Status updates

Find a postcode, place or road

A205

[A217] Wandsworth One Way System (SW18) (Wandsworth)

  Closures

From: Monday 16 January 2017
To: Saturday 11 March 2017

Last updated 15:02 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A217] Wandsworth One Way System (All Directions) - Various lane restrictions during phased collaborative utility works. From approximately 0800hrs Monday 23 until 1800hrs Friday 24 February, [A217] Ram Street, closed between [A217] Armoury Way and [A217] Wandsworth High Street. Sunday 5 until Friday 10 February, [A217] Armoury Way, between approximately 2100hrs and 0500hrs each night, lane four (of four) of closed and [A217] Ram Street, closed southbound and right-hand turn from [A217] Armoury Way into [A217] Ram Street banned. Saturday 25 February until Saturday 11 March, lane four (of four) closed between approximately 0700hrs and 1900hrs each day, except Wednesday 8 to Friday 10 March, inclusive, when lanes three and four (of four) are closed.

  • All Saints Passage (SW18) (All Directions)
  • [A217] Armoury Way (SW18) (All Directions)
  • Barchard Street (SW18) (All Directions)
  • [A217] Church Row (SW18) (All Directions)
  • Dormay Street (SW18) (All Directions)
  • Frogmore (SW18) (All Directions)
  • [A217] Old York Road (SW18) (All Directions)
  • [A217] Ram Street (SW18) (All Directions)
  • Shoreham Close (SW18) (All Directions)
  • The Causeway (SW18) (All Directions)
  • [A217] Wandsworth One Way System (SW18) (All Directions)

A4

Inner Ring

[A302,A4] Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (W2) (Westminster)

  Closures

From: Monday 09 November 2015
To: Monday 13 March 2017

Last updated 09:14 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (All Directions) - Various restrictions during Cycle Superhighway works. Find out more East West Cycle Superhighway travel advice.

  • A3214 (SW1A,SW1H,SW1E,SW1W,SW1P) (All Directions)
  • Bathurst Street (W2) (All Directions)
  • Birdcage Walk (SW1H,SW1E) (All Directions)
  • Buckingham Palace (SW1A) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Cleveland Terrace (W2) (All Directions)
  • Constitution Hill (SW1A,SW1W) (North Bound)
  • [B410] Craven Road (W2) (All Directions)
  • [A302,A4] Grosvenor Place (SW1X,SW1W) (All Directions)
  • Horse Guards Road (SW1H,SW1A) (All Directions)
  • Hyde Park Gardens (W2) (All Directions)
  • Kensington Gardens (W2) (All Directions)
  • North Carriage Drive (W2) (Westbound)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • Serpentine Road (W2) (All Directions)
  • South Carriage Drive (SW1X,W2,W1J,SW7) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stanhope Terrace (W2) (All Directions)
  • Storey's Gate (SW1H) (All Directions)
  • Sussex Gardens (W2) (All Directions)
  • The Mall (SW1A) (All Directions)
  • West Carriage Drive (W2) (North Bound)
  • Westbourne Crescent (W2) (All Directions)
  • Westbourne Terrace (W2) (All Directions)

Bishopsgate Cross Route

[A3] King William Street (EC3R,EC4R) (City Of London)

  Closures

From: Saturday 29 August 2015
To: Sunday 31 December 2017

Last updated 06:58 Tuesday 24 January 2017 : Local delays possible.

Works | TfL

[A3] King William Street (EC3R/EC4R) (Both Directions) between London Bridge and Arthur Street - Lane one closed from the bus stop at the north end of London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website.

  • [A3] Arthur Street (EC3R,EC4R) (All Directions)
  • [A3] London Bridge (EC3R,EC4R) (All Directions)

Bishopsgate Cross Route

[A3] Cannon Street (EC4M,EC4N,EC4V,EC4R) (City Of London)

  Closures

From: Tuesday 03 January 2017
To: Monday 01 May 2017

Last updated 07:04 Tuesday 24 January 2017 : Expect delays throughout the course of these works, especially at peak times.

Works | Borough

Cannon Street (EC4) (Westbound) between [A3] King William Street and Queen Victoria Street - Closed during road maintenance on behalf of the City of London. Westbound traffic is diverted via King William Street, Lombard Street and Mansion House Street to Queen Victoria Street.

  • A10 (EC4N,EC3V,EC4R) (All Directions)
  • Abchurch Lane (EC4N) (All Directions)
  • Bread Street (EC4M) (All Directions)
  • Bush Lane (EC4R) (All Directions)
  • Clement's Lane (EC3V,EC4N) (All Directions)
  • Cloak Lane (EC4N,EC4R) (All Directions)
  • College Hill (EC4N,EC4R) (All Directions)
  • Dowgate Hill (EC4N,EC4R) (All Directions)
  • Eastcheap (EC3M,EC3V,EC4R) (All Directions)
  • Fish Street Hill (EC4R) (All Directions)
  • Garlick Hill (EC4V) (All Directions)
  • Gophir Lane (EC4R) (All Directions)
  • Gracechurch Street (EC3V) (All Directions)
  • Great St Thomas Apostle (EC4N) (All Directions)
  • Great Trinity Lane (EC4V,EC4M) (All Directions)
  • King William Street (EC4N,EC4R) (All Directions)
  • Laurence Pountney Hill (EC4R) (All Directions)
  • Laurence Pountney Lane (EC4R) (All Directions)
  • Little Trinity Lane (EC4V) (All Directions)
  • Lombard Court (EC3V) (All Directions)
  • Martin Lane (EC4R) (All Directions)
  • Nicholas Lane (EC3V,EC4N) (All Directions)
  • Oxford Court (EC4N) (All Directions)
  • Pudding Lane (EC3M,EC3R) (All Directions)
  • Queen Street (EC4M,EC4N,EC4R) (All Directions)
  • Queen Victoria Street (EC4V,EC4N,EC2R,EC4M) (All Directions)
  • Salters' Hall Court (EC4N) (All Directions)
  • Scott's Yard (EC4R) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)
  • St George's Lane (EC3M) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • Talbot Court (EC3V) (All Directions)
  • Walbrook (EC4N) (All Directions)
  • Watling Court (EC4M) (All Directions)
  • Watling Street (EC4M) (All Directions)

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Closures

From: Monday 05 January 2015
To: Saturday 31 July 2021

Last updated 06:56 Tuesday 24 January 2017 : Use an alternative route.

Works | TfL

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed Find out more about Bank and Monument works

  • [A3] Arthur Street (EC4R,EC3R) (Both Directions)
  • [A3] Fish Street Hill (EC4R,EC3R) (All Directions)
  • [A3] King William Street (EC4R,EC3R) (All Directions)
  • Martin Lane (EC4R) (All Directions)

Farringdon Cross Route

Farringdon Road (Islington,Camden)

  Closures

From: Monday 22 July 2013
To: Monday 31 December 2018

Last updated 06:57 Tuesday 24 January 2017 : Expect local delays.

Works | Other

[A201] Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Farringdon Road is restricted southbound. Find out more about Crossrail works

  • Charterhouse Street (EC1N,EC1A) (All Directions)
  • Farringdon Road (EC1M) (All Directions)
  • Saffron Hill (EC1N) (All Directions)

Inner Ring

[A3213] Gillingham Street (SW1V) (Westminster)

  Closures

From: Sunday 22 January 2017
To: Friday 27 January 2017

Last updated 07:15 Tuesday 24 January 2017 : Possible delays during the course of these works.

Hazard(s) | Burst Water Main

Gillingham Street (SW1) (Eastbound) at the junction of Wilton Road - The road is closed due to a burst water main.

  • A202 (SW1V) (All Directions)
  • Carlisle Place (SW1P) (All Directions)
  • Eccleston Square (SW1V) (All Directions)
  • Gillingham Row (SW1V) (All Directions)
  • King's Scholars' Passage (SW1V) (All Directions)

Southern River Route

Bishopsgate Cross Route

[A200] Tooley Street (SE1) (Southwark)

  Closures

From: Saturday 30 April 2016
To: Wednesday 28 February 2018

Last updated 14:02 Tuesday 24 January 2017 : Use an alternative route.

Works | Other

London Bridge mainline rail station upgrade, [A200] Tooley Street and Duke Street Hill (SE1) (Eastbound) between [A3] Borough High Street and [A2205] Bermondsey Street - The road is closed between Borough High Street and Bermondsey Street. Find out more about the London Bridge mainline station upgrade and Tooley Street.

  • Battle Bridge Lane (SE1) (All Directions)
  • [A2205] Bermondsey Street (SE1) (All Directions)
  • Counter Street (SE1) (All Directions)
  • Duke Street Hill (SE1) (Eastbound)
  • Hay's Lane (SE1) (All Directions)
  • Joiner Street (SE1) (All Directions)
  • Montague Close (SE1) (All Directions)
  • Shipwright Yard (SE1) (All Directions)
  • Stainer Street (SE1) (All Directions)
  • [A200] Tooley Street (SE1) (Eastbound)
  • Tooley Street (SE1) (All Directions)
  • Weston Street (SE1) (All Directions)

[A212] Bell Green (SE26,SE23) (Lewisham)

  Closures

From: Monday 09 January 2017
To: Wednesday 25 January 2017

Last updated 14:00 Tuesday 24 January 2017 : Delays are possible.

Works | Emergency

[A212] Bell Green (All Directions) at the junction of Perry Rise - Temporary traffic signals in use to facilitate emergency gas works. Perry Rise has also been closed.

  • [A212] Bell Green (SE26,SE23) (All Directions)
  • [A212] Perry Hill (SE26,SE23) (All Directions)
  • [B227] Perry Rise (SE26,SE23) (All Directions)

[A5204] Wigmore Street (W1U) (Westminster)

  Closures

From: Thursday 12 January 2017
To: Friday 27 January 2017

Last updated 09:08 Tuesday 24 January 2017 : Use other routes whilst closure is in place.

Works | Other

[A5204] Wigmore Street (W1U) (Westbound) between Marylebone Lane and Mandeville Place - Road closure due to works.

  • B524 (W1U) (All Directions)
  • Duke's Mews (W1U) (All Directions)
  • Marylebone Lane (W1U) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Closures

From: Wednesday 18 January 2017
To: Friday 10 February 2017

Last updated 14:06 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Footscray Road - Greenwich Council will be carrying out a carriageway resurfacing program on Eltham High Street between Court Road and Footscray Road. Phase one (2000hrs 18th Jan to 0500hrs 21st Jan)

  • [A210] Eltham High Street (SE9) (All Directions)
  • [A211] Footscray Road (SE9) (All Directions)

[A501] Moorgate (EC2A,EC2M) (City Of London,Islington)

  Closures

From: Saturday 23 July 2016
To: Friday 31 March 2017

Last updated 07:05 Tuesday 24 January 2017 : Use an alternative route.

Works | Other

[A501] Moorgate (EC2M) (Southbound) at the junction of South Place - Moorgate is closed southbound for Crossrail works.

  • [A501] Moorgate (EC2A,EC2M) (Southbound)

[A400] Great Russell Street (WC1B) (Camden)

  Closures

From: Tuesday 03 January 2017
To: Tuesday 28 February 2017

Last updated 09:04 Tuesday 24 January 2017 : Use other routes whilst closures is in place.

Works | Utility

Great Russell Street (WC1B) (Westbound) between Museum Street and Bloomsbury Street - Road closed to facilitate major gas main replacement works.

A1

[A400] Archway (N19) (Islington)

  Closures

From: Monday 01 February 2016
To: Friday 14 April 2017

Last updated 07:06 Tuesday 24 January 2017 : Traffic is flowing well in the area.

Works | TfL

Archway (All Directions) - Various lane restrictions and closures to facilitate junction improvement works including closures of Vorley Road and MacDonald Road. Find out more Archway gyratory travel advice

  • A1 (N19) (All Directions)
  • Flowers Mews (N19) (All Directions)
  • [B519,A1] Highgate Hill (N19) (All Directions)
  • St John's Way (N19) (All Directions)

Inner Ring

Marylebone High Street (NW1,W1U,W1G) (Westminster)

  Closures

From: Wednesday 04 January 2017
To: Tuesday 31 January 2017

Last updated 09:17 Tuesday 24 January 2017 : Use other routes whilst closure is in place.

Works | Borough

Marylebone High Street (W1U/NW1/W1G) (Northbound) at the junction of Nottingham Street - Road closure in place from 4th until 31st January to facilitate telecommunication works. There will be no access from Marylebone High Street into Oldbury Place.

  • Beaumont Street (W1G) (All Directions)
  • Nottingham Street (W1U) (All Directions)

[A302] Victoria Street (SW1H) (Westminster)

  Closures

From: Tuesday 24 January 2017
To: Ongoing

Last updated 17:12 Tuesday 24 January 2017 : Use other route.

Hazard(s) | Burst Water Main

[A302] Victoria Street (SW1H) (Eastbound) between Buckingham Gate and Broadway - Road closed due to a burst water main.

  • Dean Farrar Street (SW1H) (All Directions)
  • [A302] Victoria Street (SW1H) (Eastbound)

[A4] New Fetter Lane (EC4A) (City Of London)

  Closures

From: Monday 16 January 2017
To: Sunday 19 February 2017

Last updated 07:03 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A4] New Fetter Lane (EC4A) (Southbound) at the junction of High Holborn - The road is closed to facilitate Thames Water works

  • Fetter Lane (EC4A) (All Directions)
  • [A4] Fetter Lane (EC4A) (Southbound)
  • [A4] New Fetter Lane (EC4A) (Southbound)
  • West Harding Street (EC4A) (All Directions)

[B412] St Marks Road (W10) (Kensington & Chelsea)

  Closures

From: Monday 16 January 2017
To: Saturday 18 March 2017

Last updated 17:13 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[B412] St Marks Road (W10) (All Directions) at the junction of St Quintin Avenue - Various road closures and lane restrictions in place due to works.

  • Chesterton Road (W10) (All Directions)
  • Kelfield Gardens (W10) (All Directions)
  • St Marks Road (W10) (All Directions)
  • [B412] St Marks Road (W10) (All Directions)
  • [B412] St Marks Road Roundabout (W10) (All Directions)

[A112] Angel Lane (E15) (Newham)

  Closures

From: Monday 16 January 2017
To: Sunday 07 May 2017

Last updated 06:49 Tuesday 24 January 2017 : Expect possible delays during the course of these works.

