Transport for London

Publications

The successful movement of freight is a key part of the Capital's infrastructure. On this page, you'll find everything from the London Freight Plan to maps and studies of the impact of heavy goods vehicles on traffic flow

London Freight Plan

View more information on the London Freight Plan or download a copy:

London Freight Plan (PDF 1.45MB)
London Freight Plan - executive summary (PDF 510KB)

Freight Plan progress reports 

London Freight data report 2010 (PDF 2.2MB)
Sustainable Freight progress measures report 2008 (PDF 151KB)
London Freight data report 2008 (PDF 2.59MB)
DHL Express FORS case study (PDF 95KB)
Understanding Londoners' perceptions of issues dealt with by the London Freight Plan (PDF 383KB)

Other Freight reports and guidance

Kerbside loading guidance
Alternative methods for the management of night-time freight noise in London (PDF 1.29MB)
London wholesale markets freight study report (PDF 2.11MB)
Appendices to London wholesale markets freight study report (PDF 5.05MB)
Regent Street delivery servicing report (PDF 8.8 MB)
HGV cycle safety technology - Procurement guide (PDF 1.5MB) 
Barclays Cycle Superhighways Technology trial (PDF 2.8MB)

Top of page

FORS case studies

Veolia Environmental Services (PDF 1.60MB)
Bedfords Transport (PDF 848KB)
CEMEX (PDF 1.93MB)
Iron Mountain (PDF 706KB)
Keystone Distribution (PDF 704KB)
PHS Datashred (PDF 673KB)
Tradeteam (PDF 714KB)
City of London (PDF 756MB)
London Waste (PDF 882KB)

Top of page

Park Royal delivery route map

Park Royal route map and guidance to using the map, November 2006 (PDF 1.034MB)

Top of page

Research

Developing a multi-modal refuse collection service for London

Project report - November 2008 (PDF 1.47MB)

West London Canal network survey, phase 1 & 2 executive summary

Phase 1 & 2 executive summary, Sept 2005 (PDF 443KB)

West London Canal network survey - Phase 2 final report volume 1

Appendix A - Part 1*
Appendix A - Part 2 (PDF 2.8MB)
Appendix A - Part 3*
Appendix A - Part 4 (PDF 594KB)
Appendix A - Part 5*
Appendix B - E (PDF 72KB)
Section 1, 2, 3 (PDF 2MB)
Section 4 - 8 (PDF 1.9MB)
West London canal network survey - phase 2 final report volume 2, Sept 2005 (PDF 1.1MB)
West London canal network survey - Phase 1 report, Sept 2004 (PDF 717KB)
West London canal works program 2005 July 2004, Dec 2004 (PDF 433KB)

HGV Traffic Impact Assessment (TIA)

Assessment of three separate studies on the impact of removing HGV traffic from the morning peak.

TIA Henley's Corner (PDF 388KB)
TIA A1 Stirling Corner HGV (PDF 108KB)
TIA Stockwell Cross (PDF 1MB)

Kew Bridge to Willesden Freight Corridor (Freight Capacity Enhancement - Feasibility Study), June 2004 (PDF 185KB)
The Development of Sites in and around London as Rail Freight Terminals, Mar 2004 (PDF 587KB)
Freight transport in London: a summary of current data and sources, Mar 2004 (PDF 240KB)
London Rail Freight Study, Apr 2003 (PDF 563KB)
Review of the London Lorry Control Scheme: Recommendations Report, Version 4 Final, 2004 (PDF 417KB)
Review of the London Lorry Control Scheme - Final Report: Review of possible changes to the Exempt Network Version 4a Draft, 2004 (PDF 1.69MB)
Multi-criteria Assessment of the cutting-back of the A4 Exempt Route to the Hammersmith Flyover ersion 2a Draft, 2003 (PDF 299KB)

Top of page

London Construction Consolidation Centre (LCCC)

LCC final report, Juy 2009 (PDF 644KB)
LCCC interim report, May 2007 (PDF 258KB)
CCCs wider use study, May 2007 (PDF 1.5MB)

Top of page

Preparing for the 2012 Games - case studies

Bike Dock Solutions - Pre-ordering (PDF 741KB)
ByBox - Secure drop boxes (PDF 375KB)
Regent Street - Consolidation and collaboration (PDF 1.5MB)
Sainsbury's - Maintenance and deliveries (PDF 1MB)   
The Brewery Romford -Temporary stockrooms (PDF 381KB)

Top of page

* Please email freight@tfl.gov.uk to request any document marked with an asterisk

Back to Transport for London

Elsewhere on tfl.gov.uk