Status updates

Find a postcode, place or road

Transport For London Road Corridors - Service updates at 29/01/2025 13:49:16
Road corridor Status
A1
A12
A13
Central London Red Routes
A10
A2
A20
A21
A23
A24
A3
A316
A4
A40
A41
Blackwall Tunnel
North Circular (A406)
South Circular (A205)
All other
road corridors
No exceptional delays on all other road corridors

A1

Inner Ring

[A501] CITY ROAD (EC1V) (Islington)

  Expected delays

From: Thursday 23 January 2025
To: Friday 02 May 2025

Last updated 21:01 Thursday 23 January 2025 : Traffic is flowing well.

Works | TfL works

[A501] City Road (Eastbound) at the junction of Colebrooke Row - Lane one (of two) closed during works.

A12

A13

[A1205] BURDETT ROAD (E14,E3) (Tower Hamlets)

  Expected delays

From: Thursday 16 January 2025
To: Sunday 16 March 2025

Last updated 08:53 Thursday 23 January 2025 : Delays are possible.

Works | Utility works

[A1205] Burdett Road (Both directions) between Thomas Road and Agnes Street - A contraflow is in place due to Thames Water works.

A13

[A13] NEWHAM WAY (E16) (Newham)

  Expected delays

From: Thursday 19 December 2024
To: Sunday 25 May 2025

Last updated 19:24 Thursday 23 January 2025 : Traffic is flowing steadily through the restrictions in place. Expect delays at peak times.

Works | TfL works

Canning Town Flyover Refurbishment Works - [A13] Newham Way (Both directions) between [A13] East India Dock Road and Beckton Road - Lane closures and restrictions in place for flyover refurbishment works. Thursday 23 January two lanes closed in both directions (2200-0600) Friday 24 and Saturday 25 January, East India Dock Tunnel, closed eastbound between 21:00 and 08:00 each night and A13 reduced to one lane westbound.

  • [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Eastbound)

Bishopsgate Cross Route

KING WILLIAM STREET (EC3V,EC4N,EC4R) (City of London)

  Expected delays

From: Monday 08 July 2024
To: Wednesday 31 December 2025

Last updated 08:26 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Borough works

King William Street (Southbound) at the junction of Lombard Street - Road closed to facilitate urban realm works.

  • KING WILLIAM STREET (EC3V,EC4N,EC4R) (Southbound)

Farringdon Cross Route

[A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (City of London)

  Expected delays

From: Monday 06 January 2025
To: Saturday 22 March 2025

Last updated 08:27 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Utility works

[A201] New Bridge Street (Southbound) between Fleet Street and Tudor Street - Road closure to facilitate gas works from 06 January to 22 March.

  • [A201] NEW BRIDGE STREET (EC4A,EC4M,EC4V) (Southbound)

Inner Ring

[A501] EUSTON ROAD (N1C,NW1,WC1H) (Camden)

  Expected delays

From: Monday 06 January 2025
To: Thursday 27 February 2025

Last updated 21:02 Thursday 23 January 2025 : Traffic is flowing well.

Works | Utility works

[A501] Euston Road (Both directions) at the junction of [A4200] Upper Woburn Place - TfL drainage works - starts Upper Woburn Place, with temporary signals and will then progress onto Euston Road with lane restrictions to Gower Street.

Western Cross Route

[A3220] BATTERSEA BRIDGE ROAD (SW11) (Wandsworth)

  Expected delays

From: Monday 13 January 2025
To: Saturday 31 May 2025

Last updated 08:58 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

Battersea Bridge Road - [A3220] Battersea Bridge Road (Both directions) at the junction of Petworth Street - Road restricted due to the Battersea Bridge Safety Improvements Scheme works.

[A404] HIGH ROAD (HA9) (Brent)

  Expected delays

From: Monday 13 January 2025
To: Monday 19 May 2025

Last updated 20:58 Thursday 23 January 2025 : There are no reported delays.

Works | Borough works

[A404] High Road (Both directions) at the junction of [B4565] Wembley Hill Road - Temporary traffic signals in place to facilitate roadworks.

Silvertown Tunnel, Greenwich Peninsula () ()

  Expected delays

From: Friday 25 February 2022
To: Friday 28 February 2025

Last updated 09:10 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. Millennium Way is currently closed. There are associated lane closures on the northbound A102 Blackwall Tunnel Southern Approach. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.

