Service updates at 19/01/2017 21:02:54
Road corridor Status
A1
A10
A13
A4
A40
Central London Red Routes
North Circular (A406)
A12
A20
A21
A3
A41
Blackwall Tunnel
South Circular (A205)
A2
A23
A24
A316
All other
road corridors
No exceptional delays on all other road corridors

A13

[A1306] Marsh Way (RM13) (Havering)

  Closures

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 08:56 Friday 20 January 2017 : Use other routes and expect delays.

Works | Borough

[A1306] Marsh Way (RM13) (Both Directions) between A13 Thames Gateway and New Road - Road closed to facilitate maintenance repairs to bridge.

A13

City Route

Southern River Route

[A101] Rotherhithe Tunnel (E1W ,E14 ,SE16) (Southwark,Tower Hamlets)

  Closures

From: Monday 30 March 2015
To: Tuesday 28 March 2017

Last updated 04:48 Tuesday 17 January 2017 : The tunnel has re-opened. Traffic is flowing well.

Works | TfL

[A101] Rotherhithe Tunnel (E1/SE16) (Both Directions) - Closed between approximately 2200hrs and 0500hrs each Monday night during overnight maintenance. No closures on Bank Holiday Mondays.

  • A1203 (E1W ,E14) (All Directions)
  • A200 (SE16) (All Directions)
  • Ainsty Street (SE16) (All Directions)
  • Albion Street (SE16) (All Directions)
  • B205 (SE16) (All Directions)
  • Bere Street (E1W) (All Directions)
  • Brodlove Lane (E1W) (All Directions)
  • [A126] Butcher Row (E1W ,E14) (All Directions)
  • Canon Beck Road (SE16) (All Directions)
  • Clack Street (SE16) (All Directions)
  • Clarence Mews (SE16) (All Directions)
  • Clifton Place (SE16) (All Directions)
  • Cranford Street (E1W) (All Directions)
  • Galleon Close (SE16) (All Directions)
  • Glasshouse Fields (E1W) (All Directions)
  • Isambard Place (SE16) (All Directions)
  • Kenning Street (SE16) (All Directions)
  • Kinburn Street (SE16) (All Directions)
  • Lower Road (SE16) (All Directions)
  • Mayflower Street (SE16) (All Directions)
  • Narrow Street (E14) (All Directions)
  • Neptune Street (SE16) (All Directions)
  • Railway Avenue (SE16) (All Directions)
  • Risdon Street (SE16) (All Directions)
  • Rotherhithe Street (SE16) (All Directions)
  • Rotherhithe Tunnel (All Directions)
  • Rupack Street (SE16) (All Directions)
  • Schoolhouse Lane (E1W) (All Directions)
  • Shadwell Pierhead (E1W) (All Directions)
  • St Marychurch Street (SE16) (All Directions)
  • Swan Road (SE16) (All Directions)
  • Temeraire Street (SE16) (All Directions)
  • Western Place (SE16) (All Directions)

A4

Inner Ring

[A302,A4] Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (W2) (Westminster)

  Closures

From: Monday 09 November 2015
To: Monday 13 March 2017

Last updated 08:22 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Cycle Superhighway East-West (Birdcage Walk, Hyde Park Corner, Hyde Park, Lancaster Gate) (All Directions) - Various restrictions during Cycle Superhighway works. Find out more East West Cycle Superhighway travel advice.

  • A4 (W1J,SW1X) (All Directions)
  • A402 (W2) (All Directions)
  • Brook Street (W2) (All Directions)
  • Hyde Park Gardens (W2) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stanhope Terrace (W2) (All Directions)
  • Storey's Gate (SW1H) (All Directions)
  • Sussex Gardens (W2) (All Directions)
  • The Mall (SW1A) (All Directions)
  • West Carriage Drive (W2) (North Bound)
  • Westbourne Terrace (W2) (All Directions)

A40

[A4127] Greenford Roundabout (UB6) (Ealing)

  Closures

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 05:39 Friday 20 January 2017 : All lanes have been reopened on the A40 onslip from Greenford Roundabout. Work resumes tonight at 2200hrs

Works | TfL

[A4127] Greenford Roundabout (UB6) (Clockwise) at the junction of [A40] Western Avenue - Lane restrictions on the [A40] on-slips from Greenford Roundabout (A4127) between approximately 2200hrs and 0500hrs each night during overnight junction improvement works. Additionally, Oldfield Lane South is closed during the works. From Wednesday 1 February to Wednesday 22 March, inclusive, [A4127] Greenford Road (Both Directions) at the junction of Greenford Roundabout, lane three (of three) closed in both directions, each night, with both the inner and outer-most lanes of the roundabout closed.

  • A40 (UB6) (All Directions)
  • Anthony Road (UB6) (All Directions)
  • Blenheim Close (UB6) (All Directions)
  • David Avenue (UB6) (All Directions)
  • [A4127] Greenford Road (UB6) (All Directions)
  • [A4127] Greenford Roundabout (UB6) (Clockwise)
  • Hicks Avenue (UB6) (All Directions)
  • Middleton Avenue (UB6) (All Directions)
  • Oldfield Lane North (UB6) (All Directions)
  • Oldfield Lane South (UB6) (Both Directions)
  • Runnymede Gardens (UB6) (All Directions)
  • Wessex Lane (UB6) (All Directions)

A406

[A104] Waterworks Corner (A406/A104) (E18,E17) (Waltham Forest)

  Closures

From: Sunday 15 January 2017
To: Tuesday 24 January 2017

Last updated 03:22 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A104] Waterworks Corner (A406/A104) (E18) (All Directions) at the junction of Southend Road (North Circular Road) - A104 (E17/E18) Waterworks Corner (A406/A104) (All Directions) at the junction of Woodford New Road - Road closure in place to facilitate carriageway resurfacing (Nights only). Phase 3: Tuesday 17th Jan. 2100hrs to Wednesday 18th Jan. 0500hrs and Thursday 19th Jan 2100hrs to Friday 20th Jan 0500hrs Eastbound On Slip from Waterworks Roundabout towards Charlie Browns will be closed. Phase 4: Wednesday 18th Jan 2100hrs to Thursday 19th Jan 0500hrs and Sunday 22nd Jan 2100hrs to Monday 23rd Jan 0500hrs Westbound Off Slip onto Waterworks Roundabout from Charlie Browns will be closed.

  • [A406] Southend Road (North Circular Road) (E18,E17) (All Directions)
  • [A104] Waterworks Corner (A406/A104) (E18,E17) (All Directions)
  • [A104] Woodford New Road (E18,E17) (All Directions)

Bishopsgate Cross Route

[A3] Cannon Street (EC4M,EC4N,EC4V,EC4R) (City Of London)

  Closures

From: Tuesday 03 January 2017
To: Monday 01 May 2017

Last updated 06:48 Friday 20 January 2017 : Expect delays throughout the course of these works, especially at peak times.

Works | Borough

Cannon Street (EC4) (Westbound) between [A3] King William Street and Queen Victoria Street - Closed during road maintenance on behalf of the City of London. Westbound traffic is diverted via King William Street, Lombard Street and Mansion House Street to Queen Victoria Street.

  • A10 (EC4N,EC3V,EC4R) (All Directions)
  • A3 (EC4N,EC3R,EC4R) (All Directions)
  • Abchurch Lane (EC4N) (All Directions)
  • Bread Street (EC4M) (All Directions)
  • Bush Lane (EC4R) (All Directions)
  • Cannon Street (EC4M,EC4N,EC4V,EC4R) (Westbound)
  • Clement's Lane (EC3V,EC4N) (All Directions)
  • Cloak Lane (EC4N,EC4R) (All Directions)
  • College Hill (EC4N,EC4R) (All Directions)
  • Dowgate Hill (EC4N,EC4R) (All Directions)
  • Eastcheap (EC3M,EC3V,EC4R) (All Directions)
  • Fish Street Hill (EC4R) (All Directions)
  • Garlick Hill (EC4V) (All Directions)
  • Gophir Lane (EC4R) (All Directions)
  • Gracechurch Street (EC3V) (All Directions)
  • Great St Thomas Apostle (EC4N) (All Directions)
  • Great Trinity Lane (EC4V,EC4M) (All Directions)
  • Laurence Pountney Hill (EC4R) (All Directions)
  • Laurence Pountney Lane (EC4R) (All Directions)
  • Little Trinity Lane (EC4V) (All Directions)
  • Lombard Court (EC3V) (All Directions)
  • Martin Lane (EC4R) (All Directions)
  • Nicholas Lane (EC3V,EC4N) (All Directions)
  • Oxford Court (EC4N) (All Directions)
  • Pudding Lane (EC3M,EC3R) (All Directions)
  • Queen Street (EC4M,EC4N,EC4R) (All Directions)
  • Queen Victoria Street (EC4V,EC4N,EC2R,EC4M) (All Directions)
  • Scott's Yard (EC4R) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • Suffolk Lane (EC4R) (All Directions)
  • Walbrook (EC4N) (All Directions)
  • Watling Court (EC4M) (All Directions)
  • Watling Street (EC4M) (All Directions)

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Closures

From: Monday 05 January 2015
To: Saturday 31 July 2021

Last updated 06:57 Friday 20 January 2017 : Use an alternative route.

Works | TfL

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed Find out more about Bank and Monument works

  • [A3] Arthur Street (EC4R,EC3R) (Both Directions)
  • [A3] Fish Street Hill (EC4R,EC3R) (All Directions)
  • [A3] King William Street (EC4R,EC3R) (All Directions)
  • Martin Lane (EC4R) (All Directions)

Bishopsgate Cross Route

Southern River Route

[A200] Tooley Street (SE1) (Southwark)

  Closures

From: Saturday 30 April 2016
To: Wednesday 28 February 2018

Last updated 14:25 Thursday 19 January 2017 : Use an alternative route.

Works | Other

London Bridge mainline rail station upgrade, [A200] Tooley Street and Duke Street Hill (SE1) (Eastbound) between [A3] Borough High Street and [A2205] Bermondsey Street - The road is closed between Borough High Street and Bermondsey Street. Find out more about the London Bridge mainline station upgrade and Tooley Street.

  • A3 (SE1) (All Directions)
  • Counter Street (SE1) (All Directions)
  • Montague Close (SE1) (All Directions)
  • Shipwright Yard (SE1) (All Directions)
  • Stainer Street (SE1) (All Directions)
  • [A200] Tooley Street (SE1) (Eastbound)
  • Tooley Street (SE1) (All Directions)

Bishopsgate Cross Route

[A3] King William Street (EC3R,EC4R) (City Of London)

  Closures

From: Saturday 29 August 2015
To: Sunday 31 December 2017

Last updated 06:56 Friday 20 January 2017 : Local delays possible.

Works | TfL

[A3] King William Street (EC3R/EC4R) (Both Directions) between London Bridge and Arthur Street - Lane one closed from the bus stop at the north end of London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website.

  • [A3] King William Street (EC3R,EC4R) (Both Directions)

Farringdon Cross Route

Farringdon Road (Islington,Camden)

  Closures

From: Monday 22 July 2013
To: Monday 31 December 2018

Last updated 06:56 Friday 20 January 2017 : Local delays possible.

Works | Other

[A201] Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Farringdon Road is restricted southbound. Find out more about Crossrail works

  • Charterhouse Street (EC1N,EC1A) (All Directions)
  • Cowcross Street (EC1M) (All Directions)
  • Farringdon Road (EC1M) (All Directions)
  • Greville Street (EC1N,EC1M) (All Directions)
  • Saffron Hill (EC1N) (All Directions)

Southern River Route

[A2205] Bermondsey Street (SE1) (Southwark)

  Closures

From: Saturday 07 January 2017
To: Monday 17 April 2017

Last updated 10:14 Saturday 14 January 2017 : Use other routes.

Works | Other

[A2205] Bermondsey Street (SE1) (Northbound) between [A200] St Thomas Street and Magdalen Street - Closed between approximately Saturday 0700hrs and midnight Sunday night each weekend during Network Rail works. Additionally, closed from approximately 0700hrs Good Friday 14 until midnight Bank Monday night, 17 April, over the Easter weekend.

  • A200 (SE1) (All Directions)
  • Battle Bridge Lane (SE1) (All Directions)
  • [A2205] Bermondsey Street (SE1) (Northbound)
  • Black Swan Yard (SE1) (All Directions)
  • Braidwood Street (SE1) (All Directions)
  • Bursar Street (SE1) (All Directions)
  • Carmarthen Place (SE1) (All Directions)
  • Counter Street (SE1) (All Directions)
  • English Grounds (SE1) (All Directions)
  • Fenning Street (SE1) (All Directions)
  • Hardwidge Street (SE1) (All Directions)
  • Holyrood Street (SE1) (All Directions)
  • Magdalen Street (SE1) (All Directions)
  • Shand Street (SE1) (All Directions)
  • Shipwright Yard (SE1) (All Directions)
  • Snowsfields (SE1) (All Directions)
  • Vinegar Yard (SE1) (All Directions)
  • Weston Street (SE1) (All Directions)
  • Woolyard (SE1) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Closures

From: Wednesday 18 January 2017
To: Friday 10 February 2017

Last updated 20:33 Thursday 19 January 2017 : The road is closed. No delays reported. Use other routes.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Footscray Road - Greenwich Council will be carrying out a carriageway resurfacing program on Eltham High Street between Court Road and Footscray Road. Phase one (2000hrs 18th Jan to 0500hrs 21st Jan)

  • [A210] Eltham High Street (SE9) (All Directions)
  • [A211] Footscray Road (SE9) (All Directions)

[A501] Moorgate (EC2A,EC2M) (City Of London,Islington)

  Closures

From: Saturday 23 July 2016
To: Friday 31 March 2017

Last updated 06:57 Friday 20 January 2017 : Use an alternative route.

Works | Other

[A501] Moorgate (EC2M) (Southbound) at the junction of South Place - Moorgate is closed southbound for Crossrail works.

  • [A501] Moorgate (EC2A,EC2M) (Southbound)
  • South Place (EC2A) (All Directions)

[A400] Great Russell Street (WC1B) (Camden)

  Closures

From: Tuesday 03 January 2017
To: Tuesday 28 February 2017

Last updated 08:15 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

Great Russell Street (WC1B) (Westbound) between Museum Street and Bloomsbury Street - Road closed to facilitate major gas main replacement works.

  • Gilbert Place (WC1A) (All Directions)
  • Willoughby Street (WC1B) (All Directions)

[A212] Bell Green (SE26,SE23) (Lewisham)

  Closures

From: Monday 09 January 2017
To: Monday 23 January 2017

Last updated 13:18 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

[A212] Bell Green (All Directions) at the junction of Perry Rise - Temporary traffic signals in use to facilitate emergency gas works. Perry Rise has also been closed.

  • [A212] Bell Green (SE26,SE23) (All Directions)
  • [A212] Perry Hill (SE26,SE23) (All Directions)
  • [B227] Perry Rise (SE26,SE23) (All Directions)

[A5204] Wigmore Street (W1U) (Westminster)

  Closures

From: Thursday 12 January 2017
To: Friday 27 January 2017

Last updated 08:16 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A5204] Wigmore Street (W1U) (Westbound) between Marylebone Lane and Mandeville Place - Road closure due to works.

  • B524 (W1U) (All Directions)
  • Duke's Mews (W1U) (All Directions)
  • Marylebone Lane (W1U) (All Directions)

A1

[A400] Archway (N19) (Islington)

  Closures

From: Monday 01 February 2016
To: Friday 14 April 2017

Last updated 06:57 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

Archway (All Directions) - Various lane restrictions and closures to facilitate junction improvement works including closures of Vorley Road and MacDonald Road. Find out more Archway gyratory travel advice

  • Archway Road (N19) (All Directions)
  • Flowers Mews (N19) (All Directions)
  • Giesbach Road (N19) (All Directions)
  • Highgate Hill (All Directions)
  • [A400] Junction Road (N19) (All Directions)
  • Macdonald Road (N19) (All Directions)
  • St John's Way (N19) (All Directions)

A10

Englefield Road (N1,E8) (Hackney,Islington)

  Closures

From: Monday 09 January 2017
To: Friday 20 January 2017

Last updated 06:51 Friday 20 January 2017 : Use an alternative route whilst works continue.

Works | Borough

Englefield Road (N1 /E8 ) (Both Directions) between Kingsland Road and Southgate Road - The road will be closed due to works in the area.

  • Englefield Road (N1,E8) (Both Directions)
  • [A10] Kingsland Road (E8) (All Directions)

Inner Ring

Marylebone High Street (NW1,W1U,W1G) (Westminster)

  Closures

From: Wednesday 04 January 2017
To: Tuesday 31 January 2017

Last updated 08:28 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

Marylebone High Street (W1U/NW1/W1G) (Northbound) at the junction of Nottingham Street - Road closure in place from 4th until 31st January to facilitate telecommunication works. There will be no access from Marylebone High Street into Oldbury Place.

  • Beaumont Street (W1G) (All Directions)
  • Devonshire Place Mews (W1G) (All Directions)
  • Mac Farren Place (NW1) (All Directions)
  • Oldbury Place (VW02,W1U) (All Directions)

[A4] New Fetter Lane (EC4A) (City Of London)

  Closures

From: Monday 16 January 2017
To: Sunday 19 February 2017

Last updated 06:51 Friday 20 January 2017 : Delays possible on diversion.

Works | Utility

[A4] New Fetter Lane (EC4A) (Southbound) at the junction of High Holborn - The road is closed to facilitate Thames Water works

  • [A4] Fetter Lane (EC4A) (Southbound)
  • [A4] New Fetter Lane (EC4A) (Southbound)
  • Rolls Buildings (EC4A) (All Directions)
  • West Harding Street (EC4A) (All Directions)

[B412] St Marks Road (W10) (Kensington & Chelsea)

  Closures

From: Monday 16 January 2017
To: Saturday 18 March 2017

Last updated 06:49 Friday 20 January 2017 : Traffic delays are possible whilst restrictions remain in place.

Works | Borough

[B412] St Marks Road (W10) (All Directions) at the junction of St Quintin Avenue - Various road closures and lane restrictions in place due to works.

  • Chesterton Road (W10) (All Directions)
  • Kelfield Gardens (W10) (All Directions)
  • [B412] St Marks Road (W10) (All Directions)
  • [B412] St Marks Road Roundabout (W10) (All Directions)
  • [B412] St Quintin Avenue (W10) (All Directions)

[B406] Berners Street (W1D,W1T) (Westminster)

  Closures

From: Sunday 09 October 2016
To: Saturday 31 March 2018

Last updated 08:18 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

Berners Street (W1T/W1D) (All Directions) at the junction of Wardour Street - Various closures and restrictions in place to facilitate works. Berners Street is closed between Oxford Street and Mortimer Street then Newman Street and Wells Street. Cleveland Street is closed between New Cavendish Street and Mortimer Street and Wardour Street between Oxford Street and Shaftesbury Avenue.

  • A5204 (W1T) (All Directions)
  • Berners Street (W1D,W1T) (All Directions)
  • Cleveland Street (W1T,W1W) (All Directions)
  • Clipstone Mews (W1T) (All Directions)
  • Fitzroy Mews (W1T) (All Directions)
  • Great Castle Street (W1G,W1W) (All Directions)
  • Maple Street (W1T) (All Directions)
  • Market Place (W1D,W1W) (All Directions)
  • Marylebone Lane (W1C) (All Directions)
  • New Cavendish Street (W1W) (All Directions)
  • Newman Passage (W1T) (All Directions)
  • Newman Street (W1T) (All Directions)
  • Old Cavendish Street (W1G) (All Directions)
  • [A40] Oxford Street (W1B,W1C,W1D,W1F,W1W) (All Directions)
  • Poland Street (W1D) (All Directions)
  • Riding House Street (W1W) (All Directions)
  • Wardour Street (W1D) (All Directions)
  • Wells Street (W1T) (All Directions)
  • Winsley Street (W1W) (All Directions)
  • Woodstock Street (W1S) (All Directions)

[A103] Hornsey Road (N7) (Islington)

  Closures

Thursday 19 January 2017

Last updated 06:45 Friday 20 January 2017 : Traffic is flowing well on the diversion. Delays are possible.

Works | Emergency

[A103] Hornsey Road (N7 ) (Southbound) at the junction of Seven Sisters Road - Road closed due to a burst water main.

  • [A103] Hornsey Road (N7) (Southbound)
  • [A503] Seven Sisters Road (N7) (All Directions)

[A112] Angel Lane (E15) (Newham)

  Closures

From: Monday 16 January 2017
To: Sunday 07 May 2017

Last updated 08:48 Friday 20 January 2017 : Use other routes and expect delays.

