Status updates

Find a postcode, place or road

Service updates at 31/01/2017 21:02:54
Road corridor Status
A1
A13
A4
Central London Red Routes
A12
A20
A23
A24
A3
Blackwall Tunnel
North Circular (A406)
South Circular (A205)
A10
A2
A21
A316
A40
A41
All other
road corridors
No exceptional delays on all other road corridors

A13

City Route

Southern River Route

[A101] Rotherhithe Tunnel (E1W ,E14 ,SE16) (Southwark,Tower Hamlets)

  Closures

From: Monday 30 March 2015
To: Tuesday 28 March 2017

Last updated 04:48 Tuesday 17 January 2017 : The tunnel has re-opened. Traffic is flowing well.

Works | TfL

[A101] Rotherhithe Tunnel (E1/SE16) (Both Directions) - Closed between approximately 2200hrs and 0500hrs each Monday night during overnight maintenance. No closures on Bank Holiday Mondays.

  • A1203 (E1W ,E14) (All Directions)
  • A200 (SE16) (All Directions)
  • Ainsty Street (SE16) (All Directions)
  • Albion Street (SE16) (All Directions)
  • B205 (SE16) (All Directions)
  • Bere Street (E1W) (All Directions)
  • Brodlove Lane (E1W) (All Directions)
  • [A126] Butcher Row (E1W ,E14) (All Directions)
  • Canon Beck Road (SE16) (All Directions)
  • Clack Street (SE16) (All Directions)
  • Clarence Mews (SE16) (All Directions)
  • Clifton Place (SE16) (All Directions)
  • Cranford Street (E1W) (All Directions)
  • Galleon Close (SE16) (All Directions)
  • Glasshouse Fields (E1W) (All Directions)
  • Isambard Place (SE16) (All Directions)
  • Kenning Street (SE16) (All Directions)
  • Kinburn Street (SE16) (All Directions)
  • Lower Road (SE16) (All Directions)
  • Mayflower Street (SE16) (All Directions)
  • Narrow Street (E14) (All Directions)
  • Neptune Street (SE16) (All Directions)
  • Railway Avenue (SE16) (All Directions)
  • Risdon Street (SE16) (All Directions)
  • Rotherhithe Street (SE16) (All Directions)
  • Rotherhithe Tunnel (All Directions)
  • Rupack Street (SE16) (All Directions)
  • Schoolhouse Lane (E1W) (All Directions)
  • Shadwell Pierhead (E1W) (All Directions)
  • St Marychurch Street (SE16) (All Directions)
  • Swan Road (SE16) (All Directions)
  • Temeraire Street (SE16) (All Directions)
  • Western Place (SE16) (All Directions)

A4

Inner Ring

[A302,A4] Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (W2) (Westminster)

  Closures

From: Monday 09 November 2015
To: Monday 13 March 2017

Last updated 10:34 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (All Directions) - Various restrictions during Cycle Superhighway works. Find out more East West Cycle Superhighway travel advice.

  • A3214 (SW1A,SW1H,SW1E,SW1W,SW1P) (All Directions)
  • A4 (W1J,SW1X) (All Directions)
  • A402 (W2) (All Directions)
  • A4209 (W2) (All Directions)
  • Albert Gate (SW1X) (All Directions)
  • Bathurst Street (W2) (All Directions)
  • Birdcage Walk (SW1H,SW1E) (All Directions)
  • [A4206] Bishop's Bridge Road (W2) (All Directions)
  • Brook Street (W2) (All Directions)
  • [B323] Buckingham Gate (SW1E) (All Directions)
  • Buckingham Palace (SW1A) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Cleveland Terrace (W2) (All Directions)
  • Constitution Hill (SW1A,SW1W) (North Bound)
  • [B410] Craven Road (W2) (All Directions)
  • Gloucester Terrace (W2) (All Directions)
  • [B310] Grosvenor Crescent (SW1X) (All Directions)
  • [A302,A4] Grosvenor Place (SW1X,SW1W) (All Directions)
  • Horse Guards Road (SW1H,SW1A) (All Directions)
  • Hyde Park Gardens (W2) (All Directions)
  • Kensington Gardens (W2) (All Directions)
  • North Carriage Drive (W2) (Westbound)
  • Orsett Terrace (W2) (All Directions)
  • Queen Anne's Gate (SW1H) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • Serpentine Road (W2) (All Directions)
  • South Carriage Drive (SW1X,W2,W1J,SW7) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stanhope Terrace (W2) (All Directions)
  • Storey's Gate (SW1H) (All Directions)
  • Sussex Gardens (W2) (All Directions)
  • The Mall (SW1A) (All Directions)
  • West Carriage Drive (W2) (North Bound)
  • Westbourne Crescent (W2) (All Directions)

Bishopsgate Cross Route

[A3] Cannon Street (EC4M,EC4N,EC4V,EC4R) (City Of London)

  Closures

From: Tuesday 03 January 2017
To: Monday 01 May 2017

Last updated 19:56 Saturday 21 January 2017 : Expect delays during the course of these works.

Works | Borough

Cannon Street (EC4) (Westbound) between [A3] King William Street and Queen Victoria Street - Closed during road maintenance on behalf of the City of London. Westbound traffic is diverted via King William Street, Lombard Street and Mansion House Street to Queen Victoria Street.

  • Abchurch Lane (EC4N) (All Directions)
  • Bread Street (EC4M) (All Directions)
  • Bush Lane (EC4R) (All Directions)
  • Cloak Lane (EC4N,EC4R) (All Directions)
  • King William Street (EC4N,EC4R) (All Directions)
  • Laurence Pountney Hill (EC4R) (All Directions)
  • Laurence Pountney Lane (EC4R) (All Directions)
  • Little Trinity Lane (EC4V) (All Directions)
  • Oxford Court (EC4N) (All Directions)
  • Queen Street (EC4M,EC4N,EC4R) (All Directions)
  • Queen Victoria Street (EC4V,EC4N,EC2R,EC4M) (All Directions)
  • Salters' Hall Court (EC4N) (All Directions)
  • Scott's Yard (EC4R) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)
  • St George's Lane (EC3M) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • Suffolk Lane (EC4R) (All Directions)
  • Talbot Court (EC3V) (All Directions)
  • Watling Street (EC4M) (All Directions)

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Closures

From: Monday 05 January 2015
To: Saturday 31 July 2021

Last updated 20:01 Saturday 21 January 2017 : Use an alternative route.

Works | TfL

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed Find out more about Bank and Monument works

  • [A3] Arthur Street (EC4R,EC3R) (Both Directions)
  • [A3] Fish Street Hill (EC4R,EC3R) (All Directions)
  • [A3] King William Street (EC4R,EC3R) (All Directions)
  • Martin Lane (EC4R) (All Directions)

Bishopsgate Cross Route

[A3] King William Street (EC3R,EC4R) (City Of London)

  Closures

From: Saturday 29 August 2015
To: Sunday 31 December 2017

Last updated 20:01 Saturday 21 January 2017 : Local delays possible.

Works | TfL

[A3] King William Street (EC3R/EC4R) (Both Directions) between London Bridge and Arthur Street - Lane one closed from the bus stop at the north end of London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website.

  • [A3] Arthur Street (EC3R,EC4R) (All Directions)
  • [A3] King William Street (EC3R,EC4R) (Both Directions)

Farringdon Cross Route

Farringdon Road (Islington,Camden)

  Closures

From: Monday 22 July 2013
To: Monday 31 December 2018

Last updated 19:55 Saturday 21 January 2017 : Expect local delays.

Works | Other

[A201] Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Farringdon Road is restricted southbound. Find out more about Crossrail works

  • Cowcross Street (EC1M) (All Directions)
  • Farringdon Road (EC1M) (All Directions)
  • Farringdon Street (EC1A) (All Directions)
  • Greville Street (EC1N,EC1M) (All Directions)
  • Saffron Hill (EC1N) (All Directions)

Southern River Route

[A2205] Bermondsey Street (SE1) (Southwark)

  Closures

From: Saturday 07 January 2017
To: Monday 17 April 2017

Last updated 23:53 Saturday 21 January 2017 : Use an alternative route and expect delays on diversion.

Works | Other

[A2205] Bermondsey Street (SE1) (Northbound) between [A200] St Thomas Street and Magdalen Street - Closed between approximately Saturday 0700hrs and midnight Sunday night each weekend during Network Rail works. Additionally, closed from approximately 0700hrs Good Friday 14 until midnight Bank Monday night, 17 April, over the Easter weekend.

  • Carmarthen Place (SE1) (All Directions)
  • Shand Street (SE1) (All Directions)
  • Shipwright Yard (SE1) (All Directions)
  • Vinegar Yard (SE1) (All Directions)

Southern River Route

Bishopsgate Cross Route

[A200] Tooley Street (SE1) (Southwark)

  Closures

From: Saturday 30 April 2016
To: Wednesday 28 February 2018

Last updated 01:24 Sunday 22 January 2017 : Use an alternative route.

Works | Other

London Bridge mainline rail station upgrade, [A200] Tooley Street and Duke Street Hill (SE1) (Eastbound) between [A3] Borough High Street and [A2205] Bermondsey Street - The road is closed between Borough High Street and Bermondsey Street. Find out more about the London Bridge mainline station upgrade and Tooley Street.

  • A3 (SE1) (All Directions)
  • Battle Bridge Lane (SE1) (All Directions)
  • [A2205] Bermondsey Street (SE1) (All Directions)
  • Counter Street (SE1) (All Directions)
  • [A200] Duke Street Hill (SE1) (All Directions)
  • Hay's Lane (SE1) (All Directions)
  • Montague Close (SE1) (All Directions)
  • Stainer Street (SE1) (All Directions)
  • Tooley Street (SE1) (All Directions)
  • Weston Street (SE1) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Closures

From: Wednesday 18 January 2017
To: Friday 10 February 2017

Last updated 01:28 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Footscray Road - Greenwich Council will be carrying out a carriageway resurfacing program on Eltham High Street between Court Road and Footscray Road. Phase one (2000hrs 18th Jan to 0500hrs 21st Jan)

  • [A211] Footscray Road (SE9) (All Directions)

[A501] Moorgate (EC2A,EC2M) (City Of London,Islington)

  Closures

From: Saturday 23 July 2016
To: Friday 31 March 2017

Last updated 20:02 Saturday 21 January 2017 : Use an alternative route.

Works | Other

[A501] Moorgate (EC2M) (Southbound) at the junction of South Place - Moorgate is closed southbound for Crossrail works.

  • [A501] Finsbury Pavement (EC2A,EC2M) (All Directions)
  • [A501] Moorgate (EC2A,EC2M) (Southbound)
  • Ropemaker Street (EC2M) (All Directions)
  • South Place (EC2A) (All Directions)

[A400] Great Russell Street (WC1B) (Camden)

  Closures

From: Tuesday 03 January 2017
To: Tuesday 28 February 2017

Last updated 10:29 Saturday 21 January 2017 : Use other routes whilst closures is in place.

Works | Utility

Great Russell Street (WC1B) (Westbound) between Museum Street and Bloomsbury Street - Road closed to facilitate major gas main replacement works.

  • [A400] Bloomsbury Street (WC1B) (All Directions)
  • Coptic Street (WC1B) (All Directions)
  • Gilbert Place (WC1A) (All Directions)
  • Great Russell Street (WC1B) (Westbound)
  • Museum Street (WC1B,WC1A) (All Directions)
  • Willoughby Street (WC1B) (All Directions)

A1

[A400] Archway (N19) (Islington)

  Closures

From: Monday 01 February 2016
To: Friday 14 April 2017

Last updated 20:02 Saturday 21 January 2017 : Traffic is flowing well in the area.

Works | TfL

Archway (All Directions) - Various lane restrictions and closures to facilitate junction improvement works including closures of Vorley Road and MacDonald Road. Find out more Archway gyratory travel advice

  • A1 (N19) (All Directions)
  • Archway Road (N19) (All Directions)
  • Flowers Mews (N19) (All Directions)
  • Giesbach Road (N19) (All Directions)
  • [B519,A1] Highgate Hill (N19) (All Directions)
  • Highgate Hill (All Directions)
  • [A400] Junction Road (N19) (All Directions)
  • Macdonald Road (N19) (All Directions)
  • St John's Way (N19) (All Directions)
  • Windermere Road (N19) (All Directions)

Inner Ring

Marylebone High Street (NW1,W1U,W1G) (Westminster)

  Closures

From: Wednesday 04 January 2017
To: Tuesday 31 January 2017

Last updated 10:36 Saturday 21 January 2017 : Use other routes whilst closure is in place.

Works | Borough

Marylebone High Street (W1U/NW1/W1G) (Northbound) at the junction of Nottingham Street - Road closure in place from 4th until 31st January to facilitate telecommunication works. There will be no access from Marylebone High Street into Oldbury Place.

  • Mac Farren Place (NW1) (All Directions)
  • Marylebone High Street (NW1,W1U,W1G) (Northbound)
  • Nottingham Place (W1U) (All Directions)
  • Nottingham Street (W1U) (All Directions)
  • Oldbury Place (VW02,W1U) (All Directions)

[B412] St Marks Road (W10) (Kensington & Chelsea)

  Closures

From: Monday 16 January 2017
To: Saturday 18 March 2017

Last updated 19:58 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[B412] St Marks Road (W10) (All Directions) at the junction of St Quintin Avenue - Various road closures and lane restrictions in place due to works.

  • [B412] St Marks Road (W10) (All Directions)
  • [B412] St Marks Road Roundabout (W10) (All Directions)

[A112] Angel Lane (E15) (Newham)

  Closures

From: Monday 16 January 2017
To: Sunday 07 May 2017

Last updated 21:05 Saturday 21 January 2017 : Delays are possible.

Works | Utility

[A112] Angel Lane (E15) (Southbound) between Leyton Road and Great Eastern Road - Road closed southbound to facilitate utility works. In addition, there are temporary traffic signals at The Grove / Windmill Lane.

