A20
[A20] ELTHAM ROAD (SE12,SE3) (Greenwich,Lewisham)
From: Thursday 09 May 2024
To: Tuesday 14 May 2024
Last updated 22:41 Friday 10 May 2024 : Traffic is flowing well through the works.
Works | Utility works
[A20] Eltham Road (Westbound) between Hamlea Close and Leyland Road - Thee way temporary lights in place to facilitate urgent SGN gas works.
A205
[A3] BATTERSEA RISE (SW11,SW18) (Wandsworth)
From: Friday 03 May 2024
To: Tuesday 14 May 2024
Last updated 22:37 Friday 10 May 2024 : Use an alternative. Traffic is flowing well through the junction.
Works | Utility works
[A3] Battersea Rise (Both directions) at the junction of Bolingbroke Grove - Temporary traffic signals are in operation to facilitate emergency Thames Water works. There is no access to Bolingbroke Grove from Battersea Rise.
- BOLINGBROKE GROVE (SW11) (Both directions)
A316
[A316] LOWER RICHMOND ROAD (TW9) (Richmond upon Thames)
From: Wednesday 09 August 2023
To: Friday 16 August 2024
Last updated 14:05 Friday 10 May 2024 : Delays are possible.
Works | TfL works
[A316] Lower Richmond Road (Both directions) at the junction of [A316] Lower Mortlake Road - Various restrictions in place to facilitate street works. Sandycombe Road is closed southbound.
- [A316] LOWER MORTLAKE ROAD (TW9) (Eastbound)
- [A316] LOWER RICHMOND ROAD (TW9) (Westbound)
- [B353] SANDYCOMBE ROAD (TW9) (Southbound)
- [B353] MANOR ROAD (TW9) (Northbound)
- [B353] MANOR ROAD (TW9) (Southbound)
A4
[A306] HAMMERSMITH BRIDGE (W6,SW13) (Hammersmith & Fulham,Richmond upon Thames)
From: Thursday 11 April 2019
To: Saturday 01 June 2024
Last updated 14:20 Friday 10 May 2024 : Use an alternative route. Delays are possible.
Asset issues | Service disruption
[A306] Hammersmith Bridge (W6) (Both Directions) - The bridge is closed to all modes of transport apart from pedestrians and cyclists.
- [A306] HAMMERSMITH BRIDGE (W6,SW13) (Both Directions)
A40
[A40] WESTERN AVENUE (W3) (Ealing)
From: Friday 08 March 2024
To: Saturday 11 May 2024
Last updated 14:25 Friday 10 May 2024 : Delays are possible.
Works | TfL works
[A40] Western Avenue (All directions) at the junction of [A4000] Horn Lane - Lane restrictions in place on Horn Lane and Park Royal Road.
- [A40] WESTERN AVENUE (W3) (Northbound)
Bishopsgate Cross Route
[A10] GRACECHURCH STREET (EC3V,EC4N,EC4R) (City of London)
From: Friday 09 February 2024
To: Monday 01 July 2024
Last updated 21:24 Friday 10 May 2024 : Use an alternative route. Traffic is flowing well.
Works | TfL works
[A10] Gracechurch Street (Both directions) at the junction of Cornhill - Temporary traffic signals in operation during junction improvement works. Leadenhall Street is closed.
- LEADENHALL STREET (EC3A,EC3V) (All directions)
Blackwall Tunnel
[A102] BLACKWALL TUNNEL SOUTHERN APPROACH (SE10) (Greenwich)
From: Monday 25 March 2024
To: Wednesday 25 September 2024
Last updated 14:04 Friday 10 May 2024 : Delays are possible.
Works | TfL works
[A102] Blackwall Tunnel Southern Approach (Northbound) at the junction of [A2203] Blackwall Lane - The on-slip from Blackwall Lane is restricted due to Silvertown Tunnel works.
City Route
[A3211] VICTORIA EMBANKMENT SLIP ROAD (N) (EC4V,EC4Y) (City of London)
From: Wednesday 04 January 2017
To: Monday 30 September 2024
Last updated 16:18 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A3211] Victoria Embankment Slip Road N (Both directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions are in place for the Tideway works. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street. The Cycle Superhighway has a new layout.. Find out more about the road changes at Victoria Embankment.
- [A201] VICTORIA EMBANKMENT (EC4V,EC4Y,SE1) (Both Directions)
- [A3211] VICTORIA EMBANKMENT (EC4Y,EC4V) (Both Directions)
- [A3211] BLACKFRIARS UNDERPASS (EC4Y,EC4V) (Eastbound)
Farringdon Cross Route
[A201] BLACKFRIARS BRIDGE (EC4V,SE1) (City of London)
From: Saturday 06 April 2024
To: Wednesday 15 May 2024
Last updated 16:30 Friday 10 May 2024 : Delays are possible.
Works | Borough works
[A201] Blackfriars Bridge (Both directions) between [A201] Blackfriars Road and [A3211] Blackfriars Underpass - Cycle lane and lane 2 closures in place in both directions to facilitate works by City of London. New Bridge Street southbound lane 1 and Queen Victoria Street southbound lane 2 also closed.