Works | Utility

[A112] Angel Lane (E15) (Southbound) between Leyton Road and Great Eastern Road - Road closed southbound to facilitate utility works. In addition, there are temporary traffic signals at The Grove / Windmill Lane.

  • [A11] Great Eastern Road (E15) (All Directions)
  • Service Route No 3 (E15) (All Directions)

[B406] Berners Street (W1D,W1T) (Westminster)

  Closures

From: Sunday 09 October 2016
To: Saturday 31 March 2018

Last updated 09:02 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

Berners Street (W1T/W1D) (All Directions) at the junction of Wardour Street - Various closures and restrictions in place to facilitate works. Berners Street is closed between Oxford Street and Mortimer Street then Newman Street and Wells Street. Cleveland Street is closed between New Cavendish Street and Mortimer Street and Wardour Street between Oxford Street and Shaftesbury Avenue.

  • B406 (W1S,W1C) (All Directions)
  • Berners Street (W1D,W1T) (All Directions)
  • Carburton Street (W1W,VW01) (All Directions)
  • Chapel Place (W1G) (All Directions)
  • Cleveland Street (W1T,W1W) (All Directions)
  • Clipstone Street (W1T) (All Directions)
  • Dering Street (W1S) (All Directions)
  • Eastcastle Street (W1T) (All Directions)
  • Foley Street (W1W) (All Directions)
  • Grafton Way (W1T) (All Directions)
  • Great Castle Street (W1G,W1W) (All Directions)
  • Great Titchfield Street (W1D) (All Directions)
  • Hanover Square (W1S) (All Directions)
  • Harewood Place (W1C) (All Directions)
  • Hills Place (W1D,W1F) (All Directions)
  • Howland Street (W1T) (All Directions)
  • John Prince's Street (W1G,W1C) (All Directions)
  • Maple Street (W1T) (All Directions)
  • Market Place (W1D,W1W) (All Directions)
  • Marylebone Lane (W1C) (All Directions)
  • New Cavendish Street (W1W) (All Directions)
  • Newman Passage (W1T) (All Directions)
  • Newman Street (W1T) (All Directions)
  • [A40] Oxford Street (W1B,W1C,W1D,W1F,W1W) (All Directions)
  • Poland Street (W1D) (All Directions)
  • Princes Street (W1B) (All Directions)
  • Ramillies Place (W1F) (All Directions)
  • Ramillies Street (W1F) (All Directions)
  • Swallow Place (W1B) (All Directions)
  • Tenterden Street (W1S) (All Directions)
  • Tottenham Street (W1T) (All Directions)
  • Wells Street (W1T) (All Directions)
  • Winsley Street (W1W) (All Directions)

[A240] Surbiton Road (KT1) (Kingston Upon Thames)

  Closures

From: Monday 05 September 2016
To: Monday 06 March 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A240] Surbiton Road (KT1) (Both Directions) between Surbiton Road and Anglesea Road - Road closure is in place as part of the Mini Holland Scheme.

  • Anglesea Road (KT1) (All Directions)
  • Surbiton Crescent (KT1) (All Directions)
  • [A240] Surbiton Road (KT1) (Both Directions)

A1

[A1] Holloway Road (N7 ,N5 ,N1) (Islington)

  Moderate

From: Monday 06 October 2014
To: Saturday 30 June 2018

Last updated 06:57 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

Highbury Corner Bridge, [A1] Holloway Road (N7) (Both Directions) at Highbury Corner - Holloway Road reduced to one lane in each direction, with a northbound bus lane suspension in place for bridge replacement works. Find out more about the works.

  • A1 (N7 ,N5 ,N1) (All Directions)
  • Highbury Corner (N1) (All Directions)
  • [A1] Holloway Road (N7 ,N5 ,N1) (Both Directions)

A1

[A1] Holloway Road (N19) (Islington)

  Moderate

From: Wednesday 21 October 2015
To: Saturday 01 April 2017

Last updated 06:33 Tuesday 24 January 2017 : Traffic is flowing well.

Works | TfL

Upper Holloway Bridge, [A1] Holloway Road (Both Directions) at the junction of Fairbridge Road near Upper Holloway station - Reduced to one lane in both directions for bridge replacement works. Find out more about Upper Holloway Bridge.

  • A400 (N19) (All Directions)
  • Alexander Road (N19) (All Directions)
  • [A1] Archway Road (N19) (All Directions)
  • Archway Road (N19) (All Directions)
  • Criterion Mews (N19) (All Directions)
  • Davenant Road (N19) (All Directions)
  • Elthorne Road (N19) (All Directions)
  • Fairbridge Road (N19) (All Directions)
  • Flowers Mews (N19) (All Directions)
  • Fortnam Road (N19) (All Directions)
  • Giesbach Road (N19) (All Directions)
  • Hampden Road (N19) (All Directions)
  • Hargrave Road (N19) (All Directions)
  • [A1] Highgate Hill (N19) (All Directions)
  • [A1,B519] Highgate Hill (N19) (All Directions)
  • [A1] Holloway Road (N19) (Both Directions)
  • Kingsdown Road (N19) (All Directions)
  • Kiver Road (N19) (All Directions)
  • Landseer Road (N19) (All Directions)
  • Marlborough Road (N19) (All Directions)
  • Marlborough Yard (N19) (All Directions)
  • Pemberton Gardens (N19) (All Directions)
  • Rupert Road (N19) (All Directions)
  • [A1] Sandridge Street (N19) (All Directions)
  • St John's Villas (N19) (All Directions)
  • [A1] St John's Way (N19) (All Directions)
  • St John's Way (N19) (All Directions)
  • Tavistock Terrace (N19) (All Directions)
  • [A1] Tollhouse Way (N19) (All Directions)
  • Tollington Way (N19) (All Directions)
  • Wedmore Gardens (N19) (All Directions)
  • Wedmore Mews (N19) (All Directions)
  • Wedmore Street (N19) (All Directions)
  • Windermere Road (N19) (All Directions)
  • Witley Road (N19) (All Directions)

A12

[A12] Eastern Avenue (RM6,IG2) (Redbridge)

  Moderate

From: Thursday 12 January 2017
To: Sunday 16 April 2017

Last updated 08:16 Tuesday 24 January 2017 : Restrictions confined to pavement and traffic islands. Traffic is flowing normal for the time of the day

Works | TfL

[A12] Eastern Avenue (RM6) (All Directions) at the junction of [B177] Barley Lane - Various restrictions during junction improvement works until approximately late April. Monday 16 January until late April, [A12] Eastern Avenue at the junction of [B177] Barley Lane, lane restrictions in all directions. Friday 3 February until late February, no right-turn from [A12] Eastern Avenue into [B177] Barley Lane or Hainault Road. mid to late February, pedestrian crossing on southern side of the junction temporarily suspended. Early to mid-March, no left-turn from Hainault Road to [A12] Eastern Avenue.**Currently restrictions remain on footway and traffic islands.**

  • A12 (RM6,IG2) (All Directions)
  • B177 (RM6) (All Directions)
  • Chadwell Heath Lane (RM6) (All Directions)
  • [A12] Eastern Avenue (RM6,IG2) (All Directions)
  • Hainault Road (RM6) (All Directions)
  • Little Heath (RM6) (All Directions)
  • Strouds Close (RM6) (All Directions)

A12

Burdett Road (E3 ,E14) (Tower Hamlets)

  Moderate

From: Tuesday 28 May 2013
To: Sunday 04 February 2018

Last updated 07:56 Tuesday 24 January 2017 : Delays are possible while restrictions are in place.

Works | Other

A1205 Burdett Road (Both directions) between St Paul's Way and Bow Common Lane - Carriageway restrictions for Crossrail works. Find out more about Crossrail works

  • Burdett Road (E3 ,E14) (South Bound)
  • St Paul's Way (E3 ,E14) (All Directions)

A12

[A11] Whitechapel Road (E1) (Tower Hamlets)

  Moderate

From: Thursday 19 January 2017
To: Wednesday 01 February 2017

Last updated 07:01 Tuesday 24 January 2017 : Delays are possible during the course of these works

Works | Utility

[A11] Whitechapel Road (E1 ) (Eastbound) at the junction of Brady Street - Bus lane closure to facilitate utility works.

  • Brady Street (E1) (All Directions)
  • Cavell Street (E1) (All Directions)

A23

[A23] Purley Way (CR0) (Croydon)

  Moderate

From: Monday 23 January 2017
To: Sunday 26 February 2017

Last updated 14:50 Tuesday 24 January 2017 : Traffic is flowing well.

Works | TfL

[A23] Purley Way (CR0) (All Directions) at the junction of Waddon Road and Mill Lane - Nightly carriageway restrictions and the use of temporary traffic signals to facilitate traffic signal modernisation works. Although temporary traffic signals will remain in use during the day, works will be contained to the pavement.

  • Mill Lane (CR0) (All Directions)
  • [A23] Purley Way (CR0) (All Directions)
  • Waddon Road (CR0) (All Directions)

A24

[A3] Kennington Park Road (SE11) (Lambeth,Southwark)

  Moderate

From: Monday 23 January 2017
To: Ongoing

Last updated 16:31 Tuesday 24 January 2017 : Traffic is moving normally at this time.

Hazard(s) | Burst Water Main

[A3] Kennington Park Road (SE11) (All Directions) at the junction of Braganza Street - There is a burst water main at this location with surface water affecting the carriageway.

  • Braganza Street (SE11) (All Directions)

A3

[A3205] Nine Elms Lane (SW8) (Wandsworth)

  Moderate

From: Tuesday 23 August 2016
To: Sunday 30 April 2017

Last updated 14:01 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A3205] Nine Elms Lane (SW8) (Both Directions) at the junction of Ponton Road - To facilitate major water works, the carriageway is reduced to one lane in each direction. In addition Ponton Road is partially restricted at the junction.

  • Nine Elms Lane (All Directions)
  • [A3205] Nine Elms Lane (SW8) (Both Directions)

A3

[A306] Roehampton Lane (SW15) (Wandsworth)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 17:14 Tuesday 24 January 2017 : Traffic is currently flowing well approaching the closure however care is required on approach. Intermittent delays are to be expected.

Hazard(s) | Burst Water Main

[A306] Roehampton Lane (SW15) (Northbound) at the junction of Kingston Road - Lane two (of two) is blocked due to a burst water main.

A4

A306 (W6) (Hammersmith & Fulham)

  Moderate

From: Saturday 28 May 2016
To: Sunday 31 December 2017

Last updated 06:57 Tuesday 24 January 2017 : New weight limit imposed on Hammersmith Bridge. Delays possible.

Works | Other

[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. The bridge will be fully closed both ways from 0700hrs on Saturday 11 February until 0500hrs on Monday 20 February.

  • Worlidge Street (W6) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Moderate

From: Tuesday 03 May 2016
To: Tuesday 30 April 2019

Last updated 08:56 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - Various restrictions until approximately April 2019 during the redevelopment of 55-91 Knightsbridge. Westbound bus lane closed until approximately April 2019. More information available on Westminster council's website.

  • [A4] Knightsbridge (SW1X) (Westbound)

A4

[A4] Exhibition Road (SW7) (Westminster,Kensington & Chelsea)

  Moderate

From: Friday 20 January 2017
To: Sunday 29 January 2017

Last updated 15:06 Tuesday 24 January 2017 : Delays are possible.

Works | Emergency

Exhibition Road (SW7) (Both Directions) between Cromwell Road and Imperial College Road - Lane restrictions because of a burst water main.

  • [A4] Cromwell Road (SW7) (All Directions)

A406

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W3,W4) (Hounslow)

  Moderate

From: Monday 20 June 2016
To: Thursday 04 January 2018

Last updated 06:58 Tuesday 24 January 2017 : Local delays possible when temporary signals in operation.

Works | TfL

Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. Click for more information on the Power Road Bridge project.

  • [A406] Gunnersbury Avenue (North Circular Road) (W3,W4) (Both Directions)

A406

[A205] Kew Bridge (TW9,TW8) (Richmond Upon Thames,Hounslow)

  Moderate

From: Monday 09 January 2017
To: Sunday 02 April 2017

Last updated 07:06 Tuesday 24 January 2017 : Possible delays during the course of these works.

Works | TfL

[A205] Kew Bridge (TW9) (All Directions) and Kew Road between Strand-on-the-Green and Kew Green - Various closures and restrictions will take place to facilitate bridge refurbishment works. The bridge will be closed on the 20th Feb and 20th March between 23:00 and 05:00. Single lane closures will also be in place during off peak hours 19:00 to 06:00 and 10:00 to 16:00 Monday to Friday and 07:30 to 13:30 on Saturdays.

  • A315 (TW8) (All Directions)
  • Bush Road (TW9) (All Directions)
  • [A205] Kew Bridge (TW9,TW8) (All Directions)
  • [A205] Kew Bridge Road (TW9,TW8) (All Directions)
  • Kew Green (TW9) (All Directions)
  • [A205] Kew Road (TW9,TW8) (All Directions)
  • Spring Grove (W4) (All Directions)
  • Strand-On-The-Green (W4) (All Directions)

A41

[A41] Finchley Road (NW3) (Camden)

  Moderate

From: Wednesday 18 January 2017
To: Sunday 29 January 2017

Last updated 15:03 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A41] Finchley Road (NW3) (Southbound) between Lithos Road and Frognal - Lane closure in place in the southbound carriageway from 18 until 27 January to facilitate electrical works. From 08:00 on 28 until 17:00 on 29 January, there will be lane closures in both directions.

  • [A41] Finchley Road (NW3) (Southbound)
  • Frognal (NW3) (All Directions)
  • Hampstead Gate (NW3) (All Directions)

Bishopsgate Cross Route

[A3] Borough High Street (SE1) (Southwark)

  Moderate

From: Wednesday 06 April 2016
To: Friday 01 September 2017

Last updated 14:00 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

[A3] Borough High Street (SE1) (Northbound) at the junction of Marshalsea Road - Intermittent bus lane restriction due to works.