  • [A112] Angel Lane (E15) (Southbound)
  • [A11] Great Eastern Road (E15) (All Directions)
  • Service Route No 3 (E15) (All Directions)

Marshall Street (W1F) (Westminster)

  Closures

From: Monday 30 January 2017
To: Friday 03 February 2017

Last updated 08:14 Thursday 05 January 2017

Works | Utility

Marshall Street (W1F) (Both Directions) between Broadwick Street and Beak Street - The road will closed due to water works.

  • Beak Street (W1F) (All Directions)
  • Broadwick Street (W1F) (All Directions)
  • Marshall Street (W1F) (Both Directions)

[A1000] High Road (N12) (Barnet)

  Closures

From: Monday 30 January 2017
To: Tuesday 07 February 2017

Last updated 18:19 Friday 09 December 2016

Works | Borough

[A1000] High Road Finchley (N12) (Both Directions) between [A1003] Woodhouse Road (Tally Ho Corner) and Leisure Way - Closed between approximately 2200hrs and 0500hrs each night during road resurfacing works on behalf of the borough of Barnet.

  • A1003 (N12) (All Directions)
  • A598 (N12) (All Directions)
  • Addington Drive (N12) (All Directions)
  • Brompton Mews (N12) (All Directions)
  • Castle Road (N12) (All Directions)
  • Chaplin Square (N12) (All Directions)
  • Christchurch Avenue (N12) (All Directions)
  • Churchfield Avenue (N12) (All Directions)
  • Churchfield Way (N12) (All Directions)
  • Crowder Close (N12) (All Directions)
  • Eton Avenue (N12) (All Directions)
  • Fallow Court Avenue (N12) (All Directions)
  • Granville Road (N12) (All Directions)
  • [A1000] High Road (N12) (Both Directions)
  • High Road (All Directions)
  • Kenver Avenue (N12) (All Directions)
  • Lambert Way (N12) (All Directions)
  • Leisure Way (N12) (All Directions)
  • Nether Street (N12) (All Directions)
  • Rosemont Avenue (N12) (All Directions)
  • Sandringham Gardens (N12) (All Directions)
  • Summers Lane (N12) (All Directions)

[B406] Berners Street (W1D,W1T) (Westminster)

  Closures

From: Sunday 09 October 2016
To: Saturday 31 March 2018

Last updated 10:31 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

Berners Street (W1T/W1D) (All Directions) at the junction of Wardour Street - Various closures and restrictions in place to facilitate works. Berners Street is closed between Oxford Street and Mortimer Street then Newman Street and Wells Street. Cleveland Street is closed between New Cavendish Street and Mortimer Street and Wardour Street between Oxford Street and Shaftesbury Avenue.

  • A4201 (W1B,W1C,W1G,W1W) (All Directions)
  • A5204 (W1T) (All Directions)
  • B406 (W1S,W1C) (All Directions)
  • Carburton Street (W1W,VW01) (All Directions)
  • Cleveland Street (W1T,W1W) (All Directions)
  • Clipstone Street (W1T) (All Directions)
  • Hanover Square (W1S) (All Directions)
  • John Prince's Street (W1G,W1C) (All Directions)
  • Newman Street (W1T) (All Directions)
  • [A40] Oxford Street (W1B,W1C,W1D,W1F,W1W) (All Directions)
  • Ramillies Place (W1F) (All Directions)
  • Ramillies Street (W1F) (All Directions)
  • Rathbone Street (W1T) (All Directions)
  • Riding House Street (W1W) (All Directions)
  • Swallow Place (W1B) (All Directions)
  • Wells Street (W1T) (All Directions)
  • Winsley Street (W1W) (All Directions)
  • Woodstock Street (W1S) (All Directions)

[A240] Surbiton Road (KT1) (Kingston Upon Thames)

  Closures

From: Monday 05 September 2016
To: Monday 06 March 2017

Last updated 01:25 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A240] Surbiton Road (KT1) (Both Directions) between Surbiton Road and Anglesea Road - Road closure is in place as part of the Mini Holland Scheme.

  • Anglesea Road (KT1) (All Directions)
  • Surbiton Crescent (KT1) (All Directions)
  • [A240] Surbiton Road (KT1) (Both Directions)

[A4] New Fetter Lane (EC4A) (City Of London)

  Closures

From: Monday 16 January 2017
To: Sunday 19 February 2017

Last updated 19:55 Saturday 21 January 2017 : Traffic is flowing well.

Works | Utility

[A4] New Fetter Lane (EC4A) (Southbound) at the junction of High Holborn - The road is closed to facilitate Thames Water works

  • [A4] Fetter Lane (EC4A) (Southbound)
  • West Harding Street (EC4A) (All Directions)

A1

[A1] Holloway Road (N7 ,N5 ,N1) (Islington)

  Expected delays

From: Monday 06 October 2014
To: Saturday 30 June 2018

Last updated 20:01 Saturday 21 January 2017 : Delays are possible.

Works | TfL

Highbury Corner Bridge, [A1] Holloway Road (N7) (Both Directions) at Highbury Corner - Holloway Road reduced to one lane in each direction, with a northbound bus lane suspension in place for bridge replacement works. Find out more about the works.

  • A1 (N7 ,N5 ,N1) (All Directions)
  • Highbury Corner (N1) (All Directions)
  • [A1] Holloway Road (N7 ,N5 ,N1) (Both Directions)

A12

[A12] Eastern Avenue (RM6,IG2) (Redbridge)

  Expected delays

From: Thursday 12 January 2017
To: Sunday 16 April 2017

Last updated 21:00 Saturday 21 January 2017 : Traffic is flowing well.

Works | TfL

[A12] Eastern Avenue (RM6) (All Directions) at the junction of [B177] Barley Lane - Various restrictions during junction improvement works until approximately late April. Monday 16 January until late April, [A12] Eastern Avenue at the junction of [B177] Barley Lane, lane restrictions in all directions. Friday 3 February until late February, no right-turn from [A12] Eastern Avenue into [B177] Barley Lane or Hainault Road. mid to late February, pedestrian crossing on southern side of the junction temporarily suspended. Early to mid-March, no left-turn from Hainault Road to [A12] Eastern Avenue.**Currently restrictions remain on footway and traffic islands.**

  • Chadwell Heath Lane (RM6) (All Directions)
  • Hainault Road (RM6) (All Directions)
  • Little Heath (RM6) (All Directions)
  • Strouds Close (RM6) (All Directions)

A12

[A127] Southend Arterial Road (RM2) (Havering)

  Expected delays

From: Sunday 13 March 2016
To: Saturday 11 November 2017

Last updated 02:35 Sunday 22 January 2017 : Traffic is flowing well.

Works | TfL

Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions during bridge replacement works. Contraflow in operation, reducing the carriageway to a single lane each direction between Gallows Corner (A12) and Squirrels Heath Road until approximately May 2017. Additionally, no access from Bryant Avenue to the [A127] until approximately February 2017. Find out more.

  • Bryant Avenue (RM2,RM3) (All Directions)
  • [A127] Southend Arterial Road (RM2) (Eastbound)

A12

Burdett Road (E3 ,E14) (Tower Hamlets)

  Expected delays

From: Tuesday 28 May 2013
To: Sunday 04 February 2018

Last updated 21:06 Saturday 21 January 2017 : Delays are possible.

Works | Other

A1205 Burdett Road (Both directions) between St Paul's Way and Bow Common Lane - Carriageway restrictions for Crossrail works. Find out more about Crossrail works

A12

[A11] Whitechapel Road (E1) (Tower Hamlets)

  Expected delays

From: Thursday 19 January 2017
To: Wednesday 01 February 2017

Last updated 21:05 Saturday 21 January 2017 : Delays are possible.

Works | Utility

[A11] Whitechapel Road (E1 ) (Eastbound) at the junction of Brady Street - Bus lane closure to facilitate utility works.

  • Brady Street (E1) (All Directions)
  • Cavell Street (E1) (All Directions)
  • Maples Place (E1) (All Directions)

A20

[A20] Loampit Vale (SE13) (Lewisham)

  Expected delays

From: Monday 09 January 2017
To: Friday 16 June 2017

Last updated 20:09 Saturday 21 January 2017 : Restrictions are confined to the pavement.

Works | TfL

[A20] Loampit Vale (SE13) (Eastbound) between [A2210] Jerrard Street and [A2210] Thurston Road - Lane restrictions between approximately 1000hrs and 1530hrs each day and 2000hrs and 0530hrs each night during bus lane extension works.

  • Bertrand Street (SE13) (All Directions)
  • Cornmill Lane (SE13) (All Directions)
  • Elmira Street (SE13) (All Directions)
  • Horton Street (SE13) (All Directions)
  • [A20] Loampit Vale (SE13) (Eastbound)
  • Station Road (SE13) (All Directions)

A205

[A217] Wandsworth One Way System (SW18) (Wandsworth)

  Expected delays

From: Monday 16 January 2017
To: Saturday 11 March 2017

Last updated 10:27 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

[A217] Wandsworth One Way System (All Directions) - Various lane restrictions during phased collaborative utility works. Monday 16 until Thursday 19 January, [A217] Wandsworth Plain and [A217] Armoury Way, reduced to two lanes (from four) between approximately 0700hrs and 1900hrs. In addition Frogmore remains closed. From approximately 0800hrs Monday 23 until 1800hrs Friday 24 February, [A217] Ram Street, closed between [A217] Armoury Way and [A217] Wandsworth High Street. Sunday 5 until Friday 10 February, [A217] Armoury Way, between approximately 2100hrs and 0500hrs each night, lane four (of four) of closed and [A217] Ram Street, closed southbound and right-hand turn from [A217] Armoury Way into [A217] Ram Street banned. Saturday 25 February until Saturday 11 March, lane four (of four) closed between approximately 0700hrs and 1900hrs each day, except Wednesday 8 to Friday 10 March, inclusive, when lanes three and four (of four) are closed.

  • All Saints Passage (SW18) (All Directions)
  • [A217] Armoury Way (SW18) (All Directions)
  • Barchard Street (SW18) (All Directions)
  • Dormay Street (SW18) (All Directions)
  • [A217] Old York Road (SW18) (All Directions)
  • The Causeway (SW18) (All Directions)
  • [A217] Wandsworth One Way System (SW18) (All Directions)

A3

[A3205] Nine Elms Lane (SW8) (Wandsworth)

  Expected delays

From: Tuesday 23 August 2016
To: Sunday 30 April 2017

Last updated 01:24 Sunday 22 January 2017 : Delays are possible.

Works | Utility

[A3205] Nine Elms Lane (SW8) (Both Directions) at the junction of Ponton Road - To facilitate major water works, the carriageway is reduced to one lane in each direction. In addition Ponton Road is partially restricted at the junction.

  • Nine Elms Lane (All Directions)
  • [A3205] Nine Elms Lane (SW8) (Both Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Expected delays

From: Tuesday 03 May 2016
To: Tuesday 30 April 2019

Last updated 10:34 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - Various restrictions until approximately April 2019 during the redevelopment of 55-91 Knightsbridge. Westbound bus lane closed until approximately April 2019. More information available on Westminster council's website.

  • [A4] Knightsbridge (SW1X) (Westbound)

A4

A306 (W6) (Hammersmith & Fulham)

  Expected delays

From: Saturday 28 May 2016
To: Sunday 31 December 2017

Last updated 19:55 Saturday 21 January 2017 : Use caution. Delays possible.

Works | Other

[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. The bridge will be fully closed both ways from 0700hrs on Saturday 11 February until 0500hrs on Monday 20 February.

  • A306 (W6) (Both Directions)
  • Hammersmith Bridge Road (W6) (All Directions)
  • Queen Caroline Street (W6) (All Directions)
  • Rutland Grove (W6) (All Directions)

A4

[A4] Cromwell Road (SW7) (Kensington & Chelsea)

  Expected delays

From: Wednesday 18 January 2017
To: Friday 31 March 2017

Last updated 00:00 Sunday 22 January 2017 : No restrictions currently in place. Traffic is flowing well.

Works | TfL

[A4] Cromwell Road (SW7) (All Directions) at the junction of Ashburn Place - Temporary traffic signals and lane restrictions for cycle grid works.

  • Ashburn Place (SW7) (All Directions)
  • Grenville Place (SW7) (All Directions)

A406

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W3,W4) (Hounslow)

  Expected delays

From: Monday 20 June 2016
To: Thursday 04 January 2018

Last updated 20:02 Saturday 21 January 2017 : Delays are possible.

Works | TfL

Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. Click for more information on the Power Road Bridge project.

A406

[A406] North Circular Road (NW2) (Brent)

  Expected delays

From: Monday 09 January 2017
To: Saturday 04 February 2017

Last updated 02:10 Sunday 22 January 2017 : Traffic is now flowing well.

Works | TfL

[A406] North Circular Road (NW2) (Westbound) between Staples Corner and Links Road - Lane one and two closure to facilitate resurfacing works. There will also be a full closure of Apsley Way. (Night Works - 22:00 to 05:00)

  • Apsley Way (NW2) (All Directions)
  • Brook Road (NW2) (All Directions)
  • Heather Road (NW2) (All Directions)
  • Links Road (NW2) (All Directions)
  • [A406] North Circular Road (NW2) (Westbound)

Bishopsgate Cross Route

[A10] Shoreditch High Street (E1) (Hackney,City Of London,Tower Hamlets)

  Expected delays

From: Saturday 24 September 2016
To: Saturday 31 March 2018

Last updated 19:54 Saturday 21 January 2017 : Traffic delays are possible when restrictions in place.

Special and Planned Events | Construction Activity

[A10] Shoreditch High Street (All Directions) at the junction of Worship Street - Planned lane restrictions to facilitate the Principle Place development.

  • [A10] Norton Folgate (E1) (All Directions)

Bishopsgate Cross Route

[A3] Borough High Street (SE1) (Southwark)

  Expected delays

From: Wednesday 06 April 2016
To: Friday 01 September 2017

Last updated 01:27 Sunday 22 January 2017 : Delays are possible.