Western Cross Route
[A3212] CHELSEA EMBANKMENT (SW11,SW1W,SW3) (Westminster,Kensington & Chelsea)
From: Friday 27 July 2018
To: Sunday 30 June 2024
Last updated 16:49 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions during Tideway Tunnel Project works. A new road layout remains in place for the duration of the works. More information on the Thames Tideway website.
- CHELSEA EMBANKMENT (SW3) (Both Directions)
[A400] HAMPSTEAD ROAD (NW1) (Camden)
From: Saturday 06 October 2018
To: Sunday 31 May 2026
Last updated 14:09 Friday 10 May 2024 : Delays are possible.
Works | Service disruption
A400 Hampstead Road NW1 (Both Directions) between Granby Terrace and Robert Street - Lane restrictions and temporary signals at various junctions during junction improvement works in collaboration with HS2 works.
- [A400] HAMPSTEAD ROAD (NW1) (Both Directions)
- [A400] HAMPSTEAD ROAD (NW1) (Northbound)
WESTERN ROAD (UB2) (Ealing,Hounslow)
From: Thursday 09 May 2024
To: Wednesday 15 May 2024
Last updated 22:59 Friday 10 May 2024 : Traffic is flowing well.
Works | Utility works
Western Road (All directions) at the junction of The Common - Temporary signals in operation to facilitate emergency works.
[A238] MERTON HIGH STREET (SW19) (Merton)
From: Tuesday 07 May 2024
To: Monday 13 May 2024
Last updated 22:44 Friday 10 May 2024 : There are no reported delays.
Works | Utility works
[A238] Merton High Street (Both directions) at the junction of Hamilton Road - Temporary traffic signals in operation to facilitate Thames Water works.
[A219] WOOD LANE (W12) (Hammersmith & Fulham)
From: Monday 29 April 2024
To: Thursday 06 June 2024
Last updated 00:07 Saturday 11 May 2024 : Traffic is flowing well.
Works | Utility works
[A219] Wood Lane (Both directions) at the junction of Macfarlane Road - Temporary signals in place to facilitate UK Power Networks works.
[A118] ROMFORD ROAD (E15,E7) (Newham)
From: Tuesday 09 April 2024
To: Thursday 31 October 2024
Last updated 21:02 Friday 10 May 2024 : Delays are possible.
Works | Borough works
[A118] Romford Road (All approaches) at the junction of Hamfrith Road - Temporary traffic signals in place for Newham Council works.
[A4000] VICTORIA ROAD (NW10,W3) (Ealing)
From: Sunday 04 February 2024
To: Friday 28 June 2024
Last updated 14:24 Friday 10 May 2024 : Delays are possible.
Works | Network Rail works
[A4000] Victoria Road (All directions) at the junction of [A4000] Wales Farm Road - Temporary traffic signals in use to facilitate rail works.
Silvertown Tunnel, Greenwich Peninsula () ()
From: Friday 25 February 2022
To: Wednesday 31 December 2025
Last updated 14:05 Friday 10 May 2024 : Delays are possible.
Works | TfL works
Silvertown Tunnel project, Greenwich Peninsula - Various restrictions during Silvertown Tunnel-related works until 2025. https://tfl.gov.uk/travel-information/improvements-and-projects/silvertown-tunnel for More information.
- MILLENNIUM WAY (SE10) (Southbound)
- WEST PARKSIDE (SE10) (Northbound)
- EDMUND HALLEY WAY (SE10) (Eastbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Southbound)
- MILLENNIUM WAY (SE10) (Northbound)
- MILLENNIUM WAY (SE10) (Both directions)
[A4205] PRAED STREET (W2) (Westminster)
From: Monday 22 January 2024
To: Saturday 11 May 2024
Last updated 23:53 Friday 10 May 2024 : Delays are possible.
Works | Collaborative works
[A4205] Praed Street (All approaches) at the junction of London Street - Temporary traffic signals and various lane restrictions in place for development works.
[A112] HIGH STREET (E13) (Newham)
From: Monday 11 December 2023
To: Friday 31 May 2024
Last updated 21:02 Friday 10 May 2024 : Delays are possible.
Works | Borough works
[A112] High Street (Both directions) at the junction of [A114] Clegg Street - Temporary traffic signals in use to facilitate collaborative works.
LEADENHALL STREET (EC3A,EC3M,EC3V) (City of London)
From: Monday 08 April 2024
To: Tuesday 28 May 2024
Last updated 16:51 Friday 10 May 2024 : Use alternative route. Delays are possible on diversion.
Works | Utility works
Leadenhall Street (Both directions) at the junction of Creechurch Lane - Road is closed due to gas connection works.
- LEADENHALL STREET (EC3A,EC3M,EC3V) (Both directions)
[A4127] GREENFORD ROAD (UB5,UB6) (Ealing)
From: Monday 02 October 2023
To: Tuesday 14 May 2024
Last updated 14:11 Friday 10 May 2024 : Delays are possible.
Works | Network Rail works
[A4127] Greenford Road (All directions) at the junction of Rockware Avenue - Temporary traffic signals are in place for HS2 works.
A10
[A503] MONUMENT WAY (N15,N17) (Haringey)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 00:12 Saturday 11 May 2024 : There are no reported delays.
Works | Utility works
[A503] Monument Way (Westbound) at the junction of [A10] High Road - Westbound lane restrictions in place to facilitate Thames Water works.
