Parkgate Road - Lane closure in place to facilitate Urban Realm Works.
Western Cross Route
[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)
From: Thursday 16 January 2025
To: Wednesday 22 January 2025
Last updated 11:20 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A3220] Battersea Bridge Road (Both directions) at the junction of Ethelburga Street - Temporary traffic signal in place to facilitate emergency water works.
[A503] SEVEN SISTERS ROAD (N4,N7) (Hackney,Haringey,Islington)
From: Thursday 16 January 2025
To: Monday 27 January 2025
Last updated 13:38 Tuesday 21 January 2025 : Traffic is flowing well. Cyclist please use caution when passing the works.
Works | Utility works
[A503] Seven Sisters Road (Eastbound) at the junction of Durham Road - Bus lane closed due to Thames Water works.
[A5200] GRAYS INN ROAD (EC1N,WC1N,WC1R,WC1X) (Camden)
From: Wednesday 15 January 2025
To: Ongoing
Last updated 14:32 Tuesday 21 January 2025 : Use an alternative route. Traffic is flowing well on diversion.
Works | Borough works
[A5200] Grays Inn Road (Southbound) at the junction of [A5201] Clerkenwell Road - Lane closures to facilitate Local Authority improvement works.
- [A5200] GRAYS INN ROAD (EC1N,WC1R,WC1X) (Southbound)
[A3216] LOWER SLOANE STREET (SW1W) (Kensington & Chelsea,Westminster)
From: Tuesday 07 January 2025
To: Friday 07 February 2025
Last updated 14:57 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A3216] Lower Sloane Street (Northbound) between Sloane Gardens and [A3216] Sloane Square - Road closed due to Cadent Gas works.
- [A3216] LOWER SLOANE STREET (SW1W) (Northbound)
[A2216] LORDSHIP LANE (SE22) (Southwark)
From: Saturday 18 January 2025
To: Tuesday 28 January 2025
Last updated 14:37 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A2216] Lordship Lane (All directions) at the junction of Heber Road - Temporary traffic signals are in operation to facilitate Thames Water works.
[A107] LOWER CLAPTON ROAD (E5,E8,E9) (Hackney)
From: Sunday 19 January 2025
To: Friday 24 January 2025
Last updated 13:31 Tuesday 21 January 2025 : Traffic is flowing well.
Works | Utility works
[A107] Lower Clapton Road (Both directions) at the junction of Powerscroft Road - Temporary traffic signals are in operation to facilitate UKPN works.
[A3216] SLOANE SQUARE (SW1W,SW1X,SW3) (Kensington & Chelsea,Westminster)
From: Monday 20 January 2025
To: Saturday 25 January 2025
Last updated 14:45 Tuesday 21 January 2025 : Use other route. There are no reported delays on diversion.
Works | Utility works
[A3216] Sloane Square (Eastbound) at the junction of Sedding Street - Road is closed due to emergency Thames Water and Cadent Gas works
- [A3216] SLOANE SQUARE (SW1W,SW1X,SW3) (Eastbound)
SURREY QUAYS ROAD (SE16) (Southwark)
From: Monday 06 January 2025
To: Monday 27 January 2025
Last updated 14:37 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
Surrey Quays Road (Both directions) between [A200] Lower Road and Deal Porters Way - Road closure due to UKPN works.
- SURREY QUAYS ROAD (SE16) (Both directions)
[A5] CRICKLEWOOD BROADWAY (NW2) (Barnet,Brent)
From: Tuesday 21 January 2025
To: Friday 24 January 2025
Last updated 15:19 Tuesday 21 January 2025 : Disruption possible.
Works | Utility works
[A5] Cricklewood Broadway (All directions) at the junction of Mora Road - Temporary traffic signals are in operation to facilitate Thames Water works.
[A400] ST MARTINS PLACE (WC2N) (Westminster)
From: Sunday 19 January 2025
To: Friday 24 January 2025
Last updated 14:31 Tuesday 21 January 2025 : Traffic is flowing well.
Works | Utility works
[A400] St Martins Place (All directions) at the junction of [A400] Charing Cross Road - Temporary signals in operation to facilitate Cadent Gas works.