  • MILLENNIUM WAY (SE10) (Southbound)
  • WEST PARKSIDE (SE10) (Northbound)
  • EDMUND HALLEY WAY (SE10) (Eastbound)
  • MILLENNIUM WAY (SE10) (Northbound)
  • MILLENNIUM WAY (SE10) (Southbound)
  • MILLENNIUM WAY (SE10) (Northbound)
  • MILLENNIUM WAY (SE10) (Both directions)
  • TUNNEL AVENUE (SE10) (Southbound)

[A118] HIGH STREET (E15,E3) (Newham,Tower Hamlets)

  Expected delays

From: Monday 09 September 2024
To: Friday 28 February 2025

Last updated 08:48 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

[A118] High Street (All approaches) at the junction of [A11] Bow Road - Lane closures on all approaches and on the roundabout, and closure of the link road under the flyover due to Sivertown Tunnel works.

[A1206] PRESTONS ROAD ROUNDABOUT (E14) (Tower Hamlets)

  Expected delays

From: Monday 16 September 2024
To: Saturday 01 March 2025

Last updated 08:47 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

Silvertown Tunnel Scheme - Preston's Roundabout - [A1206] Prestons Road Roundabout (All directions) between [A1206] Prestons Road and [A1261] Aspen Way - Lane restrictions are in place to facilitate Silvertown Tunnel related works.

A2

Inner Ring

[A201] NEW KENT ROAD (SE1,SE17) (Southwark)

  Minimal

From: Monday 06 January 2025
To: Thursday 06 March 2025

Last updated 08:27 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

[A201] New Kent Road (Both directions) between Elephant Road and Balfour Street - Various restrictions to facilitate TfL improvement works. Between 06 January - 22 January, lane closures in both directions. Full westbound closure in place on the nights of 03, 04 March. Full eastbound closure in place on the nights of 04, 05 March.

A205

[A205] WESTHORNE AVENUE (SE12) (Greenwich,Lewisham)

  Minimal

From: Thursday 19 December 2024
To: Monday 07 April 2025

Last updated 09:10 Thursday 23 January 2025 : Delays are possible.

Works | Utility works

[A205] Westhorne Avenue (Both directions) between Baring Road and (A20) Sidcup Road - Lane restrictions are in place to facilitate Thames Water works.

A23

[A2022] FOXLEY LANE (CR8) (Croydon)

  Minimal

From: Monday 27 January 2025
To: Sunday 23 February 2025

Last updated 06:43 Thursday 16 January 2025 : Expect delays during peak periods.

Works | TfL works

[A2022] Foxley Lane (Eastbound) between [A23] Banstead Road and [A23] Russell Hill Road - Lane closures to facilitate urgent drainage works. From 27 January until 16 February, lane 3 is closed. From 17 February to 23 February, the right filter lane into Russell Hill Road will be closed.

A316

[A316] CHERTSEY ROAD (TW1,TW2) (Richmond upon Thames)

  Minimal

From: Thursday 19 December 2024
To: Friday 25 July 2025

Last updated 09:20 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

[A316] Chertsey Road (Both directions) at the junction of [A310] London Road - There are lane restrictions in place due to junction improvement works.

A4

[A4] BATH ROAD (TW4,TW5) (Hounslow)

  Minimal

From: Wednesday 29 January 2025
To: Thursday 30 January 2025

Last updated 08:37 Friday 17 January 2025 : Disruption possible.

Works | Utility works

[A4] Bath Road (Eastbound) between Mornington Crescent and [A312] The Parkway - Lane one is closed to facilitate Thames Water works.

A40

Western Cross Route

[A3220] WEST CROSS ROUTE (W10,W11,W12) (Hammersmith & Fulham,Kensington & Chelsea)

  Minimal

From: Sunday 21 July 2024
To: Saturday 28 June 2025

Last updated 17:12 Thursday 23 January 2025 : Delays are possible

Works | TfL works

A40 Westway Refurbishment Scheme - A3220 West Cross Route - [A3220] West Cross Route (Southbound) between A40 Westway and Ariel Way - A40 Westway eastbound off-slip to Northern Roundabout remains closed. From Monday 2 September until Saturday 12 October, West Cross Route northbound and the slip road to Wood Lane will be closed.