Works | TfL

[A3] Borough High Street (SE1) (Northbound) at the junction of Marshalsea Road - Intermittent bus lane restriction due to works.

  • [A3] Borough High Street (SE1) (All Directions)

Blackwall Tunnel

Blackwall Tunnel (SOUTHBOUND BORE) (SE10,E14) (Greenwich,Tower Hamlets)

  Expected delays

From: Sunday 08 November 2015
To: Sunday 19 March 2017

Last updated 01:22 Sunday 22 January 2017 : The tunnel is closed to southbound traffic.Traffic is flowing well on diversion.

Works | TfL

[A102] Blackwall Tunnel (Southbound) - Closed between approximately 0100hrs and 0800hrs on two Sunday mornings of each month (except Bank Holiday weekends) during overnight maintenance. Upcoming scheduled closures: 5th and 19th February, 5th and 19th March.

  • Blackwall Tunnel (Southbound Bore) (SE10,E14) (South Bound)

City Route

Farringdon Cross Route

[A3211] Victoria Embankment (EC4Y,EC4V) (City Of London)

  Expected delays

From: Wednesday 04 January 2017
To: Friday 31 December 2021

Last updated 19:59 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Tideway, [A3211] Victoria Embankment (EC4) (Both Directions) at the junction of [A201] Blackfriars Bridge - The slip is open to eastbound traffic only. There will be a full slip road closure in both directions from 0500 on 21 January 17 to 0500 on 23 Jan 17 to prepare for the new road layout. In addition from 0001hrs Saturday 21st Jan to 0500hrs Monday 22nd Jan there will be a southbound lane one closure on Victoria Embankment (at Horse Guards Avenue) while the cycle track and footway are closed to facilitate tree removal works associates with the Tideway project. Find out more about the road changes at Victoria Embankment

  • A201 (EC4V,EC4Y,SE1) (All Directions)
  • [A201] Blackfriars Bridge (EC4V,EC4Y,SE1) (All Directions)
  • [A3211] Blackfriars Station (EC4Y,EC4V) (All Directions)
  • [A3211] Blackfriars Underpass (EC4Y,EC4V) (All Directions)
  • Carmelite Street (EC4Y) (All Directions)
  • Kingscote Street (EC4V) (All Directions)
  • Playhouse Yard (EC4V) (All Directions)
  • Tudor Street (EC4Y,EC4V) (All Directions)
  • [A3211] Victoria Embankment (EC4Y,EC4V) (Both Directions)
  • [A201] Victoria Embankment (EC4V,EC4Y,SE1) (Both Directions)
  • Victoria Embankment (EC4Y) (All Directions)
  • Watergate (EC4V) (All Directions)

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Expected delays

From: Wednesday 11 January 2017
To: Sunday 05 February 2017

Last updated 23:30 Saturday 21 January 2017 : Traffic is flowing well.

Works | Utility

[A201] Blackfriars Road (SE1) (All Directions) at the junction of Webber Street - Temporary traffic signals are operating a single alternate lane for gas works.

  • [A201] Blackfriars Road (SE1) (All Directions)

Inner Ring

[A501] City Road (EC1Y,EC2A) (Islington)

  Expected delays

From: Tuesday 03 January 2017
To: Sunday 02 April 2017

Last updated 19:55 Saturday 21 January 2017 : Traffic is flowing well past the works.

Works | Utility

[A501] City Road (EC2A) (All Directions) between Epworth Street and Worship Street - Carriageway restrictions to facilitate gas mains replacement works. The northbound lane is closed with temporary signals in place controlling a single alternate traffic flow.

  • [A501] City Road (EC1Y,EC2A) (All Directions)
  • Epworth Street (EC2A) (All Directions)
  • Featherstone Street (EC1Y) (All Directions)
  • Finsbury Square (EC2A) (All Directions)
  • Leonard Street (EC2A) (All Directions)
  • [A501] Old Street Roundabout (EC1Y,EC2A) (All Directions)
  • Oliver's Yard (EC1Y) (All Directions)
  • Worship Street (EC1Y,EC2A) (All Directions)

Southern River Route

[A3203] Lambeth Bridge (SE1,SW1P,SW1A) (Westminster)

  Expected delays

From: Wednesday 04 January 2017
To: Friday 03 March 2017

Last updated 15:53 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A3203] Lambeth Bridge (SE1) (All Directions) at the junction of [A3212] Millbank and [B323] Horseferry Road - Various restrictions and temporary traffic signals in operation during junction improvement works until approximately March. From 6 to 8 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) in both directions and Horseferry Road closed on the approach to the roundabout. From 20 to 25 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) to westbound traffic (towards Westminster) and Horseferry Road will be closed to eastbound traffic on the approach to the roundabout, with vehicle access maintained on Millbank using temporary traffic signals.

  • A3203 (SE1,SW1P,SW1A) (All Directions)
  • A3212 (SW1A,SW1P) (All Directions)
  • [B326] Marsham Street (SW1P) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Expected delays

From: Friday 29 April 2016
To: Friday 31 March 2017

Last updated 01:28 Sunday 22 January 2017 : Delays are possible.

Works | Utility

[A3036] Albert Embankment (SE1) (Northbound) at the junction of New Spring Gardens Walk - Lane one (bus lane) restrictions in place to facilitate utility works. Working hours are 08:00 to 18:00 Monday to Friday and 08:00 to 16:00 Saturdays (continuous traffic management will remain in place).

  • [A3036] Albert Embankment (SE1) (Northbound)
  • New Spring Gardens Walk (SE1) (All Directions)

[A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Waltham Forest,Hackney)

  Expected delays

From: Friday 08 January 2016
To: Friday 26 January 2018

Last updated 21:06 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Waltham Forest Council will be carrying out works as part of the Mayor's Mini Holland Cycle scheme. The works will involve the installation of a cycle lane from Whipps Cross to the borough boundary near the Lea Valley Ice Rink. Other works will include of a new bus stand at Whipps Cross and the removal of Whipps Cross Roundabout to create a new junction.

  • Albany Road (E10) (All Directions)
  • Argall Way (E10) (All Directions)
  • Avondale Road (E10) (All Directions)
  • Belvedere Road (E10) (All Directions)
  • Bickley Road (E10) (All Directions)
  • Bloxhall Road (E10) (All Directions)
  • Blyth Road (E17) (All Directions)
  • Bromley Road (E10) (All Directions)
  • Chatsworth Road (E5) (All Directions)
  • College Road (E17) (All Directions)
  • Connaught Close (E10) (All Directions)
  • Dagenham Road (E10) (All Directions)
  • Ferndale Avenue (E17) (All Directions)
  • Flempton Road (E10) (All Directions)
  • Forest Rise (E17) (All Directions)
  • Foresters Drive (E17) (All Directions)
  • Fraser Road (E10) (All Directions)
  • Grove Road (E17) (All Directions)
  • Heybridge Way (E10) (All Directions)
  • Hibbert Road (E17) (All Directions)
  • Hillstowe Street (E5) (All Directions)
  • Hitcham Road (E10) (All Directions)
  • Kenninghall Road (E5) (All Directions)
  • Kettlebaston Road (E10) (All Directions)
  • Knotts Green Road (E10) (All Directions)
  • [A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Both Directions)
  • [B159] Leyton Green Road (E10) (All Directions)
  • Manor Road (E10) (All Directions)
  • Melbourne Road (E10) (All Directions)
  • Merton Road (E17) (All Directions)
  • Morieux Road (E10) (All Directions)
  • Otley Terrace (E5) (All Directions)
  • Peterborough Road (E17) (All Directions)
  • Poplars Road (E17) (All Directions)
  • Prout Road (E5) (All Directions)
  • Raglan Road (E17) (All Directions)
  • Rigg Approach (E10) (All Directions)
  • Rochdale Road (E17) (All Directions)
  • Russell Road (E10) (All Directions)
  • Salcombe Road (E17) (All Directions)
  • Sanderstead Road (E10) (All Directions)
  • School Nook (E5) (All Directions)
  • Seymour Road (E10) (All Directions)
  • Shortlands Road (E10) (All Directions)
  • Snaresbrook Road (E11) (All Directions)
  • Vicarage Road (E10) (All Directions)
  • Waterworks Lane (E5) (All Directions)
  • West End Avenue (E10) (All Directions)
  • Whitney Road (E10) (All Directions)
  • [B160] Wood Street (E17) (All Directions)
  • [A104] Woodford New Road (E17 ,E11 ,E10 ,E5) (All Directions)
  • Woodside Park Avenue (E17) (All Directions)

[A2211] Lewisham Road (SE13,SE10) (Greenwich)

  Expected delays

From: Wednesday 04 January 2017
To: Sunday 05 March 2017

Last updated 01:26 Sunday 22 January 2017 : Delays are possible.

Works | Utility

[A2211] Lewisham Road (SE13/SE10) (All Directions) at the junction of Sparta Street - Two-way temporary signals are in place to facilitate gas main replacement works by Southern Gas Networks.

  • [A2211] Lewisham Road (SE13,SE10) (All Directions)
  • Sparta Street (SE13,SE10) (All Directions)

[A112] Broadway (E15) (Newham)

  Expected delays

From: Monday 16 January 2017
To: Wednesday 15 March 2017

Last updated 21:05 Saturday 21 January 2017 : Delays are possible.

Works | Utility

[A112] Broadway (E15) (All Directions) at the junction of Great Eastern Road - Bus contraflow lane closed for utility works.

  • A11 (E15) (All Directions)
  • [A118] Broadway (E15) (All Directions)
  • [A112] Broadway (E15) (All Directions)
  • Broadway (E15) (All Directions)
  • Burtons Court (E15) (All Directions)
  • Chant Street (E15) (All Directions)
  • Great Eastern Road (E15) (All Directions)
  • Grove Crescent Road (E15) (All Directions)
  • High Street (E15) (All Directions)
  • [A118] Romford Road (E15) (All Directions)
  • Service Route No.1 (E15) (All Directions)
  • Station Street (E15) (All Directions)
  • The Grove (E15) (All Directions)
  • [A112] Tramway Avenue (E15) (All Directions)
  • West Ham Lane (E15) (All Directions)

Leadenhall Street (EC3A,EC3V) (City Of London)

  Expected delays

From: Wednesday 14 December 2016
To: Friday 31 March 2017

Last updated 19:55 Saturday 21 January 2017 : Delays are possible.

Special and Planned Events | Construction Activity

Leadenhall Street (EC3A/EC3V) (Eastbound) at the junction of St Mary Axe - The eastbound carriageway is partially blocked due to construction works.

  • Billiter Street (EC3M) (All Directions)
  • Leadenhall Street (EC3A,EC3V) (Eastbound)
  • Lime Street (EC3M) (All Directions)
  • St Mary Axe (EC3A) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Expected delays

From: Monday 01 February 2016
To: Sunday 30 April 2017

Last updated 01:27 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Well Hall Road - Various lane restrictions and closures in place to facilitate Eltham High Street improvement works. Phase 3 (Nov 2016 to April 2017) will consist of lane suspensions. Temporary signals are also in use at the junction.

[A211] High Street (DA14) (Bexley)

  Expected delays

From: Monday 09 January 2017
To: Tuesday 28 February 2017

Last updated 01:25 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A211] High Street (All Directions) at the junction of Elm Road - Temporary traffic signals in use to facilitate major junction improvement scheme.

  • A222 (DA14,DA15) (All Directions)
  • [A211] High Street (DA14) (All Directions)
  • [A211] Main Road (DA14) (All Directions)

[A217] Holborn Way (CR4) (Merton)

  Expected delays

From: Monday 25 July 2016
To: Friday 29 September 2017

Last updated 01:25 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A217] Holborn Way (All Directions) - Various restrictions in place including lane closures and temporary traffic signals to facilitate Mitcham town centre regeneration. Roads affected include London Road, Raleigh Gardens, Upper Green (East & West) and Holborn Way.

  • [A217] Holborn Way (CR4) (All Directions)
  • [A217] London Road (CR4) (All Directions)
  • [A217] Raleigh Gardens (CR4) (All Directions)
  • Raleigh Gardens (CR4) (All Directions)
  • Upper Green West (CR4) (All Directions)

[A232] Sutton Court Road (SM1) (Sutton)

  Expected delays

From: Thursday 04 August 2016
To: Friday 21 April 2017

Last updated 01:27 Sunday 22 January 2017 : Delays are possible.

Special and Planned Events | Construction Activity

[A232] Sutton Court Road (Westbound) between Chalk Pit Way and [B2230] High Street Sutton - Lane three closed to facilitate building works at a nearby development (Off peak 1000-1530 only).

  • Bank Mews (SM1) (All Directions)
  • [A232] Carshalton Road (SM1) (All Directions)
  • [A232] Chalk Pit Way (SM1) (All Directions)
  • Orme Road (SM1) (All Directions)
  • Sutton Court Road (SM1) (Westbound)

[A4020] Uxbridge Road (W7) (Ealing)

  Expected delays

From: Monday 14 November 2016
To: Friday 01 September 2017

Last updated 19:57 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A4020] Uxbridge Road (W7) (All Directions) at the junction of Boston Road - Various restrictions to facilitate a major borough street scheme.

  • [A4001] Boston Road (W7) (All Directions)

[A105] Green Lanes (N13,EN2,EN1,N9,N21) (Enfield)

  Expected delays

From: Monday 12 September 2016
To: Friday 30 June 2017

Last updated 20:02 Saturday 21 January 2017 : Local delays possible.

Works | TfL

[A105] Green Lanes (N13) (All Directions) between London Road and Ecclesbourne Gardens - Lane closures and temporary traffic lights in operation to facilitate the Mini Holland Cycle Scheme.