A205
[A3] WANDSWORTH HIGH STREET (SW18) (Wandsworth)
From: Monday 20 January 2025
To: Tuesday 04 February 2025
Last updated 15:28 Tuesday 21 January 2025 : Traffic is slow moving on approach.
Works | Utility works
[A3] Wandsworth High Street (Westbound) at the junction of [A217] Ram Street - Lane three (of three) is blocked due to emergency Thames Water works.
A41
[A41] BAKER STREET (NW1,W1H,W1U) (Westminster)
From: Tuesday 21 January 2025
To: Ongoing
Last updated 16:59 Tuesday 21 January 2025 : Use an alternative route. Traffic is flowing well on diversion.
Hazards | Fire
[A41] Baker Street (Southbound) at the junction of Blandford Street - Baker Street is closed southbound due to emergency services incident.
[A404] HIGH ROAD (HA9) (Brent)
From: Monday 13 January 2025
To: Monday 19 May 2025
Last updated 13:40 Tuesday 21 January 2025 : Traffic is slow moving on approaches. Expect delays.
Works | Borough works
[A404] High Road (Both directions) at the junction of [B4565] Wembley Hill Road - Temporary traffic signals in place to facilitate roadworks.
A20
[A20] LEE HIGH ROAD (SE12,SE13,SE3) (Lewisham)
From: Wednesday 15 January 2025
To: Thursday 23 January 2025
Last updated 14:35 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A20] Lee High Road (Both directions) at the junction of Glenton Road - Two-way temporary traffic signals in place to facilitate SGN works.
A20
A21
LEWISHAM HIGH STREET (SE13) (Lewisham)
From: Saturday 03 August 2024
To: Monday 31 March 2025
Last updated 14:36 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.
- LEWIS GROVE (SE13) (Northbound)
- [A21] LEWISHAM HIGH STREET (SE13) (Northbound)
A205
[A205] THURLOW PARK ROAD (SE21,SE24,SE27) (Lambeth)
From: Tuesday 21 January 2025
To: Wednesday 29 January 2025
Last updated 17:00 Tuesday 21 January 2025 : Minor delays on approach.
Works | Utility works
[A205] Thurlow Park Road (Eastbound) at the junction of [A215] Norwood Road - Lane one closure eastbound to facilitate Thames Water works.
A3
[A3] ROEHAMPTON VALE (SW15) (Kingston upon Thames,Wandsworth)
From: Wednesday 08 January 2025
To: Wednesday 29 January 2025
Last updated 14:40 Tuesday 21 January 2025 : Use an alternative route. Delays are possible.
Works | Utility works
[A3] Roehampton Vale (Westbound) at the junction of [A3] Kingston Vale - Thames Water works. The slip road from westbound A3 Roehampton Vale into A308 Kingston Vale is closed.
A316
HAMPTON ROAD WEST (TW13) (Hounslow)
From: Thursday 16 January 2025
To: Wednesday 22 January 2025
Last updated 13:37 Tuesday 21 January 2025 : Traffic is flowing well.
Works | Utility works
Hampton Road West (Westbound) at the junction of [B391] Hounslow Road - Lane two is closed for Thames Water works.
A40
[A40] WESTERN AVENUE (NW10,W3,W5) (Brent,Ealing)
From: Sunday 12 January 2025
To: Ongoing
Last updated 13:38 Tuesday 21 January 2025 : Traffic is flowing well.
Hazards | Burst water main
[A40] Western Avenue (Westbound) at the junction of Concord Road - Lane one ( of three) is closed due to a Burst Water Main
A406
[A205] MORTLAKE ROAD (SW14,TW9) (Richmond upon Thames)
From: Thursday 16 January 2025
To: Wednesday 22 January 2025
Last updated 14:39 Tuesday 21 January 2025 : Use an alternative route. Delays are possible on diversion.