  • [A40] WESTWAY (W10,W12) (Eastbound)
  • [A40] WESTWAY (W10,W12) (Eastbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Northbound)
  • [A3220] WEST CROSS ROUTE (W10,W11,W12) (Southbound)
  • [A40] WESTWAY (W10,W11,W2,W9) (Eastbound)

A41

[A41] BAKER STREET (NW1,W1H,W1U) (Westminster)

  Minimal

From: Monday 27 January 2025
To: Sunday 16 February 2025

Last updated 13:47 Tuesday 07 January 2025 : Delays are possible.

Works | Utility works

[A41] Baker Street (Both directions) at the junction of [B524] Paddington Street - Three-way temporary signals in operation and Paddington Street is closed, due to Thames Water mains replacement works.

Inner Ring

[A302] GROSVENOR PLACE (SW1W,SW1X,W2) (Westminster)

  Minimal

From: Wednesday 29 January 2025
To: Thursday 30 January 2025

Last updated 12:28 Monday 13 January 2025 : Delays are possible.

Works | Utility works

[A302] Grosvenor Place (Northbound) at the junction of Chapel Street - Lane one (of two) closure is in place to facilitate overnight maintenance works taking place.

Inner Ring

[A501] EUSTON ROAD (NW1,WC1H) (Camden,Westminster)

  Minimal

From: Thursday 09 January 2025
To: Friday 07 March 2025

Last updated 08:29 Thursday 23 January 2025 : Delays are possible.

Works | Borough works

[A501] Euston Road (Eastbound) at the junction of [A400] Hampstead Road - Eastbound footway and carriageway restrictions during Euston Tower Development. Lane 1 of 3 will be closed. From 31/01 - 04/03 northbound lane 1 (of 2) is closed.

Southern River Route

[A3200] YORK ROAD (SE1) (Lambeth)

  Minimal

From: Monday 27 January 2025
To: Wednesday 29 January 2025

Last updated 13:20 Monday 23 December 2024 : Delays are possible.

Works | Utility works

[A3200] York Road (Northbound) at the junction of Chicheley Street - Lane one (of two) closure is in place to facilitate Thames Water works taking place.

Western Cross Route

[A3220] BATTERSEA BRIDGE ROAD (SW11) (Kensington & Chelsea,Wandsworth)

  Minimal

From: Monday 20 January 2025
To: Thursday 22 May 2025

Last updated 08:55 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

[A3220] Battersea Bridge Road (Both directions) at the junction of Parkgate Road - Lane closure in place to facilitate Urban Realm Works.

[A3216] LOWER SLOANE STREET (SW1W) (Kensington & Chelsea,Westminster)

  Minimal

From: Tuesday 07 January 2025
To: Friday 07 February 2025

Last updated 08:32 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Utility works

[A3216] Lower Sloane Street (Northbound) between Sloane Gardens and [A3216] Sloane Square - Road closed due to Cadent Gas works.

  • [A3216] LOWER SLOANE STREET (SW1W) (Northbound)

[A2022] LITTLE WOODCOTE LANE (CR8,SM5) (Croydon,Sutton)

  Minimal

From: Tuesday 21 January 2025
To: Monday 10 February 2025

Last updated 09:15 Thursday 23 January 2025 : Possible delays.

Works | Utility works

[A2022] Little Woodcote Lane (All approaches) at the junction of [A2022] Foxley Lane - Temporary signals in place due to emergency SGN gas works.

[A503] SEVEN SISTERS ROAD (N4) (Hackney,Haringey,Islington)

  Minimal

From: Wednesday 29 January 2025
To: Thursday 30 January 2025

Last updated 17:34 Tuesday 14 January 2025 : Delays are possible.

Works | Utility works

[A503] Seven Sisters Road (Westbound) at the junction of Alexandra Grove - Lane one closed to facilitate BT works.

A13

[A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Tower Hamlets)

  Minimal

From: Thursday 23 January 2025
To: Tuesday 04 February 2025

Last updated 21:05 Thursday 23 January 2025 : Possible delays during the works.

Works | TfL works

[A1261] East India Dock Road Tunnel (Both directions) at the junction of [A1261] Aspen Way - East India Dock Tunnel closure to facilitate maintenance works.