  • A110 (EN2,EN1) (All Directions)
  • A111 (N13) (All Directions)
  • [A1004] Alderman's Hill (N13) (All Directions)
  • Berry Close (N21) (All Directions)
  • Borden Avenue (EN1) (All Directions)
  • Broomfield Lane (N13) (All Directions)
  • Bush Hill Road (N21) (All Directions)
  • Carpenter Gardens (N21) (All Directions)
  • [B154] Church Street (N9,N21) (All Directions)
  • Compton Road (N21) (All Directions)
  • Conifer Gardens (EN1) (All Directions)
  • Crestbrook Avenue (N13) (All Directions)
  • Cromie Close (N13) (All Directions)
  • Devonshire Road (N13) (All Directions)
  • Ecclesbourne Close (N13) (All Directions)
  • Ecclesbourne Gardens (N13) (All Directions)
  • Felstead Close (N13) (All Directions)
  • Fernleigh Road (N21) (All Directions)
  • Green Dragon Lane (N21) (All Directions)
  • [A105] Green Lanes (N13,EN2,EN1,N9,N21) (All Directions)
  • Greenwood Gardens (N13) (All Directions)
  • Hazelwood Lane (N13) (All Directions)
  • Highfield Road (N21) (All Directions)
  • Kent Road (N21) (All Directions)
  • Lincoln Road (EN2) (All Directions)
  • [A105] London Road (N13,EN2,EN1,N9,N21) (All Directions)
  • Meadowcroft Road (N13) (All Directions)
  • Mortimer Drive (EN1) (All Directions)
  • Oakthorpe Road (N13) (All Directions)
  • Oaktree Avenue (N13) (All Directions)
  • Osborne Road (N13) (All Directions)
  • Oxford Gardens (N21) (All Directions)
  • Palmerston Crescent (N13) (All Directions)
  • Park Avenue (N13,EN1) (All Directions)
  • [A105] Park Avenue (N13,EN2,EN1,N9,N21) (All Directions)
  • Percy Road (N21) (All Directions)
  • Private Road (EN2) (All Directions)
  • Queen's Avenue (N21) (All Directions)
  • Radcliffe Road (N21) (All Directions)
  • Regency Court (EN1) (All Directions)
  • [A105] Ridge Avenue (N13,EN2,EN1,N9,N21) (All Directions)
  • River Avenue (N13) (All Directions)
  • River Bank (N21) (All Directions)
  • Sherbrook Gardens (N21) (All Directions)
  • Shrubbery Gardens (N21) (All Directions)
  • Silver Street (EN1) (All Directions)
  • Sittingbourne Avenue (EN1) (All Directions)
  • Solna Road (N21) (All Directions)
  • Springfield Parade Mews (N13) (All Directions)
  • Station Road (N21) (All Directions)
  • Stonard Road (N13) (All Directions)
  • Teynham Avenue (EN1) (All Directions)
  • Trade Close (N13) (All Directions)
  • Uvedale Road (EN2) (All Directions)
  • Vicar's Moor Lane (N21) (All Directions)
  • [A105] Village Road (N13,EN2,EN1,N9,N21) (All Directions)
  • Village Road (EN1) (All Directions)
  • Walnut Grove (EN1) (All Directions)
  • Walsingham Road (EN2) (All Directions)
  • Windsor Road (N13) (All Directions)
  • Woodberry Avenue (N21) (All Directions)
  • York Road (N21) (All Directions)

[A1] Aldersgate Street (EC2Y,EC1A) (City Of London)

  Expected delays

From: Monday 22 August 2016
To: Friday 31 March 2017

Last updated 19:56 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A1] Aldersgate Street (EC2Y/EC1A) (All Approaches) at the junction of Beech Street and Long Lane - Restrictions in place to facilitate heating pipe installation works into St Bart's Hospital. There will be **no** right turn from Aldersgate to Beech Street (northbound) and no right turn from Aldersgate into Long Lane (southbound).

  • [A1] Aldersgate Street (EC2Y,EC1A) (All Approaches)
  • [B100] Beech Street (EC2Y,EC1A) (All Directions)
  • Cloth Street (EC1A) (All Directions)

Victoria Street ()

  Expected delays

From: Tuesday 03 May 2011
To: Friday 31 August 2018

Last updated 10:29 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. [A202] Bressenden Place is reduced to one lane at times. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road and Allington Street are closed. Find out more.

  • Victoria Street (All Directions)

[A212] Wellesley Road (CR0,CR9) (Croydon)

  Expected delays

From: Monday 16 January 2017
To: Friday 31 March 2017

Last updated 01:23 Sunday 22 January 2017 : Delays are possible.

Works | Borough

[A212] Wellesley Road (All Directions) between Croydon Underpass and Bedford Park - Various lane restrictions and temporary traffic lights are in place to install new pedestrian crossings and alter road layout.

  • Bedford Park (CR9) (All Directions)
  • Lansdowne Road (CR9,CR0) (All Directions)
  • Sydenham Road (CR0) (All Directions)
  • Walpole Road (CR0) (All Directions)
  • [A212] Wellesley Road (CR0,CR9) (All Directions)

[B507] Lisson Grove (NW8) (Westminster)

  Expected delays

From: Thursday 08 September 2016
To: Friday 05 May 2017

Last updated 10:33 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[B507] Lisson Grove (NW8) (Southbound) at the junction of Lilestone Street - Lane restrictions in place to facilitate building works.

A12

[A12] Eastway Tunnel (A12) (E9,E15,E3) (Tower Hamlets,Newham,Hackney)

  Expected delays

From: Friday 08 July 2016
To: Saturday 18 March 2017

Last updated 02:13 Saturday 21 January 2017 : All lanes have now reopened. Traffic is flowing well.

Works | TfL

[A12] Eastway Tunnel (Southbound) - Various lane closures between approximately 2200hrs and 0500hrs during overnight maintenance. Lane one (of two) and hard shoulder closed the night of the second Friday of each month. Lanes one and two (of two) closed, with traffic running on the hard shoulder, the night of the third Friday of each month.

  • A106 (E10,E9,E15) (All Directions)
  • A12 (E9,E15,E3) (All Directions)
  • B112 (E9) (All Directions)
  • Bartrip Street (E9) (All Directions)
  • Buxhall Crescent (E9) (All Directions)
  • Cadogan Close (E9) (All Directions)
  • Cadogan Terrace (E9) (All Directions)
  • Chapman Road (E9) (All Directions)
  • [A12] Cowdry Road (E9,E15,E3) (All Directions)
  • Crowfoot Close (E9) (All Directions)
  • Dace Road (E3) (All Directions)
  • [A12] East Cross Route (E9,E15,E3) (All Directions)
  • Eastway (E9) (All Directions)
  • Eastway Tunnel (A12) (E9) (All Directions)
  • [A12] Eastway Tunnel (A12) (E9,E15,E3) (Southbound)
  • Edmeston Close (E9) (All Directions)
  • Felstead Street (E9) (All Directions)
  • Hillyfield Close (E9) (All Directions)
  • Jodrell Road (E3) (All Directions)
  • [A12] Lea Bridge (A12 / A106 Ruckholt Road) (E9,E15,E3) (All Directions)
  • Lee Conservancy Road (E9) (All Directions)
  • Merriam Avenue (E9) (All Directions)
  • Monier Road (E3) (All Directions)
  • Northwall Road (E9,E15) (All Directions)
  • Palace Close (E9) (All Directions)
  • Remus Road (E3) (All Directions)
  • Rothbury Road (E9) (All Directions)
  • Shalbourne Square (E9) (All Directions)
  • St Marks Gate (E9) (All Directions)
  • Trego Road (E9) (All Directions)
  • Trowbridge Road (E9) (All Directions)
  • Wallis Road (E9) (All Directions)
  • Wansbeck Road (E3,E9) (All Directions)
  • White Post Lane (E9) (All Directions)
  • Wick Lane (E3) (All Directions)

Inner Ring

[A1202] Holywell Lane (EC2A) (Hackney)

  Expected delays

From: Monday 30 January 2017
To: Friday 10 March 2017

Last updated 13:30 Saturday 24 December 2016

Works | Borough

Holywell Lane (EC2A) (Eastbound) between King John Court and Shoreditch High Street - Road closure due to footway widening, new kerbs and footway resurfacing. This will be between 30 January 2017 to 10 March 2017, with the exception of 26 February.

  • [A1209] Bethnal Green Road (E1) (All Directions)
  • Christina Street (EC2A) (All Directions)
  • Curtain Road (EC2A) (All Directions)
  • [A1202] Great Eastern Street (EC2A) (All Directions)
  • Holywell Lane (EC2A) (Eastbound)
  • King John Court (EC2A) (All Directions)
  • Scrutton Street (EC2A) (All Directions)
  • [A10] Shoreditch High Street (E1) (All Directions)

Inner Ring

[A4202] Park Lane (W1K,W2) (Westminster)

  Expected delays

From: Tuesday 03 January 2017
To: Sunday 19 February 2017

Last updated 06:00 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | Utility

[A4202] Park Lane (W2 /W1K) (Northbound) opposite the junction of Woods Mews - Lanes four and five (of five) closed to facilitate works by Thames Water (night works, Monday to Friday only).

  • [A4202] Park Lane (W1K,W2) (Northbound)
  • Wood's Mews (W1K) (All Directions)

Old Oak Common Lane (W3) (Hammersmith & Fulham)

  Expected delays

From: Monday 09 January 2017
To: Monday 13 February 2017

Last updated 02:36 Sunday 22 January 2017 : No restrictions currently implemented. Traffic is flowing well in the area

Works | TfL

Old Oak Common Lane (W3 ) (All Directions) at the junction of Du Cane Road - Various lane restrictions and closures to facilitate traffic signal modernisation works (2000hrs to 0500hrs). No restrictions in place.

  • Du Cane Road (W12,W3) (All Directions)
  • Erconwald Street (W12) (All Directions)
  • Old Oak Common Lane (W3) (All Directions)

A12

[A12] George Green Tunnel (IG1,E11) (Waltham Forest,Redbridge)

  Moderate

From: Friday 05 August 2016
To: Saturday 04 March 2017

Last updated 03:00 Saturday 21 January 2017 : The tunnel has reopened, traffic is flowing well.

Works | TfL

[A12] George Green Tunnel (E11) (Both Directions) and [A12] Green Man Tunnel (A114) (Eastbound) - Various closures between approximately 2200hrs and 0500hrs the first and second Fridays of each month during overnight maintenance. Closed westbound the first Friday of each month and eastbound the second.

  • A1008 (E11) (All Directions)
  • A1199 (E11) (All Directions)
  • A12 (IG1,E11) (All Directions)
  • Addison Road (E11) (All Directions)
  • Ashbridge Road (E11) (All Directions)
  • Cambridge Park (E11) (All Directions)
  • Cambridge Park Road (E11) (All Directions)
  • Cambridge Road (E11) (All Directions)
  • Camden Road (E11) (All Directions)
  • Chadwick Road (E11) (All Directions)
  • Chester Road (E11) (All Directions)
  • Colworth Road (E11) (All Directions)
  • Corbett Road (E11) (All Directions)
  • Corbicum (E11) (All Directions)
  • Dangan Road (E11) (All Directions)
  • Draycot Road (E11) (All Directions)
  • Drummond Road (E11) (All Directions)
  • [A12] Eastern Avenue (IG1,E11) (All Directions)
  • Eastern Avenue (IG4) (All Directions)
  • Elm Close (E11) (All Directions)
  • Elm Hall Gardens (E11) (All Directions)
  • [A106] Gainsborough Road (E11) (All Directions)
  • Gardner Close (E11) (All Directions)
  • [A12] George Green Tunnel (IG1,E11) (Westbound)
  • Gordon Road (E11) (All Directions)
  • [A12] Green Man Tunnel (A12) (IG1,E11) (Eastbound)
  • Hanbury Drive (E11) (All Directions)
  • [A12] Harrier Avenue (IG1,E11) (All Directions)
  • High Street (E11) (All Directions)
  • Highstone Avenue (E11) (All Directions)
  • Holly Road (E11) (All Directions)
  • [A12] Kingfisher Avenue (IG1,E11) (All Directions)
  • Kingswood Road (E11) (All Directions)
  • Lemna Road (E11) (All Directions)
  • Lonsdale Road (E11) (All Directions)
  • Mansfield Road (E11) (All Directions)
  • Nutter Lane (E11) (All Directions)
  • Poppleton Road (E11) (All Directions)
  • Preston Drive (E11) (All Directions)
  • Redbridge Lane West (E11) (All Directions)
  • Reydon Avenue (E11) (All Directions)
  • River Close (E11) (All Directions)
  • Seagry Road (E11) (All Directions)
  • Selsdon Road (E11) (All Directions)
  • Spratt Hall Road (E11) (All Directions)
  • Sydney Road (E11) (All Directions)
  • Teesdale Road (E11) (All Directions)
  • The Green (E11) (All Directions)
  • Wallwood Road (E11) (All Directions)
  • [A114] Whipps Cross Road (E11) (All Directions)
  • Wigram Road (E11) (All Directions)
  • Woodcote Road (E11) (All Directions)

A12

[A12] Green Man Tunnel (A12) (E11) (Waltham Forest,Redbridge)

  Moderate

From: Friday 05 August 2016
To: Saturday 18 March 2017

Last updated 02:59 Saturday 21 January 2017 : The tunnel has reopened. Traffic is flowing well.

Works | TfL

[A12] Green Man Tunnel (A114) (Both Directions) - Various closure between approximately 2200hrs and 0500hrs during overnight maintenance. Closed eastbound the nights of the first and second Friday of each month, in conjunction with George Green Tunnel closures. Closed in both directions the night of the third Friday of each month.