A12
[A12] COLCHESTER ROAD (RM3) (Havering)
From: Wednesday 27 July 2022
To: Sunday 31 August 2025
Last updated 14:01 Friday 10 May 2024 : Delays are possible.
Works | Motorways works
[A12] Colchester Road (Both directions) between Petersfield Avenue and M25 J28 Brook Street Roundabout. - Single lane restrictions in operation to facilitate the creation of a new slip road and redesign of the Brook Street Roundabout. For more information see https://nationalhighways.co.uk/our-roads/south-east/m25-junction-28-improvements/
A12
[A12] EASTERN AVENUE EAST (RM2,RM3) (Havering)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 00:20 Saturday 11 May 2024 : Traffic is flowing well.
Works | TfL works
[A12] Eastern Avenue East (All directions) at the junction of [A127] Southend Arterial Road - Lane restrictions to facilitate overnight TfL works.
A12
[A11] BOW ROAD (E3) (Tower Hamlets)
From: Friday 10 May 2024
To: Ongoing
Last updated 00:19 Saturday 11 May 2024 : Approach with caution.
Breakdowns | Vehicle breakdown
[A11] Bow Road (Westbound) at the junction of Mornington Grove - The road is partially obstructed due to a collision outside Bow Road Station.
A2
[A2213] KIDBROOKE PARK ROAD (SE12,SE3) (Greenwich)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 22:23 Friday 10 May 2024 : Traffic is flowing well towards the works.
Works | Utility works
[A2213] Kidbrooke Park Road (Both directions) at the junction of Old Post Office Lane - Contraflow traffic controls in place to facilitate Thames Water works.
A2
[A2] NEW CROSS ROAD (SE14,SE8) (Lewisham)
From: Thursday 09 May 2024
To: Monday 13 May 2024
Last updated 22:20 Friday 10 May 2024 : Traffic is flowing well past the works.
Works | Utility works
[A2] New Cross Road (Westbound) at the junction of Amersham Vale - Lane one is closed to facilitate London Power Networks works.
A205
[A3] HUGUENOT PLACE (SW18) (Wandsworth)
From: Friday 10 May 2024
To: Friday 17 May 2024
Last updated 22:09 Friday 10 May 2024 : Traffic is flowing well past the works.
Works | Utility works
[A3] Huguenot Place (Westbound) at the junction of Melody Road - A lane closure is in place to facilitate Thames Water works.
A3
[A243] LEATHERHEAD ROAD (KT9) (Kingston upon Thames)
From: Monday 22 April 2024
To: Friday 21 June 2024
Last updated 14:04 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A243] Leatherhead Road (Southbound) at the junction of Chalky Lane - Lane closure due to water works.
A4
[A4] BROMPTON ROAD (SW1X,SW3,SW7) (Kensington & Chelsea,Westminster)
From: Thursday 11 April 2024
To: Tuesday 14 May 2024
Last updated 16:28 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A4] Brompton Road (Westbound) at the junction of [A4] Knightsbridge - Lane one restrictions in place to facilitate UKPN works.
A40
[A40] WESTWAY (W10,W12) (Hammersmith & Fulham,Kensington & Chelsea)
From: Saturday 12 August 2023
To: Saturday 12 October 2024
Last updated 00:14 Saturday 11 May 2024 : Use alternative route.
Works | TfL works
[A40] Westway (Eastbound) at the junction of [A3220] West Cross Route - Closure of off-slip to Northern Roundabout from the A40 to facilitate critical structural repairs. Traffic has to divert via the off slip at Wood Lane and back on the On slip from Wood Lane to access the roundabout. From 21/07-28/08 the A40 eastbound entry slip from Wood Lane and A3220 West Cross Route southbound are closed. From 02/09 until 12/10, the A3220 northbound West Cross Route and A40 westbound Wood Lane exit slip are closed. Lane restrictions will also be in in place at Wood Lane.
- [A40] WESTWAY (W10,W12) (Eastbound)
A406
[A406] HANGER LANE GYRATORY (W5) (Ealing)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 00:03 Saturday 11 May 2024 : Traffic is flowing well.
Works | Collaborative works
[A406] Hanger Lane Gyratory (Northbound) at the junction of [A406] Hanger Lane - Lane restrictions in place nightly to facilitate works.
A41
[A41] BAKER STREET (NW1,W1U) (Westminster)
From: Monday 16 January 2023
To: Thursday 23 May 2024
Last updated 16:50 Friday 10 May 2024 : Delays are possible.
Works | TfL works
[A41] Baker Street (Southbound) between Allsop Place and Melcombe Street, between Allsop Place and Melcombe Street - Various restrictions in place to facilitate London Underground upgrade works. Currently lane one (of two) closed southbound on Baker Street between Allsop Place Melcombe Street.
City Route
[A3211] UPPER THAMES STREET (EC4R,EC4V) (City of London)
From: Tuesday 07 May 2024
To: Tuesday 14 May 2024
Last updated 00:17 Saturday 11 May 2024 : Traffic is flowing well.
Works | Utility works
[A3211] Upper Thames Street (Westbound) between [A300] Queen Street Place and Cousin Lane - Lane closure for Cadent Gas works.