Works | Utility

[A112] Angel Lane (E15) (Southbound) between Leyton Road and Great Eastern Road - Road closed southbound to facilitate utility works. In addition, there are temporary traffic signals at The Grove / Windmill Lane.

  • [A11] Great Eastern Road (E15) (All Directions)

[A240] Surbiton Road (KT1) (Kingston Upon Thames)

  Closures

From: Monday 05 September 2016
To: Monday 06 March 2017

Last updated 14:12 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[A240] Surbiton Road (KT1) (Both Directions) between Surbiton Road and Anglesea Road - Road closure is in place as part of the Mini Holland Scheme.

  • Anglesea Road (KT1) (All Directions)
  • [A240] Surbiton Road (KT1) (Both Directions)

A1

[A1] Holloway Road (N7 ,N5 ,N1) (Islington)

  Expected delays

From: Monday 06 October 2014
To: Saturday 30 June 2018

Last updated 06:57 Friday 20 January 2017 : Delays are possible.

Works | TfL

Highbury Corner Bridge, [A1] Holloway Road (N7) (Both Directions) at Highbury Corner - Holloway Road reduced to one lane in each direction, with a northbound bus lane suspension in place for bridge replacement works. Find out more about the works.

  • A1 (N7 ,N5 ,N1) (All Directions)

A12

Burdett Road (E3 ,E14) (Tower Hamlets)

  Expected delays

From: Tuesday 28 May 2013
To: Sunday 04 February 2018

Last updated 08:55 Friday 20 January 2017 : Delays are possible.

Works | Other

A1205 Burdett Road (Both directions) between St Paul's Way and Bow Common Lane - Carriageway restrictions for Crossrail works. Find out more about Crossrail works

  • Burdett Road (E3 ,E14) (South Bound)
  • St Paul's Way (E3 ,E14) (All Directions)

A12

[A11] Whitechapel Road (E1) (Tower Hamlets)

  Expected delays

From: Thursday 19 January 2017
To: Wednesday 01 February 2017

Last updated 07:07 Friday 20 January 2017 : Normal traffic flows for the time of day.

Works | Utility

[A11] Whitechapel Road (E1 ) (Eastbound) at the junction of Brady Street - Bus lane closure to facilitate utility works.

  • Brady Street (E1) (All Directions)
  • Maples Place (E1) (All Directions)

A12

[A12] Eastern Avenue (RM6,IG2) (Redbridge)

  Expected delays

From: Thursday 12 January 2017
To: Sunday 16 April 2017

Last updated 08:11 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A12] Eastern Avenue (RM6) (All Directions) at the junction of [B177] Barley Lane - Various restrictions during junction improvement works until approximately late April. Monday 16 January until late April, [A12] Eastern Avenue at the junction of [B177] Barley Lane, lane restrictions in all directions. Friday 3 February until late February, no right-turn from [A12] Eastern Avenue into [B177] Barley Lane or Hainault Road. mid to late February, pedestrian crossing on southern side of the junction temporarily suspended. Early to mid-March, no left-turn from Hainault Road to [A12] Eastern Avenue.**Currently restrictions remain on footway and traffic islands.**

  • A12 (RM6,IG2) (All Directions)
  • B177 (RM6) (All Directions)
  • Hainault Road (RM6) (All Directions)
  • Strouds Close (RM6) (All Directions)

A20

[A20] Lee High Road (SE13) (Lewisham)

  Expected delays

From: Thursday 05 January 2017
To: Friday 20 January 2017

Last updated 14:26 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A20] Lee High Road (SE13) (Eastbound) at the junction of Lee Church Street - Width restriction for Thames Water works.

  • Bankwell Road (SE13) (All Directions)
  • Eton Grove (SE13) (All Directions)
  • Lee Church Street (SE13) (All Directions)

A205

[A217] Wandsworth One Way System (SW18) (Wandsworth)

  Expected delays

From: Monday 16 January 2017
To: Saturday 11 March 2017

Last updated 08:12 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

[A217] Wandsworth One Way System (All Directions) - Various lane restrictions during phased collaborative utility works. Monday 16 until Thursday 19 January, [A217] Wandsworth Plain and [A217] Armoury Way, reduced to two lanes (from four) between approximately 0700hrs and 1900hrs. In addition Frogmore remains closed. Monday 23 until Friday 24 February, [A217] Ram Street, lane restrictions. Sunday 5 until Friday 10 February, [A217] Armoury Way, between approximately 2100hrs and 0500hrs each night, lane four (of four) of closed and [A217] Ram Street, closed southbound and right-hand turn from [A217] Armoury Way into [A217] Ram Street banned. Saturday 25 February until Saturday 11 March, lane four (of four) closed between approximately 0700hrs and 1900hrs each day, except Wednesday 8 to Friday 10 March, inclusive, when lanes three and four (of four) are closed.

  • [A217] Armoury Way (SW18) (All Directions)
  • [A217] Church Row (SW18) (All Directions)
  • Frogmore (SW18) (All Directions)
  • [A217] Old York Road (SW18) (All Directions)
  • [A217] Ram Street (SW18) (All Directions)
  • Shoreham Close (SW18) (All Directions)
  • [A217] Wandsworth One Way System (SW18) (All Directions)

A205

[A306] Roehampton Lane (SW15) (Wandsworth)

  Expected delays

From: Thursday 19 January 2017
To: Thursday 26 January 2017

Last updated 09:26 Friday 20 January 2017 : Delays possible when restrictions are in place.

Hazard(s) | Burst Water Main

[A306] Roehampton Lane (SW15) (Southbound) between Medfield Street and Alton Road - restrictions in place due to a burst water main.

  • [A306] Roehampton Lane (SW15) (Southbound)

A3

[A3205] Nine Elms Lane (SW8) (Wandsworth)

  Expected delays

From: Tuesday 23 August 2016
To: Sunday 30 April 2017

Last updated 14:24 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A3205] Nine Elms Lane (SW8) (Both Directions) at the junction of Ponton Road - To facilitate major water works, the carriageway is reduced to one lane in each direction. In addition Ponton Road is partially restricted at the junction.

  • Nine Elms Lane (All Directions)

A4

A306 (W6) (Hammersmith & Fulham)

  Expected delays

From: Saturday 28 May 2016
To: Sunday 31 December 2017

Last updated 06:56 Friday 20 January 2017 : Use caution. Delays possible.

Works | Other

[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. The bridge will be fully closed both ways from 0700hrs on Saturday 11 February until 0500hrs on Monday 20 February.

  • A306 (W6) (Both Directions)
  • Bridgeview (W6) (All Directions)
  • Rutland Grove (W6) (All Directions)
  • Worlidge Street (W6) (All Directions)

A4

[A4] Cromwell Road (SW7) (Kensington & Chelsea)

  Expected delays

From: Wednesday 18 January 2017
To: Friday 31 March 2017

Last updated 04:21 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A4] Cromwell Road (SW7) (All Directions) at the junction of Ashburn Place - To facilitate cycle grid works there will be lane closures and restrictions in both directions on Cromwell Road. Temporary traffic signals and lane restrictions will be in place.

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Expected delays

From: Tuesday 03 May 2016
To: Tuesday 30 April 2019

Last updated 08:19 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - Various restrictions until approximately April 2019 during the redevelopment of 55-91 Knightsbridge. Westbound bus lane closed until approximately April 2019. More information available on Westminster council's website.

  • Wilton Place (SW1X) (All Directions)

A406

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W3,W4) (Hounslow)

  Expected delays

From: Monday 20 June 2016
To: Thursday 04 January 2018

Last updated 07:03 Friday 20 January 2017 : Delays are possible.

Works | TfL

Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. Click for more information on the Power Road Bridge project.

  • [A406] Gunnersbury Avenue (North Circular Road) (W3,W4) (Both Directions)
  • Power Road (W4) (All Directions)

A406

[A205] Kew Bridge (TW9,TW8) (Richmond Upon Thames,Hounslow)

  Expected delays

From: Monday 09 January 2017
To: Sunday 02 April 2017

Last updated 07:09 Friday 20 January 2017 : Possible delays during the course of these works.

Works | TfL

[A205] Kew Bridge (TW9) (All Directions) and Kew Road between Strand-on-the-Green and Kew Green - Various closures and restrictions will take place to facilitate bridge refurbishment works. The bridge will be closed on the 20th Feb and 20th March between 23:00 and 05:00. Single lane closures will also be in place during off peak hours 19:00 to 06:00 and 10:00 to 16:00 Monday to Friday and 07:30 to 13:30 on Saturdays.

  • A315 (TW8) (All Directions)
  • Bush Road (TW9) (All Directions)
  • [A205] Kew Bridge (TW9,TW8) (All Directions)
  • [A205] Kew Bridge Road (TW9,TW8) (All Directions)
  • Kew Green (TW9) (All Directions)
  • [A205] Kew Road (TW9,TW8) (All Directions)
  • Spring Grove (W4) (All Directions)
  • Strand-On-The-Green (W4) (All Directions)

Bishopsgate Cross Route

[A10] Shoreditch High Street (E1) (Hackney,City Of London,Tower Hamlets)

  Expected delays

From: Saturday 24 September 2016
To: Saturday 31 March 2018

Last updated 06:54 Friday 20 January 2017 : Traffic delays are possible when restrictions in place.

Special and Planned Events | Construction Activity

[A10] Shoreditch High Street (All Directions) at the junction of Worship Street - Planned lane restrictions to facilitate the Principle Place development.

  • [A10] Norton Folgate (E1) (All Directions)
  • [A10] Shoreditch High Street (E1) (All Directions)
  • Worship Street (EC2M,E1) (All Directions)

Bishopsgate Cross Route

[A3] Borough High Street (SE1) (Southwark)

  Expected delays

From: Wednesday 06 April 2016
To: Friday 01 September 2017

Last updated 14:11 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | TfL

[A3] Borough High Street (SE1) (Northbound) at the junction of Marshalsea Road - Intermittent bus lane restriction due to works.

  • [A3] Borough High Street (SE1) (All Directions)
  • [A2] Great Dover Street (SE1) (All Directions)
  • [A3201] Marshalsea Road (SE1) (All Directions)

City Route

Farringdon Cross Route

[A3211] Victoria Embankment (EC4Y,EC4V) (City Of London)

  Expected delays

From: Wednesday 04 January 2017
To: Friday 31 December 2021

Last updated 09:54 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Tideway, [A3211] Victoria Embankment (EC4) (Both Directions) at the junction of [A201] Blackfriars Bridge -The slip is open to eastbound traffic only. From the 5 to 20 Jan 2017, there will be full overnight closures between 2100-0500 and a full slip road closure in both directions from 0500 on 21 January 17 to 0500 on 23 Jan 17 to prepare for the new road layout. In addition on Saturday 21st Jan (0800hrs to 2200hrs) and Sunday 22nd Jan (1000hrs to 2000hrs) there will be a southbound lane one closure on Victoria Embankment (at Horse Guards Avenue) while the cycle track and footway are closed to facilitate tree removal works associates with the Tideway project. Find out more about the road changes at Victoria Embankment

  • [A201] Blackfriars Bridge (EC4V,EC4Y,SE1) (All Directions)
  • Blackfriars Court (EC4V) (All Directions)
  • Blackfriars Passage (EC4V) (All Directions)
  • [A3211] Blackfriars Station (EC4Y,EC4V) (All Directions)
  • Bridewell Place (EC4V) (All Directions)
  • Kingscote Street (EC4V) (All Directions)
  • Playhouse Yard (EC4V) (All Directions)
  • [A3211] Queen Victoria Street (EC4Y,EC4V) (All Directions)
  • Temple Avenue (EC4Y) (All Directions)
  • Tudor Street (EC4Y,EC4V) (All Directions)
  • [A3211] Victoria Embankment (EC4Y,EC4V) (Both Directions)
  • [A201] Victoria Embankment (EC4V,EC4Y,SE1) (Both Directions)
  • Victoria Embankment (EC4Y) (All Directions)
  • Watergate (EC4V) (All Directions)

Inner Ring

[A501] City Road (EC1Y,EC2A) (Islington)

  Expected delays

From: Tuesday 03 January 2017
To: Sunday 02 April 2017

Last updated 09:37 Friday 20 January 2017 : Currently traffic flows are normal on the approach to the works.

Works | Utility

[A501] City Road (EC2A) (All Directions) between Epworth Street and Worship Street - Carriageway restrictions to facilitate gas mains replacement works. The northbound lane is closed with temporary signals in place controlling a single alternate traffic flow.

  • [A501] City Road (EC1Y,EC2A) (All Directions)
  • Featherstone Street (EC1Y) (All Directions)
  • Finsbury Square (EC2A) (All Directions)
  • Oliver's Yard (EC1Y) (All Directions)
  • Tabernacle Street (EC2A) (All Directions)
  • Worship Street (EC1Y,EC2A) (All Directions)

Inner Ring

[A3036] Wandsworth Road (SE1,SW8) (Lambeth)

  Expected delays

From: Wednesday 11 January 2017
To: Friday 20 January 2017

Last updated 14:25 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | TfL

[A3036] Wandsworth Road (SW8/SE1) (Northbound) at the junction of Bridgefoot - Cycle lane closure to facilitate Cycle Superhighway remedial works.

Inner Ring

[A1210] Mansell Street (E1) (City Of London,Tower Hamlets)

  Expected delays

From: Monday 16 January 2017
To: Wednesday 25 January 2017

Last updated 07:08 Friday 20 January 2017 : Normal traffic flows for the time of day.

Works | Utility

[A1210] Mansell Street (E1 ) (Northbound) at the junction of Alie Street - Bus lane closed to facilitate utility works.

Southern River Route

[A3203] Lambeth Bridge (SE1,SW1P,SW1A) (Westminster)

  Expected delays

From: Wednesday 04 January 2017
To: Friday 03 March 2017

Last updated 04:40 Friday 20 January 2017 : Traffic is flowing well past the works.

Works | TfL

[A3203] Lambeth Bridge (SE1) (All Directions) at the junction of [A3212] Millbank and [B323] Horseferry Road - Various restrictions and temporary traffic signals in operation during junction improvement works until approximately March. From 6 to 8 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) in both directions and Horseferry Road closed on the approach to the roundabout. From 20 to 25 February, Lambeth Bridge will be closed nightly (21:00 to 05:00) to westbound traffic (towards Westminster) and Horseferry Road will be closed to eastbound traffic on the approach to the roundabout, with vehicle access maintained on Millbank using temporary traffic signals.

  • Dean Ryle Street (SW1P) (All Directions)
  • Dean Stanley Street (SW1A) (All Directions)
  • Thorney Street (SW1P) (All Directions)

Southern River Route

[A3036] Albert Embankment (SE1) (Lambeth)

  Expected delays

From: Friday 29 April 2016
To: Friday 31 March 2017

Last updated 13:20 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A3036] Albert Embankment (SE1) (Northbound) at the junction of New Spring Gardens Walk - Lane one (bus lane) restrictions in place to facilitate utility works. Working hours are 08:00 to 18:00 Monday to Friday and 08:00 to 16:00 Saturdays (continuous traffic management will remain in place).

  • New Spring Gardens Walk (SE1) (All Directions)

[A404] Manor Park Road (NW10) (Brent)

  Expected delays

From: Friday 13 January 2017
To: Thursday 26 January 2017

Last updated 03:59 Friday 20 January 2017 : Delays possible at peak times.

Works | Emergency

[A404] Manor Park Road (All Directions) at the junction of High Street Harlesden - Temporary traffic signals in use to facilitate emergency water works.

  • [A404] High Street Harlesden (NW10) (All Directions)
  • [A404] Manor Park Road (NW10) (All Directions)
  • Park Parade (NW10) (All Directions)

[A217] Holborn Way (CR4) (Merton)

  Expected delays

From: Monday 25 July 2016
To: Friday 29 September 2017

Last updated 14:12 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[A217] Holborn Way (All Directions) - Various restrictions in place including lane closures and temporary traffic signals to facilitate Mitcham town centre regeneration. Roads affected include London Road, Raleigh Gardens, Upper Green (East & West) and Holborn Way.

  • A236 (CR4) (All Directions)
  • [A217] Holborn Way (CR4) (All Directions)
  • [A217] London Road (CR4) (All Directions)
  • [A217] Raleigh Gardens (CR4) (All Directions)
  • Raleigh Gardens (CR4) (All Directions)

Cannon Street (EC4M,EC4V,EC4R,EC4N) (City Of London)

  Expected delays

From: Saturday 07 January 2017
To: Friday 20 January 2017

Last updated 07:11 Friday 20 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

Cannon Street (EC4V/EC4N/EC4M) (Both Directions) at the junction of Queen Street - Temporary signals in operation to facilitate emergency gas main repairs.

[A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Waltham Forest,Hackney)

  Expected delays

From: Friday 08 January 2016
To: Friday 26 January 2018

Last updated 08:55 Friday 20 January 2017 : Delays are possible.

Works | Borough

[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Waltham Forest Council will be carrying out works as part of the Mayor's Mini Holland Cycle scheme. The works will involve the installation of a cycle lane from Whipps Cross to the borough boundary near the Lea Valley Ice Rink. Other works will include of a new bus stand at Whipps Cross and the removal of Whipps Cross Roundabout to create a new junction.

  • Albany Road (E10) (All Directions)
  • Burwell Road (E10) (All Directions)
  • Dagenham Road (E10) (All Directions)
  • Ferndale Avenue (E17) (All Directions)
  • Foresters Drive (E17) (All Directions)
  • Gloucester Mews (E10) (All Directions)
  • Kettlebaston Road (E10) (All Directions)
  • Lea Bridge Road (E17 ,E10) (All Directions)
  • [B159] Leyton Green Road (E10) (All Directions)
  • Manor Road (E10) (All Directions)
  • Melbourne Road (E10) (All Directions)
  • Merton Road (E17) (All Directions)
  • Millicent Road (E10) (All Directions)
  • Morieux Road (E10) (All Directions)
  • Northumberland Road (E17) (All Directions)
  • Oakhurst Gardens (E17) (All Directions)
  • Onra Road (E10) (All Directions)
  • Orient Way (E10) (All Directions)
  • Otley Terrace (E5) (All Directions)
  • Perth Road (E10) (All Directions)
  • Peterborough Road (E17) (All Directions)
  • Poplars Road (E17) (All Directions)
  • Prout Road (E5) (All Directions)
  • Raglan Road (E17) (All Directions)
  • Rigg Approach (E10) (All Directions)
  • Rochdale Road (E17) (All Directions)
  • Russell Road (E10) (All Directions)
  • Salcombe Road (E17) (All Directions)
  • Sanderstead Road (E10) (All Directions)
  • School Nook (E5) (All Directions)
  • Seymour Road (E10) (All Directions)
  • Shernhall Street (E17) (All Directions)
  • Shortlands Road (E10) (All Directions)
  • Shrubland Road (E10) (All Directions)
  • Snaresbrook Road (E11) (All Directions)
  • St Peter's Avenue (E17) (All Directions)
  • Stanley Road (E10) (All Directions)
  • Theobald Road (E10) (All Directions)
  • Vicarage Road (E10) (All Directions)
  • Waterworks Lane (E5) (All Directions)
  • Wattisfield Road (E5) (All Directions)
  • West End Avenue (E10) (All Directions)
  • Westerham Road (E10) (All Directions)
  • Western Road (E17) (All Directions)
  • [A104] Whipps Cross Roundabout (E17 ,E11 ,E10 ,E5) (All Directions)
  • [B160] Wood Street (E17) (All Directions)
  • Woodside Park Avenue (E17) (All Directions)

[A305] Richmond Road (TW1) (Richmond Upon Thames)

  Expected delays

From: Monday 16 January 2017
To: Wednesday 25 January 2017

Last updated 05:44 Friday 20 January 2017 : Delays are possible.

Works | Utility

[A305] Richmond Road (TW1) (All Directions) at the junction of St Margaret's Road - Three-way temporary traffic lights are in operation to facilitate repairs by Thames Water.

  • [A305] Richmond Road (TW1) (All Directions)
  • [A3004] St Margaret's Road (TW1) (All Directions)

[A2211] Lewisham Road (SE13,SE10) (Greenwich)

  Expected delays

From: Wednesday 04 January 2017
To: Sunday 05 March 2017

Last updated 14:11 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A2211] Lewisham Road (SE13/SE10) (All Directions) at the junction of Sparta Street - Two-way temporary signals are in place to facilitate gas main replacement works by Southern Gas Networks.

  • [A2211] Lewisham Road (SE13,SE10) (All Directions)
  • Robinscroft Mews (SE10) (All Directions)
  • Sparta Street (SE13,SE10) (All Directions)

[A2212] Burnt Ash Lane (BR1) (Bromley)

  Expected delays

From: Monday 09 January 2017
To: Friday 20 January 2017

Last updated 14:12 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A2212] Burnt Ash Lane (BR1) (All Directions) at the junction of Lake Avenue - Temporary traffic signals in use to facilitate gas works.