  • [A3] Borough (SE1) (All Directions)
  • [A3] Borough High Street (SE1) (All Directions)
  • [A2] Great Dover Street (SE1) (All Directions)
  • [A3201] Marshalsea Road (SE1) (All Directions)

Bishopsgate Cross Route

[A10] Shoreditch High Street (E1) (Hackney,City Of London,Tower Hamlets)

  Moderate

From: Saturday 24 September 2016
To: Saturday 31 March 2018

Last updated 06:56 Tuesday 24 January 2017 : Traffic delays are possible when restrictions in place.

Special and Planned Events | Construction Activity

[A10] Shoreditch High Street (All Directions) at the junction of Worship Street - Planned lane restrictions to facilitate the Principle Place development.

  • [A10] Norton Folgate (E1) (All Directions)
  • [A10] Shoreditch High Street (E1) (All Directions)
  • Worship Street (EC2M,E1) (All Directions)

City Route

Farringdon Cross Route

[A3211] Victoria Embankment (EC4Y,EC4V) (City Of London)

  Moderate

From: Wednesday 04 January 2017
To: Friday 31 December 2021

Last updated 15:05 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Tideway, [A3211] Victoria Embankment (EC4) (Both Directions) at the junction of [A201] Blackfriars Bridge - Various carriageway restrictions to facilitate these works Find out more about the road changes at Victoria Embankment

  • A201 (EC4V,EC4Y,SE1) (All Directions)
  • Apothecary Street (EC4V) (All Directions)
  • Black Friars Lane (EC4V) (All Directions)
  • [A201] Blackfriars Bridge (EC4V,EC4Y,SE1) (All Directions)
  • Blackfriars Court (EC4V) (All Directions)
  • Blackfriars Passage (EC4V) (All Directions)
  • [A3211] Blackfriars Station (EC4Y,EC4V) (All Directions)
  • [A3211] Blackfriars Underpass (EC4Y,EC4V) (All Directions)
  • Bridewell Place (EC4V) (All Directions)
  • Carmelite Street (EC4Y) (All Directions)
  • Kingscote Street (EC4V) (All Directions)
  • [A201] New Bridge Street (EC4V,EC4Y,SE1) (All Directions)
  • Playhouse Yard (EC4V) (All Directions)
  • [A3211] Queen Victoria Street (EC4Y,EC4V) (All Directions)
  • Temple Avenue (EC4Y) (All Directions)
  • Tudor Street (EC4Y,EC4V) (All Directions)
  • [A3211] Victoria Embankment (EC4Y,EC4V) (Both Directions)
  • [A201] Victoria Embankment (EC4V,EC4Y,SE1) (Both Directions)
  • Victoria Embankment (EC4Y) (All Directions)
  • Watergate (EC4V) (All Directions)

Inner Ring

[A501] City Road (EC1Y,EC2A) (Islington)

  Moderate

From: Tuesday 03 January 2017
To: Sunday 02 April 2017

Last updated 11:56 Tuesday 24 January 2017 : Traffic is flowing well through the restrictions.

Works | Utility

[A501] City Road (EC2A) (All Directions) between Epworth Street and Worship Street - Carriageway restrictions to facilitate gas mains replacement works. The northbound lane is closed with temporary signals in place controlling a single alternate traffic flow.

  • [A501] City Road (EC1Y,EC2A) (All Directions)
  • Epworth Street (EC2A) (All Directions)
  • Featherstone Street (EC1Y) (All Directions)
  • Finsbury Square (EC2A) (All Directions)
  • Leonard Street (EC2A) (All Directions)
  • [A501] Old Street Roundabout (EC1Y,EC2A) (All Directions)
  • Oliver's Yard (EC1Y) (All Directions)
  • Tabernacle Street (EC2A) (All Directions)
  • Worship Street (EC1Y,EC2A) (All Directions)

Inner Ring

[A1210] Mansell Street (E1) (City Of London,Tower Hamlets)

  Moderate

From: Monday 16 January 2017
To: Wednesday 25 January 2017

Last updated 08:22 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A1210] Mansell Street (E1 ) (Northbound) at the junction of Alie Street - Bus lane closed to facilitate utility works.

  • [A1210] Mansell Street (E1) (Northbound)

Southern River Route

[A3203] Lambeth Bridge (SE1,SW1P,SW1A) (Westminster)

  Moderate

From: Wednesday 04 January 2017
To: Friday 03 March 2017

Last updated 07:21 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

[A3203] Lambeth Bridge (SE1) (All Directions) at the junction of [A3212] Millbank and [B323] Horseferry Road - Various restrictions and temporary traffic signals in operation during junction improvement works until approximately March. From 6 to 8 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) in both directions and Horseferry Road closed on the approach to the roundabout. From 20 to 25 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) to westbound traffic (towards Westminster) and Horseferry Road will be closed to eastbound traffic on the approach to the roundabout, with vehicle access maintained on Millbank using temporary traffic signals.

  • A3203 (SE1,SW1P,SW1A) (All Directions)
  • A3212 (SW1A,SW1P) (All Directions)
  • Dean Bradley Street (SW1P) (All Directions)
  • Dean Ryle Street (SW1P) (All Directions)
  • Dean Stanley Street (SW1A) (All Directions)
  • Great Peter Street (SW1P) (All Directions)
  • [B323] Horseferry Road (SW1P) (All Directions)
  • [A3203] Lambeth Bridge (SE1,SW1P,SW1A) (All Directions)
  • [B326] Marsham Street (SW1P) (All Directions)
  • Thorney Street (SW1P) (All Directions)
  • Tufton Street (SW1P) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Moderate

From: Friday 29 April 2016
To: Friday 31 March 2017

Last updated 14:05 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A3036] Albert Embankment (SE1) (Northbound) at the junction of New Spring Gardens Walk - Lane one (bus lane) restrictions in place to facilitate utility works. Working hours are 08:00 to 18:00 Monday to Friday and 08:00 to 16:00 Saturdays (continuous traffic management will remain in place).

  • [A3036] Albert Embankment (SE1) (Northbound)
  • New Spring Gardens Walk (SE1) (All Directions)

Western Cross Route

[A3220] Earl's Court Road (SW5) (Kensington & Chelsea)

  Moderate

From: Tuesday 24 January 2017
To: Friday 31 March 2017

Last updated 14:09 Tuesday 24 January 2017 : Traffic is flowing well.

Works | TfL

[A3220] Earl's Court Road (SW5) (All Directions) at the junction of Bramham Gardens - Temporary traffic signals are operating for junction modernisation work. The carriageway will be restricted overnight Monday to Friday 2200hrs to 0500hrs.

Western Cross Route

[A3212] Chelsea Embankment (SW3) (Kensington & Chelsea)

  Moderate

From: Monday 23 January 2017
To: Sunday 23 April 2017

Last updated 15:04 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A3212] Chelsea Embankment (SW3) (Both Directions) between Chelsea Bridge and Embankment Gardens - The carriageway has been reduced to one lane both ways for utility works. A 20 mph speed limit has been imposed.

  • Embankment Gardens (SW3) (All Directions)

[A503] Seven Sisters Road (N4) (Haringey,Hackney)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 13:36 Tuesday 24 January 2017 : Traffic is flowing well.

Infrastructure Issue | Traffic Signal

[A503] Seven Sisters Road (N4 ) (All Directions) at the junction of Green Lanes - The traffic signals have been restored.

[A4020] Uxbridge Road (W7) (Ealing)

  Moderate

From: Monday 14 November 2016
To: Friday 01 September 2017

Last updated 07:02 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A4020] Uxbridge Road (W7) (All Directions) at the junction of Boston Road - Various restrictions to facilitate a major borough street scheme.

  • Broadway (W7) (All Directions)

[A212] Wellesley Road (CR0) (Croydon)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 15:33 Tuesday 24 January 2017 : Approach with care.

Infrastructure Issue | Traffic Signal

[A212] Wellesley Road (CR0) (All Directions) at the junction of Station Road - Traffic lights are all out at this junction.

  • Wellesley Road (All Directions)
  • [A212] Wellesley Road (CR0) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Moderate

From: Monday 01 February 2016
To: Sunday 30 April 2017

Last updated 14:05 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Well Hall Road - Various lane restrictions and closures in place to facilitate Eltham High Street improvement works. Phase 3 (Nov 2016 to April 2017) will consist of lane suspensions. Temporary signals are also in use at the junction.

  • A208 (SE9) (All Directions)
  • [A210] Eltham High Street (SE9) (All Directions)

[A1] Aldersgate Street (EC2Y,EC1A) (City Of London)

  Moderate

From: Monday 22 August 2016
To: Friday 31 March 2017

Last updated 17:15 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A1] Aldersgate Street (EC2Y/EC1A) (All Approaches) at the junction of Beech Street and Long Lane - Restrictions in place to facilitate heating pipe installation works into St Bart's Hospital. There will be **no** right turn from Aldersgate to Beech Street (northbound) and no right turn from Aldersgate into Long Lane (southbound).

  • [A1] Aldersgate Street (EC2Y,EC1A) (All Approaches)
  • [B100] Beech Street (EC2Y,EC1A) (All Directions)

[A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Waltham Forest,Hackney)

  Moderate

From: Friday 08 January 2016
To: Friday 26 January 2018

Last updated 06:55 Tuesday 24 January 2017 : Delays are possible while restrictions are in place.

Works | Borough

[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Waltham Forest Council will be carrying out works as part of the Mayor's Mini Holland Cycle scheme. The works will involve the installation of a cycle lane from Whipps Cross to the borough boundary near the Lea Valley Ice Rink. Other works will include of a new bus stand at Whipps Cross and the removal of Whipps Cross Roundabout to create a new junction.

  • A1006 (E17 ,E10) (All Directions)
  • A107 (E5) (All Directions)
  • A112 (E17 ,E10) (All Directions)
  • Albany Road (E10) (All Directions)
  • Argall Way (E10) (All Directions)
  • Belvedere Road (E10) (All Directions)
  • Bickley Road (E10) (All Directions)
  • Bloxhall Road (E10) (All Directions)
  • Blyth Road (E17) (All Directions)
  • Bromley Road (E10) (All Directions)
  • Burwell Road (E10) (All Directions)
  • Butterfields (E17) (All Directions)
  • Chatsworth Road (E5) (All Directions)
  • College Road (E17) (All Directions)
  • Connaught Close (E10) (All Directions)
  • Copeland Road (E10) (All Directions)
  • Cornthwaite Road (E5) (All Directions)
  • Dagenham Road (E10) (All Directions)
  • Dunton Road (E10) (All Directions)
  • Eastern Road (E17) (All Directions)
  • Elm Park Road (E10) (All Directions)
  • Ferndale Avenue (E17) (All Directions)
  • Flempton Road (E10) (All Directions)
  • Forest Rise (E17) (All Directions)
  • Foresters Drive (E17) (All Directions)
  • Fraser Road (E10) (All Directions)
  • Gloucester Road (E10) (All Directions)
  • Halford Road (E17) (All Directions)
  • Hibbert Road (E17) (All Directions)
  • Hillstowe Street (E5) (All Directions)
  • Hitcham Road (E10) (All Directions)
  • Kettlebaston Road (E10) (All Directions)
  • Lammas Road (E10) (All Directions)
  • Lea Bridge Road (E17 ,E10) (All Directions)
  • [B159] Leyton Green Road (E10) (All Directions)
  • Manor Road (E10) (All Directions)
  • Melbourne Road (E10) (All Directions)
  • Merton Road (E17) (All Directions)
  • Millicent Road (E10) (All Directions)
  • Morieux Road (E10) (All Directions)
  • Northumberland Road (E17) (All Directions)
  • Oakhurst Gardens (E17) (All Directions)
  • Onra Road (E10) (All Directions)
  • Orient Way (E10) (All Directions)
  • Perth Road (E10) (All Directions)
  • Peterborough Road (E17) (All Directions)
  • Poplars Road (E17) (All Directions)
  • Prout Road (E5) (All Directions)
  • Raglan Road (E17) (All Directions)
  • Rigg Approach (E10) (All Directions)
  • Rochdale Road (E17) (All Directions)
  • Russell Road (E10) (All Directions)
  • Sanderstead Road (E10) (All Directions)
  • School Nook (E5) (All Directions)
  • Seymour Road (E10) (All Directions)
  • Shernhall Street (E17) (All Directions)
  • Shortlands Road (E10) (All Directions)
  • Shrubland Road (E10) (All Directions)
  • Snaresbrook Road (E11) (All Directions)
  • St Peter's Avenue (E17) (All Directions)
  • Stanley Road (E10) (All Directions)
  • Theobald Road (E10) (All Directions)
  • Vicarage Road (E10) (All Directions)
  • Waterworks Lane (E5) (All Directions)
  • Wattisfield Road (E5) (All Directions)
  • West End Avenue (E10) (All Directions)
  • Westerham Road (E10) (All Directions)
  • Western Road (E17) (All Directions)
  • [A104] Whipps Cross Roundabout (E17 ,E11 ,E10 ,E5) (All Directions)
  • Whitney Road (E10) (All Directions)
  • [B160] Wood Street (E17) (All Directions)
  • [A104] Woodford New Road (E17 ,E11 ,E10 ,E5) (All Directions)
  • Woodside Park Avenue (E17) (All Directions)

[A105] Green Lanes (N13,EN2,EN1,N9,N21) (Enfield)

  Moderate

From: Monday 12 September 2016
To: Friday 30 June 2017

Last updated 07:04 Tuesday 24 January 2017 : Local delays possible.

Works | TfL

[A105] Green Lanes (N13) (All Directions) between London Road and Ecclesbourne Gardens - Lane closures and temporary traffic lights in operation to facilitate the Mini Holland Cycle Scheme.