  • [A1261] EAST INDIA DOCK ROAD TUNNEL (E14) (Both directions)

A13

City Route

[A126] BUTCHER ROW (E1,E14,E1W) (Tower Hamlets)

  Minimal

From: Wednesday 29 January 2025
To: Friday 31 January 2025

Last updated 15:44 Tuesday 21 January 2025 : Expect delays

Works | Collaborative works

[A126] Butcher Row (Southbound) at the junction of [B126] Cable Street - Lane one is closed to facilitate works.

A20

A21

LEWISHAM HIGH STREET (SE13) (Lewisham)

  Minimal

From: Saturday 03 August 2024
To: Monday 31 March 2025

Last updated 09:16 Thursday 23 January 2025 : Use an alternative route. Delays are possible on diversion.

Works | Borough works

Lewisham High Street (Northbound) at the junction of Lewis Grove - Road closure northbound between Lewisham High Street and Lee Bridge to facilitate works.

  • LEWIS GROVE (SE13) (Northbound)
  • [A21] LEWISHAM HIGH STREET (SE13) (Northbound)

A205

[A205] THURLOW PARK ROAD (SE21,SE24,SE27) (Lambeth)

  Minimal

From: Tuesday 21 January 2025
To: Wednesday 29 January 2025

Last updated 09:10 Thursday 23 January 2025 : Possible delays.

Works | Utility works

[A205] Thurlow Park Road (Eastbound) at the junction of [A215] Norwood Road - Lane one closure eastbound to facilitate Thames Water works.

A205

[A3] WANDSWORTH HIGH STREET (SW18) (Wandsworth)

  Minimal

From: Monday 20 January 2025
To: Tuesday 04 February 2025

Last updated 18:38 Thursday 23 January 2025 : Traffic is flowing well.

Works | Utility works

[A3] Wandsworth High Street (Westbound) at the junction of [A217] Ram Street - Lanes two and three (of three) is blocked due to emergency Thames Water works.

A21

[A21] HASTINGS ROAD (BR2) (Bromley)

  Minimal

From: Tuesday 28 January 2025
To: Friday 31 January 2025

Last updated 10:21 Thursday 23 January 2025 : Delays possible.

Works | Utility works

[A21] Hastings Road (Both directions) at the junction of Lower Gravel Road - Aurora Utilities Limited. Lane closure.

A3

[A3] ROEHAMPTON VALE (SW15) (Kingston upon Thames,Wandsworth)

  Minimal

From: Wednesday 08 January 2025
To: Wednesday 29 January 2025

Last updated 09:29 Thursday 23 January 2025 : Use an alternative route. Delays are possible.

Works | Utility works

[A3] Roehampton Vale (Westbound) at the junction of [A3] Kingston Vale - Thames Water works. The slip road from westbound A3 Roehampton Vale into A308 Kingston Vale is closed.

A4

Western Cross Route

[A3220] WARWICK ROAD (SW10,SW5,W14,W8) (Kensington & Chelsea)

  Minimal

From: Wednesday 22 January 2025
To: Wednesday 05 February 2025

Last updated 19:50 Thursday 23 January 2025 : Traffic is flowing well.

Works | Utility works

[A3220] Warwick Road (Northbound) at the junction of Nevern Square - Lane closure in place to facilitate UKPN works.

Bishopsgate Cross Route

Inner Ring

[A10] SHOREDITCH HIGH STREET (E1,E2,EC2A) (City of London,Hackney,Tower Hamlets)

  Minimal

Wednesday 29 January 2025

Last updated 15:32 Thursday 23 January 2025 : Delays are possible.

Planned events | Filming

River Island Filming - [A10] Shoreditch High Street (Both directions) at the junction of [A1202] Commercial Street - Filming will be taking place on the pavement in Shoreditch High Street at Commercial Street and Old Street. Also Commercial Street at Fournier Street.

Bishopsgate Cross Route

[A10] GRACECHURCH STREET (EC3V,EC4N,EC4R) (City of London)

  Minimal

From: Monday 20 January 2025
To: Friday 31 January 2025

Last updated 19:49 Thursday 23 January 2025 : There are no reported delays.