  • [A2212] Burnt Ash Lane (BR1) (All Directions)

[A110] King's Road (E4) (Waltham Forest)

  Expected delays

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 06:43 Friday 20 January 2017 : No delays reported.

Hazard(s) | Burst Water Main

[A110] King's Road (All Directions) at the junction of Larkshall Road - Temporary traffic signals to facilitate repairs by Thames water to a burst water main

  • Balgonie Road (E4) (All Directions)
  • Elmfield Road (E4) (All Directions)
  • Endlebury Road (E4) (All Directions)
  • Fairlight Avenue (E4) (All Directions)
  • [A110] King's Road (E4) (All Directions)
  • [B160] Larkshall Road (E4) (All Directions)
  • Mayfield Road (E4) (All Directions)
  • Pretoria Road (E4) (All Directions)
  • Scholars Road (E4) (All Directions)
  • Simmons Lane (E4) (All Directions)
  • [A1069] Station Road (E4) (All Directions)
  • The Four Wents (E4) (All Directions)
  • [A110] The Green (E4) (All Directions)
  • Woodland Road (E4) (All Directions)

[A112] Tramway Avenue (E15) (Newham)

  Expected delays

From: Wednesday 18 January 2017
To: Tuesday 24 January 2017

Last updated 08:56 Friday 20 January 2017 : Delays are possible.

Hazard(s) | Burst Water Main

[A112] Tramway Avenue (All Directions) at the junction of Victoria Street -A contra flow is in place to facilitate Thames Water repairs to an emergency burst water main

  • [A112] Tramway Avenue (E15) (All Directions)
  • Victoria Street (E15) (All Directions)
  • West Ham Lane (E15) (All Directions)

[A5204] Mortimer Street (W1T) (Westminster)

  Expected delays

From: Tuesday 17 January 2017
To: Saturday 21 January 2017

Last updated 08:30 Friday 20 January 2017 : Possible delays during the course of these works.

Works | Other

[A5204] Mortimer Street (W1T) (All Directions) at the junction of Berners Street - Temporary traffic lights in operation to facilitate works.

  • Berners Street (W1T) (All Directions)
  • [A5204] Mortimer Street (W1T) (All Directions)

[A5200] Gray's Inn Road (WC1X) (Camden)

  Expected delays

From: Monday 09 January 2017
To: Monday 23 January 2017

Last updated 07:10 Friday 20 January 2017 : Traffic is flowing well past restriction. Delays possible during peak hours.

Works | Utility

[A5200] Gray's Inn Road (WC1X) (Southbound) at the junction of Baldwin's Gardens - Lane one (of two) closed to facilitate UKPN works.

  • Baldwin's Gardens (EC1N) (All Directions)
  • [A5200] Gray's Inn Road (WC1X) (Southbound)

[A234] High Street (SE20) (Bromley)

  Expected delays

From: Wednesday 18 January 2017
To: Friday 27 January 2017

Last updated 15:11 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Other

[A234] High Street (SE20) (All Directions) at the junction of Southey Street - Temporary traffic lights are in operation to facilitate works.

  • [A234] High Street (SE20) (All Directions)
  • Southey Street (SE20) (All Directions)

[A112] Broadway (E15) (Newham)

  Expected delays

From: Monday 16 January 2017
To: Wednesday 15 March 2017

Last updated 08:47 Friday 20 January 2017 : Delays possible due to diverting buses.

Works | Utility

[A112] Broadway (E15) (All Directions) at the junction of Great Eastern Road - Bus contraflow lane closed for utility works.

  • [A118] Broadway (E15) (All Directions)
  • Broadway (E15) (All Directions)
  • Chant Street (E15) (All Directions)
  • Grove Crescent Road (E15) (All Directions)
  • Service Route No.1 (E15) (All Directions)
  • The Grove (E15) (All Directions)
  • West Ham Lane (E15) (All Directions)

Leadenhall Street (EC3A,EC3V) (City Of London)

  Expected delays

From: Wednesday 14 December 2016
To: Friday 31 March 2017

Last updated 06:54 Friday 20 January 2017 : Delays are possible.

Special and Planned Events | Construction Activity

Leadenhall Street (EC3A/EC3V) (Eastbound) at the junction of St Mary Axe - The eastbound carriageway is partially blocked due to construction works.

  • Billiter Street (EC3M) (All Directions)
  • Leadenhall Street (EC3A,EC3V) (Eastbound)
  • Lime Street (EC3M) (All Directions)
  • St Mary Axe (EC3A) (All Directions)

[A212] Wellesley Road (CR0,CR9) (Croydon)

  Expected delays

From: Monday 16 January 2017
To: Friday 31 March 2017

Last updated 19:35 Thursday 19 January 2017 : Delays are possible.

Works | Borough

[A212] Wellesley Road (All Directions) between Croydon Underpass and Bedford Park - Various lane restrictions and temporary traffic lights are in place to install new pedestrian crossings and alter road layout.

  • Bedford Park (CR9) (All Directions)
  • [A212] Croydon Underpass (CR0,CR9) (All Directions)
  • Lansdowne Road (CR9,CR0) (All Directions)
  • Poplar Walk (CR0) (All Directions)
  • St Michael's Road (CR0) (All Directions)
  • Sydenham Road (CR0) (All Directions)
  • Walpole Road (CR0) (All Directions)
  • [A212] Wellesley Road (CR0,CR9) (All Directions)
  • Wellesley Road (CR0,CR9) (All Directions)

[A1199] High Road (E18) (Redbridge)

  Expected delays

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 08:56 Friday 20 January 2017 : Delays are possible.

Works | Emergency

[A1199] High Road (E18) (All Directions) at the junction of George Lane - Temporary traffic signals in use to facilitate emergency Thames Water works.

[A400] Hampstead Road (NW1) (Camden)

  Expected delays

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 06:45 Friday 20 January 2017 : Traffic flows are normal at this time.

Hazard(s) | Collapsed Manhole

[A400] Hampstead Road (NW1) (Southbound) at the junction of Cardington Street - Carriageway is partially restricted due to a collapsed manhole cover.

  • Cardington Street (NW1) (All Directions)
  • [A400] Hampstead Road (NW1) (Southbound)
  • Varndell Street (NW1) (All Directions)

[A219] Wood Lane (W12) (Hammersmith & Fulham)

  Expected delays

From: Monday 09 January 2017
To: Monday 30 January 2017

Last updated 06:54 Friday 20 January 2017 : Expect local delays throughout the course of these works.

Special and Planned Events | Construction Activity

[A219] Wood Lane (W12) (All Directions) at the junction of Ariel Way (White City Bus Station by the Dimco Buildings) - There will be temporary traffic lights in operation to facilitate a crane operation

  • Ariel Way (W12) (All Directions)
  • Ring Road (W12) (All Directions)
  • [A219] Wood Lane (W12) (All Directions)

[A210] Eltham High Street (SE9) (Greenwich)

  Expected delays

From: Monday 01 February 2016
To: Sunday 30 April 2017

Last updated 14:11 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[A210] Eltham High Street (SE9) (All Directions) at the junction of Well Hall Road - Various lane restrictions and closures in place to facilitate Eltham High Street improvement works. Phase 3 (Nov 2016 to April 2017) will consist of lane suspensions.

  • A208 (SE9) (All Directions)
  • [A210] Eltham High Street (SE9) (All Directions)

[A1200] East Road (N1) (Hackney)

  Expected delays

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 07:10 Friday 20 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A1200] East Road (All Directions) at the junction of Bevenden Street - Thames Water are to carry out essential work in East Road near Bevenden Street, East Road will be reduced to a single lane in each direction.

  • Bevenden Street (N1) (All Directions)

[A1] Aldersgate Street (EC2Y,EC1A) (City Of London)

  Expected delays

From: Monday 22 August 2016
To: Friday 31 March 2017

Last updated 06:53 Friday 20 January 2017 : Traffic delays are possible whilst works continue.

Works | Borough

[A1] Aldersgate Street (EC2Y/EC1A) (All Approaches) at the junction of Beech Street and Long Lane - Restrictions in place to facilitate heating pipe installation works into St Bart's Hospital. There will be **no** right turn from Aldersgate to Beech Street (northbound) and no right turn from Aldersgate into Long Lane (southbound).

  • [A1] Aldersgate Street (EC2Y,EC1A) (All Approaches)
  • Long Lane (EC1A) (All Directions)

[A112] Prince Regent Lane (E16) (Newham)

  Expected delays

From: Monday 09 January 2017
To: Tuesday 31 January 2017

Last updated 08:49 Friday 20 January 2017 : Delays are possible.

Works | Utility

[A112] Prince Regent Lane (E16) (All Directions) at the junction of Victoria Dock Road - Temporary traffic lights due to utility works

  • Victoria Dock Road (E16) (All Directions)
  • [A112] Victoria Dock Road (E16) (All Directions)

[A105] Green Lanes (N13,EN2,EN1,N9,N21) (Enfield)

  Expected delays

From: Monday 12 September 2016
To: Friday 30 June 2017

Last updated 07:03 Friday 20 January 2017 : Local delays possible.

Works | TfL

[A105] Green Lanes (N13) (All Directions) between London Road and Ecclesbourne Gardens - Lane closures and temporary traffic lights in operation to facilitate the Mini Holland Cycle Scheme.

  • A110 (EN2,EN1) (All Directions)
  • [A1004] Alderman's Hill (N13) (All Directions)
  • Barrowell Green (N21,N13) (All Directions)
  • Berkeley Gardens (N21) (All Directions)
  • Borden Avenue (EN1) (All Directions)
  • Bush Hill (N21,EN1) (All Directions)
  • Bush Hill Road (N21) (All Directions)
  • Cambridge Gardens (N21) (All Directions)
  • Carpenter Gardens (N21) (All Directions)
  • Castleleigh Court (EN2) (All Directions)
  • [B154] Church Street (N9,N21) (All Directions)
  • Compton Road (N21) (All Directions)
  • Crestbrook Avenue (N13) (All Directions)
  • Devonshire Gardens (N21) (All Directions)
  • Ecclesbourne Gardens (N13) (All Directions)
  • Elm Park Road (N21) (All Directions)
  • Elsiedene Road (N21) (All Directions)
  • Essex Road (EN2) (All Directions)
  • Faversham Avenue (EN1) (All Directions)
  • Felstead Close (N13) (All Directions)
  • Fernleigh Road (N21) (All Directions)
  • Firs Lane (N21) (All Directions)
  • [A105] Green Lanes (N13,EN2,EN1,N9,N21) (All Directions)
  • [A105] Green Lanes Roundabout (N13,EN2,EN1,N9,N21) (All Directions)
  • Greenwood Gardens (N13) (All Directions)
  • Hazelwood Lane (N13) (All Directions)
  • Highfield Road (N21) (All Directions)
  • Kent Road (N21) (All Directions)
  • Lincoln Road (EN2) (All Directions)
  • Lodge Drive (N13) (All Directions)
  • [A105] London Road (N13,EN2,EN1,N9,N21) (All Directions)
  • London Road (EN2) (All Directions)
  • Meadowcroft Road (N13) (All Directions)
  • Mortimer Drive (EN1) (All Directions)
  • Oakthorpe Road (N13) (All Directions)
  • Oaktree Avenue (N13) (All Directions)
  • Osborne Road (N13) (All Directions)
  • Oxford Gardens (N21) (All Directions)
  • Palmerston Crescent (N13) (All Directions)
  • Park Crescent (EN2) (All Directions)
  • Private Road (EN2) (All Directions)
  • Queen's Avenue (N21) (All Directions)
  • Radcliffe Road (N21) (All Directions)
  • Regency Court (EN1) (All Directions)
  • [A105] Ridge Avenue (N13,EN2,EN1,N9,N21) (All Directions)
  • River Avenue (N13) (All Directions)
  • River Bank (N21) (All Directions)
  • Sherbrook Gardens (N21) (All Directions)
  • Silver Street (EN1) (All Directions)
  • Sittingbourne Avenue (EN1) (All Directions)
  • Solna Road (N21) (All Directions)
  • Springfield Parade Mews (N13) (All Directions)
  • Station Road (N21) (All Directions)
  • Stonard Road (N13) (All Directions)
  • Teynham Avenue (EN1) (All Directions)
  • Trade Close (N13) (All Directions)
  • Uvedale Road (EN2) (All Directions)
  • Vicar's Moor Lane (N21) (All Directions)
  • [A105] Village Road (N13,EN2,EN1,N9,N21) (All Directions)
  • Village Road (EN1) (All Directions)
  • Walnut Grove (EN1) (All Directions)
  • Walsingham Road (EN2) (All Directions)
  • Windsor Road (N13) (All Directions)
  • Woodberry Avenue (N21) (All Directions)
  • York Road (N21) (All Directions)

[A232] Sutton Court Road (SM1) (Sutton)

  Expected delays

From: Thursday 04 August 2016
To: Friday 21 April 2017

Last updated 13:19 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Special and Planned Events | Construction Activity

[A232] Sutton Court Road (Westbound) between Chalk Pit Way and [B2230] High Street Sutton - Lane three closed to facilitate building works at a nearby development (Off peak 1000-1530 only).

  • [A232] Carshalton Road (SM1) (All Directions)
  • [A232] Chalk Pit Way (SM1) (All Directions)
  • Grove Road (SM1) (All Directions)
  • [A232] Grove Road (SM1) (All Directions)
  • [B2230] High Street (SM1) (All Directions)
  • Orme Road (SM1) (All Directions)
  • Sutton Court Road (SM1) (Westbound)
  • [A232] Sutton Court Road (SM1) (All Directions)

Victoria Street ()

  Expected delays

From: Tuesday 03 May 2011
To: Friday 31 August 2018

Last updated 08:14 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. [A202] Bressenden Place is reduced to one lane at times. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road and Allington Street are closed. Find out more.

  • Victoria Street (All Directions)

[A211] High Street (DA14) (Bexley)

  Expected delays

From: Monday 09 January 2017
To: Tuesday 28 February 2017

Last updated 14:24 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[A211] High Street (All Directions) at the junction of Elm Road - Temporary traffic signals in use to facilitate major junction improvement scheme.

  • A222 (DA14,DA15) (All Directions)
  • [A211] Main Road (DA14) (All Directions)

[B507] Lisson Grove (NW8) (Westminster)

  Expected delays

From: Thursday 08 September 2016
To: Friday 05 May 2017

Last updated 08:19 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Borough

[B507] Lisson Grove (NW8) (Southbound) at the junction of Lilestone Street - Lane restrictions in place to facilitate building works.

  • [B507] Lisson Grove (NW8) (Southbound)

[A4020] Uxbridge Road (W7) (Ealing)

  Expected delays

From: Monday 14 November 2016
To: Friday 01 September 2017

Last updated 06:52 Friday 20 January 2017 : Traffic delays are possible throughout the duration of these works.

Works | Borough

[A4020] Uxbridge Road (W7) (All Directions) at the junction of Boston Road - Various restrictions to facilitate a major borough street scheme.

  • [A4001] Boston Road (W7) (All Directions)
  • Broadway (W7) (All Directions)
  • [A4020] Uxbridge Road (W7) (All Directions)

A1

[A1] Stirling Corner (WD6,NW7) (Barnet)

  Expected delays

Thursday 19 January 2017

Last updated 21:28 Thursday 19 January 2017 : Traffic is flowing well.

Traffic Incidents | Breakdown

[A1] Stirling Corner (All Directions) at the junction of Barnet By-pass and Barnet Road - All lanes are open following an earlier broken down vehicle.

  • A1 (WD6,NW7) (All Directions)

A10

[A10] High Road (N15) (Haringey)

  Expected delays

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 02:52 Friday 20 January 2017 : Traffic is flowing well.

Traffic Incidents | Collision

[A10] High Road (N15) (Southbound) at the junction of Broad Lane - All lanes are now open following an earlier collision.

  • [A503] Broad Lane (N15) (All Directions)
  • [A10] High Road (N15) (Southbound)

A20

[A20] Loampit Vale (SE13) (Lewisham)

  Expected delays

From: Monday 09 January 2017
To: Friday 16 June 2017

Last updated 21:53 Thursday 19 January 2017 : Traffic is flowing well.

Works | TfL

[A20] Loampit Vale (SE13) (Eastbound) between [A2210] Jerrard Street and [A2210] Thurston Road - Lane restrictions between approximately 1000hrs and 1530hrs each day and 2000hrs and 0530hrs each night during bus lane extension works. Restrictions are confined to the pavement.

  • A2210 (SE13) (All Directions)
  • Bertrand Street (SE13) (All Directions)
  • Branscombe Street (SE13) (All Directions)
  • Cornmill Lane (SE13) (All Directions)
  • Elmira Street (SE13) (All Directions)
  • Horton Street (SE13) (All Directions)
  • [A20] Loampit Vale (SE13) (Eastbound)
  • Station Road (SE13) (All Directions)
  • Vian Street (SE13) (All Directions)

A21

[A21] Kentish Way (BR1) (Bromley)

  Expected delays

Thursday 19 January 2017

Last updated 22:00 Thursday 19 January 2017 : Traffic is flowing well

Traffic Incidents | Breakdown

[A21] Kentish Way (BR1) (Northbound) between Stockwell Close and Harwood Avenue - Broken down has been repositioned.

  • Harwood Avenue (BR1) (All Directions)
  • [A21] Kentish Way (BR1) (Northbound)
  • Stockwell Close (BR1) (All Directions)

A4

A406

[A4] Great West Road (W4,TW8) (Hounslow)

  Expected delays

From: Monday 16 January 2017
To: Saturday 25 February 2017

Last updated 05:00 Tuesday 17 January 2017 : Traffic is flowing well in the area.

Works | Other

[A4] Great West Road (W4 /TW8) (Both Directions) between Chiswick Roundabout and Ealing Road - Lane closures to facilitate Highways England investigation works (nightly, 2230hrs to 0500hrs).

  • [A4] Chiswick Roundabout (W4,TW8) (All Directions)
  • Clayponds Avenue (TW8) (All Directions)
  • Clayponds Lane (TW8) (All Directions)
  • [B455] Ealing Road (TW8) (All Directions)
  • [A4] Great West Road (W4,TW8) (Both Directions)
  • [A4] Great West Road Roundabout (W4,TW8) (All Directions)
  • [A406] Gunnersbury Avenue (North Circular Road) (W4) (All Directions)
  • Lionel Road North (TW8) (All Directions)
  • Lionel Road South (TW8) (All Directions)
  • M4 (W4,TW8) (All Directions)

A4

Inner Ring

[A4] Piccadilly Underpass (W1J,SW1X,W1K) (Westminster)

  Expected delays

From: Saturday 14 January 2017
To: Sunday 19 March 2017

Last updated 12:33 Saturday 14 January 2017 : The underpass has reopened in both directions. Traffic is flowing well.

Works | Borough

[A4] Piccadilly Underpass (SW1) (Both Directions) - Closed between approximately 0800hrs Saturday and 1600hrs Sunday on the second weekend of each month.

  • Brick Street (W1J) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Down Street (W1J) (All Directions)
  • Down Street Mews (W1J) (All Directions)
  • [A4] Duke Of Wellington Place (W1J,SW1X,W1K) (All Directions)
  • [B310] Grosvenor Crescent (SW1X) (All Directions)
  • Grosvenor Crescent Mews (SW1X) (All Directions)
  • Hamilton Mews (W1J) (All Directions)
  • Hamilton Place (W1J) (All Directions)
  • [A4] Hyde Park Corner (W1J,SW1X,W1K) (All Directions)
  • [A4] Knightsbridge (W1J,SW1X,W1K) (All Directions)
  • Old Barrack Yard (SW1X) (All Directions)
  • Old Park Lane (W1K,W1J) (All Directions)
  • [A4202] Park Lane (W1J) (All Directions)
  • [A4] Piccadilly (W1J,SW1X,W1K) (All Directions)
  • Piccadilly (W1J) (All Directions)
  • [A4] Piccadilly Underpass (W1J,SW1X,W1K) (Both Directions)
  • South Carriage Drive (W1J,W2) (All Directions)
  • Wilton Place (SW1X) (All Directions)
  • Yarmouth Place (W1J) (All Directions)

A406

[A406] North Circular Road (NW2) (Brent)

  Expected delays

From: Monday 09 January 2017
To: Saturday 04 February 2017

Last updated 05:38 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A406] North Circular Road (NW2) (Westbound) between Staples Corner and Links Road - Lane one and two closure to facilitate resurfacing works. There will also be a full closure of Apsley Way. (Night Works - 22:00 to 05:00)

  • Apsley Way (NW2) (All Directions)
  • Brook Road (NW2) (All Directions)
  • Heather Road (NW2) (All Directions)
  • [A406] North Circular Road (NW2) (Westbound)

A406

A41

M1 (NW4,NW7,NW2,NW9,HA8) (Barnet)

  Expected delays

From: Monday 09 January 2017
To: Wednesday 25 January 2017

Last updated 05:38 Friday 20 January 2017 : Motorway has been fully reopened. Traffic is flowing well.