  • A105 (N13,EN2,EN1,N9,N21) (All Directions)
  • A110 (EN2,EN1) (All Directions)
  • A111 (N13) (All Directions)
  • [A1004] Alderman's Hill (N13) (All Directions)
  • Barrowell Green (N21,N13) (All Directions)
  • Berkeley Gardens (N21) (All Directions)
  • Berry Close (N21) (All Directions)
  • Borden Avenue (EN1) (All Directions)
  • Bridge Gate (N21) (All Directions)
  • Broomfield Lane (N13) (All Directions)
  • Bush Hill (N21,EN1) (All Directions)
  • Bush Hill Road (N21) (All Directions)
  • Cambridge Gardens (N21) (All Directions)
  • Carpenter Gardens (N21) (All Directions)
  • Castleleigh Court (EN2) (All Directions)
  • [B154] Church Street (N9,N21) (All Directions)
  • Conifer Gardens (EN1) (All Directions)
  • Crestbrook Avenue (N13) (All Directions)
  • Cromie Close (N13) (All Directions)
  • Devonshire Gardens (N21) (All Directions)
  • Devonshire Road (N13) (All Directions)
  • Eaton Park Road (N13) (All Directions)
  • Ecclesbourne Close (N13) (All Directions)
  • Ecclesbourne Gardens (N13) (All Directions)
  • Elm Park Road (N21) (All Directions)
  • Elsiedene Road (N21) (All Directions)
  • Essex Road (EN2) (All Directions)
  • Faversham Avenue (EN1) (All Directions)
  • Felstead Close (N13) (All Directions)
  • Fernleigh Road (N21) (All Directions)
  • Firs Lane (N21) (All Directions)
  • Ford's Grove (N21) (All Directions)
  • Fox Lane (N13) (All Directions)
  • Green Dragon Lane (N21) (All Directions)
  • [A105] Green Lanes (N13,EN2,EN1,N9,N21) (All Directions)
  • Greenwood Gardens (N13) (All Directions)
  • Hazelwood Lane (N13) (All Directions)
  • Highfield Road (N21) (All Directions)
  • Kent Road (N21) (All Directions)
  • Lincoln Road (EN2) (All Directions)
  • Lodge Drive (N13) (All Directions)
  • [A105] London Road (N13,EN2,EN1,N9,N21) (All Directions)
  • London Road (EN2) (All Directions)
  • Meadowcroft Road (N13) (All Directions)
  • Mortimer Drive (EN1) (All Directions)
  • Oakthorpe Road (N13) (All Directions)
  • Oaktree Avenue (N13) (All Directions)
  • Osborne Road (N13) (All Directions)
  • Oxford Gardens (N21) (All Directions)
  • Palmerston Crescent (N13) (All Directions)
  • Park Avenue (N13,EN1) (All Directions)
  • [A105] Park Avenue (N13,EN2,EN1,N9,N21) (All Directions)
  • Percy Road (N21) (All Directions)
  • Private Road (EN2) (All Directions)
  • Queen's Avenue (N21) (All Directions)
  • Radcliffe Road (N21) (All Directions)
  • Regency Court (EN1) (All Directions)
  • [A105] Ridge Avenue (N13,EN2,EN1,N9,N21) (All Directions)
  • River Avenue (N13) (All Directions)
  • River Bank (N21) (All Directions)
  • Sherbrook Gardens (N21) (All Directions)
  • Silver Street (EN1) (All Directions)
  • Solna Road (N21) (All Directions)
  • Springfield Parade Mews (N13) (All Directions)
  • Station Road (N21) (All Directions)
  • Stonard Road (N13) (All Directions)
  • Teynham Avenue (EN1) (All Directions)
  • Uvedale Road (EN2) (All Directions)
  • [A105] Village Road (N13,EN2,EN1,N9,N21) (All Directions)
  • Walnut Grove (EN1) (All Directions)
  • Walsingham Road (EN2) (All Directions)
  • Windsor Road (N13) (All Directions)
  • Woodberry Avenue (N21) (All Directions)
  • York Road (N21) (All Directions)

[A232] Sutton Court Road (SM1) (Sutton)

  Moderate

From: Thursday 04 August 2016
To: Friday 21 April 2017

Last updated 14:06 Tuesday 24 January 2017 : Delays are possible.

Special and Planned Events | Construction Activity

[A232] Sutton Court Road (Westbound) between Chalk Pit Way and [B2230] High Street Sutton - Lane three closed to facilitate building works at a nearby development (Off peak 1000-1530 only).

  • [A232] Carshalton Road (SM1) (All Directions)
  • Grove Road (SM1) (All Directions)
  • [B2230] High Street (SM1) (All Directions)
  • Orme Road (SM1) (All Directions)
  • Sutton Court Road (SM1) (Westbound)
  • [A232] Sutton Court Road (SM1) (All Directions)

[A123] High Street (IG6) (Redbridge)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 17:02 Tuesday 24 January 2017 : Drivers are requested to approach with caution.

Infrastructure Issue | Traffic Signal

[A123] High Street (IG6) (All Directions) at the junction of Fremantle Road and Baron Gardens - The traffic signals are not working.

  • [A123] High Street (IG6) (All Directions)

Victoria Street ()

  Moderate

From: Tuesday 03 May 2011
To: Friday 31 August 2018

Last updated 09:23 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. [A202] Bressenden Place is reduced to one lane at times. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road and Allington Street are closed. Find out more.

  • Victoria Street (All Directions)

[B507] Lisson Grove (NW8) (Westminster)

  Moderate

From: Thursday 08 September 2016
To: Friday 05 May 2017

Last updated 08:55 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[B507] Lisson Grove (NW8) (Southbound) at the junction of Lilestone Street - Lane restrictions in place to facilitate building works.

  • Lilestone Street (NW8) (All Directions)

[A234] High Street (SE20) (Bromley)

  Moderate

From: Wednesday 18 January 2017
To: Friday 27 January 2017

Last updated 14:01 Tuesday 24 January 2017 : Delays are possible.

Works | Other

[A234] High Street (SE20) (All Directions) at the junction of Southey Street - Temporary traffic lights are in operation to facilitate works.

  • [A234] High Street (SE20) (All Directions)
  • Southey Street (SE20) (All Directions)

[A211] High Street (DA14) (Bexley)

  Moderate

From: Monday 09 January 2017
To: Tuesday 28 February 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A211] High Street (All Directions) at the junction of Elm Road - Temporary traffic signals in use to facilitate major junction improvement scheme.

  • A222 (DA14,DA15) (All Directions)
  • [A211] High Street (DA14) (All Directions)
  • [A211] Main Road (DA14) (All Directions)

[A4200] Eversholt Street (NW1) (Camden)

  Moderate

From: Monday 23 January 2017
To: Sunday 05 February 2017

Last updated 17:13 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A4200] Eversholt Street (NW1) (Both Directions) at the junction of Phoenix Street - Temporary signals in operation to facilitate works by Thames Water.

[A112] Tramway Avenue (E15) (Newham)

  Moderate

From: Wednesday 18 January 2017
To: Tuesday 24 January 2017

Last updated 07:16 Tuesday 24 January 2017 : Delays possible during the course of these works

Hazard(s) | Burst Water Main

[A112] Tramway Avenue (All Directions) at the junction of Victoria Street -A contra flow is in place to facilitate Thames Water repairs to an emergency burst water main

  • Chopwell Close (E15) (All Directions)
  • Elderflower Way (E15) (All Directions)
  • Mandrake Way (E15) (All Directions)
  • [A112] Tramway Avenue (E15) (All Directions)
  • Victoria Street (E15) (All Directions)
  • West Ham Lane (E15) (All Directions)
  • [A112] West Ham Lane (E15) (All Directions)

[A404] Manor Park Road (NW10) (Brent)

  Moderate

From: Friday 13 January 2017
To: Thursday 26 January 2017

Last updated 07:00 Tuesday 24 January 2017 : Delays possible at peak times.

Works | Emergency

[A404] Manor Park Road (All Directions) at the junction of High Street Harlesden - Temporary traffic signals in use to facilitate emergency water works.

  • [A404] High Street Harlesden (NW10) (All Directions)
  • [A404] Manor Park Road (NW10) (All Directions)
  • Park Parade (NW10) (All Directions)

[A409] Station Road (HA1) (Harrow)

  Moderate

From: Monday 16 January 2017
To: Monday 06 February 2017

Last updated 07:02 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A409] Station Road (HA1) (All Directions) at the junction of Elmgrove Road - Lane closures to facilitate roadworks (0930hrs to 1600hrs)

[A212] Wellesley Road (CR0,CR9) (Croydon)

  Moderate

From: Monday 16 January 2017
To: Friday 31 March 2017

Last updated 14:01 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A212] Wellesley Road (All Directions) between Croydon Underpass and Bedford Park - Various lane restrictions and temporary traffic lights are in place to install new pedestrian crossings and alter road layout.

  • Bedford Park (CR9) (All Directions)
  • [A212] Croydon Underpass (CR0,CR9) (All Directions)
  • Lansdowne Road (CR9,CR0) (All Directions)
  • Poplar Walk (CR0) (All Directions)
  • St Michael's Road (CR0) (All Directions)
  • Sydenham Road (CR0) (All Directions)
  • Walpole Road (CR0) (All Directions)
  • [A212] Wellesley Road (CR0,CR9) (All Directions)
  • Wellesley Road (CR0,CR9) (All Directions)

[A5204] Mortimer Street (W1T) (Westminster)

  Moderate

From: Tuesday 17 January 2017
To: Friday 27 January 2017

Last updated 09:21 Tuesday 24 January 2017 : Delays possible whilst temporary signals are in operation.

Works | Other

[A5204] Mortimer Street (W1T) (All Directions) at the junction of Berners Street - Temporary traffic lights in operation to facilitate works.

[A4020] Uxbridge Road (UB4) (Hillingdon)

  Moderate

From: Monday 23 January 2017
To: Friday 03 February 2017

Last updated 11:55 Tuesday 24 January 2017 : Minor delays on approach.

Works | Utility

[A4020] Uxbridge Road (UB4) (Westbound) at the junction of Springfield Road - Lane closure in place to facilitate emergency gas works.

[A217] Holborn Way (CR4) (Merton)

  Moderate

From: Monday 25 July 2016
To: Friday 29 September 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A217] Holborn Way (All Directions) - Various restrictions in place including lane closures and temporary traffic signals to facilitate Mitcham town centre regeneration. Roads affected include London Road, Raleigh Gardens, Upper Green (East & West) and Holborn Way.

  • A236 (CR4) (All Directions)
  • [A217] Holborn Way (CR4) (All Directions)
  • [A217] London Road (CR4) (All Directions)
  • [A217] Raleigh Gardens (CR4) (All Directions)
  • Upper Green West (CR4) (All Directions)

[A2211] Lewisham Road (SE13,SE10) (Greenwich)

  Moderate

From: Wednesday 04 January 2017
To: Sunday 05 March 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A2211] Lewisham Road (SE13/SE10) (All Directions) at the junction of Sparta Street - Two-way temporary signals are in place to facilitate gas main replacement works by Southern Gas Networks.

  • [A2211] Lewisham Road (SE13,SE10) (All Directions)
  • Robinscroft Mews (SE10) (All Directions)
  • Sparta Street (SE13,SE10) (All Directions)

[B152] St Ann's Road (N15,N4) (Haringey)

  Moderate

From: Monday 23 January 2017
To: Friday 03 February 2017

Last updated 07:01 Tuesday 24 January 2017 : No delays reported.

Works | Utility

[B152] St Ann's Road (N4 /N15) (All Directions) at the junction of Harringay Road - Lane closures to facilitate Thames Water works.

[A112] Broadway (E15) (Newham)

  Moderate

From: Monday 16 January 2017
To: Wednesday 15 March 2017

Last updated 06:45 Tuesday 24 January 2017 : Expect delays when the restrictions are in place.

Works | Utility

[A112] Broadway (E15) (All Directions) at the junction of Great Eastern Road - Bus contraflow lane closed for utility works.

  • A11 (E15) (All Directions)
  • [A118] Broadway (E15) (All Directions)
  • [A112] Broadway (E15) (All Directions)
  • Broadway (E15) (All Directions)
  • Burtons Court (E15) (All Directions)
  • Chant Street (E15) (All Directions)
  • Great Eastern Road (E15) (All Directions)
  • Grove Crescent Road (E15) (All Directions)
  • High Street (E15) (All Directions)
  • [A118] Romford Road (E15) (All Directions)
  • Service Route No 1 (E15) (All Directions)
  • Service Route No.1 (E15) (All Directions)
  • Station Street (E15) (All Directions)
  • The Grove (E15) (All Directions)
  • [A112] Tramway Avenue (E15) (All Directions)
  • West Ham Lane (E15) (All Directions)

[A3214] Elizabeth Street (SW1W) (Westminster)

  Moderate

From: Sunday 22 January 2017
To: Ongoing

Last updated 15:08 Tuesday 24 January 2017 : No reported delays.

Hazard(s) | Burst Water Main

Elizabeth Street (SW1W) (All Directions) between Buckingham Palace Road and Ebury Street -Two (of three) lanes restricted due to a burst water main.

  • [A3214] Buckingham Palace Road (SW1W) (All Directions)
  • Bulleid Way (SW1V) (All Directions)
  • Burton Mews (SW1W) (All Directions)
  • Ebury Street (SW1W) (All Directions)
  • St George's Drive (SW1W) (All Directions)

[A502] Finchley Road (NW11) (Barnet)

  Moderate

From: Sunday 22 January 2017
To: Ongoing

Last updated 11:56 Tuesday 24 January 2017 : Use caution. No delays reported.

Hazard(s) | Burst Water Main

[A502] Finchley Road (All Directions) at the junction of Dunstan Road - Reports of a burst water main. Use caution due to icy conditions.

  • Dunstan Road (NW11) (All Directions)
  • Fernside (NW11) (All Directions)
  • [A598] Finchley Road (NW11) (All Directions)
  • [A502] Finchley Road (NW11) (All Directions)
  • Helenslea Avenue (NW11) (All Directions)
  • Hodford Road (NW11) (All Directions)
  • [A502] North End Road (NW11) (All Directions)
  • Rodborough Road (NW11) (All Directions)
  • St Albans Lane (NW11) (All Directions)
  • West Heath Avenue (NW11) (All Directions)
  • Wycombe Gardens (NW11) (All Directions)

[A5203] Caledonian Road (N7) (Islington)

  Moderate

From: Sunday 22 January 2017
To: Friday 27 January 2017

Last updated 11:55 Tuesday 24 January 2017 : Traffic is flowing well on the approach.