Inner Ring
[A3214] BUCKINGHAM PALACE ROAD (SW1E,SW1V,SW1W) (Westminster)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:02 Friday 10 May 2024 : Use other route
Works | Utility works
[A3214] Buckingham Palace Road (Northbound) between [A302] Victoria Street and Palace Street - Road closed for emergency Thames Water works.
- [A3214] BUCKINGHAM PALACE ROAD (SW1E,SW1V,SW1W) (Northbound)
Inner Ring
[A100] TOWER BRIDGE ROAD (EC3N,SE1,SE16) (Southwark,Tower Hamlets)
From: Thursday 02 May 2024
To: Wednesday 15 May 2024
Last updated 16:15 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A100] Tower Bridge Road (Southbound) at the junction of Druid Street - Lane restrictions are in place to facilitate Thames Water works.
Inner Ring
OLD STREET ROUNDABOUT (EC1Y) (Islington,Hackney)
From: Saturday 19 August 2023
To: Friday 31 May 2024
Last updated 16:17 Friday 10 May 2024 : Delays are possible.
Works | TfL works
Old Street Junction - Works for new road layout continue. Lane and footway restrictions are in place on Old Street and City Road. From Monday 22 April until Friday 31 May, various lane and directional closures will be in place between 22:00 and 05:00 each night.
- OLD STREET ROUNDABOUT (EC1Y) (All Directions)
- CITY ROAD (EC1V,EC1Y) (Northbound)
- OLD STREET (EC1V,EC1Y) (Westbound)
- PROVOST STREET (EC1V,N1) (All approaches)
[A112] HOE STREET (E10,E17) (Waltham Forest)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 14:02 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A112] Hoe Street (Both directions) at the junction of Boundary Road - Temporary traffic signals in use to facilitate Thames Water works.
[A112] CONNAUGHT ROAD (E16) (Newham)
From: Tuesday 23 April 2024
To: Saturday 11 May 2024
Last updated 14:01 Friday 10 May 2024 : Delays are possible.
Works | Borough works
Airport Roundabout - [A112] Connaught Road (All directions) between Connaught Bridge and North Woolwich Roundabout - Lane restrictions in place to facilitate borough works.
[A217] LONDON ROAD (CR4) (Merton)
From: Sunday 21 April 2024
To: Sunday 14 July 2024
Last updated 14:05 Friday 10 May 2024 : Use an alternative route. Delays are possible on diversion routes.
Works | Utility works
[A217] London Road (Northbound) between Downe Road and Locks Lane - Road closure to facilitate ongoing gas main replacement works. In addition Bond Road is also closed.
- [A217] LONDON ROAD (CR4) (Northbound)
- BOND ROAD (CR4) (Northbound)
[A4201] ALBANY STREET (NW1) (Camden)
From: Thursday 09 May 2024
To: Monday 13 May 2024
Last updated 21:23 Friday 10 May 2024 : Use other route. No reported delays on diversion.
Works | Utility works
[A4201] Albany Street (Northbound) between [A501] Marylebone Road and Osnaburgh Terrace - Road closed for emergency Thames Water works.
- [A4201] ALBANY STREET (NW1) (Northbound)
[A2208] ROTHERHITHE NEW ROAD (SE16) (Southwark)
From: Monday 22 April 2024
To: Saturday 11 May 2024
Last updated 14:05 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A2208] Rotherhithe New Road (All directions) at the junction of Galleywall Road - Temporary traffic signals are in place to facilitate UKPN works
[A4201] REGENT STREET (W1B,W1G,W1J,W1S,W1W) (Westminster)
From: Wednesday 08 May 2024
To: Monday 13 May 2024
Last updated 21:16 Friday 10 May 2024 : Use an alternative route. No reported delays on diversion.
Works | Utility works
[A4201] Regent Street (Northbound) between Hanover Street and New Burlington Street - Road closed for emergency Cadent Gas works.
- [A4201] REGENT STREET (W1B,W1G,W1J,W1S,W1W) (Northbound)
[A2015] SOUTHEND ROAD (BR3) (Bromley)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 21:56 Friday 10 May 2024 : There are no reported delays.
Works | Utility works
[A2015] Southend Road (All directions) at the junction of [A2015] Rectory Road - Temporary traffic signals are in operation to facilitate Thames Water works.
[A1020] SILVERTOWN WAY (E16) (Newham)
From: Friday 29 December 2023
To: Thursday 06 June 2024
Last updated 14:01 Friday 10 May 2024 : Delays are possible.
Works | Borough works
[A1020] Silvertown Way (All approaches) at the junction of Caxton Street North - Temporary signals and lane restrictions in place.
[A4] PICCADILLY (SW1A,W1J,W1K,W1S) (Westminster)
From: Wednesday 08 May 2024
To: Tuesday 14 May 2024
Last updated 21:14 Friday 10 May 2024 : Traffic is flowing well.
Works | Utility works
[A4] Piccadilly (Both directions) at the junction of Berkeley Street - Lane restrictions in place to facilitate Cadent Gas works.
[A109] LORDSHIP LANE (N17,N22) (Haringey)
From: Friday 10 May 2024
To: Ongoing
Last updated 23:32 Friday 10 May 2024 : Use alternative routes.
Emergency service incidents | Police activity
[A109] Lordship Lane (Both directions) at the junction of Waltheof Avenue - The road is closed due to a police incident.