Works | Other

[M1] (NW4/NW7/HA8) (Northbound) between Junction 1 (A406) and Junction 4 - Closed between approximately 2230hrs and 0530hrs each night during maintenance on behalf of Highways England. Find out more on the Highways England website.

  • A406 (NW4,NW2) (All Directions)
  • Aerodrome Road (NW4) (All Directions)
  • Algernon Road (NW4) (All Directions)
  • Brent Park Road (NW4,NW2) (All Directions)
  • Bunn's Lane (NW7) (All Directions)
  • Canberra Close (NW4) (All Directions)
  • [A5150] Colindeep Lane (NW9,NW4) (All Directions)
  • Corner Mead (NW9) (All Directions)
  • Dallas Road (NW4) (All Directions)
  • Edgeworth Close (NW4) (All Directions)
  • Edgware Way (Watford By-Pass) (All Directions)
  • [A41] Edgware Way (Watford By-Pass) (HA8,NW7) (All Directions)
  • Endersleigh Gardens (NW4) (All Directions)
  • Field Mead (NW7) (All Directions)
  • Glendor Gardens (NW7) (All Directions)
  • Grahame Park Way (NW9,NW7) (All Directions)
  • Hale Grove Gardens (NW7) (All Directions)
  • [A5100] Hale Lane (NW7) (All Directions)
  • Highwood Grove (NW7) (All Directions)
  • Lancaster Close (NW9) (All Directions)
  • Langley Park (NW7) (All Directions)
  • Layfield Road (NW4) (All Directions)
  • Limes Avenue (NW7) (All Directions)
  • Lyndhurst Avenue (NW7) (All Directions)
  • M1 (NW4,NW7,NW2,NW9,HA8) (Northbound)
  • Malcolm Crescent (NW4) (All Directions)
  • Manor Drive (NW7) (All Directions)
  • Marchant Close (NW7) (All Directions)
  • Maxwelton Close (NW7) (All Directions)
  • Mount Road (NW4) (All Directions)
  • Park Road (NW4) (All Directions)
  • Rivington Crescent (NW7) (All Directions)
  • [A5109] Selvage Lane (NW7) (All Directions)
  • [A504] Station Road (NW9,NW4) (All Directions)
  • Sturgess Avenue (NW4) (All Directions)
  • Vicarage Road (NW4) (All Directions)
  • Wheatley Close (NW4) (All Directions)
  • Wilshaw Close (NW4) (All Directions)
  • Woodcroft Avenue (NW7) (All Directions)

Bishopsgate Cross Route

[A10] King William Street (EC3V,EC4R) (City Of London)

  Expected delays

From: Saturday 07 January 2017
To: Sunday 22 January 2017

Last updated 18:36 Sunday 15 January 2017 : Traffic is flowing well on diversion.

Works | Utility

[A10] King William Street (EC4N/EC4R) (Southbound) between Bank and Abchurch Lane - Road closure to facilitate utility works. (Weekend Works Only: 08:00 to 17:30)

  • Cannon Street (EC4N) (All Directions)
  • Clement's Lane (EC4N) (All Directions)
  • Eastcheap (EC3V,EC4R) (All Directions)
  • [A10] Eastcheap (EC3V,EC4R) (All Directions)
  • [A10] Gracechurch Street (EC3V,EC4R) (All Directions)
  • [A3,A10] King William Street (EC3R,EC4N,EC4R) (All Directions)
  • King William Street (All Directions)
  • [A10] King William Street (EC3V,EC4R) (Southbound)
  • Martin Lane (EC4R) (All Directions)
  • Nicholas Lane (EC4N,EC3V) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)

Blackwall Tunnel

Blackwall Tunnel (SOUTHBOUND BORE) (SE10,E14) (Greenwich,Tower Hamlets)

  Expected delays

From: Sunday 08 November 2015
To: Sunday 19 March 2017

Last updated 10:39 Tuesday 10 January 2017 : Traffic is flowing well.

Works | TfL

[A102] Blackwall Tunnel (Southbound) - Closed between approximately 0100hrs and 0800hrs on two Sunday mornings of each month (except Bank Holiday weekends) during overnight maintenance. Upcoming scheduled closures: 22nd January, 5th and 19th February, 5th and 19th March.

  • Blackwall Tunnel (Southbound Bore) (SE10,E14) (South Bound)

Enfield Mini-Holland Programme

  Moderate

From: Saturday 01 November 2014
To: Saturday 01 December 2018

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

A12

[A12] Eastway Tunnel (A12) (E9,E15,E3) (Tower Hamlets,Newham,Hackney)

  Expected delays

From: Friday 08 July 2016
To: Saturday 18 March 2017

Last updated 05:03 Saturday 14 January 2017 : Lane restrictions now in place. Traffic is flowing well.

Works | TfL

[A12] Eastway Tunnel (Southbound) - Various lane closures between approximately 2200hrs and 0500hrs during overnight maintenance. Lane one (of two) and hard shoulder closed the night of the second Friday of each month. Lanes one and two (of two) closed, with traffic running on the hard shoulder, the night of the third Friday of each month.

  • A106 (E10,E9,E15) (All Directions)
  • A12 (E9,E15,E3) (All Directions)
  • B112 (E9) (All Directions)
  • Bartrip Street (E9) (All Directions)
  • Buxhall Crescent (E9) (All Directions)
  • Cadogan Close (E9) (All Directions)
  • Cadogan Terrace (E9) (All Directions)
  • Chapman Road (E9) (All Directions)
  • [A12] Cowdry Road (E9,E15,E3) (All Directions)
  • Crowfoot Close (E9) (All Directions)
  • Dace Road (E3) (All Directions)
  • [A12] East Cross Route (E9,E15,E3) (All Directions)
  • Eastway (E9) (All Directions)
  • Eastway Tunnel (A12) (E9) (All Directions)
  • [A12] Eastway Tunnel (A12) (E9,E15,E3) (Southbound)
  • Edmeston Close (E9) (All Directions)
  • Felstead Street (E9) (All Directions)
  • Hillyfield Close (E9) (All Directions)
  • Jodrell Road (E3) (All Directions)
  • [A12] Lea Bridge (A12 / A106 Ruckholt Road) (E9,E15,E3) (All Directions)
  • Lee Conservancy Road (E9) (All Directions)
  • Merriam Avenue (E9) (All Directions)
  • Monier Road (E3) (All Directions)
  • Northwall Road (E9,E15) (All Directions)
  • Palace Close (E9) (All Directions)
  • Remus Road (E3) (All Directions)
  • Rothbury Road (E9) (All Directions)
  • Shalbourne Square (E9) (All Directions)
  • St Marks Gate (E9) (All Directions)
  • Trego Road (E9) (All Directions)
  • Trowbridge Road (E9) (All Directions)
  • Wallis Road (E9) (All Directions)
  • Wansbeck Road (E3,E9) (All Directions)
  • White Post Lane (E9) (All Directions)
  • Wick Lane (E3) (All Directions)

A12

[A1205] Burdett Road (E14,E3) (Tower Hamlets)

  Expected delays

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 14:54 Thursday 19 January 2017 : Works resume at 1000hrs.

Works | Utility

[A1205] Burdett Road (E14/E3 ) (Northbound) at the junction of St Paul's Way - Lane restrictions due to Vodafone works, daily.

  • [A1205] Burdett Road (E14,E3) (Northbound)
  • [B140] St Paul's Way (E14,E3) (All Directions)

A4

[A4] Vicarage Farm Road (TW3) (Hounslow)

  Expected delays

From: Wednesday 07 December 2016
To: Thursday 26 January 2017

Last updated 08:20 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

Vicarage Farm Road (TW3) (All Directions) at the junction of Great West Road - Closed to facilitate works. Temporary traffic signals are also in operation on Great West Road at this junction (Nights only, 16th to 20th January).

  • [A4] Great West Road (TW4) (All Directions)

Kingston Mini-Holland Programme

  Moderate

From: Monday 09 November 2015
To: Friday 22 December 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Waltham Forest Mini-Holland Programme

  Moderate

From: Monday 26 January 2015
To: Saturday 31 March 2018

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Power Road Bridge

  Moderate

From: Monday 15 June 2015
To: Thursday 15 June 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Ardleigh Green Bridge

  Moderate

From: Thursday 01 January 2015
To: Sunday 31 December 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

City Route

[A3211] Strand Tunnel (WC2B) (Camden)

  Expected delays

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 04:13 Friday 20 January 2017 : Traffic is flowing well.

Works | Emergency

Strand Tunnel (All Directions) - Underpass now open following earlier works.

  • A301 (WC2N,SE1,WC2E,WC2B,WC2R) (All Directions)
  • A301 (WC2N,SE1,WC2E,WC2B,WC2R) (All Directions)
  • A4 (WC2B,WC2R) (All Directions)
  • A4 (WC2B,WC2R) (All Directions)
  • Catherine Street (WC2B) (All Directions)
  • Catherine Street (WC2B) (All Directions)
  • Drury Lane (WC2B) (All Directions)
  • Drury Lane (WC2B) (All Directions)
  • Exeter Street (WC2B) (All Directions)
  • Exeter Street (WC2B) (All Directions)
  • Keeley Street (WC2B) (All Directions)
  • Keeley Street (WC2B) (All Directions)
  • Kemble Street (WC2B) (All Directions)
  • Kemble Street (WC2B) (All Directions)
  • [A4200] Kingsway (WC2B,WC2A) (All Directions)
  • [A4200] Kingsway (WC2B,WC2A) (All Directions)
  • Portugal Street (WC2A) (All Directions)
  • Sardinia Street (WC2A) (All Directions)
  • Sardinia Street (WC2A) (All Directions)
  • [A3211] Victoria Embankment (WC2N,WC2E,WC2R) (All Directions)
  • [A3211] Victoria Embankment (WC2N,WC2E,WC2R) (All Directions)
  • Wellington Street (WC2B) (All Directions)
  • Wellington Street (WC2B) (All Directions)
  • Wild Court (WC2B) (All Directions)
  • Wild Court (WC2B) (All Directions)

City Route

[A3211] Victoria Embankment (SW1A) (Westminster)

  Expected delays

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 04:51 Friday 20 January 2017 : Traffic is flowing well.

Traffic Incidents | Emergency Services Incident

[A3211] Victoria Embankment (SW1A) (Both Directions) at the junction of Horse Guards Avenue - The road has now reopened following an earlier Police incident.

  • Horse Guards Avenue (SW1A) (All Directions)

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Expected delays

From: Saturday 14 January 2017
To: Sunday 05 February 2017

Last updated 18:57 Saturday 14 January 2017 : Traffic is flowing well.

Works | TfL

[A201] Blackfriars Road (SE1) (Both Directions) at the junction of Meymott Street - Restrictions in place to facilitate the installation of a zebra crossing on the Cycle Superhighway. Works are weekend works, 0900hrs-1800hrs on Saturdays, 1000hrs-1600hrs on Sundays.

  • [A201] Blackfriars Road (SE1) (Both Directions)

Inner Ring

[A4202] Park Lane (W1K,W2) (Westminster)

  Expected delays

From: Tuesday 03 January 2017
To: Sunday 19 February 2017

Last updated 06:00 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | Utility

[A4202] Park Lane (W2 /W1K) (Northbound) opposite the junction of Woods Mews - Lanes four and five (of five) closed to facilitate works by Thames Water (night works, Monday to Friday only).

  • [A4202] Park Lane (W1K,W2) (Northbound)
  • Wood's Mews (W1K) (All Directions)

Upper Holloway Bridge

  Moderate

From: Tuesday 23 September 2014
To: Saturday 30 September 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

East-West Cycle Superhighway

  Moderate

From: Sunday 01 January 2017
To: Monday 01 January 2018

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Cycle Superhighway 5 (Oval to Lewisham)

  Moderate

From: Sunday 01 January 2017
To: Friday 01 December 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

North-South Cycle Superhighway

  Moderate

From: Sunday 01 May 2016
To: Monday 01 May 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Cycle Superhighway 4 (Rotherhithe Roundabout)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Cycle Superhighway 4 (Surrey Quays Gyratory)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Cycle Superhighway 4 (Tower Bridge to Deptford)

  Moderate

From: Monday 01 August 2016
To: Saturday 01 April 2017

Last updated 15:16 Wednesday 18 January 2017

cyclesuperhighway | project

Anglers Lane (NW5) (Camden)

  Expected delays

From: Monday 21 November 2016
To: Friday 20 January 2017

Last updated 09:13 Friday 20 January 2017 : Traffic is flowing well.

Works | Utility

Anglers Lane (NW5) (Both Directions) between Kentish Town Road and Prince Of Wales Road - Earlier restrictions have been removed.

  • Alma Street (NW5) (All Directions)
  • Anglers Lane (NW5) (Both Directions)
  • Castlehaven Road (NW1) (All Directions)
  • Gaisford Street (NW5) (All Directions)
  • Grafton Road (NW5) (All Directions)
  • [A400] Kentish Town Road (NW5) (All Directions)
  • Prince Of Wales Road (NW5,NW1) (All Directions)
  • Raglan Street (NW5) (All Directions)
  • Willes Road (NW5) (All Directions)

[A232] Addiscombe Road (CR0) (Croydon)

  Expected delays

Thursday 19 January 2017

Last updated 23:06 Thursday 19 January 2017 : Traffic is flowing well

Works | Utility

[A232] Addiscombe Road (Both Directions) at the junction of Shirley Road - works are finished at this location.

  • [A232] Addiscombe Road (CR0) (Both Directions)
  • [A215] Shirley Road (CR0) (All Directions)
  • [A232] Shirley Road (CR0) (All Directions)
  • [A232] Shirley Road Roundabout (CR0) (All Directions)

[B323] Horseferry Road (SW1P) (Westminster)

  Expected delays

From: Wednesday 11 January 2017
To: Thursday 19 January 2017

Last updated 23:52 Thursday 19 January 2017 : Traffic is flowing well.

Hazard(s) | Burst Water Main

[B323] Horseferry Road (SW1) (All Directions) at the junction of Marsham Street - All lanes are now open following earlier works.

  • [B323] Horseferry Road (SW1P) (All Directions)
  • [B326] Marsham Street (SW1P) (All Directions)
  • Romney Street (SW1P) (All Directions)
  • Tufton Street (SW1P) (All Directions)

St James's Park - Changing Of The Guard (SW1A) (Westminster)

  Expected delays

From: Wednesday 21 December 2016
To: Tuesday 16 January 2018

Last updated 18:15 Thursday 19 January 2017 : Local delays possible when ceremony in progress.

Special and Planned Events | Ceremonial

St James's Park (All Directions) - Changing of the Guard - Constitution Hill, Spur Road, Birdcage Walk eastbound and The Mall at Marlborough Road will be closed to facilitate a ceremonial event. Closures in place Mondays, Wednesdays, Fridays and Sundays: 1015-1145hrs.

  • Birdcage Walk (SW1E,SW1H) (All Directions)
  • Buckingham Gate (SW1E) (All Directions)
  • Buckingham Gate (SW1E) (All Directions)
  • Buckingham Palace (SW1A) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Constitution Hill (SW1W,SW1A) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • Queen Victoria Memorial (SW1A) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • St James's Park (SW1H) (All Directions)
  • Stable Yard Road (SW1A) (All Directions)
  • Stable Yard Road (SW1A) (All Directions)
  • The Mall (SW1A) (All Directions)
  • The Mall (SW1A) (All Directions)

[A3003] Lower Richmond Road (SW14) (Richmond Upon Thames)

  Expected delays

Thursday 19 January 2017

Last updated 22:01 Thursday 19 January 2017 : Traffic is flowing well

Traffic Incidents | Collision

[A3003] Lower Richmond Road (SW14) (All Directions) at the junction of Watney Road - All lanes are open following the earlier collision

  • Kingsway (SW14) (All Directions)
  • [A3003] Lower Richmond Road (SW14) (Both Directions)
  • Watney Road (SW14) (All Directions)

[A598] Finchley Road (NW11,NW2) (Barnet)

  Expected delays

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 00:54 Friday 20 January 2017 : Traffic is light

Traffic Incidents | Breakdown

[A598] Finchley Road (NW2/NW11) (All Directions) at the junction of Cricklewood Lane - All lanes are open following a broken down coach.

  • Finchley Road (All Directions)
  • [A598] Finchley Road (NW11,NW2) (All Directions)
  • Hermitage Lane (NW11,NW2) (All Directions)

Old Oak Common Lane (W3) (Hammersmith & Fulham)

  Expected delays

From: Monday 09 January 2017
To: Monday 13 February 2017

Last updated 05:39 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

Old Oak Common Lane (W3 ) (All Directions) at the junction of Du Cane Road - Various lane restrictions and closures to facilitate traffic signal modernisation works (2000hrs to 0500hrs). No restrictions in place.

  • Du Cane Road (W12,W3) (All Directions)
  • Erconwald Street (W12) (All Directions)
  • Old Oak Common Lane (W3) (All Directions)

[B404] St Martin's Lane (WC2H,WC2N,WC2E) (Westminster)

  Expected delays

From: Saturday 14 January 2017
To: Saturday 21 January 2017

Last updated 18:11 Saturday 14 January 2017 : Traffic is flowing well

Special and Planned Events | Construction Activity

[B404] St Martin's Lane (WC2N/WC2E) (All Directions) between Cranbourn Street and New Row - Road closure due to crane operation, weekly.

  • Garrick Street (WC2E) (All Directions)
  • Great Newport Street (WC2H) (All Directions)
  • [B404] St Martin's Lane (WC2H,WC2N,WC2E) (All Directions)
  • [B404] Upper St Martin's Lane (WC2H,WC2N,WC2E) (All Directions)

A12

[A127] Southend Arterial Road (RM2) (Havering)

  Moderate

From: Sunday 13 March 2016
To: Saturday 11 November 2017

Last updated 09:47 Friday 20 January 2017 : Westbound is slow on approach from Hall Lane but also due to an earlier M25 anti-clockwise closure. Expect delays.

Works | TfL

Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions during bridge replacement works. Contraflow in operation, reducing the carriageway to a single lane each direction between Gallows Corner (A12) and Squirrels Heath Road until approximately May 2017. Additionally, no access from Bryant Avenue to the [A127] until approximately February 2017. Find out more.

  • Bryant Avenue (RM2,RM3) (All Directions)
  • [A127] Southend Arterial Road (RM2) (Eastbound)
  • Southend Arterial Road (All Directions)

A13

City Route

Southern River Route

[A1203] Limehouse Link Tunnel (E1W,E14) (Tower Hamlets)

  Moderate

From: Tuesday 19 July 2016
To: Friday 03 March 2017

Last updated 05:58 Friday 06 January 2017 : The Tunnel has been reopened.

Works | TfL

[A1203] Limehouse Link Tunnel (Both Directions) - Closed in both directions between approximately 2200hrs and 0500hrs every four weeks at the end of the month for cyclic maintenance.

  • A101 (E1W,E14) (All Directions)
  • A1261 (E14) (All Directions)
  • Barleycorn Way (E14) (All Directions)
  • Basin Approach (E14) (All Directions)
  • Bekesbourne Street (E14) (All Directions)
  • Birchfield Street (E14) (All Directions)
  • Branch Road (E14) (All Directions)
  • Brightlingsea Place (E14) (All Directions)
  • [A126] Butcher Row (E1W,E14) (All Directions)
  • Cannon Drive (E14) (All Directions)
  • Castor Lane (E14) (All Directions)
  • Cranford Street (E1W) (All Directions)
  • Dingle Gardens (E14) (All Directions)
  • Dolphin Lane (E14) (All Directions)
  • Dundee Wharf (E14) (All Directions)
  • Garford Street (E14) (All Directions)
  • Heckford Street (E1W) (All Directions)
  • Hertsmere Road (E14) (All Directions)
  • Horseferry Road (E14) (All Directions)
  • Island Row (E14) (All Directions)
  • Jardine Road (E1W) (All Directions)
  • Limehouse Causeway (E14) (All Directions)
  • [A1203] Limehouse Link (E1W,E14) (All Directions)
  • [A1203] Limehouse Link (Tunnel) (E1W,E14) (All Directions)
  • Limehouse Link Tunnel (E14) (All Directions)
  • [A1206] Limehouse Link Tunnel (E14) (All Directions)
  • [A1203] Limehouse Link Tunnel (E1W,E14) (Both Directions)
  • Mill Place (E14) (All Directions)
  • Milligan Street (E14) (All Directions)
  • Ming Street (E14) (All Directions)
  • Narrow Street (E14) (All Directions)
  • Northey Street (E14) (All Directions)
  • Norway Place (E14) (All Directions)
  • Oak Lane (E14) (All Directions)
  • Pennyfields (E14) (All Directions)
  • Premiere Place (E14) (All Directions)
  • Ratcliffe Lane (E14) (All Directions)
  • Ropemaker's Fields (E14) (All Directions)
  • Rosefield Gardens (E14) (All Directions)
  • Schoolhouse Lane (E1W) (All Directions)
  • Shoulder Of Mutton Alley (E14) (All Directions)
  • Spert Street (E14) (All Directions)
  • [A1203] The Highway (E1W,E14) (All Directions)
  • Three Colt Street (E14) (All Directions)
  • [A1206] Westferry Road (E14) (All Directions)
  • Wharf Lane (E14) (All Directions)

A406

[A406] Fore Street Tunnel (N18) (Enfield)

  Moderate

From: Thursday 04 August 2016
To: Friday 10 March 2017

Last updated 22:41 Thursday 19 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A406] Fore Street Tunnel (Both Directions) - Fully closed between approximately 2200hrs and 0500hrs the nights of first and second Thursday of each month during maintenance.