Works | Utility

[A5203] Caledonian Road (N7 ) (All Directions) at the junction of Mackenzie Road and Market Road - Temporary signals in use for water works.

  • Market Road (N7) (All Directions)

Leadenhall Street (EC3A,EC3V) (City Of London)

  Moderate

From: Wednesday 14 December 2016
To: Friday 31 March 2017

Last updated 06:59 Tuesday 24 January 2017 : Delays are possible.

Special and Planned Events | Construction Activity

Leadenhall Street (EC3A/EC3V) (Eastbound) at the junction of St Mary Axe - The eastbound carriageway is partially blocked due to construction works.

  • Leadenhall Street (EC3A,EC3V) (Eastbound)

[A503] Seven Sisters Road (N15) (Haringey)

  Moderate

From: Friday 20 January 2017
To: Wednesday 01 February 2017

Last updated 06:37 Tuesday 24 January 2017 : Traffic is flowing well though the contra flow.

Works | Utility

[A503] Seven Sisters Road (N15) (Both Directions) at the junction of Vartry Road - Southbound carriageway closure, with a single-lane contraflow in the northbound carriageway, to facilitate essential Thames Water utility works.

  • Netherton Road (N15) (All Directions)
  • [A503] Seven Sisters Road (N15) (Both Directions)
  • Vartry Road (N15) (All Directions)

[A219] Wood Lane (W12) (Hammersmith & Fulham)

  Moderate

From: Monday 09 January 2017
To: Monday 30 January 2017

Last updated 07:07 Tuesday 24 January 2017 : Expect local delays throughout the course of these works.

Special and Planned Events | Construction Activity

[A219] Wood Lane (W12) (All Directions) at the junction of Ariel Way (White City Bus Station by the Dimco Buildings) - There will be temporary traffic lights in operation to facilitate a crane operation

[A305] Richmond Road (TW1) (Richmond Upon Thames)

  Moderate

From: Monday 16 January 2017
To: Wednesday 25 January 2017

Last updated 14:01 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A305] Richmond Road (TW1) (All Directions) at the junction of St Margaret's Road - Three-way temporary traffic lights are in operation to facilitate repairs by Thames Water.

  • [A305] Richmond Road (TW1) (All Directions)
  • Rosslyn Road (TW1) (All Directions)
  • [A3004] St Margaret's Road (TW1) (All Directions)

A12

[A127] Southend Arterial Road (RM2) (Havering)

  Moderate

From: Sunday 13 March 2016
To: Saturday 11 November 2017

Last updated 16:46 Tuesday 24 January 2017 : Traffic is slow moving on all approaches. Expect delays.

Works | TfL

Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions during bridge replacement works. The carriageway is reduced to a single lane in each direction between Gallows Corner and Squirrels Heath Road until approximately May 2017. Additionally, there is no access from Bryant Avenue to the A127 until approximately February 2017.

  • Bryant Avenue (RM2,RM3) (All Directions)
  • [A127] Southend Arterial Road (RM2) (Eastbound)

A23

[A23] Purley Way (CR0) (Croydon)

  Moderate

From: Sunday 22 January 2017
To: Ongoing

Last updated 17:07 Tuesday 24 January 2017 : Traffic remains slow moving on approach to the restrictions. Minor delays at this time.

Hazard(s) | Burst Water Main

[A23] Purley Way (Northbound) at the junction of Lombard Roundabout - Lane 1 (of 2) closed due to a burst water main.

  • [A23] Lombard Roundabout (CR0) (All Directions)
  • [A236] Mitcham Road (CR0) (All Directions)
  • [A23] Mitcham Road Roundabout (CR0) (All Directions)
  • [A23] Purley Way (CR0) (Southbound)
  • [A23] Thornton Road (CR0) (All Directions)

Farringdon Cross Route

[A201] Farringdon Street (EC4A) (City Of London)

  Moderate

From: Monday 23 January 2017
To: Ongoing

Last updated 17:15 Tuesday 24 January 2017 : Tailback to Charterhouse Street.

Hazard(s) | Burst Water Main

[A201] Farringdon Street (Southbound) at the junction of Old Seacoal Street - Lane one (of two) is closed due to a burst water main.

Southern River Route

[A3212] Millbank (SW1P) (Westminster)

  Moderate

From: Friday 06 January 2017
To: Thursday 26 January 2017

Last updated 16:48 Tuesday 24 January 2017 : There are short queues on all approaches.

Works | Emergency

A3212 Millbank (SW1P/SW1V) (All Approaches) at the junction of Bessborough Gardens - Various lane closures in place to facilitate emergency gas works. Northbound Vauxhall Bridge two lanes (of five) closed. Grosvenor Road eastbound lane four (of four) closed. Millbank heading westbound has been reduced to one lane. Vauxhall Bridge Road southbound the right turn lane closed.

  • [A3212] Millbank (SW1P) (All Approaches)

[A238] Merton High Street (SW19) (Merton)

  Moderate

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 17:07 Tuesday 24 January 2017 : Traffic is slow in both directions on Merton High Street approaching these works. Expect delays.

Works | Utility

[A238] Merton High Street (SW19) (Both directions) at the junction of Hamilton Road - Single alternate lane traffic due to repair of a burst water main.

[A315] Kensington High Street (W8) (Kensington & Chelsea)

  Moderate

From: Thursday 19 January 2017
To: Monday 30 January 2017

Last updated 16:48 Tuesday 24 January 2017 : Traffic is slow on all approaches.

Works | TfL

[A315] Kensington High Street (W8 ) (All Directions) at the junction of Kensington Church Street - Temporary traffic lights are in place due to works on the permanent traffic lights.

  • Kensington Church Court (W8) (All Directions)
  • [A4204] Kensington Church Street (W8) (All Directions)
  • [A315] Kensington High Street (W8) (All Directions)

[A504] East End Road (N2) (Barnet)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 16:58 Tuesday 24 January 2017 : Delays in the area are easing.

Traffic Incidents | Breakdown

[A504] East End Road (N2 ) (All Directions) at the junction of High Road - The road is now open through the junction following an earlier broken down HGV.

  • Dairy Mews (N2) (All Directions)
  • [A504] East End Road (N2) (All Directions)
  • [A504] Fortis Green (N2) (All Directions)
  • [A1000] High Road (N2) (All Directions)

[A3216] Queenstown Road (SW11,SW8) (Wandsworth)

  Moderate

From: Tuesday 24 January 2017
To: Ongoing

Last updated 17:07 Tuesday 24 January 2017 : Moderate delays on approach in both directions.

Works | Emergency

[A3216] Queenstown Road (SW11/SW8) (All Directions) at the junction of Robertson Street - Three-way temporary signals in operation to facilitate repairs by Thames Water.

[A315] High Street (TW8) (Hounslow)

  Moderate

From: Monday 23 January 2017
To: Friday 27 January 2017

Last updated 16:49 Tuesday 24 January 2017 : Traffic is slow on approach, expect delays.

Works | Emergency

[A315] High Street (TW8) (All Directions) at the junction of Market Place - Temporary traffic lights due to emergency gas works.

  • Brent Way (TW8) (All Directions)
  • [A315] High Street (TW8) (All Directions)
  • Market Place (TW8) (All Directions)

Aldgate Gyratory

  Moderate

From: Saturday 28 June 2014
To: Wednesday 31 May 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Nags Head Gyratory

  Moderate

From: Saturday 01 September 2018
To: Tuesday 01 September 2020

Last updated 15:03 Monday 23 January 2017

modernisation | project

North-South Cycle Superhighway

  Moderate

From: Sunday 01 May 2016
To: Monday 01 May 2017

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Cycle Superhighway 5 (Oval to Lewisham)

  Moderate

From: Sunday 01 January 2017
To: Friday 01 December 2017

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Archway Gyratory

  Moderate

From: Monday 01 February 2016
To: Sunday 30 July 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

East-West Cycle Superhighway

  Moderate

From: Sunday 01 January 2017
To: Monday 01 January 2018

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Tulse Hill Gyratory

  Moderate

From: Wednesday 01 April 2020
To: Sunday 28 March 2021

Last updated 15:03 Monday 23 January 2017

modernisation | project

Westminster Bridge South

  Moderate

From: Friday 31 March 2017
To: Monday 05 February 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

A205 East Sheen Streetscape

  Moderate

From: Friday 01 June 2018
To: Tuesday 15 January 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Streatham High Road

  Moderate

From: Wednesday 01 May 2019
To: Sunday 01 September 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

St Pauls Gyratory

  Moderate

From: Sunday 01 December 2019
To: Thursday 01 April 2021

Last updated 15:03 Monday 23 January 2017

modernisation | project

Hammersmith Broadway

  Moderate

From: Monday 02 October 2017
To: Sunday 01 April 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

A243 Bridge Road Roundabout

  Moderate

From: Wednesday 01 May 2019
To: Friday 01 May 2020

Last updated 15:03 Monday 23 January 2017

modernisation | project

Hammersmith flyover

  Moderate

From: Monday 28 October 2013
To: Thursday 03 September 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Chiswick Bridge

  Moderate

From: Tuesday 01 April 2014
To: Thursday 30 April 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 11

  Moderate

From: Tuesday 15 August 2017
To: Wednesday 15 August 2018

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Fore Street Tunnel

  Moderate

From: Thursday 01 January 2015
To: Thursday 17 September 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

CS1- Apex (Shoreditch)

  Moderate

From: Wednesday 01 July 2015
To: Friday 01 April 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Hogarth flyover

  Moderate

From: Wednesday 01 January 2014
To: Thursday 01 January 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Upper Holloway Bridge

  Moderate

From: Tuesday 23 September 2014
To: Saturday 30 September 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Charlie Brown's Roundabout

  Moderate

From: Monday 01 January 2018
To: Sunday 06 January 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 1

  Moderate

From: Wednesday 01 July 2015
To: Friday 01 April 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Lambeth Bridge (South)

  Moderate

From: Tuesday 19 March 2019
To: Monday 07 October 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Marble Arch

  Moderate

From: Sunday 01 September 2019
To: Sunday 01 May 2022

Last updated 15:03 Monday 23 January 2017

modernisation | project

Great Portland Street Gyratory

  Moderate

From: Thursday 01 March 2018
To: Friday 01 March 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Brent Cross/Cricklewood

  Moderate

From: Sunday 01 April 2018
To: Friday 01 April 2022

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 4 (Tower Bridge to Deptford)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Cycle Superhighway 4 (Surrey Quays Gyratory)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Kew Bridge Junction

  Moderate

From: Saturday 01 July 2017
To: Sunday 01 July 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 4 (Rotherhithe Roundabout)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Stratford Gyratory

  Moderate

From: Tuesday 15 August 2017
To: Monday 15 July 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

A24 Tooting Broadway

  Moderate

From: Saturday 01 September 2018
To: Friday 01 March 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Bow Vision Interim

  Moderate

From: Friday 27 November 2015
To: Saturday 22 October 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 4 (Deptford to Woolwich)

  Moderate

From: Wednesday 01 March 2017
To: Friday 01 December 2017

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Wandsworth Town Centre

  Moderate

From: Wednesday 01 August 2018
To: Saturday 01 August 2020

Last updated 15:03 Monday 23 January 2017

modernisation | project

Waterloo IMAX Roundabout

  Moderate

From: Tuesday 01 October 2019
To: Thursday 01 July 2021

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 4 (London Bridge to Tower Bridge)

  Moderate

From: Monday 01 January 2018
To: Monday 01 October 2018

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Cycle Superhighway 4 (Borough High Street / Tooley Street junction)

  Moderate

From: Monday 01 January 2018
To: Monday 01 October 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

Croydon Fiveways

  Moderate

From: Tuesday 01 January 2019
To: Tuesday 01 December 2020

Last updated 15:03 Monday 23 January 2017

modernisation | project

Lambeth Bridge (North)

  Moderate

From: Thursday 20 December 2018
To: Friday 12 July 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Vauxhall Cross

  Moderate

From: Friday 01 February 2019
To: Thursday 01 July 2021

Last updated 15:03 Monday 23 January 2017

modernisation | project

Kings Cross

  Moderate

From: Sunday 01 September 2019
To: Wednesday 01 September 2021

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 4 (Woolwich Road/A102 junction)

  Moderate

From: Wednesday 01 March 2017
To: Friday 01 December 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Stockwell

  Moderate

From: Monday 12 October 2015
To: Saturday 11 June 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Old Street Roundabout

  Moderate

From: Monday 23 January 2017
To: Saturday 29 June 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 5 (Oval to Pimlico)

  Moderate

From: Wednesday 01 April 2015
To: Saturday 31 October 2015

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

North-South Cycle Superhighway

  Moderate

From: Monday 09 March 2015
To: Friday 01 April 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Quietway_Waterloo to Greenwich

  Moderate

From: Friday 31 October 2014
To: Monday 29 February 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Quietway_Bloomsbury to Walthamstow (Phase 1)

  Moderate

From: Sunday 01 February 2015
To: Wednesday 30 November 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

A406 Southend Road (South Woodford)

  Moderate

From: Saturday 01 August 2015
To: Sunday 20 September 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Blackfriars Junction

  Moderate

From: Sunday 01 March 2015
To: Sunday 01 May 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Elephant & Castle Northern Roundabout

  Moderate

From: Wednesday 01 April 2015
To: Tuesday 31 May 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Baker Street

  Moderate

From: Saturday 01 July 2017
To: Tuesday 01 January 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

A107 Lower Clapton Road junction with Urswick Road

  Moderate

From: Wednesday 01 August 2018
To: Friday 01 February 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Oval Triangle

  Moderate

From: Monday 08 December 2014
To: Wednesday 01 June 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

A10 Stoke Newington Gyratory

  Moderate

From: Thursday 10 January 2019
To: Sunday 01 September 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Malden Rushett

  Moderate

From: Monday 01 September 2014
To: Monday 01 June 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Mill Hill Circus

  Moderate

From: Sunday 01 October 2017
To: Thursday 01 March 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

A406 Neasden Scheme

  Moderate

From: Monday 12 October 2015
To: Thursday 26 May 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Euston Road

  Moderate

From: Saturday 01 September 2018
To: Sunday 01 September 2019

Last updated 15:03 Monday 23 January 2017

modernisation | project

Colliers Wood

  Moderate

From: Thursday 01 January 2015
To: Thursday 01 October 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