  • A106 (E11) (All Directions)
  • A1199 (E11) (All Directions)
  • A12 (E11) (All Directions)
  • Cambridge Park (E11) (All Directions)
  • Cambridge Park Road (E11) (All Directions)
  • Cambridge Road (E11) (All Directions)
  • Chadwick Road (E11) (All Directions)
  • Church Lane (E11) (All Directions)
  • Colworth Road (E11) (All Directions)
  • Fairlop Road (E11) (All Directions)
  • [A12] Green Man Tunnel (A12) (E11) (Eastbound)
  • Hanbury Drive (E11) (All Directions)
  • Harrington Road (E11) (All Directions)
  • Highstone Avenue (E11) (All Directions)
  • Holly Road (E11) (All Directions)
  • King's Road (E11) (All Directions)
  • Kingswood Road (E11) (All Directions)
  • Kirkdale Road (E11) (All Directions)
  • Lemna Road (E11) (All Directions)
  • Lonsdale Road (E11) (All Directions)
  • Poppleton Road (E11) (All Directions)
  • Queen's Road (E11) (All Directions)
  • Selsdon Road (E11) (All Directions)
  • Teesdale Road (E11) (All Directions)
  • Wallwood Road (E11) (All Directions)
  • [A114] Whipps Cross Road (E11) (All Directions)
  • Woodcote Road (E11) (All Directions)

A13

[A13] Commercial Road (E14) (Tower Hamlets)

  Moderate

From: Monday 16 January 2017
To: Wednesday 01 February 2017

Last updated 20:53 Saturday 21 January 2017 : Traffic is flowing well.

Works | Utility

[A13] Commercial Road (E14) (Westbound) between Wharf Lane and Island Row - Lane one is closed to facilitate works.

  • [A13] Commercial Road (E14) (Eastbound)
  • Newell Street (E14) (All Directions)
  • Wharf Lane (E14) (All Directions)

A13

City Route

Southern River Route

[A1203] Limehouse Link Tunnel (E1W,E14) (Tower Hamlets)

  Moderate

From: Tuesday 19 July 2016
To: Friday 03 March 2017

Last updated 05:58 Friday 06 January 2017 : The Tunnel has been reopened.

Works | TfL

[A1203] Limehouse Link Tunnel (Both Directions) - Closed in both directions between approximately 2200hrs and 0500hrs every four weeks at the end of the month for cyclic maintenance.

  • A101 (E1W,E14) (All Directions)
  • A1261 (E14) (All Directions)
  • Barleycorn Way (E14) (All Directions)
  • Basin Approach (E14) (All Directions)
  • Bekesbourne Street (E14) (All Directions)
  • Birchfield Street (E14) (All Directions)
  • Branch Road (E14) (All Directions)
  • Brightlingsea Place (E14) (All Directions)
  • [A126] Butcher Row (E1W,E14) (All Directions)
  • Cannon Drive (E14) (All Directions)
  • Castor Lane (E14) (All Directions)
  • Cranford Street (E1W) (All Directions)
  • Dingle Gardens (E14) (All Directions)
  • Dolphin Lane (E14) (All Directions)
  • Dundee Wharf (E14) (All Directions)
  • Garford Street (E14) (All Directions)
  • Heckford Street (E1W) (All Directions)
  • Hertsmere Road (E14) (All Directions)
  • Horseferry Road (E14) (All Directions)
  • Island Row (E14) (All Directions)
  • Jardine Road (E1W) (All Directions)
  • Limehouse Causeway (E14) (All Directions)
  • [A1203] Limehouse Link (E1W,E14) (All Directions)
  • [A1203] Limehouse Link (Tunnel) (E1W,E14) (All Directions)
  • Limehouse Link Tunnel (E14) (All Directions)
  • [A1206] Limehouse Link Tunnel (E14) (All Directions)
  • [A1203] Limehouse Link Tunnel (E1W,E14) (Both Directions)
  • Mill Place (E14) (All Directions)
  • Milligan Street (E14) (All Directions)
  • Ming Street (E14) (All Directions)
  • Narrow Street (E14) (All Directions)
  • Northey Street (E14) (All Directions)
  • Norway Place (E14) (All Directions)
  • Oak Lane (E14) (All Directions)
  • Pennyfields (E14) (All Directions)
  • Premiere Place (E14) (All Directions)
  • Ratcliffe Lane (E14) (All Directions)
  • Ropemaker's Fields (E14) (All Directions)
  • Rosefield Gardens (E14) (All Directions)
  • Schoolhouse Lane (E1W) (All Directions)
  • Shoulder Of Mutton Alley (E14) (All Directions)
  • Spert Street (E14) (All Directions)
  • [A1203] The Highway (E1W,E14) (All Directions)
  • Three Colt Street (E14) (All Directions)
  • [A1206] Westferry Road (E14) (All Directions)
  • Wharf Lane (E14) (All Directions)

A406

[A406] Fore Street Tunnel (N18) (Enfield)

  Moderate

From: Thursday 04 August 2016
To: Friday 10 March 2017

Last updated 22:41 Thursday 19 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A406] Fore Street Tunnel (Both Directions) - Fully closed between approximately 2200hrs and 0500hrs the nights of first and second Thursday of each month during maintenance.

  • A1010 (N18) (All Directions)
  • Aberdeen Road (N18) (All Directions)
  • Angel Close (N18) (All Directions)
  • Angel Place (N18) (All Directions)
  • [A406] Angel Road (N18) (All Directions)
  • [A406] Angel Road (North Circular Road) (N18) (All Directions)
  • Booker Road (N18) (All Directions)
  • College Close (N18) (All Directions)
  • Cornwall Road (N18) (All Directions)
  • Cross Street (N18) (All Directions)
  • Cuthbert Road (N18) (All Directions)
  • Dickens Lane (N18) (All Directions)
  • Dorrit Mews (N18) (All Directions)
  • Edinburgh Road (N18) (All Directions)
  • Fairfield Road (N18) (All Directions)
  • [A406] Fore Street Tunnel (N18) (Both Directions)
  • Glasgow Road (N18) (All Directions)
  • Gloucester Road (N18) (All Directions)
  • Inverness Road (N18) (All Directions)
  • King's Road (N18) (All Directions)
  • Linnell Road (N18) (All Directions)
  • Raynham Avenue (N18) (All Directions)
  • Raynham Road (N18) (All Directions)
  • Regal Court (N18) (All Directions)
  • [A406] Silver Street (N18) (All Directions)
  • Silver Street (N18) (All Directions)
  • Somerset Road (N18) (All Directions)
  • [A406] Sterling Way (N18) (All Directions)
  • [A406] Sterling Way (North Circular Road) (N18) (All Directions)
  • Upton Road (N18) (All Directions)
  • [A406] Victoria Road (N18) (All Directions)
  • Victoria Road (N18) (All Directions)
  • Wakefield Street (N18) (All Directions)

Blackwall Tunnel

O2 Arena, Greenwich () (Greenwich)

  Moderate

Tuesday 31 January 2017

Last updated 08:05 Wednesday 17 August 2016

Special and Planned Events | Concert

O2 Arena - Black Sabbath in concert. Expect delays on Millennium Way, West Parkside and Edmund Halley Way after the event has finished.

Farringdon Cross Route

City Route

Bishopsgate Cross Route

A3211 (EC4R,EC4Y,EC3R,EC4V) (City Of London)

  Moderate

From: Sunday 29 January 2017
To: Thursday 02 February 2017

Last updated 12:44 Friday 20 January 2017

Works | TfL

A3211 Upper Thames Street/Lower Thames Street (EC4V/EC4Y/EC4R/EC3R) (Eastbound) between Blackfriars Underpass and Great Tower Street - Road closed to facilitate repairs to the carriageway and line painting.

  • A201 (EC4Y,SE1,EC4V) (All Directions)
  • A3 (EC3R,EC4R) (All Directions)
  • A3211 (EC4R,EC4Y,EC3R,EC4V) (Eastbound)
  • Blackfriars Underpass (EC4V) (All Directions)
  • Booth Lane (EC4V) (All Directions)
  • Botolph Lane (EC3M) (All Directions)
  • Broken Wharf (EC4V) (All Directions)
  • Bush Lane (EC4R) (All Directions)
  • Cannon Street Station (EC4R) (All Directions)
  • Carmelite Street (EC4Y) (All Directions)
  • Castle Baynard Street (EC4V) (All Directions)
  • College Hill (EC4R) (All Directions)
  • College Street (EC4R) (All Directions)
  • Cousin Lane (EC4R) (All Directions)
  • Cross Lane (EC3R) (All Directions)
  • Dowgate Hill (EC4R) (All Directions)
  • Gardners Lane (EC4V) (All Directions)
  • Garlick Hill (EC4V) (All Directions)
  • Great Tower Street (EC3R) (All Directions)
  • Harp Lane (EC3R) (All Directions)
  • High Timber Street (EC4V) (All Directions)
  • Kennett Wharf Lane (EC4V) (All Directions)
  • Lambeth Hill (EC4V) (All Directions)
  • Laurence Pountney Lane (EC4R) (All Directions)
  • Little Trinity Lane (EC4V) (All Directions)
  • Lower Thames Street (EC3R) (All Directions)
  • Millennium Bridge (EC4V) (All Directions)
  • Monument Street (EC3R) (All Directions)
  • Pudding Lane (EC3R) (All Directions)
  • [A300] Queen Street Place (EC4R) (All Directions)
  • Queenhithe (EC4V) (All Directions)
  • St Dunstan's Hill (EC3R) (All Directions)
  • St Mary At Hill (EC3R) (All Directions)
  • Suffolk Lane (EC4R) (All Directions)
  • Swan Lane (EC4R) (All Directions)
  • Victoria Embankment (EC4Y) (All Directions)
  • White Lion Hill (EC4V) (All Directions)

Aldgate Gyratory

  Moderate

From: Saturday 28 June 2014
To: Wednesday 31 May 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

A23

[A23] Purley Way (CR0) (Croydon)

  Expected delays

From: Monday 23 January 2017
To: Sunday 26 February 2017

Last updated 07:25 Wednesday 18 January 2017

Works | TfL

[A23] Purley Way (CR0) (All Directions) at the junction of Waddon Road and Mill Lane - Nightly temporary traffic lights in operation to facilitate traffic signal modernisation works (21:00 to 05:00).

  • Mill Lane (CR0) (All Directions)
  • [A23] Purley Way (CR0) (All Directions)
  • Waddon Road (CR0) (All Directions)

Ardleigh Green Bridge

  Moderate

From: Thursday 01 January 2015
To: Sunday 31 December 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Highbury Corner

  Moderate

From: Monday 24 November 2014
To: Monday 20 November 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Old Street Roundabout

  Moderate

From: Monday 23 January 2017
To: Saturday 29 June 2019

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Archway Gyratory

  Moderate

From: Monday 01 February 2016
To: Sunday 30 July 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Cycle Superhighway 4 (Tower Bridge to Deptford)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Cycle Superhighway 4 (Surrey Quays Gyratory)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Cycle Superhighway 4 (Rotherhithe Roundabout)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

North-South Cycle Superhighway

  Moderate

From: Sunday 01 May 2016
To: Monday 01 May 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Kingston Mini-Holland Programme

  Moderate

From: Monday 09 November 2015
To: Friday 22 December 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

A23

A24

[A203] South Lambeth Road (SW9,SW8) (Lambeth)

  Expected delays

From: Monday 30 January 2017
To: Friday 17 March 2017

Last updated 19:24 Tuesday 10 January 2017

Works | TfL

[A203] South Lambeth Road (SW8) (Both Directions) at the junction of Stockwell Terrace - Various lane sectional restrictions under short duration (mobile working), due to street lighting works, daily.

  • A203 (SW9,SW8) (All Directions)
  • [A203] South Lambeth Road (SW9,SW8) (Both Directions)
  • Stockwell Terrace (SW9) (All Directions)

A4

Inner Ring

[A4] Piccadilly Underpass (W1J,SW1X,W1K) (Westminster)

  Expected delays

From: Saturday 14 January 2017
To: Sunday 19 March 2017

Last updated 12:33 Saturday 14 January 2017 : The underpass has reopened in both directions. Traffic is flowing well.

Works | Borough

[A4] Piccadilly Underpass (SW1) (Both Directions) - Closed between approximately 0800hrs Saturday and 1600hrs Sunday on the second weekend of each month.

  • Brick Street (W1J) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Down Street (W1J) (All Directions)
  • Down Street Mews (W1J) (All Directions)
  • [A4] Duke Of Wellington Place (W1J,SW1X,W1K) (All Directions)
  • [B310] Grosvenor Crescent (SW1X) (All Directions)
  • Grosvenor Crescent Mews (SW1X) (All Directions)
  • Hamilton Mews (W1J) (All Directions)
  • Hamilton Place (W1J) (All Directions)
  • [A4] Hyde Park Corner (W1J,SW1X,W1K) (All Directions)
  • [A4] Knightsbridge (W1J,SW1X,W1K) (All Directions)
  • Old Barrack Yard (SW1X) (All Directions)
  • Old Park Lane (W1K,W1J) (All Directions)
  • [A4202] Park Lane (W1J) (All Directions)
  • [A4] Piccadilly (W1J,SW1X,W1K) (All Directions)
  • Piccadilly (W1J) (All Directions)
  • [A4] Piccadilly Underpass (W1J,SW1X,W1K) (Both Directions)
  • South Carriage Drive (W1J,W2) (All Directions)
  • Wilton Place (SW1X) (All Directions)
  • Yarmouth Place (W1J) (All Directions)

A406

A4

[A4] Great West Road (W4,TW8) (Hounslow)

  Expected delays

From: Monday 16 January 2017
To: Saturday 25 February 2017

Last updated 05:00 Tuesday 17 January 2017 : Traffic is flowing well in the area.

Works | Other

[A4] Great West Road (W4 /TW8) (Both Directions) between Chiswick Roundabout and Ealing Road - Lane closures to facilitate Highways England investigation works (nightly, 2230hrs to 0500hrs).