- [A109] LORDSHIP LANE (N17,N22) (Both directions)
[A3216] SLOANE STREET (SW1X) (Kensington & Chelsea)
From: Wednesday 28 December 2022
To: Tuesday 31 December 2024
Last updated 16:51 Friday 10 May 2024 : Use an alternative route. Delays are possible on diversion.
Works | Borough works
[A3216] Sloane Street (Northbound) between Sloane Square and Knightsbridge. - Road closure in place to facilitate Urban Realms Works.
- [A3216] SLOANE STREET (SW1X) (Northbound)
- [A3216] LOWER SLOANE STREET (SW1W) (Northbound)
- [A3216] SLOANE STREET (SW1X,SW3) (Northbound)
[M25] M25 (RM14) (Havering)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:49 Friday 10 May 2024 : Use alternative routes.
Works | Motorways works
[M25] M 25 (Anti-clockwise) between Junction 29 and Junction 28 - The road is closed overnight to facilitate works. Lanes two, three, and four are closed on approach to Junction 29. The entry slip road at Junction 29 is also closed.
- [M25] M25 (RM14) (Anti-clockwise)
[A232] SHIRLEY ROAD (CR0) (Croydon)
From: Wednesday 08 May 2024
To: Tuesday 14 May 2024
Last updated 14:06 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A232] Shirley Road (Eastbound) at the junction of Valley Walk - Lane one restriction due to UKPN works.
ILDERTON ROAD (SE15,SE16) (Southwark)
From: Tuesday 07 May 2024
To: Saturday 11 May 2024
Last updated 14:03 Friday 10 May 2024 : Delays are possible.
Works | Borough works
Ilderton Road (All directions) at the junction of Surrey Canal Road - Temporary traffic signals are in place to facilitate maintenance works.
A1
A41
[A1] WATFORD WAY (NW4,NW7) (Barnet)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 00:21 Saturday 11 May 2024 : Traffic is flowing well.
Works | TfL works
[A1] Watford Way (Both directions) between The Rise and Greyhound Hill. - Reduced to one lane both north and southbound on approach to Five Ways Corner (M1) between approximately 22:00 and 05:00 each night during National Highways maintenance. No works the nights of Saturday 4 to Monday 6 May, inclusive, and Saturday 11 and Sunday 12 May.
A12
[A11] MILE END ROAD (E1,E3) (Tower Hamlets)
From: Tuesday 07 May 2024
To: Tuesday 14 May 2024
Last updated 00:17 Saturday 11 May 2024 : Traffic is flowing well.
Works | Utility works
[A11] Mile End Road (Both directions) at the junction of Harford Street - Temporary traffic signals in operation to facilitate Cadent Gas works. In addition Harford Road is closed
- HARFORD STREET (E1) (Both directions)
A12
[A11] MILE END ROAD (E1) (Tower Hamlets)
From: Tuesday 07 May 2024
To: Thursday 16 May 2024
Last updated 21:02 Friday 10 May 2024 : Approach with caution. The cycle lane has been closed. Drivers be aware of displaced cyclists.
Works | Utility works
[A11] Mile End Road (Westbound) between Beaumont Grove and [B121] Stepney Green - Cycle Superhighway 2 is closed to facilitate a temporary pedestrian walkway in the cycle lane during cable installation works.
A13
[A13] THAMES GATEWAY (RM13,RM15) (Havering)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 23:06 Friday 10 May 2024 : Use alternative routes.
Works | TfL works
[A13] Thames Gateway (Both directions) between Ferry Lane and Wennington - Overnight closures in place for maintenance works. Full closures on the 9th and 10th May, and westbound only on the nights of 11th and 12th May (2200-0600hrs)
- [A13] THAMES GATEWAY (RM13,RM15) (Both directions)
- [A13] THAMES GATEWAY (RM13,RM15) (Westbound)
A13
[A13] COMMERCIAL ROAD (E1) (Tower Hamlets)
From: Thursday 25 April 2024
To: Wednesday 15 May 2024
Last updated 16:18 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A13] Commercial Road (Both directions) between Batty Street and Back Church Lane - Lane closures in place to facilitate emergency works by Thames Water. Traffic is flowing under a contraflow system.
A205
[A205] LONDON ROAD (SE23) (Lewisham)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:45 Friday 10 May 2024 : There are no reported delays.
Works | TfL works
[A205] London Road (Both directions) at the junction of Taymount Rise - Lane restrictions are in operation during overnight carriageway resurfacing works.
A21
[A21] BROMLEY COMMON (BR2) (Bromley)
From: Friday 03 May 2024
To: Thursday 20 June 2024
Last updated 14:03 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A21] Bromley Common (Both directions) at the junction of [B265] Hayes Lane - Lane restrictions during emergency SGN works.
A23
[A23] PURLEY WAY (CR0) (Croydon)
From: Monday 29 April 2024
To: Wednesday 12 June 2024
Last updated 22:19 Friday 10 May 2024 : Traffic is flowing well through the works.
Works | TfL works
[A23] Purley Way (Both directions) at the junction of Waddon Road - Various restrictions including temporary signals during traffic signal improvement works. Thursday 18 April until Wednesday 1 May, inclusive, A23 Purley Way (Both directions) width restrictions. Thursday 2 until Wednesday 15 May, A23 (Northbound), lane one closed and A232 Croydon Road (Westbound), lane two closed. Thursday 16 until Wednesday 29 May, A23 (Both directions), lane three closed.