A406 Southend Road

  Moderate

From: Friday 25 July 2014
To: Sunday 30 November 2014

Last updated 15:03 Monday 23 January 2017

modernisation | project

Nine Elms

  Moderate

From: Tuesday 01 January 2019
To: Wednesday 01 January 2020

Last updated 15:03 Monday 23 January 2017

modernisation | project

Waltham Forest Mini-Holland Programme

  Moderate

From: Monday 26 January 2015
To: Saturday 31 March 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 2 Upgrade

  Moderate

From: Sunday 01 February 2015
To: Friday 01 April 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Highbury Corner

  Moderate

From: Monday 24 November 2014
To: Monday 20 November 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Parliament Square

  Moderate

From: Wednesday 01 April 2015
To: Thursday 05 May 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Lancaster Gate Gyratory

  Moderate

From: Wednesday 01 April 2015
To: Friday 01 July 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Spur Road Gyratory

  Moderate

From: Wednesday 01 April 2015
To: Friday 01 July 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Cycle Superhighway 8

  Moderate

From: Monday 15 February 2016
To: Friday 27 May 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Power Road Bridge

  Moderate

From: Monday 15 June 2015
To: Thursday 15 June 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Swiss Cottage

  Moderate

From: Tuesday 15 August 2017
To: Wednesday 15 August 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

Bow Vision Programme

  Moderate

From: Monday 01 October 2018
To: Monday 01 April 2024

Last updated 15:03 Monday 23 January 2017

modernisation | project

Ardleigh Green Bridge

  Moderate

From: Thursday 01 January 2015
To: Sunday 31 December 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

Tower Gateway

  Moderate

From: Wednesday 01 April 2015
To: Friday 01 July 2016

Last updated 15:03 Monday 23 January 2017

modernisation | project

Chiswick Roundabout

  Moderate

From: Saturday 01 July 2017
To: Sunday 01 July 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

Woodlands retaining wall

  Moderate

From: Thursday 01 January 2015
To: Monday 05 October 2015

Last updated 15:03 Monday 23 January 2017

modernisation | project

Enfield Mini-Holland Programme

  Moderate

From: Saturday 01 November 2014
To: Saturday 01 December 2018

Last updated 15:03 Monday 23 January 2017

modernisation | project

East-West Cycle Superhighway

  Moderate

From: Wednesday 01 April 2015
To: Saturday 01 October 2016

Last updated 15:03 Monday 23 January 2017

cyclesuperhighway | project

Kingston Mini-Holland Programme

  Moderate

From: Monday 09 November 2015
To: Friday 22 December 2017

Last updated 15:03 Monday 23 January 2017

modernisation | project

A12

[A11] Whitechapel Road (E1) (Tower Hamlets)

  Minimal

From: Monday 23 January 2017
To: Thursday 26 January 2017

Last updated 08:15 Tuesday 24 January 2017 : Traffic is flowing well

Works | TfL

[A11] Whitechapel Road (E1 ) (Both Directions) at the junction of Court Street - Lane restrictions in place to facilitate the installation of a zebra crossing in the Cycle Superhighway (daytime works).

A13

[A13] Commercial Road (E14) (Tower Hamlets)

  Minimal

From: Monday 16 January 2017
To: Wednesday 01 February 2017

Last updated 15:52 Tuesday 24 January 2017 : Traffic is flowing well past the restrictions.

Works | Utility

[A13] Commercial Road (E14) (Westbound) between Wharf Lane and Island Row - Lane one (of two) is closed to facilitate works.

A13

[A13] Commercial Road (E1) (Tower Hamlets)

  Minimal

From: Monday 23 January 2017
To: Ongoing

Last updated 16:34 Tuesday 24 January 2017 : Traffic is flowing well on approach.

Hazard(s) | Collapsed Manhole

[A13] Commercial Road (E1 ) (Eastbound) at the junction of Arbour Square - Lane one (of two) is restricted due to a collapsed manhole.

  • Bower Street (E1) (All Directions)
  • [A13] Commercial Road (E1) (Eastbound)
  • Devonport Street (E1) (All Directions)
  • Exmouth Street (E1) (All Directions)
  • Head Street (E1) (All Directions)
  • Lukin Street (E1) (All Directions)
  • Steel's Lane (E1) (All Directions)
  • Stepney Causeway (E1) (All Directions)
  • Summercourt Road (E1) (All Directions)

A2

[A2213] Kidbrooke Park Road (SE3,SE12) (Greenwich)

  Minimal

From: Tuesday 30 August 2016
To: Wednesday 31 May 2017

Last updated 14:03 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

[A2213] Kidbrooke Park Road (SE3/SE12) (All Directions) at the junction of Weigall Road - Improvement works on the A2213 Kidbrooke Park Road from 30 August. The improvements, which form part of the Kidbrooke Village development, will be completed in stages over the next year to keep disruption to a minimum. They include: Reconstructing and changing the road layout of Kidbrooke Park Road, between the junctions with Old Post Office Lane and Weigall Road, to remove the need for width and weight restrictions in the area in future. Replacing the pedestrian subway near Kidbrooke station with a surface-level signalised crossing. Introducing other improvements for pedestrians, including a new signalised crossing at the junction of Kidbrooke Park Road and Weigall Road. Installing new footways, street furniture, street lighting and drainage systems. Temporary traffic management changes will apply while the works take place - From November 2016 until February 2017: Kidbrooke Park Road will be open with one lane in each direction as normal, although the lanes will be narrower than usual.

A20

[A20] Lee High Road (SE13) (Lewisham)

  Minimal

From: Tuesday 24 January 2017
To: Ongoing

Last updated 16:01 Tuesday 24 January 2017 : Care is required on the approach.

Works | Utility

[A20] Lee High Road (SE13) (All Directions) at the junction of Clarendon Rise - Lane restrictions to facilitate some connection works

  • [B220] Belmont Hill (SE13) (All Directions)
  • Clarendon Rise (SE13) (All Directions)
  • Lewis Grove (SE13) (All Directions)
  • Marischal Road (SE13) (All Directions)
  • Mercia Grove (SE13) (All Directions)
  • Myron Place (SE13) (All Directions)

A205

[A205] Upper Richmond Road (SW15) (Wandsworth)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 14:02 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

[A205] Upper Richmond Road (SW15) (All Directions) at the junction of Charlwood Road - Various lane closures to facilitate traffic signals upgrade works.

A24

[A24] High Street Collier's Wood (SW19) (Merton)

  Minimal

From: Monday 23 January 2017
To: Ongoing

Last updated 16:45 Tuesday 24 January 2017 : Traffic is navigating around the restrictions well.

Hazard(s) | Burst Water Main

[A24] High Street Collier's Wood (SW19) (Northbound) at the junction of Waterfall Road - There is a burst water main at the location. Restrictions are in place for safety reasons.

  • Robinson Road (SW17) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Kensington & Chelsea,Westminster)

  Minimal

From: Monday 03 October 2016
To: Monday 19 June 2017

Last updated 08:59 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A4] Knightsbridge (SW1X) (Eastbound) opposite the junction of Sloane Street - The carrigeway is restricted to facilitate building works.

  • [A3216] Sloane Street (SW1X) (All Directions)

A4

[A4] Cromwell Road (SW7) (Kensington & Chelsea)

  Minimal

From: Wednesday 18 January 2017
To: Friday 22 December 2017

Last updated 14:58 Tuesday 24 January 2017 : Traffic is flowing well.

Works | TfL

[A4] Cromwell Road (SW7) (All Directions) at the junction of Ashburn Place - The carriageway will be restricted for cycle grid works.

  • Ashburn Place (SW7) (All Directions)
  • [A4] Cromwell Road (SW7) (All Directions)
  • Grenville Place (SW7) (All Directions)

A41

Inner Ring

[A41] Baker Street (NW1,W1U) (Westminster)

  Minimal

From: Monday 23 January 2017
To: Thursday 26 January 2017

Last updated 15:05 Tuesday 24 January 2017 : Possible delays during the course of these works.

Works | Utility

[A41] Baker Street (W1U/NW1) (Southbound) at the junction of Marylebone Road - Lane closure due to BT works.

  • Marylebone Road (All Directions)
  • [A501] Marylebone Road (W1U,NW1) (All Directions)

City Route

[A3211] Victoria Embankment (EC4V,EC4Y) (City Of London)

  Minimal

From: Saturday 21 January 2017
To: Ongoing

Last updated 07:41 Tuesday 24 January 2017 : Delays are possible.

Hazard(s) | Burst Water Main

Victoria Embankment (EC4Y/EC4V) (Westbound) at the junction of Temple Avenue - The cycle super highway is restricted due to a burst water main.

  • [A3211] Blackfriars Underpass (EC4V,EC4Y) (All Directions)
  • Temple Avenue (EC4Y) (All Directions)
  • [A3211] Victoria Embankment (EC4V,EC4Y) (All Directions)
  • Victoria Embankment (EC4Y) (Westbound)

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Minimal

From: Wednesday 11 January 2017
To: Sunday 05 February 2017

Last updated 16:32 Tuesday 24 January 2017 : Expect minor delays on the approach during the peak hours.

Works | Utility

[A201] Blackfriars Road (SE1) (All Directions) at the junction of Webber Street - Temporary traffic signals are operating a single alternate lane for gas works.

  • [A201] Blackfriars Road (SE1) (All Directions)
  • Webber Street (SE1) (All Directions)

Inner Ring

[A4202] Park Lane (W1K) (Westminster)

  Minimal

From: Monday 23 January 2017
To: Ongoing

Last updated 15:06 Tuesday 24 January 2017 : Traffic is flowing well.

Hazard(s) | Burst Water Main

[A4202] Park Lane (W1K) (Southbound) between Culross Street and Upper Grosvenor Street - A burst water main in the footway

  • Culross Street (W1K) (All Directions)
  • [A4202] Park Lane (W1K) (Southbound)
  • Upper Grosvenor Street (W1K) (All Directions)

Inner Ring

[A501] Pentonville Road (N1) (Islington,Camden)

  Minimal

From: Wednesday 18 January 2017
To: Friday 27 January 2017

Last updated 15:07 Tuesday 24 January 2017 : Minor delays through the restrictions.

Works | Emergency

[A501] Pentonville Road (N1 ) (Eastbound) at the junction of Caledonian Road - Lane one (of two) is closed for gas works.

  • [A5203] Caledonian Road (N1) (All Directions)

Inner Ring

[A3213] Eccleston Bridge (SW1V,SW1W) (Westminster)

  Minimal

From: Monday 05 September 2016
To: Sunday 30 April 2017

Last updated 08:55 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A3213] Eccleston Bridge (SW1V) (Westbound) between Bridge Place and [A3214] Buckingham Palace Road - Lane three (of three) closed to facilitate essential waterproofing and maintenance works to the bridge.

  • [A3213] Belgrave Road (SW1V,SW1W) (All Directions)
  • Hugh Street (SW1V) (All Directions)

Inner Ring

[A1202] Commercial Street (E1) (Tower Hamlets)

  Minimal

From: Tuesday 29 November 2016
To: Friday 22 December 2017

Last updated 07:00 Tuesday 24 January 2017 : Delays are possible while restrictions are in place.

Works | Borough

[A1202] Commercial Street (E1 ) (Northbound) at the junction of White's Row - Partial lane restriction due to construction works.

  • Fashion Street (E1) (All Directions)
  • Toynbee Street (E1) (All Directions)

Inner Ring

Bishopsgate Cross Route

[A10] Shoreditch High Street (E1) (Hackney)

  Minimal

From: Tuesday 24 January 2017
To: Ongoing

Last updated 14:23 Tuesday 24 January 2017 : Approach with care.

Hazard(s) | Surface Damage

[A10] Shoreditch High Street (E1 ) (Southbound) at the junction of Commercial Street - The carriageway is breaking-up around a manhole cover.

Inner Ring

[A3214] Buckingham Palace Road (SW1E,SW1W) (Westminster)

  Minimal

From: Thursday 24 November 2016
To: Friday 27 January 2017

Last updated 09:03 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A3214] Buckingham Palace Road (SW1W/SW1E) (Southbound) at the junction of Victoria Street - Lanes 1 & 2 (of 4) are closed for works on Victoria Street into Buckingham Palace Road southbound.

  • [A3214] Buckingham Palace Road (SW1E,SW1W) (All Directions)
  • Carlisle Place (SW1E,SW1V) (All Directions)

Inner Ring

[A201] Swinton Street (WC1X) (Islington,Camden)

  Minimal

From: Friday 20 January 2017
To: Friday 27 January 2017

Last updated 15:06 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Emergency

[A201] Swinton Street (Westbound) between King's Cross Road and Gray's Inn Road - Lane one is restricted due to a burst water main.

  • Argyle Street (WC1H) (All Directions)
  • Cromer Street (WC1H) (All Directions)
  • [A201] King's Cross Road (WC1X) (All Directions)
  • [A201] Penton Rise (WC1X) (All Directions)
  • Swinton Place (WC1X) (All Directions)
  • [A201] Swinton Street (WC1X) (Westbound)
  • Vernon Rise (WC1X) (All Directions)
  • Vernon Square (WC1X) (All Directions)

[A1010] High Road (N17) (Haringey)

  Minimal

From: Tuesday 24 January 2017
To: Friday 27 January 2017

Last updated 14:32 Tuesday 24 January 2017 : Expect some delay.

Works | Utility

[A1010] High Road (N17) (All Directions) at the junction of Brereton Road - Lane restrictions to facilitate a water connection

  • Bill Nicholson Way (N17) (All Directions)
  • Bromley Road (N17) (All Directions)
  • Gascoigne Close (N17) (All Directions)
  • Park Lane (N17) (All Directions)

[A110] East Barnet Road (EN4) (Barnet)

  Minimal

From: Tuesday 24 January 2017
To: Wednesday 01 February 2017

Last updated 17:13 Tuesday 24 January 2017 : There are no reported delays.