Works | TfL works

[A10] Gracechurch Street (Both directions) at the junction of Leadenhall Street - Lane restrictions to facilitate collaborative works.

Inner Ring

[A3214] BUCKINGHAM PALACE ROAD (SW1E,SW1V,SW1W) (Westminster)

  Minimal

From: Wednesday 29 January 2025
To: Friday 31 January 2025

Last updated 19:59 Wednesday 22 January 2025 : Delays possible.

Works | Utility works

[A3214] Buckingham Palace Road (Southbound) between [A202] Bressenden Place and Victoria Square - Lanes one and two closed to facilitate telecoms works.

Southern River Route

[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)

  Minimal

From: Saturday 31 August 2024
To: Thursday 08 May 2025

Last updated 08:50 Thursday 23 January 2025 : Delays are possible.

Works | TfL works

[A3203] Lambeth Bridge (Both directions) between [A3212] Millbank and [A3036] A 3036 - Various restrictions during junction improvement works at either side of Lambeth Bridge. Currently restrictions are in place on all approaches and inner ring of Lambeth Roundabout. From 30 January 21:30 until 07 February 05:00, there will be nightly road closures of Lambeth Bridge, Lambeth Palace Road, Lambeth Road & Albert Embankment, with diversions in place via Westminster and Vauxhall Bridges.

[A4] STRAND (WC2A,WC2R) (Westminster)

  Minimal

Wednesday 29 January 2025

Last updated 10:51 Thursday 23 January 2025 : Delays are possible.

Planned events | Demonstration/March

[A4] Strand (Both directions) between [A4] Aldwych and [A4] Fleet Street - Lane restrictions are in place due to a demonstration.

[A2043] MALDEN ROAD (SM3) (Sutton)

  Minimal

From: Monday 27 January 2025
To: Wednesday 29 January 2025

Last updated 19:49 Wednesday 22 January 2025 : Delays possible.

Works | Utility works

[A2043] Malden Road (Southbound) at the junction of Tilehurst Road - Lane restriction in place to facilitate telecoms works.

[A502] GOLDERS GREEN ROAD (NW11) (Barnet)

  Minimal

From: Tuesday 28 January 2025
To: Thursday 30 January 2025

Last updated 12:17 Saturday 18 January 2025 : Delays possible.

Works | Borough works

[A502] Golders Green Road (Westbound) at the junction of Woodstock Avenue - Lane restrictions in place to facilitate telecoms works.

[A215] WALWORTH ROAD (SE1,SE17) (Southwark)

  Minimal

From: Monday 13 January 2025
To: Friday 03 October 2025

Last updated 08:35 Thursday 23 January 2025 : Delays are possible.

Works | Construction activity

[A215] Walworth Road (Southbound) at the junction of [A3] Newington Butts - Lane restriction contained to southbound Walworth Road to facilitate scaffolding works.

EASTBOURNE TERRACE (W2) (Westminster)

  Minimal

From: Monday 27 January 2025
To: Friday 31 January 2025

Last updated 12:51 Tuesday 14 January 2025 : Delays possible.

Works | Utility works

Eastbourne Terrace (Eastbound) at the junction of [B410] Craven Road - Road closed eastbound due to Thames Water works.

[A404] HARROW ROAD (W10,W9) (Westminster)

  Minimal

Wednesday 29 January 2025

Last updated 16:25 Thursday 16 January 2025 : Possible delays during the works.

Works | Borough works

[A404] Harrow Road (Both directions) at the junction of Elgin Avenue - Lane restriction in place to facilitate road improvement works.

HIGH STREET NORTH (E6) (Newham)

  Minimal

From: Monday 27 January 2025
To: Thursday 27 February 2025

Last updated 11:42 Friday 17 January 2025 : Delays may be experienced while works are being carried out.

Works | Utility works

High Street North (Both directions) at the junction of [A124] Barking Road - Road closed in both directions to facilitate carriageway resurfacing work.

[A232] CHEAM ROAD (SM1,SM2) (Sutton)

  Minimal

From: Wednesday 29 January 2025
To: Friday 31 January 2025

Last updated 07:28 Tuesday 14 January 2025 : Delays are possible.

Works | Utility works

[A232] Cheam Road (All approaches) between York Road and Gander Green Lane - Multi way temporary traffic signals in operation to facilitate BT works.