A23
[A23] BRIXTON ROAD (SW9) (Lambeth)
From: Thursday 09 May 2024
To: Friday 17 May 2024
Last updated 22:36 Friday 10 May 2024 : Use caution on approach traffic lights have failed.
Asset issues | Asset maintenance
[A23] Brixton Road (All directions) at the junction of [A203] Stockwell Park Walk - Traffic signals have failed.
A24
[A24] BALHAM HIGH ROAD (SW12,SW17) (Wandsworth)
From: Friday 10 May 2024
To: Monday 13 May 2024
Last updated 22:43 Friday 10 May 2024 : Traffic is flowing well past the works.
Works | Utility works
[A24] Balham High Road (Northbound) at the junction of Chestnut Grove - Lane closure to facilitate Thames Water works.
A3
HOOK RISE NORTH (KT6,KT9) (Kingston upon Thames)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:12 Friday 10 May 2024 : Traffic is flowing well towards the works.
Works | Utility works
Hook Rise North (Northbound) at the junction of Swallow Park Close, a3 Kingston Bypass - Lane one (of three) closed between approximately 22:00 and 05:00 during overnight 3 mobile works.
A316
HAMPTON ROAD WEST (TW13) (Hounslow)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 00:00 Saturday 11 May 2024 : Traffic is flowing well.
Works | Utility works
Hampton Road West (Southbound) at the junction of Canterbury Road - Lane restrictions in place for gas works.
A4
[A4] BATH ROAD (TW6,UB3) (Hillingdon)
From: Monday 08 April 2024
To: Tuesday 18 June 2024
Last updated 14:21 Friday 10 May 2024 : Delays are possible whilst works continue.
Works | TfL works
[A4] Bath Road (All approaches) at the junction of Hatton Road North - Various restrictions in place to facilitate junction modernising work.
A4
[A4] KNIGHTSBRIDGE (SW1X,SW3,SW7,W1J,W2) (Kensington & Chelsea,Westminster)
From: Wednesday 03 April 2024
To: Wednesday 29 May 2024
Last updated 16:28 Friday 10 May 2024 : Delays are possible.
Works | Collaborative works
The Berkeley Hotel refurbishment. - [A4] Knightsbridge (Westbound) between Old Barrack Yard and Wilton Place - Various restrictions during ongoing refurbishment works at The Berkeley Hotel. Reduced to one lane. Thursday 2 until Tuesday 14 May, Wilton Place (Both directions), closed. Tuesday 28 and Wednesday 29 May, A4 Piccadilly Underpass (Westbound), closed.
Farringdon Cross Route
Inner Ring
[A201] KINGS CROSS ROAD (N1,WC1X) (Camden,Islington)
From: Wednesday 08 May 2024
To: Wednesday 15 May 2024
Last updated 21:16 Friday 10 May 2024 : Traffic is flowing well.
Works | Utility works
[A201] Kings Cross Road (Northbound) at the junction of Field Street - Lane one is closed to facilitate urgent repairs to damaged water main.
Inner Ring
Southern River Route
[A3036] ALBERT EMBANKMENT (SE1) (Lambeth)
From: Wednesday 08 May 2024
To: Ongoing
Last updated 21:21 Friday 10 May 2024 : Traffic is flowing well.
Works | Utility works
[A3036] Albert Embankment (Northbound) at the junction of Tinworth Street - Lane closure to facilitate utility works.
Southern River Route
[A3203] LAMBETH BRIDGE (SE1,SW1P) (Lambeth,Westminster)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 21:18 Friday 10 May 2024 : Traffic is flowing well.
Works | TfL works
[A3203] Lambeth Bridge (Both directions) at the junction of [A3212] Millbank - Various lane restrictions during junction improvement works.
[M25] M25 (KT11) (UNK)
From: Friday 10 May 2024
To: Monday 13 May 2024
Last updated 22:46 Friday 10 May 2024 : Drivers using the signed diversion route won’t be subject to any Ultra Low Emission Zone (ULEZ) charges that may usually apply.
Works | Motorways works
Wisley Interchange project - [M25] M 25 (Both directions) between Junction 10 (A3) and Junction 9 (A243). - Closed between approximately 21:00 Friday and 06:00 Monday during bridge maintenance. Traffic is diverted both ways via M25 Junction 8, A217, A240, A24, A240, A3, M25 Junction 10.
- [A243] BYPASS ROAD (KT21,KT22) (Both directions)
- [M25] M25 (GU23,KT11) (Both directions)
- [M25] M25 (KT11,KT21,KT22) (Both directions)
[A4] PICCADILLY (SW1A,W1J,W1K,W1S) (Westminster)
From: Friday 10 May 2024
To: Sunday 12 May 2024
Last updated 21:24 Friday 10 May 2024 : Traffic is flowing well.
Works | Utility works
BERKELEY STREET WESTMINSTER, SW1A, W1J - [A4] Piccadilly (Westbound) at the junction of Berkeley Street - Lane restrictions in operation to facilitate Vodafone works.
[A215] NORWOOD ROAD (SE24) (Lambeth,Southwark)
From: Friday 10 May 2024
To: Thursday 16 May 2024
Last updated 22:39 Friday 10 May 2024 : Traffic is flowing well past the works.