  • [A4] Chiswick Roundabout (W4,TW8) (All Directions)
  • Clayponds Avenue (TW8) (All Directions)
  • Clayponds Lane (TW8) (All Directions)
  • [B455] Ealing Road (TW8) (All Directions)
  • [A4] Great West Road (W4,TW8) (Both Directions)
  • [A4] Great West Road Roundabout (W4,TW8) (All Directions)
  • [A406] Gunnersbury Avenue (North Circular Road) (W4) (All Directions)
  • Lionel Road North (TW8) (All Directions)
  • Lionel Road South (TW8) (All Directions)
  • M4 (W4,TW8) (All Directions)

Bishopsgate Cross Route

[A10] Cornhill (EC3V,EC2N,EC2R) (City Of London)

  Expected delays

From: Monday 30 January 2017
To: Thursday 13 April 2017

Last updated 07:51 Thursday 12 January 2017

Works | Utility

Cornhill (EC3V/EC2N/EC2R) (Both Directions) between Threadneedle Street and Gracechurch Street - Road closure due to Thames Water works. Eastbound diversion via Threadneedle Street & Bishopsgate and westbound diversion from Aldgate via Fenchurch Street, Gracechurch Street, King William Street and Lombard Street.

  • A10 (EC2N,EC3V) (All Directions)
  • Abchurch Lane (EC4N) (All Directions)
  • Bartholomew Lane (EC2N) (All Directions)
  • Bell Inn Yard (EC3V) (All Directions)
  • Birchin Lane (EC3V) (All Directions)
  • Corbet Court (EC3V) (All Directions)
  • Cornhill (EC3V,EC2N,EC2R) (Both Directions)
  • Finch Lane (EC3V) (All Directions)
  • George Yard (EC3V) (All Directions)
  • King William Street (EC4N) (All Directions)
  • Leadenhall Street (EC2N,EC3V) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Mansion House Place (EC4N) (All Directions)
  • Mansion House Street (EC2R,EC3V) (All Directions)
  • Old Broad Street (EC2R) (All Directions)
  • Poultry (EC2R) (All Directions)
  • Prince's Street (EC2R) (All Directions)
  • Queen Victoria Street (EC3V,EC2R) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)
  • St Mildred's Court (EC2R) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • Threadneedle Street (EC3V,EC2R) (All Directions)
  • Walbrook (EC4N) (All Directions)
  • Whittington Avenue (EC3V) (All Directions)

Cycle Superhighway 5 (Oval to Lewisham)

  Moderate

From: Sunday 01 January 2017
To: Friday 01 December 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

East-West Cycle Superhighway

  Moderate

From: Sunday 01 January 2017
To: Monday 01 January 2018

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Upper Holloway Bridge

  Moderate

From: Tuesday 23 September 2014
To: Saturday 30 September 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Power Road Bridge

  Moderate

From: Monday 15 June 2015
To: Thursday 15 June 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Enfield Mini-Holland Programme

  Moderate

From: Saturday 01 November 2014
To: Saturday 01 December 2018

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Waltham Forest Mini-Holland Programme

  Moderate

From: Monday 26 January 2015
To: Saturday 31 March 2018

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Expected delays

From: Saturday 14 January 2017
To: Sunday 05 February 2017

Last updated 18:08 Saturday 21 January 2017 : Works contained to the footpath.

Works | TfL

[A201] Blackfriars Road (SE1) (Both Directions) at the junction of Meymott Street - Restrictions in place to facilitate the installation of a zebra crossing on the Cycle Superhighway. Works are weekend works, 0900hrs-1800hrs on Saturdays, 1000hrs-1600hrs on Sundays.

  • [A201] Blackfriars Road (SE1) (Both Directions)
  • Meymott Street (SE1) (All Directions)

[A4020] Uxbridge Road (UB4) (Hillingdon)

  Expected delays

From: Monday 23 January 2017
To: Friday 03 February 2017

Last updated 15:30 Friday 20 January 2017

Works | Utility

[A4020] Uxbridge Road (UB4) (Westbound) at the junction of Springfield Road - Lane closure in place to facilitate emergency gas works.

  • Springfield Road (UB4) (All Directions)

[A308] Fulham Road (SW3,SW7) (Kensington & Chelsea)

  Expected delays

From: Monday 30 January 2017
To: Monday 06 February 2017

Last updated 16:19 Wednesday 04 January 2017

Works | Other

[A308] Fulham Road (SW3/SW7) (All Directions) at the junction of Old Church Street -Temporary traffic signals are in operation at this location to facilitate works.

  • [A308] Fulham Road (SW3,SW7) (All Directions)
  • Old Church Street (SW3) (All Directions)

[A402] Bayswater Road (W2) (Westminster)

  Expected delays

From: Tuesday 31 January 2017
To: Wednesday 01 February 2017

Last updated 07:31 Thursday 12 January 2017

Works | TfL

[A402] Bayswater Road (Eastbound) at the junction of Lancaster Terrace - Lane one closure due to deliveries to facilitate the lift replacement works in the station

  • [A402] Bayswater Road (W2) (Eastbound)
  • Elms Mews (W2) (All Directions)
  • [A4209,A402] Lancaster Terrace (W2) (All Directions)
  • [A402] Lancaster Terrace (W2) (All Directions)

St James's Park - Changing Of The Guard (SW1A) (Westminster)

  Expected delays

From: Wednesday 21 December 2016
To: Tuesday 16 January 2018

Last updated 11:48 Friday 20 January 2017 : Local delays possible when ceremony in progress.

Special and Planned Events | Ceremonial

St James's Park (All Directions) - Changing of the Guard - Constitution Hill, Spur Road, Birdcage Walk eastbound and The Mall at Marlborough Road will be closed to facilitate a ceremonial event. Closures in place Mondays, Wednesdays, Fridays and Sundays: 1015-1145hrs.

  • Birdcage Walk (SW1E,SW1H) (Eastbound)
  • Birdcage Walk (SW1E,SW1H) (All Directions)
  • Buckingham Gate (SW1E) (All Directions)
  • Buckingham Gate (SW1E) (All Directions)
  • Buckingham Palace (SW1A) (All Directions)
  • Buckingham Palace (SW1A) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stable Yard Road (SW1A) (All Directions)
  • Stable Yard Road (SW1A) (All Directions)
  • The Mall (SW1A) (All Directions)
  • The Mall (SW1A) (All Directions)

[A503] Seven Sisters Road (N15) (Haringey)

  Moderate

From: Friday 20 January 2017
To: Wednesday 01 February 2017

Last updated 20:43 Saturday 21 January 2017 : Traffic is flowing well on approach.

Works | Utility

[A503] Seven Sisters Road (N15) (Both Directions) at the junction of Vartry Road - Southbound carriageway closure, with a single-lane contraflow in the northbound carriageway, to facilitate essential Thames Water utility works. Traffic Management will remain in place continuously (24/7) .

  • Netherton Road (N15) (All Directions)
  • [A503] Seven Sisters Road (N15) (Both Directions)
  • Vartry Road (N15) (All Directions)

A1

[A503] Seven Sisters Road (N7) (Islington)

  Minimal

From: Monday 23 January 2017
To: Tuesday 14 March 2017

Last updated 13:46 Friday 20 January 2017

Works | TfL

[A503] Seven Sisters Road (All Directions) at the junction of Holloway Road - Temporary lights, lane restrictions and closures to facilitate traffic signal modernisation works. Works will not take place during Arsenal home matches (night works, except weekends).

  • Bowman's Mews (N7) (All Directions)
  • [A1] Holloway Road (N7) (All Directions)
  • [A503] Parkhurst Road (N7) (All Directions)
  • [A503] Seven Sisters Road (N7) (All Directions)

A1

[A1] Holloway Road (N19) (Islington)

  Minimal

From: Wednesday 21 October 2015
To: Saturday 01 April 2017

Last updated 02:32 Sunday 22 January 2017 : Traffic is flowing well.

Works | TfL

Upper Holloway Bridge, [A1] Holloway Road (Both Directions) at the junction of Fairbridge Road near Upper Holloway station - Various restrictions during bridge replacement works. From 16th January until 1st April, the carriageway will be reduced to one lane in both directions between Fairbridge Road and Wedmore Gardens. Find out more about Upper Holloway Bridge.

  • Alexander Road (N19) (All Directions)
  • [A1] Archway Road (N19) (All Directions)
  • Archway Road (N19) (All Directions)
  • Criterion Mews (N19) (All Directions)
  • Hampden Road (N19) (All Directions)
  • [A1,B519] Highgate Hill (N19) (All Directions)
  • [A1] Holloway Road (N19) (Both Directions)
  • Marlborough Road (N19) (All Directions)
  • St John's Villas (N19) (All Directions)
  • [A1] St John's Way (N19) (All Directions)
  • Tavistock Terrace (N19) (All Directions)
  • [A1] Tollhouse Way (N19) (All Directions)
  • Wedmore Gardens (N19) (All Directions)
  • Wedmore Mews (N19) (All Directions)
  • Windermere Road (N19) (All Directions)

A13

East India Dock Tunnel (E14) (Tower Hamlets)

  Minimal

From: Monday 05 January 2015
To: Tuesday 28 February 2017

Last updated 23:02 Monday 02 January 2017 : The tunnel is open, traffic is flowing well.

Works | TfL

[A1261] East India Dock Tunnel (Both Directions) - closed between approximately 2200hrs and 0600hrs during overnight maintenance.

  • East India Dock Tunnel (E14) (Both Directions)

A2

[B203] Old Kent Road (SE1) (Southwark)

  Minimal

From: Monday 23 January 2017
To: Tuesday 28 February 2017

Last updated 10:37 Friday 16 December 2016

Works | TfL

[A2] Old Kent Road (SE1) (Both Directions) at the junction of Penry Street - Lane restrictions between approximately 2100hrs and 0500hrs each night during traffic signal upgrade works.

  • Congreve Street (SE17) (All Directions)
  • [B203] Dunton Road (SE1) (All Directions)
  • East Street (SE1,SE17) (All Directions)
  • Freemantle Street (SE17) (All Directions)
  • Hendre Road (SE1) (All Directions)
  • Ivy Church Lane (SE1) (All Directions)
  • Kinglake Street (SE1,SE17) (All Directions)
  • Madron Street (SE1,SE17) (All Directions)
  • Marcia Road (SE1) (All Directions)
  • Mina Road (SE1) (All Directions)
  • [B203] Old Kent Road (SE1) (Both Directions)
  • [A2] Old Kent Road (SE1) (All Directions)
  • Penry Street (SE1) (All Directions)
  • Stanford Place (SE1) (All Directions)
  • Surrey Square (SE1,SE17) (All Directions)
  • Surrey Terrace (SE17) (All Directions)
  • Upnor Way (SE17) (All Directions)

A2

[A2213] Kidbrooke Park Road (SE3,SE12) (Greenwich)

  Minimal

From: Tuesday 30 August 2016
To: Wednesday 31 May 2017

Last updated 01:26 Sunday 22 January 2017 : Delays are possible.

Works | TfL

[A2213] Kidbrooke Park Road (SE3/SE12) (All Directions) at the junction of Weigall Road - Improvement works on the A2213 Kidbrooke Park Road from 30 August. The improvements, which form part of the Kidbrooke Village development, will be completed in stages over the next year to keep disruption to a minimum. They include: Reconstructing and changing the road layout of Kidbrooke Park Road, between the junctions with Old Post Office Lane and Weigall Road, to remove the need for width and weight restrictions in the area in future. Replacing the pedestrian subway near Kidbrooke station with a surface-level signalised crossing. Introducing other improvements for pedestrians, including a new signalised crossing at the junction of Kidbrooke Park Road and Weigall Road. Installing new footways, street furniture, street lighting and drainage systems. Temporary traffic management changes will apply while the works take place - From November 2016 until February 2017: Kidbrooke Park Road will be open with one lane in each direction as normal, although the lanes will be narrower than usual.

  • [A2213] Kidbrooke Park Road (SE3,SE12) (All Directions)

A205

[A205] Upper Richmond Road (SW15) (Wandsworth)

  Minimal

From: Monday 30 January 2017
To: Wednesday 01 February 2017

Last updated 19:21 Tuesday 20 December 2016

Works | Utility

[A205] Upper Richmond Road (SW15) (All Directions) between Oxford Road and Putney High Street - Contra flow in operation to facilitate Thames Water new connection works.

  • A219 (SW15) (All Directions)
  • Chelverton Road (SW15) (All Directions)
  • Disraeli Road (SW15) (All Directions)
  • Norroy Road (SW15) (All Directions)
  • Oxford Road (SW15) (All Directions)
  • [A205] Upper Richmond Road (SW15) (All Directions)
  • Werter Road (SW15) (All Directions)

A205

[A205] Stanstead Road (SE23) (Lewisham)

  Minimal

From: Monday 30 January 2017
To: Sunday 26 March 2017

Last updated 16:20 Monday 16 January 2017

Works | TfL

[A205] Stanstead Road (SE23) (Both Directions) between Colfe Road and Kilmorie Road - Temporary traffic signals in operation with lane restrictions between approximately 2000hrs and 0500hrs Monday to Thursday nights, inclusive, and between 0800hrs and 1700hrs each day, Friday to Sunday, inclusive, during junction improvement works.

  • B218 (SE23) (All Directions)
  • Colfe Road (SE23) (All Directions)
  • Cranston Road (SE23) (All Directions)
  • Elsinore Road (SE23) (All Directions)
  • Kemble Road (SE23) (All Directions)
  • Kilmorie Road (SE23) (All Directions)
  • Malham Road (SE23) (All Directions)
  • Park Rise Road (SE23) (All Directions)
  • [A205] Stanstead Road (SE23) (Both Directions)
  • Wastdale Road (SE23) (All Directions)

A21

[A21] Kentish Way (BR1) (Bromley)

  Minimal

From: Monday 30 January 2017
To: Saturday 25 March 2017

Last updated 23:41 Friday 20 January 2017

Works | TfL

[A21] Kentish Way (BR1) (Both Directions) at the junction of Stockwell Close and Elmfield Road - Various restrictions during junction improvement works. From approximately 0700hrs Monday 30 January until 1600hrs Monday 20 March, lane restrictions. From Monday 20 until Friday 24 March, inclusive, lane restrictions northbound between approximately 2200hrs and 0500hrs each night during road resurfacing works.