  • A1010 (N18) (All Directions)
  • Aberdeen Road (N18) (All Directions)
  • Angel Close (N18) (All Directions)
  • Angel Place (N18) (All Directions)
  • [A406] Angel Road (N18) (All Directions)
  • [A406] Angel Road (North Circular Road) (N18) (All Directions)
  • Booker Road (N18) (All Directions)
  • College Close (N18) (All Directions)
  • Cornwall Road (N18) (All Directions)
  • Cross Street (N18) (All Directions)
  • Cuthbert Road (N18) (All Directions)
  • Dickens Lane (N18) (All Directions)
  • Dorrit Mews (N18) (All Directions)
  • Edinburgh Road (N18) (All Directions)
  • Fairfield Road (N18) (All Directions)
  • [A406] Fore Street Tunnel (N18) (Both Directions)
  • Glasgow Road (N18) (All Directions)
  • Gloucester Road (N18) (All Directions)
  • Inverness Road (N18) (All Directions)
  • King's Road (N18) (All Directions)
  • Linnell Road (N18) (All Directions)
  • Raynham Avenue (N18) (All Directions)
  • Raynham Road (N18) (All Directions)
  • Regal Court (N18) (All Directions)
  • [A406] Silver Street (N18) (All Directions)
  • Silver Street (N18) (All Directions)
  • Somerset Road (N18) (All Directions)
  • [A406] Sterling Way (N18) (All Directions)
  • [A406] Sterling Way (North Circular Road) (N18) (All Directions)
  • Upton Road (N18) (All Directions)
  • [A406] Victoria Road (N18) (All Directions)
  • Victoria Road (N18) (All Directions)
  • Wakefield Street (N18) (All Directions)

A41

[A41] Finchley Road (NW3) (Camden)

  Moderate

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 07:56 Friday 20 January 2017 : Traffic is flowing.

Works | Emergency

[A41] Finchley Road (NW3) (Southbound) at the junction of Canfield Gardens - All lanes are now open following emergency utility works.

  • Canfield Gardens (NW3) (All Directions)
  • [A41] Finchley Road (NW3) (Northbound)

Inner Ring

[A3214] Buckingham Palace Road (SW1W) (Westminster)

  Moderate

Thursday 19 January 2017

Last updated 22:59 Thursday 19 January 2017 : Traffic is flowing well.

Traffic Incidents | Collision

[A3214] Buckingham Palace Road (SW1W) (Southbound) at the junction of Belgrave Road - All lanes are now open following an earlier collision.

  • A3213 (SW1W) (All Directions)
  • [A3214] Buckingham Palace Road (SW1W) (Both Directions)

Inner Ring

[A501] Pentonville Road (N1) (Islington,Camden)

  Moderate

From: Wednesday 18 January 2017
To: Tuesday 24 January 2017

Last updated 09:43 Friday 20 January 2017 : Traffic is flowing well past the works.

Works | Emergency

[A501] Pentonville Road (N1 ) (Eastbound) at the junction of Caledonian Road - Lane one (of two) is closed for gas works.

  • [A5203] Caledonian Road (N1) (All Directions)
  • [A501] Pentonville Road (N1) (Eastbound)

Southern River Route

[A3212] Millbank (SW1P) (Westminster)

  Moderate

From: Friday 06 January 2017
To: Thursday 26 January 2017

Last updated 09:56 Friday 20 January 2017 : There are eastbound queues on Grosvenor Road. Expect delays.

Works | Emergency

A3212 Millbank (SW1P/SW1V) (All Approaches) at the junction of Bessborough Gardens - Various lane closures in place to facilitate emergency gas works. Northbound Vauxhall Bridge two lanes (of five) closed. Grosvenor Road eastbound lane four (of four) closed. Millbank heading westbound has been reduced to one lane. Vauxhall Bridge Road southbound the right turn lane closed.

[A315] Kensington High Street (W8) (Kensington & Chelsea)

  Moderate

From: Thursday 19 January 2017
To: Monday 30 January 2017

Last updated 09:44 Friday 20 January 2017 : Traffic is slow on the eastbound approach with tailbacks to the junction with Addison Road. Southbound traffic is slow from Notting Hill Gate.

Works | TfL

[A315] Kensington High Street (W8 ) (All Directions) at the junction of Kensington Church Street - Temporary traffic lights are in place due to works on the permanent traffic lights.

  • Kensington Church Court (W8) (All Directions)
  • [A4204] Kensington Church Street (W8) (All Directions)
  • [A315] Kensington High Street (W8) (All Directions)

Archway Gyratory

  Moderate

From: Monday 01 February 2016
To: Sunday 30 July 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

Highbury Corner

  Moderate

From: Monday 24 November 2014
To: Monday 20 November 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

[A238] Merton High Street (SW19) (Merton)

  Moderate

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 09:47 Friday 20 January 2017 : Expect delays on approach and in the surrounding area, especially during peak periods.

Works | Utility

[A238] Merton High Street (SW19) (Both directions) at the junction of Hamilton Road - Single alternate lane traffic due to repair of a burst water main.

  • [A238] Merton High Street (SW19) (All Directions)

Aldgate Gyratory

  Moderate

From: Saturday 28 June 2014
To: Wednesday 31 May 2017

Last updated 15:16 Wednesday 18 January 2017

modernisation | project

A1

[A1] Holloway Road (N19) (Islington)

  Minimal

From: Wednesday 21 October 2015
To: Saturday 01 April 2017

Last updated 06:45 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

Upper Holloway Bridge, [A1] Holloway Road (Both Directions) at the junction of Fairbridge Road near Upper Holloway station - Various restrictions during bridge replacement works. From 16th January until 1st April, the carriageway will be reduced to one lane in both directions between Fairbridge Road and Wedmore Gardens. Find out more about Upper Holloway Bridge.

  • A400 (N19) (All Directions)
  • Alexander Road (N19) (All Directions)
  • [A1] Archway Road (N19) (All Directions)
  • Archway Road (N19) (All Directions)
  • Criterion Mews (N19) (All Directions)
  • Davenant Road (N19) (All Directions)
  • Elthorne Road (N19) (All Directions)
  • Fairbridge Road (N19) (All Directions)
  • Flowers Mews (N19) (All Directions)
  • Fortnam Road (N19) (All Directions)
  • Giesbach Road (N19) (All Directions)
  • Hampden Road (N19) (All Directions)
  • [A1] Highgate Hill (N19) (All Directions)
  • [A1,B519] Highgate Hill (N19) (All Directions)
  • Kingsdown Road (N19) (All Directions)
  • Kiver Road (N19) (All Directions)
  • Landseer Road (N19) (All Directions)
  • Marlborough Road (N19) (All Directions)
  • Marlborough Yard (N19) (All Directions)
  • Pemberton Gardens (N19) (All Directions)
  • Rupert Road (N19) (All Directions)
  • [A1] Sandridge Street (N19) (All Directions)
  • St John's Villas (N19) (All Directions)
  • [A1] St John's Way (N19) (All Directions)
  • St John's Way (N19) (All Directions)
  • Tavistock Terrace (N19) (All Directions)
  • [A1] Tollhouse Way (N19) (All Directions)
  • Tollington Way (N19) (All Directions)
  • Wedmore Gardens (N19) (All Directions)
  • Wedmore Mews (N19) (All Directions)
  • Wedmore Street (N19) (All Directions)
  • Windermere Road (N19) (All Directions)
  • Witley Road (N19) (All Directions)

A1

[A1] Archway Road (N19) (Islington)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 09:23 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A1] Archway Road (N19) (Northbound) at the junction of Waterlow Road - Lane closure to facilitate bus shelter works.

  • [A1] Archway Road (N19) (Northbound)
  • Waterlow Road (N19) (All Directions)
  • Whitehall Park (N19) (All Directions)

A10

[A10] Great Cambridge Road (N9,EN1) (Enfield)

  Minimal

Thursday 19 January 2017

Last updated 21:47 Thursday 19 January 2017 : Traffic is flowing well.

Traffic Incidents | Collision

[A10] Great Cambridge Road (N9 /EN1) (Northbound) at the junction of Bury Street - All lanes are open following a collision

  • Bury Street West (N9) (All Directions)

A10

[A10] Stoke Newington High Street (N16) (Hackney)

  Minimal

From: Friday 06 January 2017
To: Friday 20 January 2017

Last updated 06:56 Friday 20 January 2017 : Delays are possible.

Works | Emergency

[A10] Stoke Newington High Street (N16) (Northbound) between Dynevor Road and Brooke Road - Lane three (of three) is closed for emergency Thames Water repair works.

  • Brooke Road (N16) (All Directions)
  • Dynevor Road (N16) (All Directions)

A12

[A12] George Green Tunnel (IG1,E11) (Waltham Forest,Redbridge)

  Minimal

From: Friday 05 August 2016
To: Saturday 04 March 2017

Last updated 05:03 Saturday 14 January 2017 : The westbound tunnel is closed. All traffic is using the eastbound tunnel. Traffic is flowing well through the restrictions.

Works | TfL

[A12] George Green Tunnel (E11) (Both Directions) and [A12] Green Man Tunnel (A114) (Eastbound) - Various closures between approximately 2200hrs and 0500hrs the first and second Fridays of each month during overnight maintenance. Closed westbound the first Friday of each month and eastbound the second.

  • A1008 (E11) (All Directions)
  • A1199 (E11) (All Directions)
  • A12 (IG1,E11) (All Directions)
  • Addison Road (E11) (All Directions)
  • Ashbridge Road (E11) (All Directions)
  • Cambridge Park (E11) (All Directions)
  • Cambridge Park Road (E11) (All Directions)
  • Cambridge Road (E11) (All Directions)
  • Camden Road (E11) (All Directions)
  • Chadwick Road (E11) (All Directions)
  • Chester Road (E11) (All Directions)
  • Colworth Road (E11) (All Directions)
  • Corbett Road (E11) (All Directions)
  • Corbicum (E11) (All Directions)
  • Dangan Road (E11) (All Directions)
  • Draycot Road (E11) (All Directions)
  • Drummond Road (E11) (All Directions)
  • [A12] Eastern Avenue (IG1,E11) (All Directions)
  • Eastern Avenue (IG4) (All Directions)
  • Elm Close (E11) (All Directions)
  • Elm Hall Gardens (E11) (All Directions)
  • [A106] Gainsborough Road (E11) (All Directions)
  • Gardner Close (E11) (All Directions)
  • [A12] George Green Tunnel (IG1,E11) (Westbound)
  • Gordon Road (E11) (All Directions)
  • [A12] Green Man Tunnel (A12) (IG1,E11) (Eastbound)
  • Hanbury Drive (E11) (All Directions)
  • [A12] Harrier Avenue (IG1,E11) (All Directions)
  • High Street (E11) (All Directions)
  • Highstone Avenue (E11) (All Directions)
  • Holly Road (E11) (All Directions)
  • [A12] Kingfisher Avenue (IG1,E11) (All Directions)
  • Kingswood Road (E11) (All Directions)
  • Lemna Road (E11) (All Directions)
  • Lonsdale Road (E11) (All Directions)
  • Mansfield Road (E11) (All Directions)
  • Nutter Lane (E11) (All Directions)
  • Poppleton Road (E11) (All Directions)
  • Preston Drive (E11) (All Directions)
  • Redbridge Lane West (E11) (All Directions)
  • Reydon Avenue (E11) (All Directions)
  • River Close (E11) (All Directions)
  • Seagry Road (E11) (All Directions)
  • Selsdon Road (E11) (All Directions)
  • Spratt Hall Road (E11) (All Directions)
  • Sydney Road (E11) (All Directions)
  • Teesdale Road (E11) (All Directions)
  • The Green (E11) (All Directions)
  • Wallwood Road (E11) (All Directions)
  • [A114] Whipps Cross Road (E11) (All Directions)
  • Wigram Road (E11) (All Directions)
  • Woodcote Road (E11) (All Directions)

A12

[A12] Green Man Tunnel (A12) (E11) (Waltham Forest,Redbridge)

  Minimal

From: Friday 05 August 2016
To: Saturday 18 March 2017

Last updated 05:04 Saturday 14 January 2017 : Traffic is flowing well.

Works | TfL

[A12] Green Man Tunnel (A114) (Both Directions) - Various closure between approximately 2200hrs and 0500hrs during overnight maintenance. Closed eastbound the nights of the first and second Friday of each month, in conjunction with George Green Tunnel closures. Closed in both directions the night of the third Friday of each month.

  • A106 (E11) (All Directions)
  • A1199 (E11) (All Directions)
  • A12 (E11) (All Directions)
  • Cambridge Park (E11) (All Directions)
  • Cambridge Park Road (E11) (All Directions)
  • Cambridge Road (E11) (All Directions)
  • Chadwick Road (E11) (All Directions)
  • Church Lane (E11) (All Directions)
  • Colworth Road (E11) (All Directions)
  • Fairlop Road (E11) (All Directions)
  • [A12] Green Man Tunnel (A12) (E11) (Eastbound)
  • Hanbury Drive (E11) (All Directions)
  • Harrington Road (E11) (All Directions)
  • Highstone Avenue (E11) (All Directions)
  • Holly Road (E11) (All Directions)
  • King's Road (E11) (All Directions)
  • Kingswood Road (E11) (All Directions)
  • Kirkdale Road (E11) (All Directions)
  • Lemna Road (E11) (All Directions)
  • Lonsdale Road (E11) (All Directions)
  • Poppleton Road (E11) (All Directions)
  • Queen's Road (E11) (All Directions)
  • Selsdon Road (E11) (All Directions)
  • Teesdale Road (E11) (All Directions)
  • Wallwood Road (E11) (All Directions)
  • [A114] Whipps Cross Road (E11) (All Directions)
  • Woodcote Road (E11) (All Directions)

A12

[A11] Bow Flyover (E15,E3) (Tower Hamlets,Newham)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 03:21 Friday 20 January 2017 : Traffic is light

Works | TfL

[A11] Bow Flyover (All Directions) - The works are complete

  • A12 (E3,E15) (All Directions)
  • [A11] Bow Road (E15,E3) (All Directions)
  • [A11] Bow Roundabout (E15,E3) (All Directions)
  • [A11] High Street (E15,E3) (All Directions)

A12

A13

Blackwall Tunnel

[A102] Blackwall Tunnel Northern Approach (E14) (Tower Hamlets)

  Minimal

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 03:56 Friday 20 January 2017 : Traffic is light

Works | TfL

[A12] Blackwall Tunnel Northern Approach (E3 /E14) (Both Directions) between Old Ford (A12) and Blackwall Tunnel (Southbound Bore) - Open following maintenance works.

  • A102 (E14) (All Directions)
  • A11 (E15,E3) (All Directions)
  • [B125] Abbott Road (E14) (All Directions)
  • Abbott Road (All Directions)
  • Andrew Street (E14) (All Directions)
  • Ashton Street (E14) (All Directions)
  • Balmore Close (E14) (All Directions)
  • [A102] Blackwall Tunnel (Northbound Bore) (E14) (All Directions)
  • [A102] Blackwall Tunnel (Southbound Bore) (E14) (All Directions)
  • [A102] Blackwall Tunnel Northern Approach (E14) (Both Directions)
  • [A12] Blackwall Tunnel Northern Approach (E15,E14,E3) (All Directions)
  • Blackwall Tunnel Northern Approach (E3) (All Directions)
  • [A12] Bow Underpass (A12) (E15,E14,E3) (All Directions)
  • Bromley Hall Road (E14) (All Directions)
  • [B140] Bromley High Street (E3) (All Directions)
  • [A102] Brunswick Road (E14) (All Directions)
  • Dee Street (E14) (All Directions)
  • Devas Street (E3) (All Directions)
  • Ditchburn Street (E14) (All Directions)
  • [A13] East India Dock Road (E14) (All Directions)
  • Empson Street (E3) (All Directions)
  • Ettrick Street (E14) (All Directions)
  • Everest Place (E14) (All Directions)
  • Findhorn Street (E14) (All Directions)
  • Franklin Street (E3) (All Directions)
  • Gillender Street (E14,E3) (All Directions)
  • Hancock Road (E3) (All Directions)
  • Imperial Street (E3) (All Directions)
  • Joshua Street (E14) (All Directions)
  • Leven Road (E14) (All Directions)
  • Lochnagar Street (E14) (All Directions)
  • Naval Row (E14) (All Directions)
  • Prestage Way (E14) (All Directions)
  • Priory Street (E3) (All Directions)
  • Robin Hood Lane (E14) (All Directions)
  • [A102] St Leonard's Road (E14) (All Directions)
  • Talwin Street (E3) (All Directions)
  • Twelvetrees Crescent (E3) (All Directions)
  • Washington Close (E3) (All Directions)
  • Woolmore Street (E14) (All Directions)
  • Zetland Street (E14) (All Directions)

A13

[A13] Commercial Road (E14) (Tower Hamlets)

  Minimal

From: Monday 16 January 2017
To: Monday 06 February 2017

Last updated 07:07 Friday 20 January 2017 : Normal traffic flows for the time of day.

Works | Utility

[A13] Commercial Road (E14) (Westboud) between Wharf Lane and Island Row - Lane one (of two) is closed due to works.

  • Newell Street (E14) (All Directions)
  • Wharf Lane (E14) (All Directions)

A13

East India Dock Tunnel (E14) (Tower Hamlets)

  Minimal

From: Monday 05 January 2015
To: Tuesday 28 February 2017

Last updated 23:02 Monday 02 January 2017 : The tunnel is open, traffic is flowing well.

Works | TfL

[A1261] East India Dock Tunnel (Both Directions) - closed between approximately 2200hrs and 0600hrs during overnight maintenance.

  • East India Dock Tunnel (E14) (Both Directions)

A13

[A13] A13 Thames Gateway (RM15,RM19) (Havering)

  Minimal

From: Tuesday 03 January 2017
To: Monday 30 January 2017

Last updated 04:55 Friday 20 January 2017 : Use alternate route when closure in place. Traffic currently flowing well.

Works | Other

[A13] A13 Thames Gateway (Both Directions) between Wennington Interchange and Stifford Interchange - Road closed to facilitate CCTV and electrical upgrade works (night works).

  • [A13] A13 Thames Gateway (RM15,RM19) (Both Directions)
  • M25 (RM15,RM19) (All Directions)
  • [A1306] New Road (RM13) (All Directions)
  • [A1012] Stifford Clays Road Roundabout (RM16) (All Directions)

A2

[A2213] Kidbrooke Park Road (SE3,SE12) (Greenwich)

  Minimal

From: Tuesday 30 August 2016
To: Wednesday 31 May 2017

Last updated 14:12 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | TfL

[A2213] Kidbrooke Park Road (SE3/SE12) (All Directions) at the junction of Weigall Road - Improvement works on the A2213 Kidbrooke Park Road from 30 August. The improvements, which form part of the Kidbrooke Village development, will be completed in stages over the next year to keep disruption to a minimum. They include: Reconstructing and changing the road layout of Kidbrooke Park Road, between the junctions with Old Post Office Lane and Weigall Road, to remove the need for width and weight restrictions in the area in future. Replacing the pedestrian subway near Kidbrooke station with a surface-level signalised crossing. Introducing other improvements for pedestrians, including a new signalised crossing at the junction of Kidbrooke Park Road and Weigall Road. Installing new footways, street furniture, street lighting and drainage systems. Temporary traffic management changes will apply while the works take place - From November 2016 until February 2017: Kidbrooke Park Road will be open with one lane in each direction as normal, although the lanes will be narrower than usual.