Works | Utility works
[A215] Norwood Road (Northbound) at the junction of [A2214] Dulwich Road - Lane one (of two) is closed to facilitate SGN works.
MOVERS LANE (IG11) (Barking & Dagenham)
From: Tuesday 02 April 2024
To: Sunday 08 September 2024
Last updated 14:02 Friday 10 May 2024 : Delays are possible.
Works | Utility works
Movers Lane (Northbound) between [A13] Alfreds Way and [A123] Ripple Road - Temporary traffic signals to facilitate Cadent Gas works.
- MOVERS LANE (IG11) (Northbound)
[A400] HAMPSTEAD ROAD (NW1) (Camden)
From: Thursday 09 May 2024
To: Tuesday 14 May 2024
Last updated 14:25 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A400] Hampstead Road (Northbound) between [A400] Harrington Square and Mornington Crescent - Lane one (of two) closed during emergency Thames Water works.
[A315] HIGH STREET (TW8,TW9) (Hounslow)
From: Wednesday 13 December 2023
To: Tuesday 23 July 2024
Last updated 14:09 Friday 10 May 2024 : Delays are possible.
Works | TfL works
Cycleway 9: Extension to Hounslow. - [A315] High Street (Both directions) between A205 Chiswick High Road and A3002 Half Acre. - Various restrictions during works related to the extension of Cycleway 9 to Hounslow until late July. Temporary traffic signals and lane restrictions will be in place at various junctions as works progress. Additionally, footpaths will be closed with pedestrians re-directed to alternative safe routes. From Monday 18 March, three-way temporary signals will be in operation at the junction of Ealing Road for approximately two months.
- ALEXANDRA ROAD (TW8) (Both directions)
RED LION SQUARE (WC1B,WC1R,WC1V,WC1X) (Camden)
From: Monday 18 March 2024
To: Monday 01 July 2024
Last updated 16:30 Friday 10 May 2024 : Delays are possible.
Works | Borough works
Red Lion Square (Eastbound) at the junction of [A40] Procter Street - Red Lion Square is closed and there are lane restrictions in Proctor Street
- [A40] DRAKE STREET (WC1R,WC1X) (Westbound)
- [A401] THEOBALDS ROAD (WC1B,WC1N,WC1R,WC1X) (Westbound)
- RED LION SQUARE (WC1B,WC1R,WC1V,WC1X) (Both directions)
[A104] DALSTON LANE (E8) (Hackney)
From: Friday 10 May 2024
To: Ongoing
Last updated 00:31 Saturday 11 May 2024 : Use alternative routes.
Collisions | Vehicle collision
[A104] Dalston Lane (Westbound) at the junction of [A10] Kingsland Road - The road is closed due to a collision.
- [A104] DALSTON LANE (E8) (Eastbound)
[M25] M25 (BR8) (UNK)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:17 Friday 10 May 2024 : Drivers using the signed diversion route won’t be subject to any Ultra Low Emission Zone (ULEZ) charges that may usually apply.
Works | Motorways works
[M25] M 25 (Anti-clockwise) between Junction 3 (M20) and Junction 2 (A2). - Closed between approximately 22:00 and 05:30 each night during National Highways maintenance. Anti-clockwise traffic diverted via M25 Junction 3, A20 (Westbound), A205 (Northbound), A2 (Eastbound) to M25 Junction 2.
- [M25] M25 (BR8,DA1,DA2,DA4) (Anti-clockwise)
[A504] WEST GREEN ROAD (N15) (Haringey)
From: Tuesday 07 May 2024
To: Friday 14 June 2024
Last updated 00:10 Saturday 11 May 2024 : Use alternative route. Traffic is flowing well.
Works | Utility works
[A504] West Green Road (Both directions) between High Road Tottenham and Westerfield Road - Road closed to facilitate gas main works.
- [A504] WEST GREEN ROAD (N15) (Both directions)
EAST ACTON LANE (W3) (Ealing)
From: Thursday 09 May 2024
To: Ongoing
Last updated 00:06 Saturday 11 May 2024 : Use alternative route.
Works | Utility works
East Acton Lane (Westbound) at the junction of Old Oak Common Lane - Road is closed to facilitate Thames Water works.
- EAST ACTON LANE (W3) (Westbound)
[A1199] ST PAULS ROAD (N1) (Islington)
From: Wednesday 08 May 2024
To: Wednesday 15 May 2024
Last updated 14:26 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A1199] St Pauls Road (Both directions) at the junction of Wallace Road - Temporary traffic signals in operation to facilitate utility works.
[A211] FOOTSCRAY ROAD (SE9) (Greenwich)
From: Wednesday 08 May 2024
To: Tuesday 14 May 2024
Last updated 14:06 Friday 10 May 2024 : Use an alternative route. Delays are possible.
Works | Utility works
[A211] Footscray Road (Both directions) between [B263] Green Lane and Southwood Road - The road has been closed due to a burst water main.
- [A211] FOOTSCRAY ROAD (SE9) (Both directions)
QUEEN VICTORIA STREET (EC2R,EC4M,EC4N,EC4V) (City of London)
From: Friday 10 May 2024
To: Monday 13 May 2024
Last updated 21:21 Friday 10 May 2024 : Traffic is flowing well.