Works | Utility

[A110] East Barnet Road (EN4) (All Directions) at the junction of Victoria Road - - Lane restrictions to facilitate gas connection work

  • Henry Road (EN4) (All Directions)
  • Victoria Road (EN4) (All Directions)

[B220] Belmont Hill (SE13) (Lewisham)

  Minimal

From: Tuesday 24 January 2017
To: Friday 27 January 2017

Last updated 14:53 Tuesday 24 January 2017 : Approach with caution

Works | Borough

[B220] Belmont Hill (SE13) (All Directions) at the junction of Belmont Grove - Temporary traffic signals to facilitate bus stop work

  • Belmont Grove (SE13) (All Directions)
  • [B220] Belmont Hill (SE13) (All Directions)
  • The Squirrels (SE13) (All Directions)

[A2215] Hanover Park (SE15) (Southwark)

  Minimal

From: Tuesday 24 January 2017
To: Friday 03 February 2017

Last updated 16:33 Tuesday 24 January 2017 : No delays to report at this time.

Works | Utility

[A2215] Hanover Park (SE15) (Both Directions) at the junction of Cerise Road - Temporary traffic signals in operation during Thames Water sewer works.

  • Cerise Road (SE15) (All Directions)
  • Cicely Road (SE15) (All Directions)
  • [A2215] Clayton Road (SE15) (All Directions)
  • [A2215] Hanover Park (SE15) (Both Directions)
  • Mckerrell Road (SE15) (All Directions)
  • Oliver Mews (SE15) (All Directions)
  • Raul Road (SE15) (All Directions)
  • Robert Keen Close (SE15) (All Directions)
  • Rye Lane (SE15) (All Directions)

Eastbourne Terrace (W2) (Westminster)

  Minimal

From: Monday 01 July 2013
To: Tuesday 02 January 2018

Last updated 09:14 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Eastbourne Terrace (Both Directions) between Cleveland Terrace and [A4205] Praed Street - Various long term restrictions and, at times, closures during Crossrail works.

  • Chilworth Mews (W2) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Cleveland Terrace (W2) (All Directions)
  • Conduit Mews (W2) (All Directions)
  • Craven Road (W2) (All Directions)
  • Eastbourne Mews (W2) (All Directions)
  • Eastbourne Terrace (W2) (All Directions)
  • Gloucester Mews (W2) (All Directions)
  • Praed Street (W2) (All Directions)
  • Spring Street (W2) (All Directions)
  • Westbourne Terrace (W2) (All Directions)

[A307] Petersham Road (TW10) (Richmond Upon Thames)

  Minimal

From: Monday 23 January 2017
To: Thursday 26 January 2017

Last updated 14:00 Tuesday 24 January 2017 : Traffic is reportedly slow on approach.

Works | Emergency

[A307] Petersham Road (TW10) (All Directions) at the junction of Nightingale Lane - Temporary traffic signals in use to facilitate emergency UKPN works.

  • Nightingale Lane (TW10) (All Directions)
  • [A307] Petersham Road (TW10) (All Directions)

[A312] Hampton Road West (TW13) (Hounslow)

  Minimal

From: Monday 23 January 2017
To: Friday 27 January 2017

Last updated 16:00 Tuesday 24 January 2017 : Traffic flows are normal at this time. Expect delays at peak times.

Works | Utility

[A312] Hampton Road West (TW13) (Northbound) at the junction of Mount Road - Lane 1 (of 2) closed to facilitate Thames Water works.

  • Mount Road (TW13) (All Directions)

[A307] Kew Road (TW9) (Richmond Upon Thames)

  Minimal

From: Monday 23 January 2017
To: Wednesday 25 January 2017

Last updated 14:55 Tuesday 24 January 2017 : Expect delays.

Works | Emergency

[A307] Kew Road (TW9) (Southbound) at the junction of Church Road - Lane closure to facilitate emergency Thames Water works.

  • Church Road (TW9) (All Directions)
  • Clarence Street (TW9) (All Directions)
  • [A307] Kew Road (TW9) (Southbound)

Mansion House Street (EC3V,EC2R) (City Of London)

  Minimal

From: Monday 23 January 2017
To: Friday 27 January 2017

Last updated 06:41 Tuesday 24 January 2017 : Traffic is moving well.

Works | Emergency

Mansion House Street (EC3V/EC2R) (Eastbound) at the junction of Queen Victoria Street - Lane 1 blocked due to emergency Thames Water works.

  • Cornhill (EC3V,EC2R) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Mansion House Place (EC4N) (All Directions)
  • Mansion House Street (EC3V,EC2R) (Eastbound)
  • Poultry (EC2R) (All Directions)
  • Prince's Street (EC2R) (All Directions)
  • Queen Victoria Street (EC2R,EC3V) (All Directions)
  • St Mildred's Court (EC2R) (All Directions)
  • Threadneedle Street (EC3V,EC2R) (All Directions)
  • Walbrook (EC4N) (All Directions)

[A23] Kennington Road (SE11) (Lambeth)

  Minimal

From: Monday 23 January 2017
To: Ongoing

Last updated 16:22 Tuesday 24 January 2017 : Approach with caution. Traffic is flowing well.

Works | Emergency

[A23] Kennington Road (SE11) (Northbound) at the junction of Black Prince Road - Surface water in lane 1 due to a burst water main.

  • Black Prince Road (SE11) (All Directions)
  • [A23] Kennington Road (SE11) (Northbound)

[A218] Merton Road (SW18) (Wandsworth)

  Minimal

From: Monday 23 January 2017
To: Monday 30 January 2017

Last updated 14:06 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A218] Merton Road (SW18) (All Directions) at the junction of Granville Road - Temporary traffic signals in use to facilitate gas works.

[A212] Catford Hill (SE6) (Lewisham)

  Minimal

From: Monday 23 January 2017
To: Friday 27 January 2017

Last updated 14:55 Tuesday 24 January 2017 : No reported delays.

Works | Emergency

[A212] Catford Hill (SE6) (All Directions) at the junction of Beechfield Road - Temporary traffic signals in use to facilitate emergency Thames Water works.

  • Exbury Road (SE6) (All Directions)

[A2209] Deptford Church Street (SE8) (Lewisham)

  Minimal

From: Friday 22 April 2016
To: Friday 28 April 2017

Last updated 14:06 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Giffin Street - Various lane restrictions in place to facilitate Thames Tideway sewer works.

  • [A2209] Deptford Church Street (SE8) (Both Directions)
  • Frankham Street (SE8) (All Directions)
  • Giffin Street (SE8) (All Directions)

A504 (N10) (Haringey)

  Minimal

From: Sunday 22 January 2017
To: Saturday 11 March 2017

Last updated 07:04 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

A504 Fortis Green Road (N10) (All Directions) at the junction of Tetherdown- Temporary lights for junction modernisation works.

  • A504 (N10) (All Directions)
  • Tetherdown (N10) (All Directions)

[B413] Shirland Road (W9) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 09:05 Tuesday 24 January 2017 : Delays possible whilst temporary signals are in operation.

Works | Utility

[B413] Shirland Road (W9 ) (All Directions) at the junction of Sutherland Avenue - There will be temporary signals in operation due to gas works in the area.

  • [B413] Shirland Road (W9) (All Directions)

[B242] Bedford Hill (SW12) (Wandsworth)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 14:03 Tuesday 24 January 2017 : Delays are possible.

Works | TfL

[B242] Bedford Hill (SW12) (All Directions) at the junction of Byrne Road - Temporary traffic lights and various lane closures in operation to facilitate pedestrian crossing upgrade works.

[A302] Victoria Street (SW1H,SW1E) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Friday 10 March 2017

Last updated 09:18 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A302] Victoria Street (SW1E/SW1H) (All Directions) at the junction of Artillery Row - Victoria Street will have an eastbound lane one closure and Buckingham Gate will be closed, northbound only, between Victoria Street and Spenser Street to facilitate junction improvement works.

  • B323 (SW1H,SW1E) (All Directions)

[B540] Hornsey Lane (N6) (Haringey)

  Minimal

From: Tuesday 17 January 2017
To: Wednesday 25 January 2017

Last updated 06:55 Tuesday 24 January 2017 : Expect delays when temporary signals in operation.

Works | Utility

[B540] Hornsey Lane (N6 ) (All Directions) at the junction of Ashmount Road - Two-way temporary traffic lights will be in operation to facilitate National Grid gas works

  • [B540] Hornsey Lane (N6) (All Directions)
  • Stanhope Road (N6) (All Directions)

[A1006] Blackhorse Lane (E17) (Waltham Forest)

  Minimal

From: Monday 23 January 2017
To: Sunday 29 January 2017

Last updated 06:37 Tuesday 24 January 2017 : Possible delays when restrictions are in place.

Works | Utility

[B179] Blackhorse Lane (E17) (All Directions) at the junction of Forest Road - Temporary traffic signals in operation to facilitate Water Connection Work works.

  • [B179,A1006] Blackhorse Lane (E17) (All Directions)
  • [A1006] Blackhorse Lane (E17) (All Directions)
  • [A1006] Blackhorse Road (E17) (All Directions)
  • [A503] Forest Road (E17) (All Directions)

[A5205] Prince Albert Road (NW1) (Westminster,Camden)

  Minimal

From: Wednesday 04 January 2017
To: Wednesday 25 January 2017

Last updated 09:06 Tuesday 24 January 2017 : Delays possible while temporary signals are in operation.

Works | Utility

[A5205] Prince Albert Road (NW1) (All Directions) at the junction of St Mark's Square - Temporary traffic signals in use to facilitate Thames Water works.

Prince's Street (EC2R) (City Of London)

  Minimal

From: Wednesday 18 January 2017
To: Friday 24 February 2017

Last updated 07:04 Tuesday 24 January 2017 : Delays possible.

Works | Utility

Prince's Street (EC2R) (All Directions) at the junction of Gresham Street - lane closed to facilitate water works.

  • Gresham Street (EC2R) (All Directions)
  • Lothbury (EC2R) (All Directions)
  • Moorgate (EC2R) (All Directions)
  • Prince's Street (EC2R) (All Directions)

[A206] Woolwich Road (DA17) (Bexley)

  Minimal

From: Monday 16 January 2017
To: Thursday 26 January 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays possible.

Works | Utility

[A206] Woolwich Road (DA17) (Both Directions) at the junction of Gloucester Road - Two-way temporary traffic signals in operation to facilitate gas connection works.

  • Woolwich Road (All Directions)

[A112] High Road Leyton (E10) (Waltham Forest)

  Minimal

From: Friday 13 January 2017
To: Friday 27 January 2017

Last updated 06:41 Tuesday 24 January 2017 : Possible delays while restrictions are in place.

Works | Utility

[A112] High Road Leyton (E10) (All Directions) at the junction of Midland Road - Single alternate traffic flow controlled by temporary lights to facilitate gully works.

  • Midland Road (E10) (All Directions)
  • Tilbury Road (E10) (All Directions)

[A40] High Holborn (WC1V,WC2B) (Camden)

  Minimal

From: Tuesday 03 January 2017
To: Thursday 01 June 2017

Last updated 09:09 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A40] High Holborn (WC2B/WC1V) (Westbound) at the junction of Drury Lane - Lane closure to facilitate truck deliveries and crane works, to facilitate building works.

  • Museum Street (WC1A,WC2B) (All Directions)

[A4] Strand (WC2R) (Westminster)

  Minimal

From: Monday 16 January 2017
To: Friday 17 February 2017

Last updated 09:15 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A4] Strand (Westbound) at the junction of Arundel Street - Lane restrictions in place to facilitate footway works.

  • Strand (WC2R) (Westbound)

[A210] Blackfen Road (DA15) (Bexley)

  Minimal

From: Tuesday 03 January 2017
To: Tuesday 31 January 2017

Last updated 14:04 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A210] Blackfen Road (DA15) (All Directions) at the junction of Fen Grove - Lane restrictions to facilitate SGN gas mains replacement works

  • [A210] Blackfen Road (DA15) (All Directions)
  • Burleigh Avenue (DA15) (All Directions)
  • Chester Road (DA15) (All Directions)
  • Christopher Close (DA15) (All Directions)
  • Curran Avenue (DA15) (All Directions)
  • Darnley Close (DA15) (All Directions)
  • Fen Grove (DA15) (All Directions)
  • Hawthorn Terrace (DA15) (All Directions)
  • Leechcroft Avenue (DA15) (All Directions)
  • Queenswood Road (DA15) (All Directions)
  • Raeburn Road (DA15) (All Directions)
  • Ronaldstone Road (DA15) (All Directions)

[A400] Cambridge Circus (WC2H) (Westminster)

  Minimal

From: Saturday 14 January 2017
To: Thursday 30 November 2017

Last updated 09:19 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A400] Cambridge Circus (WC2) (All Directions) - Various restrictions between approximately Saturday 14 January and Thursday 30 November during the Cambridge Circus regeneration scheme. 0800hrs Saturday 21 January until approximately 2100hrs Sunday 5 February, [A400] Charing Cross Road (Southbound) between Denmark Street and Great Newport Street, closed. 2100hrs Sunday 5 until approximately 2100hrs Friday 10 February, [A401] Shaftesbury Avenue (Eastbound) between Cambridge Circus (A400) and Stacey Street, closed. [A401] Shaftesbury Avenue (Eastbound) between Dean Street and Cambridge Circus (A400) and [A401] Shaftesbury Avenue (Westbound) between Earlham Street and Cambridge Circus (A400), reduced to one lane . Find out more on Westminster council's website.

  • Earlham Street (WC2H) (All Directions)
  • Romilly Street (W1D) (All Directions)

[A407] High Road (NW10) (Brent)

  Minimal

From: Tuesday 24 January 2017
To: Friday 27 January 2017

Last updated 07:06 Tuesday 24 January 2017 : No reported delays.