A20

[A202] Camberwell New Road (SE11,SE5) (Lambeth,Southwark)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 05:06 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A202] Camberwell New Road (SE11/SE5) (All Directions) at the junction of John Ruskin Street - Works are finished at this location.

  • Bolton Crescent (SE5) (All Directions)
  • [A202] Camberwell New Road (SE11,SE5) (All Directions)
  • Farmers Road (SE5) (All Directions)
  • Foxley Road (SE5,SW9) (All Directions)
  • John Ruskin Street (SE5,SE17) (All Directions)
  • Kendal Close (SW9) (All Directions)
  • Midnight Avenue (SE5) (All Directions)
  • Warham Street (SE5) (All Directions)
  • Wyndham Road (SE5) (All Directions)

A20

[A202] Camberwell New Road (SE5) (Lambeth,Southwark)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 00:40 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A202] Camberwell New Road (SE5) (All Directions) at the junction of Wyndham Road - Works are finished.

  • Wyndham Road (SE5) (All Directions)

A205

[A205] Thurlow Park Road (SE21) (Lambeth)

  Minimal

From: Wednesday 18 January 2017
To: Friday 20 January 2017

Last updated 05:45 Friday 20 January 2017 : Delays are possible.

Works | Utility

[A205] Thurlow Park Road (SE21) (Westbound) between Carson Road and Rosendale Road - Lane one of two is restricted due to Thames Water repair works.

  • Carson Road (SE21) (All Directions)

A205

[A3] Wandsworth High Street (SW18) (Wandsworth)

  Minimal

From: Saturday 14 January 2017
To: Sunday 22 January 2017

Last updated 19:19 Monday 16 January 2017 : Traffic is flowing well

Works | Other

[A3] Wandsworth High Street (SW18) (Westbound) between Ram Street and Buckhold Road - Lane 4 (of 4) closed to facilitate a scaffoldng installation (weekends only).

  • A217 (SW18) (All Directions)
  • [A218] Buckhold Road (SW18) (All Directions)
  • [A3] Wandsworth High Street (SW18) (Westbound)

A205

[A205] London Road (SE23) (Lewisham)

  Minimal

Thursday 19 January 2017

Last updated 21:56 Thursday 19 January 2017 : Traffic is flowing well

Works | TfL

[A205] London Road (SE23) (All Directions) at the junction of Taymount Rise - Works are cancelled.

  • Taymount Rise (SE23) (All Directions)

A205

[A205] Upper Richmond Road (SW15) (Wandsworth)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 14:28 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | TfL

[A205] Upper Richmond Road (SW15) (All Directions) at the junction of Charlwood Road - Various lane closures to facilitate traffic signals upgrade works.

  • Charlwood Road (SW15) (All Directions)
  • [A205] Upper Richmond Road (SW15) (All Directions)

A21

[A21] Bromley Road (SE6) (Lewisham)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 08:33 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A21] Bromley Road (SE6) (Southbound) at the junction of Daneby Road - Lane one of two restricted to facilitate UKPN works.

  • Daneby Road (SE6) (All Directions)

A23

[A203] Stockwell Road (SW9) (Lambeth)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 16:39 Thursday 19 January 2017 : Traffic is flowing well.

Works | Utility

[A203] Stockwell Road (SW9) (Northbound) at the junction of Stockwell Green - Width restrictions to facilitate BT works. (Day Works - 09:30 - 16:30)

A23

[A2022] Banstead Road (CR8) (Croydon)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 05:07 Friday 20 January 2017 : Traffic is flowing well.

Works | Utility

[A23] Banstead Road (CR8) (Westbound) at the junction of Foxley Lane - Works are finished.

  • [A2022] Banstead Road (CR8) (All Directions)
  • [A23] Banstead Road (CR8) (Westbound)
  • [A2022] Foxley Lane (CR8) (All Directions)
  • [A23] Foxley Lane (CR8) (All Directions)

A23

[A23] Brixton Road (SW9) (Lambeth)

  Minimal

From: Wednesday 18 January 2017
To: Tuesday 24 January 2017

Last updated 14:27 Thursday 19 January 2017 : Delays possible during peak periods.

Works | Utility

[A23] Brixton Road (SW9) (Northbound) after the junction of Hillyard Street - Lane one of two (bus lane) restricted due to UKPN works.

  • [A23] Brixton Road (SW9) (Northbound)
  • Groveway (SW9) (All Directions)
  • Lorn Road (SW9) (All Directions)
  • Melbourne Mews (SW9) (All Directions)
  • Melbourne Square (SW9) (All Directions)
  • Normandy Road (SW9) (All Directions)
  • Pembry Close (SW9) (All Directions)

A3

[A3] Malden Underpass (A3) (KT3) (Kingston Upon Thames,Merton)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 04:25 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A3] Malden Underpass (KT3) (Both Directions) at the junction of [A2043] Malden Road - Reduced to one lane in each direction between approximately 2200hrs and 0500hrs each weekday night during the installation of advertising hoardings.

  • Albert Road (KT3) (All Directions)
  • Barnfield (KT3) (All Directions)
  • Blakes Avenue (KT3) (All Directions)
  • Blakes Lane (KT3) (All Directions)
  • Bodley Road (KT3) (All Directions)
  • Kirrane Close (KT3) (All Directions)
  • Malden Road (All Directions)
  • Malden Way (KT3) (All Directions)
  • [A3] Malden Way (KT3) (All Directions)
  • Oakfield Close (KT3) (All Directions)
  • Savile Close (KT3) (All Directions)
  • Woodfield Gardens (KT3) (All Directions)

A3

[A3] Beverley Way (KINGSTON BY PASS) (SW20,KT3) (Merton,Kingston Upon Thames)

  Minimal

From: Monday 16 January 2017
To: Sunday 22 January 2017

Last updated 17:21 Monday 16 January 2017 : Traffic is flowing well on approach.

Works | Utility

[A3] Beverley Way (Kingston By Pass) (KT3/SW20) (Northbound) at the junction of Bushey Road - Lane one (of three) closures for urgent UKPN utility excavation works. In addition, lane two (of two) will be restricted on the northbound exit slip towards Bushey Road.

  • Albert Road (KT3) (All Directions)
  • B282 (KT3) (All Directions)
  • [A3] Beverley Way (Kingston By Pass) (SW20,KT3) (Northbound)
  • [A298] Bushey Road (SW20,KT3) (All Directions)
  • Cobham Avenue (KT3) (All Directions)
  • [A3] Malden Way (Kingston By Pass) (SW20,KT3) (All Directions)
  • [A3] Shannon Corner (SW20,KT3) (All Directions)
  • Stanley Avenue (KT3) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Kensington & Chelsea,Westminster)

  Minimal

From: Monday 03 October 2016
To: Monday 19 June 2017

Last updated 08:18 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A4] Knightsbridge (SW1X) (Eastbound) opposite the junction of Sloane Street - The carrigeway is restricted to facilitate building works.

  • [A3216] Sloane Street (SW1X) (All Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Minimal

From: Saturday 14 January 2017
To: Saturday 04 February 2017

Last updated 08:04 Friday 20 January 2017 : Delays are possible while restrictions are in place.

Special and Planned Events | Construction Activity

[A4] Knightsbridge (Westbound) at the junction of Old Barrack Yard - Lane restrictions in place for construction works.

  • [A4] Knightsbridge (SW1X) (Westbound)

A4

[A4] Great West Road (TW8) (Hounslow)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 05:31 Friday 20 January 2017 : No reported delays.

Works | Utility

[A4] Great West Road (TW8) (All Directions) at the junction of Transport Avenue - All lanes are now open following overnight works.

  • [A4] Great West Road (TW8) (All Directions)
  • Transport Avenue (TW8) (All Directions)

A4

[A306] Great West Road (W6) (Hammersmith & Fulham)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 05:09 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A4] Great West Road (W6 ) (Both Directions) between Hogarth Roundabout and Hammersmith Flyover - All lanes are now open following earlier works.

  • A316 (W4) (All Directions)
  • Airedale Avenue (W4) (All Directions)
  • Airedale Avenue South (W4) (All Directions)
  • Beavor Lane (W6) (All Directions)
  • Berestede Road (W6) (All Directions)
  • Bridge Avenue (W6) (All Directions)
  • Bridgeview (W6) (All Directions)
  • British Grove (W6) (All Directions)
  • British Grove Passage (W4) (All Directions)
  • British Grove South (W4) (All Directions)
  • Chiswick Lane South (W4) (All Directions)
  • Devonshire Road (W4) (All Directions)
  • Dorchester Grove (W4) (All Directions)
  • Eyot Gardens (W6) (All Directions)
  • [A306] Great West Road (W6) (All Directions)
  • [A4] Great West Road (W4,W6) (Both Directions)
  • [A4] Great West Road Chiswick (W4,W6) (All Directions)
  • [A306] Hammersmith Bridge Road (W6) (All Directions)
  • [A306] Hammersmith Bridge Road Roundabout (W6) (All Directions)
  • [A4] Hammersmith Flyover (W4,W6) (All Directions)
  • Hammersmith Flyover (W6) (All Directions)
  • [A4] Hogarth Lane (W4,W6) (All Directions)
  • [A4] Hogarth Roundabout (W4,W6) (All Directions)
  • King Street (W6) (All Directions)
  • Mall Road (W6) (All Directions)
  • Mawson Lane (W4) (All Directions)
  • Netheravon Road (W4) (All Directions)
  • Netheravon Road South (W4) (All Directions)
  • Nigel Playfair Avenue (W6) (All Directions)
  • North Eyot Gardens (W6) (All Directions)
  • North Verbena Gardens (W6) (All Directions)
  • Oil Mill Lane (W6) (All Directions)
  • Queen Caroline Street (W6) (All Directions)
  • Rivercourt Road (W6) (All Directions)
  • Samels Court (W6) (All Directions)
  • South Black Lion Lane (W6) (All Directions)
  • Standish Road (W6) (All Directions)
  • Sussex Place (W6) (All Directions)
  • Talgarth Road (W6) (All Directions)
  • Verbena Gardens (W6) (All Directions)
  • Weltje Road (W6) (All Directions)

A40

[A40] Westway (W10,W11) (Kensington & Chelsea)

  Minimal

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 05:32 Friday 20 January 2017 : Traffic is flowing well.

Special and Planned Events | Construction Activity

[A40] Westway (W10/W11) (Westbound) between Ladbroke Grove and Northern Roundabout - All lanes are now open following earlier works.

  • Crowthorne Road (W10) (All Directions)
  • Kingsdown Close (W10) (All Directions)
  • [B450] Ladbroke Grove (W10) (All Directions)
  • Malton Mews (W10) (All Directions)
  • [A3220] Northern Roundabout (W10,W12) (All Directions)
  • St Marks Road (W10,W11) (All Directions)
  • Thorpe Close (W10) (All Directions)
  • [A40] Westway (W10,W11) (Westbound)

A40

[A40] Western Avenue (W3,W12) (Ealing,Hammersmith & Fulham)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 05:45 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

[A40] Western Avenue (Eastbound) between Old Oak Common Lane and Horn Lane - All lanes are now open following earlier works.

  • A40 (W3,W12) (All Directions)
  • A4000 (W3) (All Directions)
  • Braid Avenue (W3) (All Directions)
  • Cotton Avenue (W3) (All Directions)
  • Kingsdown Avenue (W3) (All Directions)
  • Old Oak Common Lane (W3) (All Directions)
  • Park View (W3) (All Directions)
  • Perryn Road (W3) (All Directions)
  • Portal Way (W3) (All Directions)
  • Rosebank Way (W3) (All Directions)
  • [A40] Savoy Circus (W3,W12) (All Directions)
  • Savoy Circus (W3,W12) (All Directions)
  • St Andrews Road (W3) (All Directions)
  • St Dunstan's Avenue (W3) (All Directions)
  • Sunningdale Avenue (W3) (All Directions)
  • The Approach (W3) (All Directions)
  • Western Avenue (W3) (Eastbound)
  • [A40] Western Avenue (W3,W12) (All Directions)
  • [A40] Westway (W3,W12) (All Directions)
  • York Road (W3) (All Directions)

A40

[A40] Western Avenue (W3) (Ealing)

  Minimal

From: Saturday 14 January 2017
To: Friday 20 January 2017

Last updated 06:55 Friday 20 January 2017 : Delays possible when restrictions in place.

Works | Emergency

[A40] Western Avenue (W3) (Eastbound) at the junction of Mansfield Road - Possible lane restrictions during emergency National Grid gas works.

  • Mansfield Road (W3) (All Directions)
  • [A40] Western Avenue (W3) (Eastbound)

A406

[A406] North Circular Road (NW2,NW10) (Brent,Barnet)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 05:41 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | TfL

[A406] North Circular Road (NW10) (Both Directions) between A406 / Brentfield Road and Waterloo Road - All lanes are now open following earlier overnight works.

  • A5 (NW2) (All Directions)
  • Aboyne Road (NW10) (All Directions)
  • Adrian Avenue (NW2) (All Directions)
  • Apsley Way (NW2) (All Directions)
  • B4557 (NW10) (All Directions)
  • Brendon Avenue (NW10) (All Directions)
  • Brentfield Road (NW10) (All Directions)
  • Brook Road (NW2) (All Directions)
  • Chartley Avenue (NW2) (All Directions)
  • Coles Green Road (NW2) (All Directions)
  • Dog Lane (NW10) (All Directions)
  • Eastleigh Close (NW2) (All Directions)
  • [A406] Edgware Road Roundabout (NW2,NW10) (All Directions)
  • Garden Way (NW10) (All Directions)
  • Heather Road (NW2) (All Directions)
  • Herne Close (NW10) (All Directions)
  • Jackman Mews (NW2) (All Directions)
  • Kenwyn Drive (NW2) (All Directions)
  • Links Road (NW2) (All Directions)
  • M1 (NW2) (All Directions)
  • Neasden Lane (NW10) (All Directions)
  • [A406] North Circular Road (NW2,NW10) (All Directions)
  • North Circular Road (NW2,NW10) (All Directions)
  • Randall Avenue (NW2) (All Directions)
  • St Raphael's Way (NW10) (All Directions)
  • [A406] Staples Corner Flyover (NW2,NW10) (All Directions)
  • The Circle (NW2) (All Directions)
  • The Link (NW2) (All Directions)
  • Village Way (NW10) (All Directions)
  • Waterloo Road (NW2) (All Directions)
  • Woodheyes Road (NW10) (All Directions)

A41

[A41] Swiss Cottage (NW6,NW3) (Camden)

  Minimal

From: Thursday 19 January 2017
To: Saturday 21 January 2017

Last updated 08:05 Friday 20 January 2017 : Traffic is moving well.

Works | TfL

[A41] Swiss Cottage (Northbound) - Lane 1 (of 4) closed to facilitate bus shelter works (daily, 0800hrs to 1500hrs).

  • [A41] Avenue Road (NW6,NW3) (All Directions)
  • [B511] College Crescent (NW3) (All Directions)
  • [A41] Swiss Cottage (NW6,NW3) (Northbound)

A41

[A41] Finchley Road (NW3) (Camden)

  Minimal

From: Wednesday 18 January 2017
To: Friday 27 January 2017

Last updated 07:19 Thursday 19 January 2017 : Traffic is slow moving in the area due to works at the junction with Frognal Court.

Works | Utility

[A41] Finchley Road (NW3) (Southbound) between Lithos Road and Frognal - Lane closure in place from 18 until 27 January to facilitate electrical works (Weekdays only).

  • [A41] Finchley Road (NW3) (Southbound)
  • Frognal (NW3) (All Directions)
  • Lithos Road (NW3) (All Directions)
  • Rosemont Road (NW3) (All Directions)

Bishopsgate Cross Route

[A501] City Of London Area - Demonstration (Ref: 0166) (EC2V) (City Of London)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 18:19 Thursday 19 January 2017 : All closures have been removed traffic is moving well.

Special and Planned Events | Demonstration

CITY OF LONDON AREA (All Directions) - Demonstration - There will be extensive road closures in place in the City of London area due to a demonstration at Bank junction. Please use alternative routes where possible.

  • A10 (EC4R,EC2N,EC3V,EC4N) (All Directions)
  • A10 (EC4R,EC2N,EC3V,EC4N) (All Directions)
  • Abchurch Lane (EC4N) (All Directions)
  • Abchurch Lane (EC4N) (All Directions)
  • Bucklersbury (EC2R,EC4N) (All Directions)
  • Bucklersbury (EC2R,EC4N) (All Directions)
  • Cannon Street (EC4V,EC4N) (All Directions)
  • Cannon Street (EC4V,EC4N) (All Directions)
  • Cheapside (EC1A,EC2V) (All Directions)
  • Cheapside (EC1A,EC2V) (All Directions)
  • Clement's Lane (EC4N) (All Directions)
  • Cornhill (EC2N,EC3V,EC2R) (All Directions)
  • Cornhill (EC2N,EC3V,EC2R) (All Directions)
  • Finch Lane (EC3V) (All Directions)
  • Finch Lane (EC3V) (All Directions)
  • Foster Lane (EC2V) (All Directions)
  • Foster Lane (EC2V) (All Directions)
  • Great Swan Alley (EC2R) (All Directions)
  • Great Swan Alley (EC2R) (All Directions)
  • Gresham Street (EC2R,EC2V) (All Directions)
  • Gresham Street (EC2R,EC2V) (All Directions)
  • Gutter Lane (EC2V) (All Directions)
  • King Street (EC2V) (All Directions)
  • King Street (EC2V) (All Directions)
  • King William Street (All Directions)
  • [A3] King William Street (EC4N,EC4R) (All Directions)
  • King William Street (All Directions)
  • [A3] King William Street (EC4N,EC4R) (All Directions)
  • Lawrence Lane (EC2V) (All Directions)
  • Leadenhall Street (EC2N) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Lothbury (EC2R) (All Directions)
  • Lothbury (EC2R) (All Directions)
  • Mansion House Street (EC3V,EC2R) (All Directions)
  • Mansion House Street (EC3V,EC2R) (All Directions)
  • [A501] Moorgate (EC2R,EC2V) (All Directions)
  • Moorgate (All Directions)
  • [A501] Moorgate (EC2R,EC2V) (All Directions)
  • Moorgate (All Directions)
  • Moorgate Place (EC2R) (All Directions)
  • Moorgate Place (EC2R) (All Directions)
  • Old Broad Street (EC2R,EC2N) (All Directions)
  • Old Broad Street (EC2R,EC2N) (All Directions)
  • Pancras Lane (EC2R) (All Directions)
  • Pancras Lane (EC2R) (All Directions)
  • Prince's Street (EC2R) (All Directions)
  • Queen Street (EC4M,EC4N) (All Directions)
  • Queen Victoria Street (EC3V,EC4V,EC4N,EC2R) (All Directions)
  • Salters' Hall Court (EC4N) (All Directions)
  • Salters' Hall Court (EC4N) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)
  • Sherborne Lane (EC4N) (All Directions)
  • Sise Lane (EC2R) (All Directions)
  • St Mildred's Court (EC2R) (All Directions)
  • St Mildred's Court (EC2R) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • St Swithin's Lane (EC4N) (All Directions)
  • Threadneedle Street (EC2N,EC2R,EC3V) (All Directions)
  • Threadneedle Street (EC2N,EC2R,EC3V) (All Directions)
  • Trump Street (EC2V) (All Directions)
  • Trump Street (EC2V) (All Directions)

City Route

[A301] Strand Underpass (WC2B,SE1,WC2E,WC2N,WC2R) (Lambeth,Westminster)

  Minimal

From: Saturday 14 January 2017
To: Sunday 09 April 2017

Last updated 17:57 Thursday 19 January 2017 : Northbound traffic on Waterloo Bridge is slow moving towards Strand.

Works | Borough

[A301] Strand Underpass (WC2) (Northbound) - Closed between approximately 0800hrs Saturday and 2000hrs Sunday on the weekends of Saturday 21 and 28 January during investigatory works on behalf of Westminster council. Subsequently, closed from approximately 2000hrs Sunday 5 February until early April during maintenance.