Works | Borough works
Queen Victoria Street (Both directions) at the junction of Cannon Street - Temporary traffic signals in operation to facilitate maintenance works.
[A1200] EAST ROAD (N1) (Hackney)
From: Tuesday 07 May 2024
To: Friday 17 May 2024
Last updated 16:27 Friday 10 May 2024 : Delays possible when restrictions are in place.
Works | Utility works
[A1200] East Road (All approaches) at the junction of Bevenden Street - Temporary traffic signals are in operation to facilitate electrical utility works.
[A1011] SILVERTOWN WAY (E16) (Newham)
From: Monday 29 April 2024
To: Saturday 22 June 2024
Last updated 14:02 Friday 10 May 2024 : Delays are possible.
Works | Borough works
[A1011] Silvertown Way (All approaches) at the junction of [A124] Barking Road - London Borough of Newham will be carrying out Urban Realm Works on Silvertown Way at the junction of the southern entrance and exit of Canning Town Bus Station. Southern Exit and Entry Closure from 04:00 29/04/2024 until 00:01 23/06/2024.
MILLENNIUM WAY (SE10) (Greenwich)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 22:31 Friday 10 May 2024 : Expect increased pedestrian footfall and delays in the area on egress of the event
Planned events | Concert
Keane in Concert - Millennium Way (Both directions) at the junction of Waterview Drive - Keane In concert at the O2 Arena Greenwich. 20,000 capacity. Expect increased footfall at ingress and egress. from 6.30pm till 11.30pm
[A219] FULHAM PALACE ROAD (SW6,W6) (Hammersmith & Fulham)
From: Friday 10 May 2024
To: Wednesday 15 May 2024
Last updated 22:57 Friday 10 May 2024 : Delays are possible.
Asset issues | Asset maintenance
[A219] Fulham Palace Road (Southbound) at the junction of Nella Road - The traffic signals have been damaged following a collision. Temporary traffic signals are in operation.
[A4020] HIGH STREET (W3) (Ealing)
From: Sunday 05 May 2024
To: Saturday 11 May 2024
Last updated 14:21 Friday 10 May 2024 : Delays are possible while works are in place.
Works | Utility works
[A4020] High Street (All approaches) at the junction of Crown Street - Temporary traffic signals in use to facilitate Cadent Gas works.
THE MALL (SW1A,SW1Y) (Westminster)
From: Monday 02 October 2023
To: Thursday 30 May 2024
Last updated 16:50 Friday 10 May 2024 : Use an alterative route. Delays are possible on diversion.
Works | Construction activity
The Mall (Westbound) at the junction of Spring Gardens - The road is closed during construction by Admiralty Arch
- THE MALL (SW1A,SW1Y) (Eastbound)
[A232] CARSHALTON ROAD (SM1,SM5) (Sutton)
From: Friday 10 May 2024
To: Ongoing
Last updated 22:45 Friday 10 May 2024 : There are no reported delays.
Works | TfL works
[A232] Carshalton Road (Both directions) at the junction of [A232] Pound Street - Temporary traffic signals are in operation to facilitate carriageway maintenance works.
IVYDALE ROAD (SE15) (Southwark)
From: Wednesday 01 May 2024
To: Friday 10 May 2024
Last updated 14:06 Friday 10 May 2024 : Use alternative routes. Delays are possible on diversion.
Works | Borough works
IVYDALE ROAD SOUTHWARK, SE15 - Ivydale Road (Both directions) at the junction of Harlescott Road - The road is closed due to emergency works.
- IVYDALE ROAD (SE15) (Both directions)
[A234] CRYSTAL PALACE PARK ROAD (SE20,SE26) (Bromley)
From: Thursday 02 May 2024
To: Friday 24 May 2024
Last updated 14:03 Friday 10 May 2024 : Delays are possible.
Works | Utility works
[A234] Crystal Palace Park Road (All directions) at the junction of Lawrie Park Road - Temporary traffic signal in operation to facilitate Thames Water works.
[B210] ARTILLERY PLACE (SE18) (Greenwich)
From: Tuesday 07 May 2024
To: Monday 13 May 2024
Last updated 14:06 Friday 10 May 2024 : No reported delays.
Works | Utility works
ARTILLERY PLACE GREENWICH, SE18 - [B210] Artillery Place (All directions) at the junction of [B210] Wellington Street - Temporary traffic lights in operation to facilitate utility work.
TUNNEL AVENUE (SE10) (Greenwich)
From: Monday 17 July 2023
To: Friday 17 January 2025
Last updated 14:04 Friday 10 May 2024 : Delays are possible.
Works | TfL works
Tunnel Avenue (Southbound) at the junction of [A102] Blackwall Tunnel Southern Approach - Road closed for Silvertown Tunnel works
- TUNNEL AVENUE (SE10) (All approaches)
- TUNNEL AVENUE (SE10) (Southbound)
[A5100] STATION ROAD (HA8) (Barnet,Harrow)
From: Friday 10 May 2024
To: Saturday 11 May 2024
Last updated 00:16 Saturday 11 May 2024 : No reported delays.
Works | Borough works
[A5100] Station Road (Both directions) at the junction of Rectory Lane - Multi-way temporary traffic signals are in operation during Barnet Borough Council overnight carriageway resurfacing works.