Works | Utility

[A407] High Road (All Directions) at the junction of Church Road - The road is closed to facilitate water mains works

  • Beaconsfield Road (NW10) (All Directions)
  • Bourke Close (NW10) (All Directions)
  • Brenthurst Road (NW10) (All Directions)
  • Chapel Close (NW10) (All Directions)
  • Church Road (NW10) (All Directions)
  • [A407] Church Road (NW10) (All Directions)
  • Cobbold Road (NW10) (All Directions)
  • Dalmeyer Road (NW10) (All Directions)
  • [A407] High Road Roundabout (NW10) (All Directions)
  • Mayo Road (NW10) (All Directions)
  • [B453] Neasden Lane (NW10) (All Directions)
  • Preston Gardens (NW10) (All Directions)
  • Suffolk Road (NW10) (All Directions)
  • White Hart Lane (NW10) (All Directions)

[A3214] St George's Drive (SW1W,SW1V) (Westminster)

  Minimal

From: Wednesday 04 January 2017
To: Sunday 30 April 2017

Last updated 09:11 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Elizabeth Bridge (SW1W/SW1V) (Westbound) between St George's Drive and Buckingham Palace Road - The bridge will be reduced to one lane and there will be temporary signals in operation at Bulleid Way, due to bridge works.

  • [A3214] Buckingham Palace Road (SW1W) (All Directions)
  • St George's Drive (SW1W,SW1V) (Westbound)

[A503] Forest Road (E17) (Waltham Forest)

  Minimal

From: Monday 28 November 2016
To: Friday 30 June 2017

Last updated 06:56 Tuesday 24 January 2017 : Delays are possible while restrictions are in place.

Works | Borough

[A503] Forest Road (E17) (Both Directions) between Blackhorse Road and Palmerston Road - Various restrictions in place to facilitate the installation of new cycle lanes.

  • [A1006] Blackhorse Road (E17) (All Directions)
  • [A503] Forest Road (E17) (Both Directions)

[A112] Hoe Street (E17) (Waltham Forest)

  Minimal

From: Tuesday 01 November 2016
To: Sunday 31 December 2017

Last updated 06:47 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[A112] Hoe Street (E17) (Both Directions) at the junction of Selborne Road - Reduced to one lane in each direction during bridge works on behalf of Waltham Forest council.

  • St Mary Road (E17) (All Directions)

[A306] Castelnau (SW13) (Richmond Upon Thames)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 14:03 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[A306] Castelnau (SW13) (Both Directions) at the junction of Newport Road - Thames Water are carrying out Sewer Repairs at this location. To enable the works, two way temporary traffic signals are being used.

[A1009] Hall Lane (E4) (Waltham Forest)

  Minimal

From: Monday 23 January 2017
To: Thursday 26 January 2017

Last updated 06:41 Tuesday 24 January 2017 : No reported delays

Works | Utility

[A1009] Hall Lane (E4 ) (All Directions) at the junction of Albert Crescent - Lane closures to facilitate Thames Water works.

  • Cherrydown Avenue (E4) (All Directions)
  • [A1009] Hall Lane (E4) (All Directions)

[A315] London Road (TW7) (Hounslow)

  Minimal

From: Monday 16 January 2017
To: Friday 10 February 2017

Last updated 07:03 Tuesday 24 January 2017 : No reported delays.

Works | Utility

[A315] London Road (TW7) (All Directions) at the junction of Spring Grove Road - Temporary traffic signals in use to facilitate sewer works.

  • [B363] Spring Grove Road (TW7) (All Directions)

[A502] Haverstock Hill (NW3) (Camden)

  Minimal

From: Friday 20 January 2017
To: Friday 27 January 2017

Last updated 07:01 Tuesday 24 January 2017 : No reported delays

Works | Utility

[A502] Haverstock Hill (NW3) (All Directions) at the junction of Adelaide Road - Lane restrictions in use to facilitate BT works.

  • [B509] Adelaide Road (NW3) (All Directions)

[A40] Procter Street (WC1N,WC1V,WC1R) (Camden)

  Minimal

From: Friday 20 January 2017
To: Saturday 30 September 2017

Last updated 09:22 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A40] Procter Street (WC1R) (Southbound) between Theobald's Road and High Holborn - Bus lane closure due to Crossrail works.

  • Red Lion Square (WC1R) (All Directions)
  • [A40] Theobald's Road (WC1N,WC1V,WC1R) (All Directions)

[A5] Kilburn High Road (NW6) (Camden)

  Minimal

From: Tuesday 24 January 2017
To: Thursday 26 January 2017

Last updated 15:00 Tuesday 24 January 2017 : Traffic is flowing well.

Works | Utility

[A5] Kilburn High Road (NW6) (Northbound) at the junction of Buckley Road - Lane closure due to Virgin Media works.

  • Buckley Road (NW6) (All Directions)
  • Grangeway (NW6) (All Directions)
  • [A5] Kilburn High Road (NW6) (Northbound)

[A5204] Wigmore Street (W1U) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Tuesday 28 February 2017

Last updated 09:09 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A5204] Wigmore Street (W1U) (All Directions) at the junction of Marylebone Lane - Lane closures due to signal upgrade works.

[A400] Charing Cross Road (WC2H) (Camden)

  Minimal

From: Thursday 19 January 2017
To: Tuesday 24 January 2017

Last updated 09:20 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

[A400] Charing Cross Road (WC2H) (Northbound) at the junction of Denmark Street - Lane restriction due to UKPN works.

[A117] Forest Drive (E12) (Newham)

  Minimal

From: Monday 23 January 2017
To: Sunday 29 January 2017

Last updated 07:05 Tuesday 24 January 2017 : No reported delays

Works | Borough

[A117] Forest Drive (E12) (All Directions) at the junction of Aldersbrook Road - Three-way temporary signals in operation to facilitate footway works by Newham Council.

  • [A117] Forest Drive (E12) (All Directions)

[A123] Fencepiece Road (IG6) (Redbridge)

  Minimal

From: Thursday 19 January 2017
To: Friday 27 January 2017

Last updated 07:04 Tuesday 24 January 2017 : Delays are possible.

Works | Emergency

[A123] Fencepiece Road (IG6) (Both Directions) at the junction of Kingsley Road - Width restriction in place southbound for gas works. Possible use of temporary signals.

  • Kingsley Road (IG6) (All Directions)

[B243] Woodside Green (SE25) (Croydon)

  Minimal

From: Thursday 19 January 2017
To: Wednesday 25 January 2017

Last updated 14:05 Tuesday 24 January 2017 : Delays are possible.

Hazard(s) | Burst Water Main

[B243] Woodside Green (SE25) (Both Directions) at the junction of Stroud Road - Two-way temporary signals in operation due to works on a burst water main.

  • Stroud Road (SE25) (All Directions)
  • [B243] Woodside Green (SE25) (All Directions)

A4 (W1J) (Westminster)

  Minimal

From: Tuesday 24 January 2017
To: Thursday 26 January 2017

Last updated 14:59 Tuesday 24 January 2017 : All lanes are open. Work is confined to the footway. Traffic is flowing well.

Works | Utility

[A4] A4 Piccadilly (W1J) (All Directions) at the junction of Old Bond Street -Both eastbound lanes will be closed. All traffic will be directed to use the bus lane to facilitate utility works.

  • A4 (W1J) (All Directions)
  • Old Bond Street (W1S) (All Directions)

Leadenhall Street (EC3A) (City Of London)

  Minimal

From: Monday 23 January 2017
To: Ongoing

Last updated 08:51 Tuesday 24 January 2017 : Traffic is flowing well, use caution

Hazard(s) | Burst Water Main

Leadenhall Street (EC3A) (All Directions) at the junction of Aldgate - There is a burst water main at this location

[A5204] Goodge Street (W1T) (Camden)

  Minimal

From: Tuesday 24 January 2017
To: Thursday 26 January 2017

Last updated 08:39 Tuesday 24 January 2017 : Delays are possible.

Works | Other

[A5204] Goodge Street (W1T) (All Directions) at the junction of Charlotte Street - Temporary traffic lights in place due to works

  • Charlotte Street (W1T) (All Directions)
  • [A5204] Goodge Street (W1T) (All Directions)

[A400] Charing Cross Road (WC2H,WC1B,W1T) (Camden,Westminster)

  Minimal

From: Thursday 17 March 2016
To: Friday 31 March 2017

Last updated 09:12 Tuesday 24 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Tottenham Court Road station upgrade; [A400] Charing Cross Road (WC2) (Northbound) at the junction of [A40] New Oxford Street - Various restrictions in place due to urban realm works in connection with the project. For more information about the Tottenham Court Road station upgrade project

  • A40 (WC2H,W1D,WC1A,WC1B) (All Directions)
  • A401 (WC1A,WC2H) (All Directions)
  • Adeline Place (WC1B) (All Directions)
  • Bainbridge Street (WC1B) (All Directions)
  • [A400] Bloomsbury Street (WC2H,WC1B,W1T) (All Directions)
  • Bucknall Street (WC1A,WC2H) (All Directions)
  • [A400] Charing Cross Road (WC2H,WC1B,W1T) (North Bound)
  • Coptic Street (WC1A,WC1B) (All Directions)
  • Dyott Street (WC2H,WC1B,WC1A) (All Directions)
  • Falconberg Mews (W1D) (All Directions)
  • Goslett Yard (WC2H) (All Directions)
  • Grape Street (WC2H) (All Directions)
  • Great Russell Street (WC1B) (All Directions)
  • Greek Street (W1D) (All Directions)
  • Hanway Street (W1T) (All Directions)
  • Little Russell Street (WC1A) (All Directions)
  • Manette Street (W1D) (All Directions)
  • Phoenix Street (WC2H) (All Directions)
  • Soho Square (W1D) (All Directions)
  • Stacey Street (WC2H) (All Directions)
  • Stedham Place (WC1A) (All Directions)
  • Streatham Street (WC1B,WC1A) (All Directions)
  • Sutton Row (W1D) (All Directions)
  • [A400] Tottenham Court Road (WC2H,WC1B,W1T) (All Directions)
  • Wedgewood Mews (W1D) (All Directions)
  • West Central Street (WC1A) (All Directions)
  • Willoughby Street (WC1B) (All Directions)

[A211] Footscray Road (SE9) (Bexley)

  Minimal

From: Tuesday 17 January 2017
To: Wednesday 25 January 2017

Last updated 14:01 Tuesday 24 January 2017 : Delays are possible.

Works | Emergency

[A211] Footscray Road (SE9) (All Directions) at the junction of County Gate - Temporary traffic signals in use to facilitate urgent gas works.

  • County Gate (SE9) (All Directions)
  • [A211] Footscray Road (SE9) (All Directions)
  • Telford Road (SE9) (All Directions)

[A238] Coombe Lane West (KT2) (Kingston Upon Thames)

  Minimal

From: Monday 16 January 2017
To: Thursday 26 January 2017

Last updated 14:05 Tuesday 24 January 2017 : Delays possible.

Works | Emergency

[A238] Coombe Lane West (KT2) (Both Directions) at the junction of Crown Road - Temporary traffic signals in use to facilitate emergency Thames Water works.

  • [A238] Coombe Lane West (KT2) (All Directions)
  • Southwood Avenue (KT2) (All Directions)

[A1010] High Road (N17) (Haringey)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 07:03 Tuesday 24 January 2017 : Minor delays possible due to the lane closure.

Works | Utility

[A1010] High Road (N17) (Southbound) at the junction of Reform Row - Bus lane closed to facilitate sewer works.

[A105] Ridge Avenue (N21) (Enfield)

  Minimal

From: Friday 13 January 2017
To: Friday 28 April 2017

Last updated 07:05 Tuesday 24 January 2017 : Expect local delays.

Works | Borough

[A105] Ridge Avenue (Both Directions) at the junction of Church Street - Temporary signals and various restrictions in place to facilitate works as part of the Mini-Holland Cycle Scheme.

  • [B154] Church Street (N9,N21) (All Directions)

[B207] Trundley's Road (SE8) (Lewisham)

  Minimal

From: Wednesday 11 January 2017
To: Friday 10 February 2017

Last updated 14:02 Tuesday 24 January 2017 : Delays are possible.

Works | Borough

[B207] Trundley's Road (SE8) (Northbound) at the junction of John Silkin Lane - Lane restriction for works.

[A5] Shoot-Up Hill (NW2,NW6) (Brent)

  Minimal

From: Monday 16 January 2017
To: Saturday 28 January 2017

Last updated 08:58 Tuesday 24 January 2017 : Delays possible whilst temporary signals are in operation.

Works | TfL

[A5] Shoot-up Hill (NW2) (All Directions) at the junction of Kilburn High Road - Temporary traffic lights are in use to facilitate bridge repair works.

  • [A5] Shoot-Up Hill (NW2,NW6) (All Directions)

[B152] St Ann's Road (N15) (Haringey)

  Minimal

From: Monday 16 January 2017
To: Wednesday 01 February 2017

Last updated 17:15 Tuesday 24 January 2017 : Delays possible.

Works | Utility

[B152] St Ann's Road (N15) (All Directions) at the junction of Seven Sisters Road - Lane restrictions in place to facilitate Thames Water works.

  • [A503] Seven Sisters Road (N15) (All Directions)
  • [B152] St Ann's Road (N15) (All Directions)

[B2212] Hayes Road (BR2) (Bromley)

  Minimal

From: Monday 23 January 2017
To: Friday 27 January 2017

Last updated 14:00 Tuesday 24 January 2017 : Delays are possible.

Works | Utility

[B2212] Hayes Road (BR2) (All Directions) at the junction of Hayes Lane - Temporary traffic lights are in operation to facilitate gas works.

  • [B265] Hayes Lane (BR2) (All Directions)
  • [B2212] Hayes Road (BR2) (All Directions)

[A219] Wood Lane (W10,W12) (Hammersmith & Fulham)

  Minimal

From: Monday 09 January 2017
To: Tuesday 24 January 2017

Last updated 06:45 Tuesday 24 January 2017 : Delays are possible when restrictions in place.

Works | TfL

[A219] Wood Lane (All Directions) at the junction of North Pole Road - TfL will carrying out a traffic signal upgrade at the above location. Night work between 2000-0500 carriageway works using temporary traffic lights.

  • [B412] North Pole Road (W10) (All Directions)
  • [A219] Scrubs Lane (W10,W12) (All Directions)
  • [A219] Wood Lane (W10,W12) (All Directions)
Close Favourites

My Lines

My Buses

My Roads

My River Buses

My Emirates Air Line

My Journeys

My Places

    Close edit Favourites

    Favourite lines

    Favourite buses

    Favourite roads

    Favourite river buses

    Favourite Emirates Air Line

    Favourite journeys