  • A3211 (WC2E,WC2N,WC2R) (All Directions)
  • [A4] Aldwych (WC2R,WC2B) (All Directions)
  • Catherine Street (WC2B) (All Directions)
  • Exeter Street (WC2B) (All Directions)
  • Kemble Street (WC2B) (All Directions)
  • [A4200] Kingsway (WC2A,WC2B) (All Directions)
  • [A301] Lancaster Place (WC2B,SE1,WC2E,WC2N,WC2R) (All Directions)
  • Portugal Street (WC2A) (All Directions)
  • Sardinia Street (WC2A) (All Directions)
  • Savoy Hill (WC2R) (All Directions)
  • Savoy Place (WC2R) (All Directions)
  • Savoy Row (WC2R) (All Directions)
  • Savoy Street (WC2R,WC2N) (All Directions)
  • [A4] Strand (WC2R,WC2B) (All Directions)
  • [A4] Strand Underpass (WC2R,WC2B) (All Directions)
  • [A301] Strand Underpass (WC2B,SE1,WC2E,WC2N,WC2R) (Northbound)
  • [A301] Waterloo Bridge (WC2B,SE1,WC2E,WC2N,WC2R) (All Directions)
  • Wellington Street (WC2B) (All Directions)

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Minimal

From: Wednesday 11 January 2017
To: Sunday 05 February 2017

Last updated 05:30 Friday 20 January 2017 : Traffic is flowing well.

Works | Utility

[A201] Blackfriars Road (SE1) (All Directions) at the junction of Webber Street - Temporary traffic signals are operating a single alternate lane for gas works.

Inner Ring

[A3213] Eccleston Bridge (SW1V,SW1W) (Westminster)

  Minimal

From: Monday 05 September 2016
To: Sunday 30 April 2017

Last updated 08:29 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A3213] Eccleston Bridge (SW1V) (Westbound) between Bridge Place and [A3214] Buckingham Palace Road - Lane three (of three) closed to facilitate essential waterproofing and maintenance works to the bridge.

  • [A3213] Eccleston Bridge (SW1V,SW1W) (Westbound)

Inner Ring

[A5202] Pancras Road (N1,NW1) (Camden)

  Minimal

From: Sunday 15 January 2017
To: Sunday 22 January 2017

Last updated 08:15 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

[A5202] Pancras Road (NW1/N1 ) (Northbound) at the junction of Euston Road - there will be a lane restriction in place due to water works in the area.

Inner Ring

[A202] Bressenden Place (SW1W,SW1E) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 04:02 Friday 20 January 2017 : Traffic is flowing well.

Works | Utility

[A202] Bressenden Place (SW1E/SW1W) (Eastbound) at the junction of Warwick Row - All lanes are now open following earlier works.

  • [A202] Bressenden Place (SW1W,SW1E) (Eastbound)
  • [A3214] Buckingham Palace Road (SW1W) (All Directions)
  • [A3217] Lower Grosvenor Place (SW1W) (All Directions)
  • Palace Place (SW1E) (All Directions)
  • Warwick Row (SW1W) (All Directions)

Inner Ring

[A3214] Buckingham Palace Road (SW1E,SW1W) (Westminster)

  Minimal

From: Thursday 24 November 2016
To: Friday 27 January 2017

Last updated 08:19 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A3214] Buckingham Palace Road (SW1W/SW1E) (Southbound) at the junction of Victoria Street - Lanes 1 & 2 (of 4) are closed for works on Victoria Street into Buckingham Palace Road southbound.

  • A302 (SW1E,SW1W) (All Directions)
  • [A3214] Buckingham Palace Road (SW1E,SW1W) (All Directions)
  • Eaton Lane (SW1W) (All Directions)

Inner Ring

[A1202] Commercial Street (E1) (Tower Hamlets)

  Minimal

From: Tuesday 29 November 2016
To: Friday 22 December 2017

Last updated 08:49 Friday 20 January 2017 : Delays are possible.

Works | Borough

[A1202] Commercial Street (E1 ) (Northbound) at the junction of White's Row - Partial lane restriction due to construction works.

Inner Ring

[A202] Bressenden Place (SW1W,SW1E) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Saturday 21 January 2017

Last updated 05:03 Friday 20 January 2017 : Traffic is flowing well.

Special and Planned Events | Construction Activity

[A202] Bressenden Place (SW1W) (All Directions) and Victoria Street - Various restrictions will be in place on both of these roads, due to construction works, nightly.

  • [A202] Bressenden Place (SW1W,SW1E) (All Directions)
  • [A3214] Buckingham Palace Road (SW1W) (All Directions)
  • Carlisle Place (SW1E) (All Directions)
  • [A3217] Lower Grosvenor Place (SW1W) (All Directions)
  • Victoria Square (SW1W) (All Directions)
  • [A302,A202] Victoria Street (SW1E) (All Directions)
  • [A202] Victoria Street (SW1W,SW1E) (All Directions)
  • Warwick Row (SW1W) (All Directions)

Southern River Route

A3036 (SE1) (Lambeth)

  Minimal

From: Monday 16 January 2017
To: Saturday 21 January 2017

Last updated 05:02 Friday 20 January 2017 : Traffic is flowing well.

Works | TfL

A3036 Lambeth Palace Road / Albert Embankment (SE1) (Both Directions) at the junction of Lambeth Bridge - Lane two (of two) closures in each direction on either side of Lambeth Bridge Roundabout for junction improvement works (works will take place between 9pm-5am, TM will remain in situ 24/7).

  • A3036 (SE1) (Both Directions)
  • A3203 (SE1) (All Directions)

Southern River Route

[A200] St Thomas Street (SE1) (Southwark)

  Minimal

Thursday 19 January 2017

Last updated 23:06 Thursday 19 January 2017 : No reported delays.

Traffic Incidents | Other

[A200] St Thomas Street (SE1) (All Directions) - The earlier stuck HGV is no longer causing issues.

  • [A200] St Thomas Street (SE1) (All Directions)
  • Stainer Street (SE1) (All Directions)
  • Weston Street (SE1) (All Directions)

Western Cross Route

[A3220] Earl's Court Road (SW5) (Kensington & Chelsea)

  Minimal

From: Friday 13 January 2017
To: Friday 20 January 2017

Last updated 04:36 Friday 20 January 2017 : Traffic is flowing well.

Hazard(s) | Burst Water Main

[A3220] Earl's Court Road (SW5) (Southbound) at the junction of Barkston Gardens - All lanes are now open following earlier works.

  • Barkston Gardens (SW5) (All Directions)
  • [A3220] Earl's Court Road (SW5) (Southbound)
  • Penywern Road (SW5) (All Directions)

[A40] High Holborn (WC1V,WC2B) (Camden)

  Minimal

From: Tuesday 03 January 2017
To: Thursday 01 June 2017

Last updated 08:15 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

[A40] High Holborn (WC2B/WC1V) (Westbound) at the junction of Drury Lane - Lane closure to facilitate truck deliveries and crane works, to facilitate building works.

  • Drury Lane (WC2B) (All Directions)

[A210] Blackfen Road (DA15) (Bexley)

  Minimal

From: Tuesday 03 January 2017
To: Tuesday 31 January 2017

Last updated 14:10 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A210] Blackfen Road (DA15) (All Directions) at the junction of Fen Grove - Lane restrictions to facilitate SGN gas mains replacement works

  • [A210] Blackfen Road (DA15) (All Directions)
  • Burleigh Avenue (DA15) (All Directions)
  • Chester Road (DA15) (All Directions)
  • Christopher Close (DA15) (All Directions)
  • Curran Avenue (DA15) (All Directions)
  • Darnley Close (DA15) (All Directions)
  • Fen Grove (DA15) (All Directions)
  • Hawthorn Terrace (DA15) (All Directions)
  • Raeburn Road (DA15) (All Directions)

[A4] Strand (WC2R) (Westminster)

  Minimal

From: Monday 16 January 2017
To: Friday 17 February 2017

Last updated 08:29 Friday 20 January 2017 : Possible delays during the course of these works

Works | Borough

[A4] Strand (Westbound) at the junction of Arundel Street - Lane restrictions in place to facilitate footway works.

  • Arundel Street (WC2R) (All Directions)
  • Strand (WC2R) (Westbound)

[A400] Cambridge Circus (WC2H) (Westminster)

  Minimal

From: Saturday 14 January 2017
To: Thursday 30 November 2017

Last updated 08:30 Friday 20 January 2017 : Possible delays during the course of these works

Works | Borough

[A400] Cambridge Circus (WC2) (All Directions) - Various restrictions between approximately Saturday 14 January and Thursday 30 November during the Cambridge Circus regeneration scheme. 0800hrs Saturday 14 until 2100 Sunday 15 January, [A400] Charing Cross Road (Southbound) between Denmark Street and [A401] Shaftesbury Avenue, closed. 0800hrs Saturday 21 January until approximately 2100hrs Sunday 5 February, [A400] Charing Cross Road (Southbound) between Denmark Street and Great Newport Street, closed. 2100hrs Sunday 5 until approximately 2100hrs Friday 10 February, [A401] Shaftesbury Avenue (Eastbound) between Cambridge Circus (A400) and Stacey Street, closed. [A401] Shaftesbury Avenue (Eastbound) between Dean Street and Cambridge Circus (A400) and [A401] Shaftesbury Avenue (Westbound) between Earlham Street and Cambridge Circus (A400), reduced to one lane . Find out more on Westminster council's website.

  • Romilly Street (W1D) (All Directions)

[A206] Woolwich Road (DA17) (Bexley)

  Minimal

From: Monday 16 January 2017
To: Thursday 26 January 2017

Last updated 14:12 Thursday 19 January 2017 : Delays possible.

Works | Utility

[A206] Woolwich Road (DA17) (Both Directions) at the junction of Gloucester Road - Two-way temporary traffic signals in operation to facilitate gas connection works.

  • Gloucester Road (DA17) (All Directions)
  • Woolwich Road (All Directions)

[A400] Charing Cross Road (WC2H) (Camden)

  Minimal

From: Thursday 19 January 2017
To: Tuesday 24 January 2017

Last updated 04:54 Friday 20 January 2017 : Traffic is flowing well past the works.

Works | Utility

[A400] Charing Cross Road (WC2H) (Northbound) at the junction of Denmark Street - Lane restriction due to UKPN works.

  • Manette Street (W1D) (All Directions)

[A112] High Road Leyton (E10) (Waltham Forest)

  Minimal

From: Friday 13 January 2017
To: Friday 27 January 2017

Last updated 08:48 Friday 20 January 2017 : Delays are possible.

Works | Utility

[A112] High Road Leyton (E10) (All Directions) at the junction of Midland Road - Single alternate traffic flow controlled by temporary lights to facilitate gully works.

  • Fletcher Lane (E10) (All Directions)
  • [A112] High Road Leyton (E10) (All Directions)
  • Midland Road (E10) (All Directions)

[A1055] Watermead Way (N17) (Haringey)

  Minimal

From: Saturday 07 January 2017
To: Sunday 29 January 2017

Last updated 08:49 Friday 20 January 2017 : Delays are possible. Weekend works only.

Works | Utility

[A1055] Watermead Way (N17) (All Directions) at the junction of Marigold Road - Various weekend lane closures to facilitate UKPN works. Saturday 21 January - Sunday 22 January 2017 - Central lane closure. Saturday 28 January - Sunday 29 January 2017 - Northbound lane closure. There are no works planned for the weekend 14 & 15 January due to the Tottenham FC home game

  • [A1055] Watermead Way (N17) (All Directions)

[A4201] Regent Street (W1W,W1S,W1C,W1B,W1J) (Westminster)

  Minimal

From: Tuesday 17 January 2017
To: Monday 23 January 2017

Last updated 05:01 Friday 20 January 2017 : Traffic is flowing well.

Works | Borough

[A4201] Regent Street (W1W/W1C/W1S/W1J) (Both Directions) between Piccadilly Circus and Oxford Circus - Road closed to facilitate the removal of Christmas decorations (night works).

  • [A40] Oxford Street (W1F,W1W,W1C,W1B) (All Directions)
  • [A4201] Piccadilly Circus (W1W,W1S,W1C,W1B,W1J) (All Directions)
  • [A4201] Regent Street (W1W,W1S,W1C,W1B,W1J) (Both Directions)

[A4] Regent Street (SW1Y,W1J) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 00:15 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | Borough

[A4] Regent Street (Northbound) between Pall Mall and Piccadilly Circus - All lanes are open following earlier planned works.

  • [A4] Pall Mall (SW1Y,W1J) (All Directions)
  • [A4201,A4] Piccadilly Circus (W1J,W1B) (All Directions)

[A112] Hoe Street (E17) (Waltham Forest)

  Minimal

From: Tuesday 01 November 2016
To: Sunday 31 December 2017

Last updated 08:54 Friday 20 January 2017 : Delays are possible.

Works | Borough

[A112] Hoe Street (E17) (Both Directions) at the junction of Selborne Road - Reduced to one lane in each direction during bridge works on behalf of Waltham Forest council.

  • [A112] Hoe Street (E17) (Both Directions)

[A1010] Fore Street (N9) (Enfield)

  Minimal

Thursday 19 January 2017

Last updated 21:49 Thursday 19 January 2017 : No reported delays

Traffic Incidents | Collision

[A1010] Fore Street (N9 ) (All Directions) at the junction of Brettenham Road - All lanes are open following a collision

  • Brettenham Road (N18) (All Directions)
  • Fleece Drive (N9) (All Directions)
  • [A1010] Fore Street (N9) (All Directions)

[A5204] Wigmore Street (W1U) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Tuesday 28 February 2017

Last updated 08:12 Friday 20 January 2017 : Delays possible at peak times.

Works | TfL

[A5204] Wigmore Street (W1U) (All Directions) at the junction of Marylebone Lane - Lane closures due to signal upgrade works.

  • Marylebone Lane (W1U) (All Directions)

[A41] Portman Square (W1C,W1H,W1U) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 04:53 Friday 20 January 2017 : Traffic is flowing well in the area,

Works | Borough

[A41] Portman Square (All Directions) between Portman Street and Gloucester Place, Seymour Street and Wigmore Street - All lanes are now open following earlier works.

  • [A41] Baker Street (W1C,W1H,W1U) (All Directions)
  • Bryanston Street (W1C) (All Directions)
  • Edwards Mews (W1H) (All Directions)
  • Fitzhardinge Street (W1U) (All Directions)
  • [A41] Gloucester Place (W1C,W1H,W1U) (All Directions)
  • Granville Place (W1H) (All Directions)
  • North Audley Street (W1C) (All Directions)
  • [A41] Orchard Street (W1C,W1H,W1U) (All Directions)
  • [A40] Oxford Street (W1C,W1K) (All Directions)
  • Park Street (W1K) (All Directions)
  • Portman Close (W1H,W1U) (All Directions)
  • Portman Mews South (W1H) (All Directions)
  • [A41] Portman Square (W1C,W1H,W1U) (All Directions)
  • [A5204] Portman Square (W1H,W1U) (All Directions)
  • [A41] Portman Street (W1C,W1H,W1U) (All Directions)
  • Robert Adam Street (W1U) (All Directions)
  • Seymour Mews (W1H) (All Directions)
  • [A5204] Seymour Street (W1H,W1U) (All Directions)
  • Upper Berkeley Street (W1H) (All Directions)
  • [A5204] Wigmore Street (W1H,W1U) (All Directions)

[A219] Wood Lane (W10,W12) (Hammersmith & Fulham)

  Minimal

From: Monday 09 January 2017
To: Tuesday 24 January 2017

Last updated 07:09 Friday 20 January 2017 : Delays are possible when restrictions in place.

Works | TfL

[A219] Wood Lane (All Directions) at the junction of North Pole Road - TfL will carrying out a traffic signal upgrade at the above location. Night work between 2000-0500 carriageway works using temporary traffic lights.

  • [A219] Scrubs Lane (W10,W12) (All Directions)

[A2016] Eastern Way (SE28) (Greenwich)

  Minimal

Thursday 19 January 2017

Last updated 23:05 Thursday 19 January 2017 : No reported delays

Traffic Incidents | Breakdown

[A2016] Eastern Way (SE28) (Eastbound) at the junction of Carlyle Road - All lanes are open following the earlier broken down car.

  • [A2016] Eastern Way (SE28) (All Directions)

[B453] Neasden Lane (NW10) (Brent)

  Minimal

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 07:08 Friday 20 January 2017 : Expect delays while restrictions are in place.

Works | Utility

[B453] Neasden Lane (NW10) (All Directions) at the junction of High Road - Lane closure on Neasden Lane and on the roundabout at the High Road to facilitate gas works.

  • [B453] Neasden Lane (NW10) (All Directions)

Bramley Road (W10) (Kensington & Chelsea)

  Minimal

From: Monday 09 January 2017
To: Friday 20 January 2017

Last updated 07:09 Friday 20 January 2017 : Delays are possible when temporary signals in operation.

Works | Other

Bramley Road (W10) (All Directions) at the junction of Silchester Road- Temporary traffic signals to facilitate London cycle grid Q2 route

  • Bramley Road (W10) (All Directions)

[A4003] Willesden Lane (NW10) (Brent)

  Minimal

Thursday 19 January 2017

Last updated 21:04 Thursday 19 January 2017 : There are no reported delays.

Traffic Incidents | Collision

[A4003] Willesden Lane (NW10) (All Directions) at the junction of Walm Lane - All restrictions have been removed following an earlier collision.

  • A407 (NW2,NW10) (All Directions)
  • [A4003] High Road (NW10) (All Directions)
  • Park Avenue (NW10) (All Directions)
  • [A4003] Willesden Lane (NW10) (All Directions)

Eastbourne Terrace (W2) (Westminster)

  Minimal

From: Monday 01 July 2013
To: Tuesday 02 January 2018

Last updated 08:21 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Eastbourne Terrace (Both Directions) between Cleveland Terrace and [A4205] Praed Street - Various long term restrictions and, at times, closures during Crossrail works.

  • Chilworth Mews (W2) (All Directions)
  • Chilworth Street (W2) (All Directions)
  • Cleveland Terrace (W2) (All Directions)
  • Conduit Mews (W2) (All Directions)
  • Conduit Place (W2) (All Directions)
  • Craven Road (W2) (All Directions)
  • Eastbourne Mews (W2) (All Directions)
  • Eastbourne Terrace (W2) (All Directions)
  • Gloucester Mews (W2) (All Directions)
  • Praed Street (W2) (All Directions)
  • Spring Street (W2) (All Directions)
  • Westbourne Terrace (W2) (All Directions)

[A3214] St George's Drive (SW1W,SW1V) (Westminster)

  Minimal

From: Wednesday 04 January 2017
To: Sunday 30 April 2017

Last updated 08:24 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Other

Elizabeth Bridge (SW1W/SW1V) (Westbound) between St George's Drive and Buckingham Palace Road - The bridge will be reduced to one lane and there will be temporary signals in operation at Bulleid Way, due to bridge works.

[A312] Uxbridge Road (TW12) (Richmond Upon Thames)

  Minimal

Thursday 19 January 2017

Last updated 22:09 Thursday 19 January 2017 : No reported delays.

Traffic Incidents | Collision

[A312] Uxbridge Road (TW12) (All Directions) at the junction of Broad Lane - All lanes are open following the earlier collision

  • Broad Lane (TW12) (All Directions)
  • Gloucester Road (TW12) (All Directions)
  • [A312] Uxbridge Road (TW12) (All Directions)

Wickham Court Road (BR4) (Bromley)

  Minimal

Thursday 19 January 2017

Last updated 21:59 Thursday 19 January 2017 : No reported delays

Traffic Incidents | Collision

Wickham Court Road (BR4) (All Directions) at the junction of Corkscrew Hill - No reported delays from the collision

  • Stambourne Way (BR4) (All Directions)
  • Wickham Court Road (BR4) (All Directions)

[A1020,A1011] Silvertown Way (E16) (Newham)

  Minimal

Thursday 19 January 2017

Last updated 21:06 Thursday 19 January 2017 : No delays reported.

Traffic Incidents | Collision

[A1020] Silvertown Way (E16) (All Directions) at the junction of Shirley Street - All lanes open following a collision

  • Caxton Street North (E16) (All Directions)
  • George Street (E16) (All Directions)
  • Peto Street North (E16) (All Directions)
  • [A1020,A1011] Silvertown Way (E16) (All Directions)

Herbrand Street (WC1N) (Camden)

  Minimal

Thursday 19 January 2017

Last updated 21:48 Thursday 19 January 2017 : Traffic is flowing well.

Traffic Incidents | Collision

Herbrand Street (WC1N) (All Directions) at the junction of Coram Street - All lanes are now open following an earlier collision.

  • Coram Street (WC1N) (All Directions)

[A503] Forest Road (E17) (Waltham Forest)

  Minimal

From: Monday 28 November 2016
To: Friday 30 June 2017

Last updated 08:50 Friday 20 January 2017 : Delays are possible.

Works | Borough

[A503] Forest Road (E17) (Both Directions) between Blackhorse Road and Palmerston Road - Various restrictions in place to facilitate the installation of new cycle lanes.

  • Palmerston Road (E17) (All Directions)

[A1] Aldersgate Street (EC1A,EC2Y) (City Of London)

  Minimal

From: Friday 13 January 2017
To: Sunday 22 January 2017

Last updated 07:53 Monday 16 January 2017 : The road has now reopened. Works resume 1900hrs on 20th January.