  • [A21] Kentish Way (BR1) (Both Directions)
  • Rafford Way (BR1) (All Directions)
  • Stockwell Close (BR1) (All Directions)

A23

[A23] Streatham High Road (SW16) (Lambeth)

  Minimal

From: Monday 30 January 2017
To: Wednesday 01 March 2017

Last updated 20:03 Tuesday 13 December 2016

Works | TfL

[A23] Streatham High Road (SW16) (All Directions) at the junction of Natal Road - Lane restrictions due to BT new connection

  • Albert Carr Gardens (SW16) (All Directions)
  • Lewin Road (SW16) (All Directions)
  • Natal Road (SW16) (All Directions)
  • [A23] Streatham High Road (SW16) (All Directions)

A24

[A217] Oldfields Road (SM3,SM1) (Sutton)

  Minimal

From: Monday 30 January 2017
To: Thursday 02 February 2017

Last updated 15:10 Friday 06 January 2017

Works | TfL

[A217] Oldfields Road (SM3/SM1) (Southbound) opposite the junction of Kimpton Park Way - Lane one (of two) closure to facilitate works to remove and replace a tree and repair the damaged footway.

  • Burford Road (SM1) (All Directions)
  • Clensham Lane (SM1) (All Directions)
  • Kimpton Park Way (SM3,SM1) (All Directions)
  • [A217] Oldfields Road (SM3,SM1) (Southbound)

A24

[A3] Clapham Road (SE11,SW9) (Lambeth)

  Minimal

From: Monday 23 January 2017
To: Friday 03 February 2017

Last updated 20:39 Tuesday 10 January 2017

Works | TfL

[A3] Clapham Road (SW9) (All Directions) at the junction of Elias Place - Lane restrictions will be in place to facilitate traffic signal modernisation works.

  • [A3] Clapham Road (SE11,SW9) (All Directions)
  • Elias Place (SE11) (All Directions)
  • Hanover Gardens (SE11) (All Directions)
  • [A3] Kennington Park Road (SE11,SW9) (All Directions)
  • Prima Road (SW9) (All Directions)

A3

[A240] Kingston Road (KT4,KT9) (Kingston Upon Thames)

  Minimal

From: Monday 23 January 2017
To: Friday 17 March 2017

Last updated 13:39 Friday 20 January 2017

Works | TfL

[A240] Kingston Road (KT4/KT9) (All Directions) at the junction of Jubilee Way - Temporary signals in operation to facilitate traffic signal modernisation works (night works).

  • Old Kingston Road (KT4) (All Directions)

A3

A240 (KT5,KT6) (Kingston Upon Thames)

  Minimal

From: Friday 27 January 2017
To: Wednesday 15 February 2017

Last updated 03:27 Saturday 07 January 2017

Works | TfL

[A240] Kingston Road (KT9) (Northbound) between Toby Way and [A3] Kingston By-Pass - Lane one (of three) closed between approximately 2100hrs and 0400hrs each weekday night during footpath works. Additionally, [A3] Kingston By-Pass (Southbound) on-slip, lane restrictions for the duration of the works.

  • A240 (KT5,KT6) (All Directions)
  • Barnsbury Lane (KT5) (All Directions)
  • Broad Oaks (KT6) (All Directions)
  • Ewell Road (KT6) (All Directions)
  • Hamilton Avenue (KT6) (All Directions)
  • Hook Rise North (KT6) (All Directions)
  • [A3] Hook Rise North (Kingston By-Pass) (KT5,KT6,KT9) (All Directions)
  • Hook Rise North (Kingston By-Pass) (KT6) (All Directions)
  • Hook Rise South (KT6) (All Directions)
  • [A3] Hook Rise South (Kingston By-Pass) (KT5,KT6,KT9) (All Directions)
  • [A3] Kingston By-Pass (KT5,KT6,KT9) (Southbound)
  • Princes Avenue (KT6) (All Directions)
  • St George's Gardens (KT6) (All Directions)
  • Sunray Avenue (KT5) (All Directions)
  • Toby Way (KT6) (All Directions)
  • [A3] Tolworth Rise North (KT5,KT6,KT9) (All Directions)
  • [A3] Tolworth Rise South (KT5,KT6,KT9) (All Directions)
  • [A3] Tolworth Underpass (A3) (KT5,KT6,KT9) (All Directions)
  • Woodland Way (KT5) (All Directions)

A3

[A3] Hook Rise North (KINGSTON BY-PASS) (KT6,KT9) (Kingston Upon Thames)

  Minimal

From: Monday 30 January 2017
To: Friday 03 February 2017

Last updated 12:52 Friday 20 January 2017

Works | TfL

[A3] Hook Rise North (Kingston By-pass) (All Directions) between Royston Court and Princes Avenue - The road is closed to facilitate footway resurfacing works

  • [A3] Hook Rise North (Kingston By-Pass) (KT6,KT9) (All Directions)
  • [A3] Hook Rise South (Kingston By-Pass) (KT6,KT9) (All Directions)
  • Princes Avenue (KT6) (All Directions)
  • [A3] Tolworth Underpass (A3) (KT6,KT9) (All Directions)

A4

[A4] Great West Road (TW8) (Hounslow)

  Minimal

From: Monday 23 January 2017
To: Saturday 04 February 2017

Last updated 17:46 Tuesday 20 December 2016

Works | TfL

Grand Union Canal Bridge, [A4] Great West Road (TW8) (Both Directions) between Shield Drive (West Cross Centre business park) and [A3002] Boston Manor Road - Lane restrictions between approximately 2200hrs and 0500hrs each weekday night during bridge inspection works.

  • [A4] Boston Manor Road (TW8) (All Directions)
  • [A3002] Boston Manor Road (TW8) (All Directions)
  • Boston Park Road (TW8) (All Directions)
  • [M4] Chiswick Flyover (M4) (TW8) (All Directions)
  • Chiswick Flyover (M4) (All Directions)
  • Church Walk (TW8) (All Directions)
  • [A4] Great West Road (TW8) (Both Directions)
  • Harlequin Avenue (TW8) (All Directions)
  • Orchard Road (TW8) (All Directions)
  • Riverbank Way (TW8) (All Directions)
  • Shield Drive (TW8) (All Directions)
  • Syon Gate Way (TW8) (All Directions)
  • Transport Avenue (TW8) (All Directions)
  • West Cross Way (TW8) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Minimal

From: Saturday 14 January 2017
To: Saturday 04 February 2017

Last updated 15:35 Saturday 21 January 2017 : Traffic is flowing well

Special and Planned Events | Construction Activity

[A4] Knightsbridge (Westbound) at the junction of Old Barrack Yard - Lane restrictions in place for construction works.

  • Old Barrack Yard (SW1X) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Kensington & Chelsea,Westminster)

  Minimal

From: Monday 03 October 2016
To: Monday 19 June 2017

Last updated 10:32 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A4] Knightsbridge (SW1X) (Eastbound) opposite the junction of Sloane Street - The carrigeway is restricted to facilitate building works.

  • [A4] Knightsbridge (SW1X) (Eastbound)

A41

[A41] Wellington Road (NW8) (Westminster)

  Minimal

From: Monday 30 January 2017
To: Wednesday 01 February 2017

Last updated 14:52 Wednesday 04 January 2017

Works | TfL

[A41] Wellington Road (NW8) (Northbound) between St John's Wood Road and Wellington Place - Lane one (of two) closure for daytime bus shelter upgrade works (10am-3pm).

  • [A5205] St John's Wood Road (NW8) (All Directions)
  • Wellington Place (NW8) (All Directions)
  • [A41] Wellington Road (NW8) (Northbound)

A41

[A5] Maida Vale (NW8,W9) (Westminster)

  Minimal

From: Thursday 26 January 2017
To: Friday 03 February 2017

Last updated 15:08 Friday 30 December 2016

Works | Utility

Maida Vale (NW8/W9 ) (Northbound) at the junction of Clifton Road - Lane one restricted to facilitate utility works.

  • Clarendon Terrace (W9) (All Directions)
  • [B413] Clifton Road (W9) (All Directions)
  • Maida Vale (All Directions)
  • [A5] Maida Vale (NW8,W9) (Northbound)
  • [A5205] St John's Wood Road (W9,NW8) (All Directions)

Inner Ring

[A1202] Commercial Street (E1) (Tower Hamlets)

  Minimal

From: Tuesday 29 November 2016
To: Friday 22 December 2017

Last updated 21:05 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A1202] Commercial Street (E1 ) (Northbound) at the junction of White's Row - Partial lane restriction due to construction works.

  • [A1202] Commercial Street (E1) (Northbound)
  • Fashion Street (E1) (All Directions)
  • Toynbee Street (E1) (All Directions)
  • White's Row (E1) (All Directions)

Inner Ring

[A202] Bressenden Place (SW1E,SW1W) (Westminster)

  Minimal

From: Monday 30 January 2017
To: Saturday 04 February 2017

Last updated 13:46 Friday 20 January 2017

Works | Other

[A202] Bressenden Place (SW1E/SW1W) (Southbound) between Warwick Way and Victoria Street - Lane restrictions in place to facilitate works by NOVA (night works).

Inner Ring

[A3213] Eccleston Bridge (SW1V,SW1W) (Westminster)

  Minimal

From: Monday 05 September 2016
To: Sunday 30 April 2017

Last updated 10:35 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A3213] Eccleston Bridge (SW1V) (Westbound) between Bridge Place and [A3214] Buckingham Palace Road - Lane three (of three) closed to facilitate essential waterproofing and maintenance works to the bridge.

  • Bridge Place (SW1V) (All Directions)
  • [A3214] Buckingham Palace Road (SW1W) (All Directions)
  • Bulleid Way (SW1V) (All Directions)
  • [A3213] Eccleston Bridge (SW1V,SW1W) (Westbound)
  • Hugh Street (SW1V) (All Directions)

Western Cross Route

[A3212] Chelsea Embankment (SW3) (Kensington & Chelsea)

  Minimal

From: Monday 23 January 2017
To: Sunday 23 April 2017

Last updated 18:31 Friday 20 January 2017

Works | Utility

[A3212] Chelsea Embankment (SW3) (Both Directions) between Chelsea Bridge and Embankment Gardens - One lane closed and a 20mph speed limit to facilitate National Grid Gas and Thames Tideway collaborative works.

  • [A3216] Chelsea Bridge (SW1W) (All Directions)
  • [A3212] Chelsea Embankment (SW3) (Both Directions)
  • Embankment Gardens (SW3) (All Directions)

[A3217] King's Road (SW3) (Kensington & Chelsea)

  Minimal

From: Monday 30 January 2017
To: Friday 03 February 2017

Last updated 05:52 Monday 02 January 2017

Works | Utility

[A3217] King's Road (SW3) (All Directions) at the junction of Bramerton Street - National Grid will be working at the above location to carry out a new gas service to a property.To enable this, there will be two way temporary traffic lights in operation. (Continuous)

  • Bramerton Street (SW3) (All Directions)
  • Carlyle Square (SW3) (All Directions)
  • [A3217] King's Road (SW3) (All Directions)

[A503] Forest Road (E17) (Waltham Forest)

  Minimal

From: Monday 28 November 2016
To: Friday 30 June 2017

Last updated 21:06 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A503] Forest Road (E17) (Both Directions) between Blackhorse Road and Palmerston Road - Various restrictions in place to facilitate the installation of new cycle lanes.

  • [A1006] Blackhorse Road (E17) (All Directions)
  • [A503] Forest Road (E17) (Both Directions)

[A40] High Holborn (WC1V,WC2B) (Camden)

  Minimal

From: Tuesday 03 January 2017
To: Thursday 01 June 2017

Last updated 10:30 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A40] High Holborn (WC2B/WC1V) (Westbound) at the junction of Drury Lane - Lane closure to facilitate truck deliveries and crane works, to facilitate building works.

  • Museum Street (WC1A,WC2B) (All Directions)

[A3214] St George's Drive (SW1W,SW1V) (Westminster)

  Minimal

From: Wednesday 04 January 2017
To: Sunday 30 April 2017

Last updated 10:34 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Elizabeth Bridge (SW1W/SW1V) (Westbound) between St George's Drive and Buckingham Palace Road - The bridge will be reduced to one lane and there will be temporary signals in operation at Bulleid Way, due to bridge works.

  • [A3214] Buckingham Palace Road (SW1W) (All Directions)

Eastbourne Terrace (W2) (Westminster)

  Minimal

From: Monday 01 July 2013
To: Tuesday 02 January 2018

Last updated 10:34 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Eastbourne Terrace (Both Directions) between Cleveland Terrace and [A4205] Praed Street - Various long term restrictions and, at times, closures during Crossrail works.

  • Chilworth Street (W2) (All Directions)
  • Craven Road (W2) (All Directions)
  • Gloucester Mews (W2) (All Directions)
  • Praed Street (W2) (All Directions)
  • Spring Street (W2) (All Directions)

Curzon Street (W1J) (Westminster)

  Minimal

From: Monday 30 January 2017
To: Friday 03 February 2017

Last updated 13:19 Thursday 05 January 2017

Works | Utility

Curzon Street (W1J) (All Directions) between Queen Street and Clarges Street - The road will be closed due to works in the area.

  • Clarges Street (W1J) (All Directions)
  • Curzon Street (W1J) (All Directions)
  • Queen Street (W1J) (All Directions)

[A302] Victoria Street (SW1H,SW1E) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Friday 10 March 2017

Last updated 10:38 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A302] Victoria Street (SW1E/SW1H) (All Directions) at the junction of Artillery Row - Victoria Street will have an eastbound lane one closure and Buckingham Gate will be closed, northbound only, between Victoria Street and Spenser Street to facilitate junction improvement works.