Works | Utility works
[A205] Mortlake Road (Both directions) at the junction of High Park Road - Road is closed in both directions to allow for essential road maintenance to be carried out by Thames Water
- [A205] MORTLAKE ROAD (TW9) (Both directions)
A406
[A406] NORTH CIRCULAR ROAD (N13) (Enfield)
From: Tuesday 21 January 2025
To: Ongoing
Last updated 17:04 Tuesday 21 January 2025 : The eastbound carriageway has now been closed Use alternative routes
Collisions | Vehicle collision
[A406] North Circular Road (All directions) between [A105] Green Lanes and [A406] Bowes Road - There has been a collision at this location
- [A406] BOWES ROAD (N13,N22) (Eastbound)
A41
[A41] FINCHLEY ROAD (NW8) (Camden,Westminster)
From: Sunday 12 January 2025
To: Ongoing
Last updated 13:37 Tuesday 21 January 2025 : There are minor delays on approaches. Expect delays.
Works | Utility works
Utility Works - Thames Water - [A41] Finchley Road (Both directions) at the junction of [A41] Wellington Road - Side road closures will be implemented with local diversions from the 6th of January to 3rd February to allow for water works by Thames Water.
Bishopsgate Cross Route
[A10] GRACECHURCH STREET (EC3V,EC4N,EC4R) (City of London)
From: Monday 20 January 2025
To: Friday 31 January 2025
Last updated 14:34 Tuesday 21 January 2025 : There are no reported delays.
Works | TfL works
[A10] Gracechurch Street (Both directions) at the junction of Leadenhall Street - Lane restrictions to facilitate collaborative works.
Inner Ring
[A501] PENTONVILLE ROAD (N1,WC1X) (Camden,Islington)
From: Tuesday 21 January 2025
To: Ongoing
Last updated 14:30 Tuesday 21 January 2025 : Traffic is flowing well.
Works | TfL works
[A501] Pentonville Road (Both directions) at the junction of [A201] Kings Cross Road - Carriageway restrictions and the use of temporary traffic signals during these works.
Southern River Route
[A200] TOOLEY STREET (SE1) (Southwark)
From: Monday 20 January 2025
To: Friday 24 January 2025
Last updated 14:46 Tuesday 21 January 2025 : Delays are possible.
Works | Utility works
[A200] Tooley Street (Both directions) at the junction of Boss Street - Lane restrictions in place to facilitate Southern Gas connection works.
Southern River Route
[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)
From: Saturday 31 August 2024
To: Thursday 08 May 2025
Last updated 14:53 Tuesday 21 January 2025 : Delays are possible.
Works | TfL works
[A3203] Lambeth Bridge (Both directions) between [A3212] Millbank and [A3036] A 3036 - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. From 30 January 21:30 until 07 February 05:00, there will be nightly road closures of Lambeth Bridge, Lambeth Palace Road, Lambeth Road & Albert Embankment, with diversions in place via Westminster and Vauxhall Bridges.
[A1000] GREAT NORTH ROAD (EN5) (Barnet)
From: Monday 20 January 2025
To: Thursday 23 January 2025
Last updated 13:39 Tuesday 21 January 2025 : There are minor queues on approaches.
Works | Utility works
[A1000] Great North Road (Both directions) at the junction of Lyonsdown Road - There are temporary traffic lights at this location while a utilities company carries out works.
[A4127] GREENFORD ROAD (UB5,UB6) (Ealing)
From: Monday 20 January 2025
To: Monday 27 January 2025
Last updated 13:38 Tuesday 21 January 2025 : There are no reported delays.
Works | Borough works
[A4127] Greenford Road (Both directions) at the junction of Rockware Avenue - Temporary traffic signals in place to facilitate roadworks
[A215] WALWORTH ROAD (SE1,SE17) (Southwark)
From: Monday 13 January 2025
To: Friday 03 October 2025
Last updated 15:02 Tuesday 21 January 2025 : Delays are possible.
Works | Construction activity
[A215] Walworth Road (Southbound) at the junction of [A3] Newington Butts - Lane restriction contained to southbound Walworth Road to facilitate scaffolding works.
[A404] HARROW ROAD (W2) (Westminster)
From: Monday 20 January 2025
To: Tuesday 21 January 2025
Last updated 14:33 Tuesday 21 January 2025 : Traffic is flowing well.
Works | Borough works
[A404] Harrow Road (Eastbound) at the junction of Warwick Avenue - Lane restriction in place to facilitate Borough of Westminster resurfacing works.