Special and Planned Events | Construction Activity

[A1] Aldersgate Street (Northbound) between Long Lane and [A1211] London Wall - Closed during crane operations between approximately 1900hrs Friday and 2200hrs Sunday on the weekends of both Friday 13 and 20 January. Northbound traffic is diverted via [A1211] London Wall, [A501] Moorgate, [A501] Finsbury pavement, [B100] Chiswell Street and Beech Street.

  • [A1] Aldersgate Street (EC1A,EC2Y) (Northbound)
  • [A1] Aldersgate Street Roundabout (EC1A,EC2Y) (All Directions)
  • [B100] Beech Street (EC2Y,EC1A) (All Directions)
  • Cloth Street (EC1A) (All Directions)
  • [A1211] London Wall (EC2Y,EC2V) (All Directions)
  • Long Lane (EC1A) (All Directions)
  • Middle Street (EC1A) (All Directions)
  • [A40] Montague Street (EC1A) (All Directions)
  • Newbury Street (EC1A) (All Directions)
  • Noble Street (EC2V) (All Directions)

[A223] Bexley High Street (DA5) (Bexley)

  Minimal

From: Tuesday 17 January 2017
To: Monday 23 January 2017

Last updated 14:27 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

[A223] Bexley High Street (DA5) (All Directions) at the junction of Bourne Road - Temporary traffic lights in place due to a burst water main.

  • [A223] Bourne Road (DA5) (All Directions)
  • Thanet Road (DA5) (All Directions)
  • Weir Road (DA5) (All Directions)

[A123] Fencepiece Road (IG6) (Redbridge)

  Minimal

From: Thursday 19 January 2017
To: Friday 27 January 2017

Last updated 08:57 Friday 20 January 2017 : Delays are possible.

Works | Emergency

[A123] Fencepiece Road (IG6) (Both Directions) at the junction of Kingsley Road - Width restriction in place southbound for gas works. Possible use of temporary signals.

[A1010] High Road (N17) (Haringey)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 07:10 Friday 20 January 2017 : Possible delays during the course of these works.

Works | Utility

[A1010] High Road (N17) (Southbound) at the junction of Reform Row - Bus lane closed to facilitate sewer works.

  • Reform Row (N17) (All Directions)

[A300] Southwark Bridge Road (SE1) (Southwark)

  Minimal

From: Monday 16 January 2017
To: Tuesday 24 January 2017

Last updated 14:27 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Other

[A300] Southwark Bridge Road (SE1) (Both Directions) at the junction of Sumner Street - Restrictions in place due to works.

[A306] Castelnau (SW13) (Richmond Upon Thames)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 14:25 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A306] Castelnau (SW13) (Both Directions) at the junction of Newport Road - Thames Water are carrying out Sewer Repairs at this location. To enable the works, two way temporary traffic signals are being used.

  • [A306] Castelnau (SW13) (Both Directions)

[A311] Wellington Road (TW12) (Richmond Upon Thames)

  Minimal

From: Monday 16 January 2017
To: Tuesday 24 January 2017

Last updated 14:29 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A311] Wellington Road (TW12) (All Directions) at the junction of Clonmel Road - Temporary traffic lights in operation due to works in the area.

  • Clonmel Road (TW11) (All Directions)
  • [A311] Wellington Road (TW12) (All Directions)

[B205] Redriff Road (SE16) (Southwark)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 09:56 Friday 20 January 2017 : Traffic is flowing well.

Works | Borough

[B205] Redriff Road (SE16) (Both Directions) between Deal Porters Way and Surrey Quays Road - The earlier resurfacing works have finished.

  • Deal Porters Way (SE16) (All Directions)
  • [B205] Redriff Road (SE16) (Both Directions)
  • Surrey Quays Road (SE16) (All Directions)

[A404] Harrow Road (W9) (Westminster)

  Minimal

From: Thursday 19 January 2017
To: Sunday 22 January 2017

Last updated 08:16 Friday 20 January 2017 : Delays possible while restrictions in place.

Works | Utility

[A404] Harrow Road (W9 ) (Eastbound) at the junction of Ashmore Road - Lane restrictions in place to facilitate works by Thames Water.

  • [A404] Harrow Road (W9) (Eastbound)

[A105] Ridge Avenue (N21) (Enfield)

  Minimal

From: Friday 13 January 2017
To: Friday 28 April 2017

Last updated 06:49 Friday 20 January 2017 : Local congestion is likely whilst works are in place.

Works | Borough

[A105] Ridge Avenue (Both Directions) at the junction of Church Street - Temporary signals and various restrictions in place to facilitate works as part of the Mini-Holland Cycle Scheme.

  • [A105] Ridge Avenue (N21) (Both Directions)

[B518] Highgate Road (NW5) (Camden)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 07:07 Friday 20 January 2017 : Delays possible when restrictions in place.

Works | Utility

[B518] Highgate Road (NW5) (All Directions) at the junction of Fortess Road - Lane closure due to gas works.

  • A400 (NW5) (All Directions)
  • Falkland Road (NW5) (All Directions)
  • [B518] Highgate Road (NW5) (All Directions)

[A1010] High Road (N17) (Haringey)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 06:53 Friday 20 January 2017 : Traffic delays are likely whilst works continue.

Special and Planned Events | Construction Activity

[A1010] High Road (N17) (All Directions) at the junction of Paxton Road - Bus lane suspension to facilitate building works.

  • Paxton Road (N17) (All Directions)
  • Whitehall Street (N17) (All Directions)

[A400] Charing Cross Road (WC2H,WC1B,W1T) (Camden,Westminster)

  Minimal

From: Thursday 17 March 2016
To: Friday 31 March 2017

Last updated 08:28 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

Tottenham Court Road station upgrade; [A400] Charing Cross Road (WC2) (Northbound) at the junction of [A40] New Oxford Street - Various restrictions in place due to urban realm works in connection with the project. For more information about the Tottenham Court Road station upgrade project

  • [A400] Charing Cross Road (WC2H,WC1B,W1T) (North Bound)
  • Coptic Street (WC1A,WC1B) (All Directions)
  • Dyott Street (WC2H,WC1B,WC1A) (All Directions)
  • Great Russell Street (WC1B) (All Directions)
  • Greek Street (W1D) (All Directions)
  • Hanway Street (W1T) (All Directions)
  • Little Russell Street (WC1A) (All Directions)
  • Manette Street (W1D) (All Directions)
  • New Compton Street (WC2H) (All Directions)
  • New Oxford Street (WC2H) (All Directions)
  • Phoenix Street (WC2H) (All Directions)
  • Soho Square (W1D) (All Directions)
  • Stacey Street (WC2H) (All Directions)
  • Stedham Place (WC1A) (All Directions)
  • Sutton Row (W1D) (All Directions)
  • [A400] Tottenham Court Road (WC2H,WC1B,W1T) (All Directions)
  • Wedgewood Mews (W1D) (All Directions)
  • Willoughby Street (WC1B) (All Directions)

[A503] Seven Sisters Road (N15) (Haringey)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 18:00 Thursday 19 January 2017 : Traffic is flowing well.

Works | Utility

[A503] Seven Sisters Road (N15) (Northbound) at the junction of Albert Road - There will be a lane closure in place due to works in the area, 1000 to 1500 daily.

  • Albert Road (N15) (All Directions)
  • [A503] Seven Sisters Road (N15) (Northbound)

[B353] Sandycombe Road (TW9) (Richmond Upon Thames)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 14:28 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[B353] Sandycombe Road (TW9) (All Directions) at the junction of Gainsborough Road - Temporary signals in operation due to gas works.

  • Gainsborough Road (TW9) (All Directions)
  • [B353] Sandycombe Road (TW9) (All Directions)

[B207] Trundley's Road (SE8) (Lewisham)

  Minimal

From: Wednesday 11 January 2017
To: Saturday 28 January 2017

Last updated 14:25 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[B207] Trundley's Road (SE8) (Northbound) at the junction of John Silkin Lane - Lane restriction for works.

  • John Silkin Lane (SE8) (All Directions)

[A5] Shoot-Up Hill (NW2,NW6) (Brent)

  Minimal

From: Monday 16 January 2017
To: Saturday 28 January 2017

Last updated 08:17 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | TfL

[A5] Shoot-up Hill (NW2) (All Directions) at the junction of Kilburn High Road - Temporary traffic lights are in use to facilitate bridge repair works.

  • Exeter Road (NW2) (All Directions)
  • [A5] Kilburn High Road (NW2,NW6) (All Directions)
  • Maygrove Road (NW6) (All Directions)
  • [A5] Shoot-Up Hill (NW2,NW6) (All Directions)

[A2043] Kingston Road (KT3) (Kingston Upon Thames)

  Minimal

From: Tuesday 17 January 2017
To: Friday 20 January 2017

Last updated 05:08 Friday 20 January 2017 : No reported delays.

Works | Borough

[A2043] Kingston Road (KT3) (All Directions) at the junction of Wellington Crescent - Works are finished at this location.

  • [A2043] Kingston Road (KT3) (All Directions)
  • Wellington Crescent (KT3) (All Directions)

[B152] St Ann's Road (N15) (Haringey)

  Minimal

From: Monday 16 January 2017
To: Wednesday 01 February 2017

Last updated 07:09 Friday 20 January 2017 : Delays possible at peak times.

Works | Utility

[B152] St Ann's Road (N15) (All Directions) at the junction of Seven Sisters Road - Lane restrictions in place to facilitate Thames Water works.

  • [A503] Seven Sisters Road (N15) (All Directions)

[A2209] Deptford Church Street (SE8) (Lewisham)

  Minimal

From: Friday 22 April 2016
To: Friday 28 April 2017

Last updated 13:21 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Utility

[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Giffin Street - Various lane restrictions in place to facilitate Thames Tideway sewer works.

  • Giffin Street (SE8) (All Directions)

[A409] Station Road (HA1) (Harrow)

  Minimal

From: Monday 16 January 2017
To: Monday 06 February 2017

Last updated 09:31 Friday 20 January 2017 : Expect delays while restrictions are in place.

Works | Borough

[A409] Station Road (HA1) (All Directions) at the junction of Elmgrove Road - Lane closures to facilitate roadworks.

  • Central Parade (HA1) (All Directions)
  • Elmgrove Road (HA1) (All Directions)
  • Hindes Road (HA1) (All Directions)
  • Station Road (All Directions)
  • [A409] Station Road (HA1) (All Directions)

Prince's Street (EC2R) (City Of London)

  Minimal

From: Wednesday 18 January 2017
To: Friday 24 February 2017

Last updated 07:08 Friday 20 January 2017 : Possible delays during the course of these works.

Works | Utility

Prince's Street (EC2R) (All Directions) at the junction of Gresham Street - lane closed to facilitate water works.

  • Lothbury (EC2R) (All Directions)

[B413] Shirland Road (W9) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Friday 27 January 2017

Last updated 08:21 Friday 20 January 2017 : Delays possible whilst restrictions are in place.

Works | Utility

[B413] Shirland Road (W9 ) (All Directions) at the junction of Sutherland Avenue - There will be temporary signals in operation due to gas works in the area.

  • [B413] Shirland Road (W9) (All Directions)
  • Sutherland Avenue (W9) (All Directions)

[A312] Fagg's Road (TW14) (Hounslow)

  Minimal

From: Saturday 14 January 2017
To: Friday 20 January 2017

Last updated 06:55 Friday 20 January 2017 : Delays possible at peak times.

Works | Emergency

[A312] Fagg's Road (TW14) (Northbound) at the junction of Dukes Green Avenue - Lane one closure in place to facilitate emergency Thames Water works.

  • Dukes Green Avenue (TW14) (All Directions)

[B243] Woodside Green (SE25) (Croydon)

  Minimal

From: Thursday 19 January 2017
To: Wednesday 25 January 2017

Last updated 13:56 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Hazard(s) | Burst Water Main

[B243] Woodside Green (SE25) (Both Directions) at the junction of Stroud Road - Two-way temporary signals in operation due to works on a burst water main.

  • [B243] Woodside Green (SE25) (All Directions)

[A315] High Street (TW8) (Hounslow)

  Minimal

From: Thursday 19 January 2017
To: Friday 20 January 2017

Last updated 00:13 Friday 20 January 2017 : No reported delays.

Works | Other

[A315] High Street (TW8) (All Directions) at the junction of Ferry Lane - All lanes are now open following earlier works.

  • Ferry Square (TW8) (All Directions)

[A503] Seven Sisters Road (N7) (Islington)

  Minimal

From: Wednesday 18 January 2017
To: Tuesday 24 January 2017

Last updated 08:47 Friday 20 January 2017 : Traffic flowing well past the restrictions.

Works | Utility

[A503] Seven Sisters - Road (N7 ) (All Directions) at the junction of Salterton Road - Planned lane restrictions to facilitate Thames Water works. Works are currently confined to the loading bay.

  • Salterton Road (N7) (All Directions)
  • [A503] Seven Sisters Road (N7) (All Directions)

[A5205] Prince Albert Road (NW1) (Westminster,Camden)

  Minimal

From: Wednesday 04 January 2017
To: Wednesday 25 January 2017

Last updated 08:17 Friday 20 January 2017 : Delays possible while temporary signals are in use.

Works | Utility

[A5205] Prince Albert Road (NW1) (All Directions) at the junction of St Mark's Square - Temporary traffic signals in use to facilitate Thames Water works.

  • [A5205] Prince Albert Road (NW1) (All Directions)

[A212] Catford Hill (SE6) (Lewisham)

  Minimal

From: Monday 09 January 2017
To: Friday 20 January 2017

Last updated 14:27 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Borough

[A212] Catford Hill (SE6) (All Directions) at the junction of Rathfern Road - Two-way temporary traffic lights are in place to facilitate works.

  • Rathfern Road (SE6) (All Directions)

[A222] Lower Addiscombe Road (CR0) (Croydon)

  Minimal

From: Tuesday 17 January 2017
To: Monday 23 January 2017

Last updated 14:27 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

[A222] Lower Addiscombe Road (CR0) (All Directions) at the junction of Havelock Road - Temporary traffic signals in place to facilitate emergency utility works.

  • [A222] Lower Addiscombe Road (CR0) (All Directions)

[A504] The Burroughs (NW4) (Barnet)

  Minimal

From: Thursday 12 January 2017
To: Friday 20 January 2017

Last updated 07:10 Friday 20 January 2017 : Delays are possible.

Works | Utility

[A504] The Burroughs (NW4) (All Directions) at the junction of Brampton Grove - There will be three-way temporary traffic lights in operation to facilitate BT works

  • Brampton Grove (NW4) (All Directions)
  • [A504] The Burroughs (NW4) (All Directions)

[B507] Abbey Road (NW6,NW8) (Camden)

  Minimal

From: Monday 16 January 2017
To: Sunday 22 January 2017

Last updated 07:08 Friday 20 January 2017 : No reported delays.

Works | Utility

[B507] Abbey Road (NW8/NW6) (All Directions) at the junction of Belsize Road - Temporary traffic signals in operation to facilitate UKPN works.

  • [B509] Belsize Road (NW6) (All Directions)

[B540] Hornsey Lane (N6) (Haringey)

  Minimal

From: Tuesday 17 January 2017
To: Wednesday 25 January 2017

Last updated 07:08 Friday 20 January 2017 : Expect delays when temporary signals in operation.

Works | Utility

[B540] Hornsey Lane (N6 ) (All Directions) at the junction of Ashmount Road - Two-way temporary traffic lights will be in operation to facilitate National Grid gas works

  • Stanhope Road (N6) (All Directions)

[A302] Victoria Street (SW1H,SW1E) (Westminster)

  Minimal

From: Monday 09 January 2017
To: Friday 10 March 2017

Last updated 08:29 Friday 20 January 2017 : Possible delays during the course of these works

Works | Borough

[A302] Victoria Street (SW1E/SW1H) (All Directions) at the junction of Artillery Row - Victoria Street will have an eastbound lane one closure and Buckingham Gate will be closed, northbound only, between Victoria Street and Spenser Street to facilitate junction improvement works.

[A211] Footscray Road (SE9) (Bexley)

  Minimal

From: Tuesday 17 January 2017
To: Wednesday 25 January 2017

Last updated 14:29 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

[A211] Footscray Road (SE9) (All Directions) at the junction of County Gate - Temporary traffic signals in use to facilitate urgent gas works.

  • County Gate (SE9) (All Directions)
  • [A211] Footscray Road (SE9) (All Directions)
  • Telford Road (SE9) (All Directions)

[A238] Coombe Lane West (KT2) (Kingston Upon Thames)

  Minimal

From: Monday 16 January 2017
To: Thursday 26 January 2017

Last updated 14:26 Thursday 19 January 2017 : Delays possible.

Works | Emergency

[A238] Coombe Lane West (KT2) (Both Directions) at the junction of Crown Road - Temporary traffic signals in use to facilitate emergency Thames Water works.

  • Southwood Avenue (KT2) (All Directions)

[A4020] Uxbridge Road (W12) (Hammersmith & Fulham)

  Minimal

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 06:55 Friday 20 January 2017 : Delays possible at peak times.

Works | Emergency

[A4020] Uxbridge Road (W12) (All Directions) at the junction of Percy Road - Temporary traffic signals in use to facilitate emergency gas works.

  • Coningham Mews (W12) (All Directions)
  • Percy Road (W12) (All Directions)
  • Thorpebank Road (W12) (All Directions)
  • [A4020] Uxbridge Road (W12) (All Directions)

[A40] High Holborn (WC2H,WC1V) (Camden)

  Minimal

From: Monday 16 January 2017
To: Monday 23 January 2017

Last updated 04:50 Friday 20 January 2017 : Traffic is flowing well in the area.

Works | Utility

[A40] High Holborn (WC1V) (Westbound) at the junction of Endell Street - There will be various lane closures for utility works. Lane one westbound is closed. There are also lane restrictions in Endell Street.

  • [B401] Endell Street (WC2H) (All Directions)
  • [A40] High Holborn (WC2H,WC1V) (Westbound)

[A3217] King's Road (SW3) (Kensington & Chelsea)

  Minimal

From: Monday 16 January 2017
To: Friday 20 January 2017

Last updated 08:55 Friday 20 January 2017 : Delays are possible while temporary signals are in use.

Works | Emergency

[A3217] King's Road (SW3) (All Directions) at the junction of Radnor Walk - Temporary traffic signals in use to facilitate National Grid Gas works.

  • Burnsall Street (SW3) (All Directions)
  • Jubilee Place (SW3) (All Directions)
  • Radnor Walk (SW3) (All Directions)
  • Shawfield Street (SW3) (All Directions)

[A4020] The Vale (W3) (Ealing)

  Minimal

From: Thursday 19 January 2017
To: Monday 23 January 2017

Last updated 03:51 Friday 20 January 2017 : Delays are possible should further carriageway restrictions be implemented.

Works | Utility

[A4020] The Vale (W3 ) (Westbound) at the junction of Birkbeck Grove - Restrictions on the footway to facilitate gas works.

  • Birkbeck Grove (W3) (All Directions)

[B242] Bedford Hill (SW12) (Wandsworth)

  Minimal

From: Monday 16 January 2017
To: Friday 27 January 2017

Last updated 14:28 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | TfL

[B242] Bedford Hill (SW12) (All Directions) at the junction of Byrne Road - Temporary traffic lights and various lane closures in operation to facilitate pedestrian crossing upgrade works.

  • [B242] Bedford Hill (SW12) (All Directions)
  • Byrne Road (SW12) (All Directions)
  • Larch Close (SW12) (All Directions)

[A315] London Road (TW7) (Hounslow)

  Minimal

From: Monday 16 January 2017
To: Friday 10 February 2017

Last updated 07:10 Friday 20 January 2017 : Possible delays during the course of these works.

Works | Utility

[A315] London Road (TW7) (All Directions) at the junction of Spring Grove Road - Temporary traffic signals in use to facilitate sewer works.

  • Clifton Road (TW7) (All Directions)
  • [B363] Spring Grove Road (TW7) (All Directions)

A3

[A3] Roehampton Vale (SW15) (Wandsworth)

  Minimal

From: Friday 13 January 2017
To: Friday 20 January 2017

Last updated 14:26 Thursday 19 January 2017 : Delays possible when restrictions are in place.

Works | Emergency

[A3] Roehampton Vale (Northbound) at the junction of Norstead Place - Lane restrictions due to emergency gas works. Works are currently confined to the footway.

  • [A3] Kingston Road (SW15) (All Directions)
Close Favourites

My Lines

My Buses

My Roads

My River Buses

My Emirates Air Line

My Journeys

My Places

    Close edit Favourites

    Favourite lines

    Favourite buses

    Favourite roads

    Favourite river buses

    Favourite Emirates Air Line

    Favourite journeys