[A400] Cambridge Circus (WC2H) (Westminster)

  Minimal

From: Saturday 14 January 2017
To: Thursday 30 November 2017

Last updated 10:49 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A400] Cambridge Circus (WC2) (All Directions) - Various restrictions between approximately Saturday 14 January and Thursday 30 November during the Cambridge Circus regeneration scheme. 0800hrs Saturday 21 January until approximately 2100hrs Sunday 5 February, [A400] Charing Cross Road (Southbound) between Denmark Street and Great Newport Street, closed. 2100hrs Sunday 5 until approximately 2100hrs Friday 10 February, [A401] Shaftesbury Avenue (Eastbound) between Cambridge Circus (A400) and Stacey Street, closed. [A401] Shaftesbury Avenue (Eastbound) between Dean Street and Cambridge Circus (A400) and [A401] Shaftesbury Avenue (Westbound) between Earlham Street and Cambridge Circus (A400), reduced to one lane . Find out more on Westminster council's website.

  • A401 (WC2H,W1D) (All Directions)
  • [A400] Charing Cross Road (WC2H) (All Directions)
  • Moor Street (WC2H,W1D) (All Directions)

[A4] Strand (WC2R) (Westminster)

  Minimal

From: Monday 16 January 2017
To: Friday 17 February 2017

Last updated 10:36 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A4] Strand (Westbound) at the junction of Arundel Street - Lane restrictions in place to facilitate footway works.

  • [A4] Aldwych (WC2R) (All Directions)
  • Arundel Street (WC2R) (All Directions)
  • [A4] Strand (WC2R) (All Directions)
  • Strand (WC2R) (Westbound)

[A2209] Deptford Church Street (SE8) (Lewisham)

  Minimal

From: Friday 22 April 2016
To: Friday 28 April 2017

Last updated 01:28 Sunday 22 January 2017 : Delays are possible.

Works | Utility

[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Giffin Street - Various lane restrictions in place to facilitate Thames Tideway sewer works.

  • Giffin Street (SE8) (All Directions)

[A112] Hoe Street (E17) (Waltham Forest)

  Minimal

From: Tuesday 01 November 2016
To: Sunday 31 December 2017

Last updated 21:06 Saturday 21 January 2017 : Delays are possible.

Works | Borough

[A112] Hoe Street (E17) (Both Directions) at the junction of Selborne Road - Reduced to one lane in each direction during bridge works on behalf of Waltham Forest council.

  • [A112] Hoe Street (E17) (Both Directions)

[A503] Camden Road (NW1) (Camden)

  Minimal

From: Saturday 28 January 2017
To: Sunday 05 February 2017

Last updated 13:37 Friday 20 January 2017

Works | Utility

[A503] Camden Road (NW1) (All Directions) at the junction of Rochester Square - Lane closures to facilitate electrical works.

  • Rochester Road (NW1) (All Directions)
  • Rochester Square (NW1) (All Directions)

[A308] Kingston Vale (SW15) (Kingston Upon Thames)

  Minimal

From: Monday 30 January 2017
To: Friday 03 February 2017

Last updated 19:38 Saturday 14 January 2017

Works | Utility

[A308] Kingston Vale (SW15) (All Directions) at the junction of Woodview Close - Temporary traffic lights are in operation to facilitate utility works.

  • [A308] Kingston Vale (SW15) (All Directions)
  • Robinwood Place (SW15) (All Directions)
  • Woodview Close (SW15) (All Directions)

Arsenal Fc, Emirates Stadium () (Islington)

  Minimal

Tuesday 31 January 2017

Last updated 16:46 Sunday 15 January 2017

Special and Planned Events | Sporting

Emirates Stadium - Arsenal v Watford, ko 1945hrs. Expect increased traffic and pedestrian numbers before and after the match.

[A503] Camden Road (NW1) (Camden)

  Minimal

From: Monday 30 January 2017
To: Friday 10 February 2017

Last updated 12:51 Friday 20 January 2017

Works | Utility

[A503] Camden Road (NW1) (Southbound) at the junction of Rochester Square - Weekday off peak (1000hrs to 1500hrs) lane restrictions in place to facilitate gas works.

  • [A503] Camden Road (NW1) (Southbound)
  • Rochester Road (NW1) (All Directions)
  • Rochester Square (NW1) (All Directions)

[A232] Addiscombe Road (CR0) (Croydon)

  Minimal

From: Tuesday 31 January 2017
To: Thursday 02 February 2017

Last updated 17:47 Sunday 15 January 2017

Works | Utility

[A232] Addiscombe Road (CR0) (Both Directions) between Fryston Avenue and Birch Tree Way - Two-way temporary traffic signals to facilitate overnight Thames Water utility connection works (8pm-5am).

  • [A232] Addiscombe Road (CR0) (Both Directions)
  • Birch Tree Way (CR0) (All Directions)
  • Fryston Avenue (CR0) (All Directions)
  • Mapledale Avenue (CR0) (All Directions)

[A4200] Eversholt Street (NW1) (Camden)

  Minimal

From: Monday 23 January 2017
To: Sunday 05 February 2017

Last updated 15:39 Thursday 12 January 2017

Works | Utility

[A4200] Eversholt Street (NW1) (Both Directions) at the junction of Phoenix Street - Temporary signals in operation to facilitate works by Thames Water.

  • [A4200] Eversholt Street (NW1) (Both Directions)
  • Phoenix Road (NW1) (All Directions)

[B152] St Ann's Road (N15,N4) (Haringey)

  Minimal

From: Monday 23 January 2017
To: Friday 03 February 2017

Last updated 18:24 Monday 16 January 2017

Works | Utility

[B152] St Ann's Road (N4 /N15) (All Directions) at the junction of Harringay Road - Lane closures to facilitate Thames Water works.

  • [A105] Green Lanes (N8,N4) (All Directions)
  • [B152] Harringay Road (N15,N4) (All Directions)
  • [B152] St Ann's Road (N15,N4) (All Directions)

[A105] Ridge Avenue (N21) (Enfield)

  Minimal

From: Friday 13 January 2017
To: Friday 28 April 2017

Last updated 19:57 Saturday 21 January 2017 : Expect local delays.

Works | Borough

[A105] Ridge Avenue (Both Directions) at the junction of Church Street - Temporary signals and various restrictions in place to facilitate works as part of the Mini-Holland Cycle Scheme.

Poultry (EC2R) (City Of London)

  Minimal

From: Friday 20 January 2017
To: Sunday 26 February 2017

Last updated 12:23 Saturday 21 January 2017 : Use other routes. Traffic is flowing well in the area

Works | Other

Poultry (EC2R) (Westbound) between Queen Victoria Street and Mansion House Street - Weekend road closures due to building cleaning works, involving an aerial platform. Diversion via Queen Victoria Street, Queen Street and Poultry. Closures will be on the following dates: From 1900 hours Friday 20/01/2017 to 1700 hours Sunday 22/01/2017, from 1900 hours Friday 27/01/2017 to 1700 hours Sunday 29/01/2017, from 1900 hours Friday 17/02/2017 to 1700 hours Sunday 19/02/2017, from 1900 hours Friday 24/02/2017 to 1700 hours Sunday 26/02/2017.

  • Cheapside (EC2V) (All Directions)
  • Cornhill (EC2R,EC3V) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Mansion House Place (EC4N) (All Directions)
  • Mansion House Street (EC2R,EC3V) (All Directions)
  • Old Jewry (EC2R) (All Directions)
  • Poultry (EC2R) (Westbound)
  • Prince's Street (EC2R) (All Directions)
  • Queen Victoria Street (EC2R,EC3V) (All Directions)
  • St Mildred's Court (EC2R) (All Directions)
  • Threadneedle Street (EC2R,EC3V) (All Directions)
  • Walbrook (EC4N) (All Directions)

[A400] Tottenham Court Road (WC1E,W1T) (Camden)

  Minimal

From: Saturday 28 January 2017
To: Sunday 05 February 2017

Last updated 01:46 Thursday 19 January 2017

Works | Other

[A400] Tottenham Court Road (WC1E/W1T) (All Directions) at the junction of Goodge Street - Lane closure due to Virgin Media works

  • Chenies Street (WC1E) (All Directions)
  • [A5204] Goodge Street (W1T) (All Directions)
  • [A400] Tottenham Court Road (WC1E,W1T) (All Directions)

[B518] Highgate Road (NW5) (Camden)

  Minimal

From: Wednesday 25 January 2017
To: Wednesday 01 February 2017

Last updated 17:12 Wednesday 18 January 2017

Works | Other

[B518] Highgate Road (NW5) (All Directions) at the junction of Wesleyan Place - Lane restrictions to facilitate link box replacement

  • Wesleyan Place (NW5) (All Directions)

[A400] Charing Cross Road (WC2H,WC1B,W1T) (Camden,Westminster)

  Minimal

From: Thursday 17 March 2016
To: Friday 31 March 2017

Last updated 10:35 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Tottenham Court Road station upgrade; [A400] Charing Cross Road (WC2) (Northbound) at the junction of [A40] New Oxford Street - Various restrictions in place due to urban realm works in connection with the project. For more information about the Tottenham Court Road station upgrade project

  • A401 (WC1A,WC2H) (All Directions)
  • Bucknall Street (WC1A,WC2H) (All Directions)
  • [A400] Charing Cross Road (WC2H,WC1B,W1T) (North Bound)
  • Grape Street (WC2H) (All Directions)
  • Great Russell Street (WC1B) (All Directions)
  • Hanway Place (W1T) (All Directions)
  • New Compton Street (WC2H) (All Directions)
  • New Oxford Street (WC2H) (All Directions)

[B306] Lower Richmond Road (SW15) (Wandsworth)

  Minimal

From: Monday 30 January 2017
To: Thursday 02 February 2017

Last updated 06:47 Thursday 19 January 2017

Works | Other

[B306] Lower Richmond Road (SW15) (Both Directions) at the junction of Bendemeer Road - Temporary traffic signals in operation to facilitate works.

  • Bendemeer Road (SW15) (All Directions)
  • [B306] Lower Richmond Road (SW15) (Both Directions)

[A5] Maida Vale (W9,NW6) (Camden,Westminster)

  Minimal

From: Saturday 28 January 2017
To: Friday 17 February 2017

Last updated 15:50 Thursday 19 January 2017

Works | Borough

[A5] Maida Vale (W9 ) (All Directions) at the junction of Kilburn Park Road - There will be minor lane restrictions to facilitate footway scheme by Westminster City council.

  • [A5] Maida Vale (W9,NW6) (All Directions)

[A5204] Wigmore Street (W1U) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Tuesday 28 February 2017

Last updated 10:28 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A5204] Wigmore Street (W1U) (All Directions) at the junction of Marylebone Lane - Lane closures due to signal upgrade works.

  • Marylebone Lane (W1U) (All Directions)
  • [A5204] Wigmore Street (W1U) (All Directions)

[B152] St Ann's Road (N15) (Haringey)

  Minimal

From: Monday 16 January 2017
To: Wednesday 01 February 2017

Last updated 20:04 Saturday 21 January 2017 : Delays possible at peak times.

Works | Utility

[B152] St Ann's Road (N15) (All Directions) at the junction of Seven Sisters Road - Lane restrictions in place to facilitate Thames Water works.

  • [B152] St Ann's Road (N15) (All Directions)

[A40] Procter Street (WC1N,WC1V,WC1R) (Camden)

  Minimal

From: Friday 20 January 2017
To: Saturday 30 September 2017

Last updated 18:27 Saturday 21 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A40] Procter Street (WC1R) (Southbound) between Theobald's Road and High Holborn - Bus lane closure due to Crossrail works.

  • Boswell Street (WC1N) (All Directions)
  • Catton Street (WC1R) (All Directions)
  • Eagle Street (WC1V) (All Directions)
  • Fisher Street (WC1R) (All Directions)
  • [A40] High Holborn (WC1N,WC1V,WC1R) (All Directions)
  • Old Gloucester Street (WC1N) (All Directions)
  • [A401] Procter Street (WC1N,WC1X,WC1R) (All Directions)
  • [A40] Procter Street (WC1N,WC1V,WC1R) (Southbound)
  • Red Lion Square (WC1R) (All Directions)

[A409] Station Road (HA1) (Harrow)

  Minimal

From: Monday 16 January 2017
To: Monday 06 February 2017

Last updated 10:26 Saturday 21 January 2017 : Expect delays while restrictions are in place.

Works | Borough

[A409] Station Road (HA1) (All Directions) at the junction of Elmgrove Road - Lane closures to facilitate roadworks.

  • Central Parade (HA1) (All Directions)
  • Elmgrove Road (HA1) (All Directions)
  • Hindes Road (HA1) (All Directions)
  • Station Road (All Directions)
  • [A409] Station Road (HA1) (All Directions)

[A315] London Road (TW7) (Hounslow)

  Minimal

From: Monday 16 January 2017
To: Friday 10 February 2017

Last updated 20:05 Saturday 21 January 2017 : Possible delays during the course of these works.

Works | Utility

[A315] London Road (TW7) (All Directions) at the junction of Spring Grove Road - Temporary traffic signals in use to facilitate sewer works.

  • Clifton Road (TW7) (All Directions)
  • [B363] Spring Grove Road (TW7) (All Directions)

Prince's Street (EC2R) (City Of London)

  Minimal

From: Wednesday 18 January 2017
To: Friday 24 February 2017

Last updated 20:03 Saturday 21 January 2017 : Possible delays during the course of these works.

Works | Utility

Prince's Street (EC2R) (All Directions) at the junction of Gresham Street - lane closed to facilitate water works.

  • Lothbury (EC2R) (All Directions)
  • Prince's Street (EC2R) (All Directions)
Close Favourites

My Lines

My Buses

My Roads

My River Buses

My Emirates Air Line

My Journeys

My Places

    Close edit Favourites

    Favourite lines

    Favourite buses

    Favourite roads

    Favourite river buses

    Favourite Emirates Air Line

    Favourite journeys